NON PLAN SPILL OVER WORKS - NOT TENDERED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
ASE Maintanence- Urgent repairs to the damaged Sea wall for a length of 60 m at Beevi Jaram at Puduponnnani in Ponnani Municipality (For a length of 55.00 m)
2018/1929/IA IDMpm/2018/1929/IA
19-06-2018
2711-02-103-99-34-3 15,00,000 15,00,000
2
FD-Construction of Protection wall to Ayathil thodu on the east side of Koickal HSS in Kollam Corporation
2018/590/IA MIDklm/2018/590/IA
Dated:
21-03-2018
2702-03-101-98-03 18,00,000 17,98,320
3
FD- Protecting the left bank of Perumba river at Kottayil in Cheruthazham Grama Panchayath
2016/2907/IA IDTsy/2016/2907/IA
21-01-2017
2711-01-103-98-34-03-00 18,00,000 18,00,000
4
Annual maintenance of Kalpara LI scheme in Heroor village of Mangalpady Panchayath for the year 2016-2017
2016/334/IA MIDKgd/2016/334/IA
15-07-2016
2702-01-800-94-00-34-3 6,15,000 6,15,000
5
ANNUAL MAINTENANCE OF BERIYOLIKA LI SCHEME IN ICHILANGODE VILLAGE OF MANGALPADY PANCHAYATH FOR THE YEAR 2016-2017
2016/83/IA MIDKgd/2016/83/IA
05-11-2016
2702-01-800-94-00-34-3 3,99,050 3,99,050
6
PROTECTING THE RIGHT BANK OF PULLUKAYAR (MANIMALA RIVER) NEAR KOOTTICKAL KWA PUMP HOUSE IN KOOTTICKAL PANCHAYATH
2017/201/IA IDKtm /2017/201/IA
28-03-2018
2711-01-103-98-34-03-00 4,17,000 4,17,000
7
Renovation of pump house and construction of suction pit, cistern and road to lift irrigation scheme at Kakkuppadi from Bhavani river in Agali Panchayath in Attappadi in Palakkad district.
2016/1651/IA MIDPkd/2016/1651/IA

28-03-2018
4702-00-101-89-00-00-00 45,00,000 45,00,000
8
ASE WORK-CLOSING OF FIHING GAP NORTH OF CP STONE 2190 AT KODUVALLY-MANAKKA DWEEP AT THALASSERY MUNICIPALITY
2017/4990/IA IDTsy/2017/4990/IA
14-02-2018
2711-02-103-99-34-3 12,75,000 11,65,000
9
FD PROTECTING THE RIGHT BANK OF ELITHODU AT VARAPRATH IN PANOOR MUNICIPALITY IN KANNUR DISTRICT.
2016/2917/IA IDTsy2016/2917/IA
21-01-2017
2711-01-103-98-34-03-00 20,00,000 20,00,000
10
FD-Providing Antisalinity bund at Kanakkankadavu-Providing Screening works and Sluice arrangements at Kozhithuruthu in Puthenvelikkara Panchayath
2017/581/IA IDEkm/2017/581/IA
04-05-2017
2711-01-103-98-34-03-00 5,00,000 4,90,000
11
PROTECTING THE BANK OF MUKADAI THODU(KOTTAMMAM THODU)AND MAINTENANCE OFCHECK DAMAT MUKADAI THODU IN WARD No.14 OFMALAYATTOOR / NEELESWARAM PANCHAYATH
2016/2882/IA IDEkm/2016/2882/IA
01-02-2017
2711-01-103-98-34-03-00 15,00,000 15,00,000
12
CONSTRUCTING TEMPORARY CHECK DAM ACROSS PERIYAR RIVER NEAR PANAMKUZHI KADAVU IN VENGOOR PANCHAYATH IN ERNAKULAM DISTRICT
2016/3013/IA D2-77646/16(16)
27-01-2017
2711-01-103-99-00-34-3 20,00,000 20,00,000
13
URGENT REPAIRS TO TEMPORARY CHECK DAM ACROSS PERIYAR RIVER NEAR PALLIKKADAVU AT DOWN STREAM OF MALAYATTOOR BRIDGE IN MALAYATTOOR-NEELEESWARAM PANCHAYATH IN ERNAKULAM DISTRICT
2016/3042/IA D2-77646/16(14)
27-01-2017
2711-01-103-99-00-34-3 15,00,000 15,00,000
14
PROTECTING THE ERODED LEFT BANK OF MEENACHIL RIVER AT EDAMATTAM NEAR AMRUTHANANDAMAYI MADHAM IN BHARANANGANAM PANCHAYATH
2016/2869/IA IDKtm/2016/2869/IA
20-01-2017
2711-01-103-98-34-03-00 20,00,000 20,00,000
15
URGENT REPAIRS TO THE TEMPORARY CHECKDAM ACROSS PERIYAR RIVER AT THE DOWNSTREAM OF KWA PUMP HOUSE NEAR KOMENTHACHURCH IN MALAYATTOOR - NEELEESWARAMPANCHAYAT IN ERNAKULAM DISTRICT
2016/3043/IA D2 77646/16(13)
27-01-2017
2702-03-101-97(00) 15,00,000 15,00,000
16
Protecting the bank Of Chalakkudy River at Eloorkkara in Ward No 15 of Parakkadavu Panchayath
2016/710/IA Order No W4/40531/1
5/AS
11-01-2016
2711-01-103-98-34-03-00 10,00,000 10,00,000
17
Deepening and protecting the tributary of Periyar river near Chettibhagom market in Varapuzha Panchayath
2016/963/IA ORDER No. IDEkm/201
6/963/IA
02-02-2017
2711-01-103-98-34-03-00 15,00,000 15,00,000
18
PM Improvements of Irrigation facilities in Poothampadom Ela in ward no.3 and 4 of mallapuzhassery grama panchayath,Aranmula constituency,Pathanamthitta District.
2018/4105/IA 825/2018-2019
28-02-2019
2702-01-800-94-00-34-3 12,00,000 12,00,000
19
Protecting the side of Periyar at Thekkethuruth in wardNo 17 of Chendamangalam Panchayath
2016/904/IA W4-9802/16/AS
29-02-2016
2711-01-103-99-00-34-3 12,00,000 12,00,000
20
Protection works to the left bank of Periyar river ,eastern boundary of Santhi Sadanam Asramam Avolichal in ward No 6 of Kavalangad Panchayath
2016/986/IA W4/7220/2016/As
29-02-2016
2711-01-103-99-00-34-3 10,00,000 10,00,000
21
Protecting the side of Periyar at Banglavu kadavu and constructing the kadavu in ward No 10 of Kalady Panchayath Reach II
2016/941/IA A2 423/16
29-02-2016
2711-01-103-99-00-34-3 5,00,000 5,00,000
22
Urgent repairs and additional protection works to the bank of chalakudy River near Panchayath kadavu in ward No11 of Parakkadavu Panchayath
2016/905/IA A2-2855/2015
29-02-2016
2711-01-103-98-34-03-00 3,50,000 3,50,000
23
Construction of Edavazhi Kadavu and side protection wall to the Left bank of Thoombathodu-tributory of Periyar River at Thuruth in ward No.11 of Chengamanad Grama Panchayath
2018/2855/IA IDEkm/2018/2855/IA
01-03-2019
2711-01-103-98-34-03-00 9,90,000 9,90,000
24
Protecting the side of Chalakkudy River near Kuthiyathodu L I Scheme in ward No.1 of Kunnukara Panchayath.
2016/1018/IA W4/34542/15/AS
30-11-2015
2711-01-103-99-00-34-3 12,50,000 12,50,000
25
Protecting the side of Periyar River at Pazhappurayilkadavu in ward No 11 of Karumalloor Panchayath
2016/709/IA W4 -34541/15
29-02-2016
2711-01-103-98-34-03-00 10,00,000 10,00,000
26
PM - improvements of irrigation facilities to Elamkulam Ela in Kalluvathukkal Panchayath
2019/263/IA ORDER No. MIDklm/20
19/263/IA
02-03-2019
2702-01-800-94-00-34-3 15,00,000 15,00,000
27
Reformation of sea wall for a length of 15m from 143m south of cp No 2566 to 128m south of CP No 2566 at Thaikadappuram in Nileshwaram Municipality.
2019/202/IA IDKgd/2019/202/IA
28-02-2019
2711-02-103-99-34-3 10,00,000 10,00,000
28
Reformation of sea wall for a length of 31m from 22m south of CP stone No . 2566 to 9m North of CP stone No . 2566 at Thaikadappuram in Nileshwaram Municipality of Hosdurg Taluk.
2016/2682/IA IDKgd/2016/2682/IA
28-02-2019
2711-02-103-99-34-3 15,00,000 15,00,000
29
ASE Work- Natural calamity 2017-18-Urgent protection work to the coastal belt of Panoor between CESCP No 588 to 591 of Thrikkunnapuzha Panchayath in Harippad Constituency.
2017/1611/IA ORDER No. IDAlp/201
7/1611/IA Dated: 23-05-2017
23-05-2017
2711-02-103-99-34-3 19,90,000 19,90,000
30
Special Repairs and Reconstruction of Iykkadu Lift Irrigation Scheme to Malakkara Arattupuzha Ela in ward No.1 of Aranmula Panchayath
2017/772/IA MIDPta/2017/772/IA
24-03-2017
2702-01-800-94-00-34-3 10,00,000 10,00,000
31
Special repairs and reconstruction of Malakkara Lift Irrigation Scheme from Thellivizha Chal to Kunnithara in Ward No.2 of Aranmula Panchayath
2016/2391/IA MIDPta/2016/2391/IA

14-12-2016
2702-01-800-94-00-34-3 35,00,000 35,00,000
32
FD Protecting Right bank of Valapattanam river in RS No 56 per 4, Pappinisseri village at Aroli in Pappinisseri Panchayath
2018/2956/IA IDTsy/2018/2956/IA
08-03-2019
2711-01-103-98-34-03-00 10,30,000 10,30,000
33
PREVENTING SALINITY INTRUSION AT PURAPPILLIKKAVU IN PERIYAR RIVER-OPERATION OF SHUTTERS
2018/5946/IA ORDER No. IDEkm/201
8/5946/IA
27-02-2019
2702-01-800-94-00-34-3 7,50,000 7,50,000
34
Thrissur kole lands - Construction of permanent sluice at the mouth of the Parappuzha in Thrissur District Fabrication,painting and erection of two regulator
2017/90/MH IMDmpa/2017/90/MH
27-03-2018
2702-01-800-94-00-34-3 16,00,000 16,00,000
35
De-silting of Marakkadi Thodu in Perambra Panchayath Kozhikode District
2020/2644/IA MIDKkd/2020/2644/IA

24-06-2020
2702-03-101-98-03 95,000 95,000
36
ASE Works-constructing sea wall to close the existing fishing gap of length 40m at Kannankadavu beach near CP 1891 in Chemenchery panchayath.
2018/4064/IA IDKkd/2018/4064/IA
06-08-2020
2711-02-103-99-34-3 30,00,000 29,00,000
37
Maintenance of V C B in Valiya thodu at Mylackal junction in ward no - 2 & 3 of Elanthoor Panchayath
EST NO.2017/2986/IA 843/2017-2018
16-03-2018
2702-01-800-94-00-34-3 6,00,000 6,00,000
38
ASE - Natural Calamities- Urgent reformation works of damaged seawall for a length of 40 m between CP stone 1162 &1163 near Cherai beach at Pallippuram Panchayath (Beach ward No 23)
2019/6895/IA IDEkm/2018/2483/IA
06-03-2019
2711-02-103-99-34-3 36,00,000 32,00,000
39
Protection work to the eroded left bank of Kurumali river in ward No.2 at Pallom in Parappukkara panchayath
2019/8341/IA AIDTsr/2019/8341/IA

14-02-2020
2711-01-103-98-34-03-00 14,00,000 13,35,000
40
FC-Protecting the left bank of Vamanapuram River upstream of bridge near Vellumannadikadavu in Pullampara Grama Panchayath
2019/11059/IA IDTvm/2019/11059/IA

29-01-2020
2711-01-103-99-00-34-3 5,60,000 5,60,000
41
Restoration of the protection wall on the upstream of pozhikkara regulator in ChathanoorConstituency.
2020/73/IA ISDKlm/2020/73/IA
06-02-2020
2711-01-103-98-34-03-00 9,97,000 9,90,000
42
Detailed estimate for annual routine Works under coastal engineering section Thiruvananthapuram for the year 2017-18
CEFSTsr/2017/40/IDR
B
06-02-2018
2711-02-103-99-34-3 4,10,914 4,10,914
43
CONSTRUCTING TEMPORARY CHECK DAM ACROSS PERIYAR RIVER AT DOWN STREAM OF KAPRIKKADU L.I SCHEME IN KOOVAPPADY PANCHAYATH IN ERNAKULAM DISTRICT
2016/3041/IA D2-77646/16(15)
27-01-2017
2711-01-103-99-00-34-3 20,00,000 20,00,000
44
ASE -Reformation of damaged sunken sea wall in ward no. 16 in between CP stone 976 and 978 at South side of Harbour in Challanam Panchayath of Ernakulam District
2020/5128/IA G.O Rt) No. 690/202
0/WRD
06-11-2020
2711-02-103-99-34-3 1,23,60,000 1,17,00,000
45
ASE- Reformation of damaged sea wall between CESCP stones 982 and 987 at various places from Vachakkal to Gunduparambu in Chellanam Panchayath of Ernakulam District.
2020/5031/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,30,00,000 1,30,00,000
46
ASE -Reformation of damaged and sunken sea wall using stones between CESCP stones 1005& 1012 at various places from Chalakkadavu to Kandakkadavu of Chellanam Panchayath in Ernakulam District.
2020/5327/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,72,00,000 1,72,00,000
47
Construction of steel bridge across the Edapally thodu at Thuthiyoor in Thrikkakara panchayath.
2020/2065/IA D4-1784/2020
03-09-2020
2702-01-800-94-00-34-3 10,00,000 10,00,000
48
Protecting the north side of Periyar river near Pavanathara fish farm in Kadamakkuddy Panchayath in Ernakulam District
2016/2421/IA IDEkm/2016/2421/IA
02-02-2017
2711-01-103-99-00-34-3 19,50,000 19,50,000
49
ASE -Reformation and Reconstruction of damaged sunken seawall using stones in between CESCP Stones 996 & 997 in Chellanam Panchayath in Ernakulam District
2020/5161/IA G.O (RT)62/2021/WRD

30-01-2021
2711-02-103-99-34-3 1,00,00,000 1,00,00,000
50
Emergency protection work using geo textile bag at Companypady Vachakkal Bazar and North of Velamkanni Church in Chellanam Panchayath
2019/7711/IA IDEkm/2019/7711/IA
10-07-2019
2711-02-103-99-34-3 22,87,000 22,87,000
51
ASE WORKS Reformation of sea wall for a length of 28m South of CP 269 at Kappil
2016/190/IA IDTvm/2016/190/IA
19-03-2018
2711-02-103-99-34-3 10,20,000 10,20,000
52
ASE WORKS Reformation of sea wall for a length of 44m towards north from 30m north of CP 269 at Kappil
2016/191/IA IDTvm/2016/191/IA
20-03-2018
2711-02-103-99-34-3 16,00,000 16,00,000
53
FD-Bund protection work and shutter for Vettoor Ela thodu near fisheman colony in Thazhavettoor bhagam in Vettoor Panchayath
2019/6551/IA MIDTvpm/2019/6551/I
A
25-01-2020
2702-03-101-98-03 5,00,000 5,00,000
54
FD-Urgent side protection work to river near orrapu Bridge in edvaka panchath.
2019/1005/IA MIDSby/2019/1005/IA

28-02-2019
2702-03-101-98-03 12,00,000 12,00,000
55
Sabarimala Pilgrimage 2020-2021 Departmental work - Operating and up keeping the six permanent VCBs and Jalasechana karyalayam at Pamba
2020/4575/IA ORDER No. ISDKlm/20
20/4575/IA
08-10-2020
2711-01-103-99-00-34-3 9,50,000 9,50,000
56
CONSTRUCTION OF 21 NOS GROYNE FIELD AT ARATTUPUZHA IN BETWEEN CH 56.600KM TO 57.800KM AT ARATTUPUZHA GRAMAPANCHAYATH IN HARIPPAD CONSTITUENCY( CONDUCTING BATHYMETRIC SURVEY).
2017/362/IDRB CEFSTsr/2017/362/ID
RB
12-12-2017
2711-02-103-99-34-3 45,000 45,000
57
FD- Side protection to Chirammal Valliayi puzha at D/S side of Chirammal valliayi VCB in Mokeri panchayath, Kannur District.
2020/4774/IA MIDKnr/2020/4774/IA

11-10-2020
2702-03-101-98-03 7,00,000 7,00,000
58
PM - Renovation of Kunnathkara SWE/VCB at Poovampuzha in Maniyur Panchayat,Kozhikode District.
2019/10816/IA MIDKkd/2019/10816/I
A
30-01-2020
2702-01-800-94-00-34-3 25,00,000 25,00,000
59
FC - Protecting the right bank of Chandragiri river on upstream of Cheroor kadavu in RS No 147/2,147/1 of Chengala village in Chengala grama panchayat of Kasargod taluk.
2019/190/IA IDKgd/2019/190/IA
12-02-2020
2711-01-103-99-00-34-3 30,00,000 30,00,000
60
Reformation of sea wall for a length of 40m from 91m South of CP stone No 2565 to 51m south of Cp stone No 2565 at Thaikadappuram in Nileshwaram Municipality
2020/4272/IA Idkgd/2020/4272/IA
24-08-2020
2711-02-103-99-34-3 20,00,000 20,00,000
61
Reformation of seawall for a length of 34m from 126m South of Cp stone No 2565 to 92m South of stone no 2565 in nileshwaram Municipality
2020/4271/IA Idkgd/2020/4271/IA
24-08-2020
2711-02-103-99-34-3 17,00,000 17,00,000
62
Removal of silt and debrises from Uppala river near Pathwady bridge in Mangalpady Grama Panchayath
2020/853/IA DCKSGD-2840/2020-K3

27-04-2020
2059-01-051-96-00-17 17,50,000 17,50,000
63
Removal of silt and debrises from Manjeshwaram river at Kanila in Manjeshwaram Grama Panchayath
2020/862/IA DCKSGD-2840/2020-K3

27-04-2020
2059-01-051-96-00-17 16,00,000 16,00,000
64
PM-Protecting the sides of kayal at Mannel bhagom in ward no.6 of Thaneermukkom pt.
2016/54/KP KDDTm/2016/54/KP
07-03-2019
2702-03-101-98-03 15,30,000 15,30,000
65
Reformation of sea wall for a length of 40m from 50m South of Cp stone no 2565 to 10m south of stone no 2565 at Thaikadappuram in Nileshwaram Municipality
2020/4273/IA IDkgd/2020/4273/IA
24-08-2020
2711-02-103-99-34-3 20,00,000 20,00,000
66
Protection works to the sides of Purakadan thodu NORTH of S.N jn in Punnamada ward in Alappuzha municipality
KDDTm/2017/25/KP KDDTm/2017/25/KP
30-03-2017
2701-15-101-98(18) 9,00,000 9,00,000
67
Construction of Drain West of Koippally jn. at kuttichira in karalakam ward in Alappuzha municipality.
2017/42/KP KDDTm/2017/42/KP
13-03-2018
2702-01-800-94-00-34-3 10,00,000 10,00,000
68
PM- Putting up tidal bunds in various places of Mannancherry Panchayath and across Srayi thodu in Muhamma Panchayath for 2018-19
2018/88/KP KDDTm/2018/88/KP
19-09-2018
2702-01-800-94-00-34-3 1,30,000 1,30,000
69
TB Putting up tidal bund in various places of thanneermukkam panchayath for the year 2018-19
KDDTm/2018/85/KP
19-09-2018
2702-01-800-94-00-34-3 4,20,000 4,20,000
70
PM Putting up Tidal Bund across Nellathodu in Thanneermukkam Panchayath for 2018-19
2018/82/KP KDDTm/2018/82/KP
19-09-2018
2702-01-800-94-00-34-3 42,000 42,000
71
- Flood 2018-Removal of silt fro suction pit ,canal and rectification of damaged main canal between ch 0m to 50m of K.C LIS in Annamanada Panchayath
2018/3152/IA ORDER No. MIDTsr/20
18/3152/IA
01-12-2018
4702-00-101-89-00-00-00 8,00,000 8,00,000
72
Demarcation of boundaries of Karinkayam dam land in Kizhakkanchery GP and providing survey stones and related activities.
2019/567/IA MIDPkd/2019/567/IA
31-03-2020
2702-01-800-94-00-34-3 3,00,000 3,00,000
73
PUTTING UP TIDAL BUND IN VARIOUS PLACES OF AROOR PANCHAYATH
2020/166/KP ORDER No. KDDTm/202
0/166/KP
24-10-2020
2702-01-800-94-00-34-3 12,30,000 12,30,000
74
Premonsoon works 2020-Desilting & cleaning of canal near Kalarkode Mahadeva temple from puthanmadom towards east up to Alappuzha -Ambalapuzha canal
KP/204/2020 MIDCgr/2020/204/KP
01-07-2020
2702-03-101-98-03 2,40,000 2,40,000
75
PM-2017-18-Urgent repairs to electrical installation and supply of starter for 100HP motor pump set in Plazhy Lift Irrigation Scheme, Palakkad
2019/11634/IA W2/AS/11964/18
23-03-2018
2702-01-800-94-00-34-3 4,40,000 4,40,000
76
CSM Removal of obstruction in LBMC from Ch 35 100 to 40 900 Km and Kondayoor Branch Canal for 2016 17
2016/990/IA IDTsr/2016/990/IA
26-08-2016
2701-03-101-98-00-18 1,10,000 1,10,000
77
PM- PROTECTING OF VARAMBINAKAM- MANCHIRRA VACHAL TO VARAMBINAKAM PADASEKHARAM IN WARD NO.14 OF THIRUVARPPU PANCHAYATH
2020/823/IA MIDKtm/2020/823/IA
21-10-2020
2702-01-800-94-00-34-3 4,00,000 4,00,000
78
Protecting the left bank of Kurumali River at Mattathurkunnu starting Sy.No.1612/1 ward no. 19 of Mattathur Panchayath
2018/5278/IA AIDTsr/2018/5278/IA

07-01-2021
2711-01-103-99-00-34-3 18,00,000 18,00,000
79
Annual Maintenance of VCB across Manjeshwar river at Badaje in Badaje village of Manjeshwar Panchayat for the year 2018-2019 (opening vents)
2018/1142/IA MIDKgd/2018/1142/IA

17-10-2018
2702-01-800-94-00-34-3 3,15,000 3,15,000
80
ASE Emergency temporary protection measures for south side of CP stone 114 at Vettukad Thiruvananthapuram .
2019/8605/IA ORDER No. IDTvm/201
9/8605/IA
03-10-2019
2711-02-103-99-34-3 3,00,000 3,00,000
81
Reformation of sea wall for a length of 55m at Shinkarathoppu north of KM54 at Poothura in Chirayinkeezhu Grama Panchayath.
2017/383/IA INDTTvpm/2017/383/I
A
31-03-2017
2711-02-103-99-34-3 38,50,000 38,50,000
82
P.M-Renovation of Vadakara L.I. Scheme in Velloor Grama Panchayat
2016/3056/IA 2016/3056/IA
30-01-2017
2702-01-800-94-00-34-3 25,00,000 24,99,607
83
Protective Irrigation works 2018-19- Putting up an earthen bund across K.V.Canal in Vaikom Municipality
2018/1378/IA 2018/1378/IA
22-09-2018
2702-01-800-94-00-34-3 1,55,000 1,55,000
84
PM-Protective Irrigation works for the Year 2016-17-Putting up an earthen bund across K.V.Canal in Vaikom Municipality
2016/1099/IA 2016/1099/IA
07-12-2016
2702-01-800-94-00-34-3 1,55,000 1,55,000
85
PM-Protective Irrigation works for the Year 2017-18 Putting up an earthen bund across Vadayar in Vaikom municipality
2017/1150/IA 2017/1150/IA
20-09-2017
2702-01-800-94(00) 4,50,000 4,50,000
86
PM-Protective Irrigation works for the year 2017-18- Putting up an earthen bund across K.V.Canal in Vaikom Municipality
2011/1149/IA 2017/1149/IA
20-09-2017
2702-01-800-94-00-34-3 1,60,000 1,60,000
87
Renovation of Uppala Anicut - Fabrication of 02 Nos. of shutters , hoist bridges and overhauling of existing hoist mechanism
2019/240/MH IMDmpa/2019/240/MH
03-08-2020
2702-01-800-94-00-34-3 8,20,000 8,20,000
88
Maintenance of shutters of Shiriya anicut in Kasaragod District
2016/96/MH IMDmpa/2016/96/MH
06-08-2020
2702-01-800-94-00-34-3 5,20,000 5,20,000
89
Protection works to Kakkassery thodu (Vachal of Eraveeswaram padasekharam) d/s of Kakkassery culvert in Aymanam Panchayath
2017/4001/IA MIDKtm/2017/4001/IA

22-03-2018
2702-03-101-98-03 4,00,000 4,00,000
90
Protecting the East side of Kadepparambu - Ambooram thodu (Kadappanathodu) in ward No.8 of Thiruvarppu P)anchayath in Ettumanoor Constituency
2018/5594/IA MIDKtm/2018/5594/IA

26-02-2019
2702-01-800-94-00-34-3 11,20,000 11,20,000
91
Improvements to Vachal and protecting the sides of Theruvil padasekharam in ward No.4 of Thiruvarppu Panchayath in Ettumanoor Constituecy
2018/5595/IA MIDKtm/2018-2019/20
18/5595/IA
26-02-2019
2702-01-800-94-00-34-3 17,30,000 17,30,000
92
Maintenance of various L.I.Schemes in Ettumanoor Municipality in Ettumanoor Constituency
2016/1874/IA MIDKtm/2016/1874/IA

22-02-2017
2702-01-800-94-00-34-3 10,00,000 10,00,000
93
P.M.Protecting the sides of Maloorkkavu Kulam in Madukkummoodu road in Thrikkodithanam panchayath
2019/80/IA MIDKtm/2019/80/IA
26-02-2019
2702-01-800-94-00-34-3 12,10,000 12,10,000
94
P.M.Maintenance of L.I Scheme-Erecting pump and motor,extension of suction line of Aymanamkuzhy Lift Irrigation scheme in Ettumanoor Municipality
2017/930/IA MIDKtm/2017/930/IA
27-03-2018
2702-01-800-94-00-34-3 4,90,000 4,90,000
95
Improvements to the Chellichira - Poonjal padasekharam in ward No.1 of Panachikkadu panchayath in Kottayam Constituency
2018/664/IA MIDktrm/2018/664/IA

19-03-2018
2702-01-800-94-00-34-3 7,00,000 7,00,000
96
Protecting the sides of Kurisupally thodu near St.Johns Kurisupally road in ward No.2 of Kumarakom Panchayath
2017/2522/IA MIDKtm/2017/2522/IA

22-03-2018
2702-03-101-98-03 4,00,000 4,00,000
97
PM- Deepening works to the vachal thodu of Malloor Padasekharam in Aymanam Panchayath
2018/653/IA MIDKtm/2018/653/IA
19-03-2018
2702-01-800-94-00-34-3 4,00,000 4,00,000
98
Meenachil meenanthra river linking project -Rennovation works to Madakkal thodu
2017/4770/IA MIDKtm/2017/4770/IA

03-02-2018
2702-03-101-98-03 15,00,000 15,00,000
99
ASE-Reformation and raising of sunken seawall using 300 to 400 kg stones for a length of 74m in between CP Stone 1125 and 1126 at Aniyil in Vypin Island
2017/2565/IA IDEKM/2017/2565/IA
11-03-2019
2711-02-103-99-34-3 35,00,000 35,00,000
100
Rectification works to breached canal portion of Thiruvanchoor Neericadu ,Arumanoor LI scheme in Ayarkunnam panchayath
2016/1876/IA MIDKtm/2016/1876/IA

20-12-2016
2702-01-800-94-00-34-3 7,00,000 7,00,000
101
F.C.2019-20 Protecting the right bank of Pennar thodu and construction of bathing ghat at the down stream of Cheepunkal bridge in Arpookkara panchayath.
2018/516/IA IDKtm/2018/516/IA
05-02-2020
2711-01-103-99-00-34-3 6,70,000 6,70,000
102
FD-Protecting the left bank of Vamanapuram River andconstruction of Balikadavu at Thavaikkal Kadavu inVithura Grama Panchayath
2016/2896/IA IDTvm/2016/2896/IA
30-01-2017
2711-01-103-98-34-03-00 24,00,000 23,30,000
103
Maintenance of MI structure and other allied works in Kalipil Ela thodu in Kareepra Panchayath
2020/3010/IA MIDklm/2020/3010/IA

30-10-2020
2702-01-800-94-00-34-3 5,00,000 5,00,000
104
PM-Urgent Rectification of damaged shutter of sluice at Nattuthodu in ward 15 of Clappana Panchayath
2020/5611/IA MIDklm/2020/5611/IA

15-01-2021
2702-01-800-94-00-34-3 3,00,000 3,00,000
105
ASE-Reformation and raising of sunken sea wall using 300kg to 400kg stones for a length of 38m between CP stones 1127&1128 starting at 12.50mts North of CP stone1127 at Aniyil in Vypin Islant
2016/2943/IA IDEkm/2016/2943/IA
21-01-2017
2711-02-103-99-34-3 15,00,000 15,00,000
106
ASE-Reformation and raising of damaged sunken sea wall using 300 kg to 400 kg stones for a length of 45m between CP stones 1129 and 1130 starting at 33m north of CP stones 1129 at Edavanakkad in Vypin Island
2016/2903/IA IDEkm/2016/2903/IA
21-01-2017
2711-02-103-99-34-3 15,00,000 15,00,000
107
Annual Maintenance of Shiriya anicut in Badoor village of Puthige panchayath for the year 2018_19
2018/1116/IA MIDKgd/2018/1116/IA

17-10-2018
2702-01-800-94-00-34-3 7,11,000 7,11,000
108
Annual maintenance of SWE bund on the left bank of Kumbala river in Kumbala Panchayath for the year 2018_19 (opening vent )
MIDKgd/2018/1115/IA

04-08-2018
2702-01-800-94-00-34-3 57,000 56,135
109
AM OF SHIRIYA ANICUT IN BADOOR VILLAGE IN PUTHIGE PANCHAYATH FOR THE YEAR 2015-16
DB6-2565(A)/15
03-09-2015
2702-01-800-94-00-34-3 6,25,000 6,25,000
110
Rennovation of outerbund at Varambinakam padasekhram in Vakathanam panchayarh
MIpy48/15-14 82/EE/15-16
18-02-2016
2702-01-800-94-00-34-3 14,00,000 14,00,000
111
PM -Construction of side protection works of chirapalamthodu at Ettupara bhagom in Ayarkunnampanchayatrh
MIPY38/15 00/00/16-17
27-05-2016
2702-01-800-94-00-34-3 10,00,000 10,00,000
112
Maintenance and cleaning of Aruvikkara Check dam and balikadavu prior and during Karkidaka Vavu Bali rituals for the year 2018
2018/1503/IA IDTvm/2018/1503/IA
13-07-2018
2711-01-103-99-00-34-3 1,15,000 1,15,000
113
Maintenance and cleaning of Thiruvallam Thodu and all allied works in all kadavus & maintenance of Aruvikkara Check dams and balikadavu prior and during Karkidaka Vavu Bali rituals for the year 2017
2017/2011/IA IDTvm/2017/2011/IA
05-07-2017
2711-01-103-99-00-34-3 2,90,000 2,90,000
114
Ferry Charges at Naluchira and Kurichickal under irrigation section, Thottappally for the year 2018 - 19 (from 1/04/2018 to 31/03/2019).
2018/1281/IA IDAlp/2018/1281/IA
21-01-2019
2701-15-101-98(18) 5,89,000 5,89,000
115
Construction of kadavu at the right bank of Muvattupuzha river near Velloorkunnam templein ward no.23 of Muvattupuzha Municipality
2018/5918/IA R.D. 3-58/20109
31-01-2019
4702-00-101-83(00) 18,00,000 18,00,000
116
Natural calamity-Emergency dumping using geo bags for protection work near CP 0260 at necessary location in Vettakkada in Varkala Constituency
2021/2155/IA IDTvm/2021/2155/IA
19-05-2021
2711-02-103-99-34-3 2,50,000 2,50,000
117
Cutting and open the sand bar at Andakaranazhy for the year 2020-21
2020/90/KP KDDTm/2020/90/KP
30-04-2020
2702-01-800-94-00-34-3 5,20,000 5,20,000
118
Annual Maintenance of cherandathur chira LI scheme in Maniyur Panchayath Kozhikode Dsitrict
MIDKkd/2017/1950/IA

11-12-2017
2702-01-800-94-00-34-3 1,00,000 1,00,000
119
Renovation of VCB at Koovatti in Kinanur Karinthalam Panchayath
2019/1025/IA MIDKgd/2019/1025/IA

02-08-2019
2702-01-800-94-00-34-3 6,60,000 6,60,000
120
RMF-Urgent Temporary protection works to the left bank of Karuvannur River bund road on U/S of Arattupuzha bridge in ward no.8 of Vallachira Panchayath
2018/2766/IA DCTSR/2938/2018-H4
22-07-2018
2701-80-800-97-34-03 1,50,000 1,50,000
121
Investigation works for the construction of Check Dam across Krumali River at Snehapuram - Kakkadavu in Puthukad and Parappukkara Panchayath.
2018/1088/IA AIDTsr/2018/1088/IA

31-03-2018
2701-02-101-98-00-00-18 4,14,000 4,14,000
122
Urgent Disaster Relief Work to Keeranallur Regulator Cum Bridge (across Keeranallur River) and Newcut Regulator in Parappanangadi Municipality for the year 2021-2022
2021/3430/IA IDMpm/2021/3430/IA
03-08-2021
2711-01-103-99-00-34-3 1,00,000 1,00,000
123
Emergency work- Cutting of pozhi at Andhakaranazhy due to Tauktae cyclone to avoid the unexpected flooding
2021/157/KP KDDTm/2021/157/KP
19-05-2021
2702-03-101-98-03 1,20,000 1,20,000
124
ASE- urgent dumping to construct emergency protection wall between G14 and G13 groynes of beempally in Trivandrum constituency
2021/2303/IA IDTvm/2021/2303/IA
19-05-2021
2711-02-103-99-34-3 5,00,000 5,00,000
125
ASE Work-Urgent Construction of protection wall for a length of 15 m towards south from 212m south of Cp 0094 near Tsunami Kurushadi in Thiruvananthapuram Constituency
2021/1398/IA IDTvm/2021/1398/IA
24-05-2021
2711-02-103-99-34-3 4,50,000 4,50,000
126
Annual Maintenance to VCB at Koolikana in Badiadka Panchayat for the year 2018-19 (Opening Vents)
2018/1129/IA MIDKgd/2018/1129/IA

20-08-2018
2702-01-800-94-00-34-3 4,10,000 4,10,000
127
Annual Maintenance to VCB at Koolikana in Badiadka Panchayat for the year 2018-19 (Closing Vents)
2018/1129/IA MIDKgd/2018/1129/IA

20-08-2018
2702-01-800-94-00-34-3 4,10,000 4,10,000
128
ANNUAL MAINTENANCE TO VCB AT NADUVANABAIL IN KUMBADAJE PANCHAYATH FOR 2018-19 (opening of vents)
MIDKgd/2018/1107/IA

16-09-2018
2702-01-800-94-00-34-3 95,500 89,100
129
CONSTRUCTION OF TEMPORARY PIPE CULVERT ACROSS VARATTAR RIVER AT PUTHUKULANGARA CHAPPATH
2017/3021/IA ISDKlm/2017/3021/IA

17-10-2017
2711-01-103-99-00-34-3 4,50,000 4,50,000
130
ASE Work- Urgent maintenance to the damaged sea wall towards south of CP stone 2197 at Pareekadavu in Dharmadam Panchayath.
2017/2934/IA IDTsy/2017/2934/IA
04-03-2019
2711-02-103-99-34-3 14,40,000 14,40,000
131
Monsoon Preparedness 2021- Cutting and removal of damaged and threatening trees at the kunnathupalam SWE/VCB in Olavanna Panchayat
2021/2279/IA MIDKkd/2021/2279/IA

24-05-2021
2702-03-101-98-03 16,000 16,000
132
Monsoon Preparedness 2021-Urgent desilting and jungle clearance in Aamathodu inChorode panchayat , Kozhikode District.
2021/2418/IA MIDKkd/2021/2418/IA

04-06-2021
2702-03-101-98-03 90,000 90,000
133
Urgent Protection work to the damaged left bank of Meenachil river near Kulappurakkadavu in Kottayam Municipality
2021/2479/IA IDKtm/2021/2479/IA
20-09-2021
2711-01-103-98-34-03-00 17,00,000 17,00,000
134
Rejuvenation of Valiyathodu near SH convent, Thuruthippally in Njeezhoor panchayath of Kaduthuruthy Constituency
2021/3531/IA IDKtm/2021/3531/IA
22-09-2021
2711-01-103-99-00-34-3 25,40,000 25,40,000
135
Emergency protection work using Geo bags at north side of Velankanni fishing gap in between CESCP stone 998 and 999 in Chellanam Island
2019/7210/IA ORDER No. IDEkm/201
9/7210/IA
31-05-2019
2711-02-103-99-34-3 11,50,000 11,50,000
136
- Emergency protection work using geo bags at companypady between CESCP stone 984 and 986 in Chellanam Island
2019/3574/IA ORDER No. IDEkm/201
9/3574/IA
31-05-2019
2711-02-103-99-34-3 28,70,000 28,70,000
137
Protecting the Erroded banks of vembanadu kayal from thookakadavu(varanadu temple) to puthuval nikarth purayidom in ward No 2 of Thanneermukkom pt
2018/48/KP KDDTm/2018/48/KP Da
ted: 14-06-2019
14-06-2019
2702-03-101-98-03 3,25,000 3,25,000
138
Sabarimala pilgrimage 2021-2022 Departmental work Operating and upkeeping the six Permanent VCBs and Jalasechana Karyalam at pampa thriveni
2021/4499/IA ISDKlm/2021/4499/IA

12-10-2021
2711-01-103-98-34-03-00 10,80,000 10,80,000
139
AM 2019-20 Fully Comprehensive Annual Maintainance of Moongilmada LIS for The Whole pumbing season starting from 1st August 2019 to 31st July 2020
2019/8091/IA MIDPkd/2019/8091/IA

06-08-2019
2702-01-800-94-00-34-3 1,86,000 1,86,000
140
Fabrication,Painting and erection of 1 no MS shutter ,Fabrication of new worm and pinion with screw rod at Anamooli left canal shutter and Fabrication of new worm and pinion for Main River shutter at Anamooli under MI division ,Palakad GENERAL DETAILS
2016/33/MH IMDmpa/2016/33/MH
23-02-2017
2702-01-800-94-00-34-3 3,60,000 3,60,000
141
Maintenance and overhauling of hoisting mechanisms of 10nos of regulator shutters of Pookottumanna RCB in Chungathara Panchayath
2018/72MH IMDmpa/2018/72/MH
28-12-2018
2702-01-800-94-00-34-3 5,30,000 5,25,000
142
FC-Maintenance and repair of Poorapuzha lock shutters and its Hoisting mechanisms under Irrigation Division ,Malapurram
2016/80/MH IMDmpa/2016/80/MH
18-12-2017
2711-01-103-99-00-34-3 23,00,000 23,00,000
143
Emergency ASE work - Tauktae cyclone - Rectification of damaged sea wall for a length of 28.5m from north of CP0063 at Panathurakara in Nemom LA
2021/2310/IA ORDER No. IDTvm/202
1/2310/IA
20-07-2021
2711-02-103-99-34-3 25,000 2,50,000
144
Annual Maintenanceof LI Station Vazhamuttom in Vallicodu Panchayath for the year 2021-22(Civil works)
2021/1957/IA MIDPta/2021/1957/IA

12-10-2021
2702-01-800-94-00-34-3 92,000 93,000
145
Annual maintenance of LI Station Padinjarepadom in Vallicodu Panchayath for the year 2021-22(Civil works)
2021/1956/IA MIDPta/2021/1956/IA

12-10-2021
2702-01-800-94-00-34-3 82,000 82,000
146
ANNUAL MAINTENANCE WORK TO REGULATOR CUM BRIDGE AT PANDIKANDAM IN BEDADKA GRAMA PANCHAYATH OF KASARAGOD FOR THE YEAR 2021-22
2021/2050/IA MIDKgd/2021/2050/IA

22-09-2021
2702-01-800-94-00-34-3 80,000 80,000
147
Providing temporary salinity barrier (Tidal bund) across Achankovil river near Cheruthanakadvu bridge at Varolil bhagom in Cheruthana Panchayath of Harippad LAC
2021/4795/IA IDAlp/2021/4795/IA
10-12-2021
2711-01-103-99-00-34-3 29,00,000 29,00,000
148
Putting up one temporary tidal bund Pulikkeezhu river at Mahadevikadu and Demolishing the bund and other allied works after the purpose served for the year 2021-22
2021/4220/IA IDAlp/2021/4220/IA
10-12-2021
2711-01-103-99-00-34-3 8,00,000 8,00,000
149
Urgent restoration of Kuzhithodu in ward no.16 of Manjoor panchayath.
2021/2362/IA MIDKtm/2021/2362/IA

28-05-2021
2702-03-101-98-03 88,000 88,000
150
EMERGENCY MONSOON PREPAREDNESS 2021- URGENT RESTORATION OF VATTIPPULLU - SASTHAMPARAMBU THODU AT MOUTH PORTION OF VEMBANAD KAYAL NEAR NIRAAMAYA RETREATS IN KUMARKOM PANCHAYTH.
2021/2764/IA MIDKtm/2021/2764/IA

04-06-2021
2702-03-101-98-03 2,90,000 2,90,000
151
Emergency Monsoon Preparedness 2021- Desilting of Erooppa thodu at Pottassery bhagom to the upstream of Pottassery culvert in Changanassery LAC
2021/3419/IA MIDKtm/2021/3419/IA

02-07-2021
2702-03-101-98-03 1,00,000 1,00,000
152
Flood october 2021. Emergency removal of debris and other obstructions from Manimalayar under and near Kokkayar bridge
2021/6204/IA MIDPta/2021/6204/IA

13-01-2022
2711-01-103-99-00-34-3 1,00,000 1,00,000
153
Flood october 2021. Emergency removal of debris and other boulders from Manimalayar under and near Mukkulam bhagam
2021/6205/IA MIDPta/2021/6205/IA

13-01-2022
2711-01-103-99-00-34-3 50,000 50,000
154
Cleaning waste and debris accumulated during flood 2021between three bridges of Vengal thodu in Peringara panchayath
2021/6211/IA MIDPta/2021/6211/IA

13-01-2022
2711-01-103-99-00-34-3 3,00,000 3,00,000
155
Clearing waste and debris accumulated during flood 2021 at Vakkel kadavu VCB in Kallooppara Panchayath
2021/6165/IA MIDPta/2021/6165/IA

13-01-2022
2711-01-103-99-00-34-3 20,000 20,000
156
Urgent cleaning of Puliyathodu near Thiruvamanapuram bridge in Eraviperoor panchayath Ch. 91/420
2021/6175/IA MIDPta/2021/6175/IA

13-01-2022
2711-01-103-99-00-34-3 4,80,000 4,80,000
157
Urgent cleaning of Puliyathodu in Kuttoor panchayath in Thiruvalla constituency
2021/6171/IA MIDPta/2021/6171/IA

13-01-2022
2711-01-103-99-00-34-3 4,90,000 4,90,000
158
Urgent side protection works to Kizhakke Kuthukuzhy thodu in Kothamangalam Muncipality and Kavalangad Panchayath
2021/5118/IA MIDEkm/2021/5118/IA

31-03-2022
2702-03-101-98-03 26,70,000 26,70,000
159
Pre Monsoon Urgent Clearing and Desilting of Njavarathodu near Pathanamthitta Municipal Stadium in Pathanamthitta Municipality
2021/2606/IA MIDPta/2021/2606/IA

31-05-2021
2702-03-101-98-03 75,000 75,000
160
AM 2021-22 Annual Maintenance of Gramankadavu LI scheme in Pothukallu GP.
2021/2104/IA MIDMpm/2021/2104/IA

21-12-2021
2702-01-800-94-00-34-3 8,10,000 8,10,000
161
ASE Work Rectification of damaged seawall at various locations near Neendakara fishing colony between CESCP No 382 and CESCP No 387 in Neendakara panchayat at chavara LAC
2022/3694/IA ISDKlm/2022/3694/IA

22-03-2022
2711-02-103-99-34-3 25,00,000 25,00,000
162
FD-Protecting the Right bank of Vamanapuram River including Reformation of Existing Kadavu near Subhramannyan Temple at Kezhattingal in Attingal Municipality
2019/11615/IAa IDTvm/2019/11615/IA

19-09-2021
2711-01-103-98-34-03-00 33,50,000 33,50,000
163
NC - 2021-22 - Urgent removel of blockage due to the thick floating materials such as fallen trees , bamboos and other floating materials at Arthissery bridge in Kaithathodu Branch of manimala river at Thalavady and Muttar Panchayath,Thalavady panchyath bridge,Vyasapuram bridge, Thalavady High school bridge at Thalavady Panchyath in Kuttanadu LAC
2021/435/KP MIDCgr/2021/435/KP
20-10-2021
2702-03-101-98-03 2,46,310 2,46,310
164
2021 2022 - Emergency work for desilting of green channel, raising of canal and repair works of breached canal at various LI Schemes under MI Section Mallappally
2022/263/IA MIDPta/2022/263/IA
02-03-2022
2702-01-800-94-00-34-3 4,70,000 4,70,000
165
Annual maintenance of Kammana LI Scheme in Edavaka Panchayath for 2021-2022
MIDSby/2021/2299/IA

05-10-2021
2702-01-800-94-00-34-3 2,20,000 2,20,000
166
2022-23 repair works of NRV Valves pvc pipes M S pipes etc of Various LIS in Kuzhur,Mala&Poyya panchayath.
IRR/IA/EST/2867/2022_5_1_1 AS/59D/22/22507
01-10-2022
2702-01-800-94-00-34-3 4,80,000 4,80,000
167
2022-23 Annual repair works of NRV Valves pvc pipes M pipes etc of Various LI in Annamanada Panchayath and Thiruthiparambu LI S in Aloor panchayath.
IRR/IA/EST/2865/2022_5_1_1 AS/59D/22/22678
07-10-2022
2702-01-800-94-00-34-3 3,80,000 3,80,000
168
2022-23 Annual maintenance -repair and maintenance works of canals under chirayanchal parikkappilly thandathikulam LI and Thiruthiparambu LIS in Aloor panchayath
IRR/IA/EST/2863/2022_5_1_1 AS/59D/22/22357
27-09-2022
2702-01-800-94-00-34-3 6,30,000 6,30,000
169
2022-23 Annual maintenance of KC,Annamanada,Palissery2,Palissery1,and Poovathussery,Vennuthura LI Schemes
IRR/IA/EST/2864/2022_5_1_1 AS/59D/22/22355
27-09-2022
2702-01-800-94-00-34-3 5,60,000 5,60,000
170
Annual Maintenance LI Schemes under MI Section Perumbavoor-Koodalapad,Pantheerazhipara, Vellaramugal, Vazhakkulathuchira, Kandanthara, Painkimala, Onamveli,Kannamkulam and Perumani LIS for the year 2022-23
IRR/IA/EST/2782/2022_5_2_2 AS/59D/22/22266
24-09-2022
2702-01-800-94-00-34-3 9,20,000 6,00,000
171
PM- Protecting the sides of thodu at Erumathala Parambunkal padi Bhagom in Ward No. 16 of Vazhoor Panchayath in Kottayam Dt
2016/779/IA MIDKtm/2016/779/IA
23-09-2017
2702-01-800-94-00-34-3 3,00,000 3,00,000
172
GENERAL-Annual Maintenance 2022-23-Narippottakunnu LIS in Parudur Panchayath-General Civil Work
IRR/IA/EST/5/2022_5_3_2 AS/59D/22/22953
15-10-2022
2702-01-800-94-00-34-3 4,50,000 4,50,000
173
GENERAL-Annual Maintenance 2022-23-Koottakadvu LIS in Parudur PanchayathGeneral Civil Work
IRR/IA/EST/5/2022_5_4_3 AS59D2222958
15-10-2022
2702-01-800-94-00-34-3 5,30,000 5,30,000
174
GENERAL-Annual maintenance 2022-23 of LIS Anakkal,Kulukkallur Panchayath,Palakkad district-Annual maintenance 2022-23-General Civil Work
IRR/IA/EST/26532022_5_1_1 AS59D2222960
15-10-2022
2702-01-800-94-00-34-3 5,30,000 5,30,000
175
GENERAL-Annual Maintenance 2022-2023-Annual maintenance works to LIS Chorottur in Vaniyamkulam Pyt.-General Civil Work
IRR/IA/EST/3440/2022_5_5_4 AS59D2222970
15-10-2022
2702-01-800-94-00-34-3 5,30,000 5,30,000
176
Emergency work at Various LI stations in Aranmula Panchayath in Aranmula Constituency
2022/235/IA MIDPta/2022/235/IA
28-02-2022
2702-01-800-94-00-34-3 2,42,000 2,42,000
177
GENERAL-ASE work -kovilthottam light house-ASE work Urgent protection work of seacoast for a length of 25m south of CP411 near kovilthottam light house in chavara constituency-General Civil Work
IRR/IA/EST/4192/2022_5_1_1 AS/59D/22/20873
03-08-2022
2711-02-103-99-34-3 14,10,000 14,10,000
178
GENERALSABARIMALA PILGRIMAGE 2022 2023 Departmental work Operating and up keeping the Permanent VCB s and jalasechana karyalam at pampa Thriveni General Civil Work
IRR/IA/EST/6860/2022_23_1_1 AS/59D/22/23056
19-10-2022
2711-01-103-99-00-34-3 11,50,000 11,50,000
179
GENERAL-Emergency Monsoon Preparedness works 2022-kooroppada gp-Urgent - clearing the obstructions in Pannagamthodu Near Erathupuzha bridge in Kooroppada panchayth-General Civil Work
IRR/IA/EST/3502/2022_5_1_1 AS/59D/22/21670
17-08-2022
2702-03-101-98-03-34-03 10,000 10,000
180
GENERAL-Annual Maintenance - Kunduchira-Annual maintenance of Kunduchira Anicut in Thalassery Muncipality, Kannur district for the year 2022-23-General Civil Work-1
IRR/IA/EST/2397/2022_5_1_1 AS/59D/22/23390
29-10-2022
2702-01-800-94-00-34-3 2,70,000 2,70,000
181
Annual Mace MISP /5/AM/2022-Annual Maintenance of LI Scheme for the year 2022-2023 of LI station No 2 in Thazhakkara panchayath, under MI Section, Pandalam-General Civil Work.
IRR/KP/EST/5455/2022_5_1_1 AS/59D/22/24137
08-12-2022
2702-01-800-94-00-34-3 2,04,000 2,04,000
182
Protecting the right bank of Manimala river downstream of Kuttoor bridge near St. Marys Tennis Academy in ward no.21 Thiruvalla Municipality
6014/2022 AS/59D/22/24983
07-02-2023
2711-01-103-99-00-34-3 15,00,000 15,00,000
183
Renovation of Thalppancode kulam in Ward No X of Vilavoorkkal Panchayat in Kattakkada Constituency.
2020/782/IA ORDER No. MIDTvpm/2
020/782/IA
16-03-2020
2702-03-101-98-03 3,00,000 3,00,000
184
GENERAL-Construction of side protection wall on the left side of Kariyil thodu adjacent to the property owned by Mrs. Nazeema as per the judgement dated WP (C) 18260 of 2016F dated 23rd June 2016-do-General Civil Work
IRR/IA/FL/3098/2022 AS/59D/22/24703
09-01-2023
2702-03-101-98-03-34-03 25,50,000 21,60,000
185
GENERAL-Edachakai Anicut: Kasaragod District-Fabrication and erection of Stainless steel shutters-General Mechanical Work
IRR/MH/EST/8331/2022_16_2_1 AS/59D/22/25998
30-03-2023
2702-01-800-94-00-34-3 6,80,000 1,84,000
186
Construction of a Retaining wall for protection of thodu near Vettubali kulam at Mudavoorppara in Pallichal Grama Panchayath.
IRR/IA/EST/3072/2022_5_1_1 AS/59D/22/25108
20-02-2023
2702-03-101-98-03 13,60,000 13,60,000
187
GENERAL-AM 2022-2023-Annual maintenance for 4 Nos. Pump houses Kanjirathadi, Pandarakari, Nilamelkari and Mankilikari at Kalliyoor Panchayath and Thiruvananthapuram Corporation-General Civil Work
IRR/IA/EST/5120/2022_5_1_1 AS/59D/22/23638
14-11-2022
2702-01-800-94-00-34-3 10,00,000 10,00,000
188
GENERAL-Near Pandarakkari PH-Construction of Side Protection wall of Kannukalichal thodu near Pandarakkari Pump house in Kalliyoor Grama Panchayath-General Civil Work
IRR/IA/EST/2164/2023_5_1_1 ORDER No. AS/59D/22
/26100
31-03-2023
4702-00-101-84-01-00-00 4,70,000 4,70,000
189
General Asarikulam FD-Urgent repair to damaged bund of Assrikulam thodu Thannimoodu in Neyyattinkara Muncipality- General bwork
IRR/IA/EST/697/2022_5_1_1 AS/59D/22/25217
28-02-2023
2702-03-101-98-03-34-03 5,36,000 5,36,000
190
GENERAL-BOX CULVERT- POOVAR GP-Construction of Box Culvert at Pandarathottam in Arumanoor ward in Poovar Grama Panchayath in Kovalam LAC-General Civil Work-1
IRR/IA/EST/4064/2022_5_1_1 AS/59D/22/24837
24-01-2023
4702-00-101-84-01-00-00 9,50,000 9,50,000
191
GENERAL-Project Maintenance-Urgent repairs to Sub canal of Palathole branch canal from ch 1360m to 1560m of LI Scheme, Ramanchadi in Elamkulam Panchayath, Malappuram District. -General Civil Work.
IRR/IA/EST/4618/2022_5_1_1 AS/59D/22/25572
14-03-2023
4702-00-101-84-01-00-00 15,00,000 15,00,000
192
Urgent desiltng of poothara karayathampoyil thodu at downsteam of palliyara bridge in kayakkodi Grama panchayat,Kozhikode District
IRR/IA/EST/1772/2022 AS/59D/22/20263
07-07-2022
2702-03-101-98-03-34-03 1,58,000 1,58,000
193
GENERAL-Azheekkal Weigh Bridge-Repairs and Upgradation of departmental weigh bridge at Azheekkal in Alappad panchayath in Karunagappally LAC.-General Civil Work
IRR/IA/EST/7603/2022_5_1_1 AS/59D/22/23743
17-11-2022
2711-02-103-99-34-3 9,60,000 9,60,000
194
Urgent rectification for the damaged Left bund of Neyyar River at Sabarimuttom, U/S of Pirayammood Bridge in Neyyattinkara LA Constituency
IRR/IA/EST/91/2022_5_8_7 AS/59D/22/25758
24-03-2023
2711-01-103-98-34-03-00 25,00,000 25,00,000
195
GENERAL-Salt water prevention works 2022-23 -Constructing Temporary bund across Aruthootty thodu to prevent salt water intrusion_ in Kottayam district-General civil work
IRR/IA/EST/7932/2022_5_1_1 AS/59D/22/25157
24-02-2023
2711-01-103-99-00-34-3 4,32,000 4,10,000
196
GENERAL Saltwater prevention works 2022 23 Construction of temporary bund across Anjunny thodu to prevent salt water intrusion in Kottayam District General civil work
IRR/IA/EST/7932/2022_5_1_1 AS/59D/22/25156
24-02-2023
2711-01-103-99-00-34-3 2,53,000 2,30,000
197
Saltwater prevention 2022 23 Construction of Temporary bund across Meenachil River Kallumada branch to prevent salt water intrusion near Kallumada Bridge in Kottayam District
IRR/IA/EST/9084/2022_5_1_1 AS/59D/22/25155
24-02-2023
2711-01-103-99-00-34-3 6,80,000 6,80,000
198
GENERAL-Sreekrishnamugham Temple-ASE Urgent protection works to construct Rubble mount wall for a length of 100m south of CP1235 and towards south in SN Puram Panchayat in Kodungallur Taluk.-General Civil Work
IRR/IA/EST/8804/2022_5_1_1 AS/59D/22/25374
13-03-2023
2711-02-103-99-34-3 35,60,000 35,60,000
199
GENERAL-MI PRIORITY-Improving Irrigation Facilities and Rectification of Leading channel from Pallickal dam to Virippoly Ela in Sooranandu North Panchayath-General Civil Work
IRR/IA/EST/5506/2022_5_1_1 AS/59D/22/25865
28-03-2023
4702-00-101-84-01-00-00 15,00,000 15,00,000

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PyIP Annual maintenance of Project Circle Office at Kannur ,Section office and pump house at koodali, IB at Parassinikkadavu and abolished building at Kannapuram
2016/241/P1 PYIPDKr/2016/241/P1

17-03-2017
2700-12-00-00(00) 15,00,000 15,00,000
2
PyIP- Repairs to Naniyoor Aqueduct at chainage 41/400km
2016/269/P1 PYIPDKr/2016/269/P1

03-03-2017
2700-12-00-00(00) 10,00,000 10,00,000
3
PyIP - Repairing the pump house at Parassinikkadavu IB for the year 2014-15
00 D1 PYIP/AP/379/14
21-03-2015
2700-12-00-00(00) 1,00,000 1,00,000
4
Flood damage 2018- Urgent rectification of canal breach near Ch 6/800 of Chala distributory of Edakkad Branch Canal at Chala for the year 2018- 19
2018/775/P1 PyIPDKr/2018/775/P1

18-01-2019
2700-12-00-00(00) 1,00,000 1,00,000
5
PyIP- Rejuvenation of main canal between Ch 3/400 and Ch 4/000 km. - clearing jungle and desiltation for the year 2018-19
2018/480/P1 PyIPDkr/2018/480/P1

23-01-2019
2700-12-101-98-00-18-00 6,85,000 6,85,000
6
PyIP-Maintenance of pazhassi quarters and project house at thana for the year 2016-2017
2018/13/p1 PyIPDKr/2017/13/p1
15-03-2017
2700-12-00-00(00) 7,98,000 7,98,000
7
KPIP-Annual maintenance-LBMC-Removal of all obstructions and providing arrangements for ensuring smooth water distribution in LBMC and its distributories bet.Ch:23/000km to 33/000 kmfor the year 2016-17
2016/139/P1 ORDER No. KPIPDKa/2
016/139/P1
17-11-2016
2700-18-00-00(00) 1,50,000 1,50,000
8
Purchase of T & P automatic levelling instrument
2018/950/IA CPDEmlm/2018/950/IA

21-03-2018
2701-20-101-98-00-18 50,000 50,000
9
PyIP-Urgent repairs to main canal in between ch.16/043km and 16/150km for the year 2017-18
2018/119/P1 PYIPDKr/2018/119/P1

31-03-2018
2700-12-101-98-00-18-00 20,00,000 20,00,000
10
Urgent rectification works to the head regulator shutter of Chulannur branch canal at 19/950Km and cross regulator shutter of main canal at Manamkulambu at ch 20/200 Km of LBMC
2018/47/MH IMDmpa/2018/47/MH
23-01-2019
2700-02-00-00(00) 8,00,000 8,00,000
11
Flood 2018 & 2019 - Renovation of shutters and hoisting mechanisms of Thrithala regulator (Mechanical works).
G&P2/325/18/WRD

09-10-2019
2701-20-101-98-00-18 1,35,00,000 1,35,00,000
12
Cheramangalam -Replacement of canal shutters by providing new screw gear shutter and its hoisting mechanism
:2019/328/MH IMDmpa/2019/328/MH
31-03-2020
2701-17-00-00(00) 3,50,000 3,50,000
13
MP-LBC-Fabrication, painting and erection of SS C-groove, MS shutters and hoisting mechanism at CH 00/000 Kuthanur offtake (1no shutter) and CH 00/000 Erimayoor offtake (2nos shutters)
2020/58/MH IMDmpa/2020/58/MH
24-07-2020
2700-02-00-00(00) 10,00,000 10,00,000
14
MP-RBC-Fabrication, painting and erection of SS C grooves and MS shutter & its hoisting mechanism of surplus shutter at CH 13-560 and maintenance of MS shutter at CH 13-940 in RBMC Dhoni farm
2020/60/MH IMDmpa/2020/60/MH
21-07-2020
2700-02-00-00(00) 4,57,000 4,53,000
15
MP-RBC-Sluice shutters repairing in RB main canal b/w Ch 20/000 km to 32/000 km and its branch canal including surplus shutter at Ch 20/100 km
2020/84/MH IMDmpa/2020/84/MH
03-09-2020
2700-02-00-00(00) 2,50,000 2,50,000
16
CPP-Urgent maintenance of CPP Colony and Quarters buildings for the year 2019-2020
2019/1749/P1 IDCr/2019/1749/P1
21-12-2019
2700-17-101-98-00-18-00 15,00,000 15,00,000
17
CPP -Urgent Reconstruction of damaged road towards Quarters C11 to D8 inside the CPP Colony for the year 2018-19
2019/23/P1 IDCr/2019/23/P1
15-02-2019
2700-17-101-98-00-18-00 5,00,000 5,00,000
18
KyIP-ACP 2Ol7-18- Annual mtce of Nadakkuthazha Dty from ch.3 /IOO to 4/6O0 and Puthuppanam sub dty from ch.1/000 to tail end.including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc
2017/317/P1 KYIPDPa/2017/317/P1

14-09-2017
1,50,000 1,50,000
19
KYIP ACP 2019-20 Annual Maintenance of Iringal branch canal between Ch 0/000 and 3/000 km and Kodakkad Distributory
2019/1525/P1 KYIPDPa/2019/1525/P
1
22-01-2020
2700-13-101-98-00-18-00 3,00,000 3,00,000
20
KYIP ACP(NP) 2019-20 Annual Maintenance of Nadakkuthazha Distributory from Ch 3/100 to 4/600 km and Puduppanam Sub Distributory from Ch 1/000 to tail end
2019/1523/P1 KYIPDPa/2019/1523/P
1
22-01-2020
2700-13-101-98-00-18-00 2,00,000 2,00,000
21
KYIP ACP(NP) 2019_20 Removal of Slipped Earth and Maintenance of Iringal branch Canal from Ch 16/750 km to 19/320 km
2019/2361/P1 KYIPDPa/2019/2361/P
1
22-01-2020
2700-13-101-98-00-18-00 2,00,000 2,00,000
22
KYIP ACP (NP)2019-20 Annual Maintenance of Iringal branch canal between Ch 3/000 and 5/800 km and Vellarakkad Distributory between Ch 0/000 and 1/000 km
2019/1524/P1 KYIPDPa/2019/1524/P
1
22-01-2020
2700-13-101-98-00-18-00 30,000 3,00,000
23
KyIP Flood damage 2018 - Removal of Slipped Earth and Strengthening of Super passage Under Tunnel etc between ch 20-000 and 23-500 KM of Right Bank Main Canal - 4 No UT and 3 Nos SP
2018/1153/P1 KYIPDPa/2018/1153/P
1
16-01-2019
7,75,000 7,75,000
24
KYIP-ACP(NP)-2019-20- Surveying and erecting boundary stone from ch 3/000 km to 5/170 km of Chorode distributary.
2020/325/P1 KYIPDPa/2020/325/P1

24-03-2020
2700-13-101-98-00-18-00 25,000 25,000
25
KyIP - ACP - 2018 -19 - Emergency work - Urgent Reformation of the breached RBMC at ch 27/600KM in Nadapuram and Purameri Panchayat of Nadapuram LA
2018/366/P1 KYIPDPa/2018/366/P1

10-08-2018
3,00,000 3,00,000
26
KyIP Flood damage 2018 - Removal of Dipped Earth and Strengthening of Super Passage , Under Tunnel etc between Ch 2/900 to 3/300km of Maniyur Branch Canal.
2018/1260/P1 KYIPDPa/2018/1260/P
1
05-12-2018
5,00,000 5,00,000
27
KyIP Flood damage 2018 - Removal of Dipped Earth and Strengthening of Super Passage , Under Tunnel etc between Ch 1/500 to 2/500km of Maniyur Branch Canal.
2018/1250/P1 KYIPDPa/2018/1250/P
1
05-12-2018
5,00,000 5,00,000
28
KyIP Flood damage 2018 - Removal of Dipped Earth and Strengthening of Super Passage , Under Tunnel etc between Ch 3/500 to 5/000km of Maniyur Branch Canal.
2018/1278/P1 KYIPDPa/2018/1278/P
1
05-12-2018
5,00,000 5,00,000
29
KyIP Flood damage 2018 - Removal of Dipped Earth and Strengthening of Super Passage , Under Tunnel etc between Ch 6/400 to 6/700km of Maniyur Branch Canal.
2018/1287/P1 KYIPDPa/2018/1287/P
1
06-12-2018
5,00,000 5,00,000
30
KyIP Flood damages 2018 Rectification works to Puduppanam sub Distributary Canal and Removal of silt from cut and cover.
2018/1047/P1 KYIPDPa/2018/1047/P
1
06-12-2018
3,50,000 3,50,000
31
KyIP ACP 2018-19 - Annual mtce of Iringal branch canal bet ch 3/000 km to 5/800km and Vellarakkad Dty from ch0/000 to 1/1100 km.
2018/1007/P1 KYIPDPa/2018/1007/P
1
04-12-2018
2,85,000 2,85,000
32
KyIP ACP 2018-19 - Annual mtce of Nadakkuthazha Dty from ch.3 /100 to 4/600 and Puthuppanam sub dty from ch.1/000 to tail end.
2018/1036/P1 KYIPDPa/2018/1036/P
1
05-12-2018
2,10,000 2,10,000
33
KyIP-ACP 2Ol7-18- Rectilication works to Canal at mouth of Chemmarathoor Dty and providing shutter at ch.4/200 km of Maniyur branch canal in Villiappally Panchayath including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc
2017/352/P1 KYIPDPa/2017/352/P1

01-11-2017
3,00,000 3,00,000
34
KyIP-ACP 2Ol7-18- Annual mtce of Iringal branch canal bet ch.3/53o km to 5/8OO and Vellarakkad Dty from ch.O/OOO to l /1OO km of Koyilandy Municipality including repairs of shutter, painting and lettering of scale, KM, HMstones, name boards etc.
2017/311/P1 KYIPDPa/2017/311/P1

12-09-2017
2,00,000 2,00,000
35
KyIP-ACP 2Ol7-18- Annual mtce of Iringal Branch Canal between ch.0/O0 Km and 3/OO0km, and Kodakkad Dty in Koyilandy Municipality including repairs of shutter, painting and lettering of scale, KM, HM stones name boards etc.
2017/310/P1 KYIPDPa/2017/310/P1

12-09-2017
2,00,000 2,00,000
36
KyIP-ACP 2077-18- Annual Mtce of IBC from ch 16/150 to 19/32O km in Payyoli Municipality including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc.
2017/336/p1 KYIPDPa/2017/336/P1

08-11-2017
1,50,000 1,50,000
37
KyIP-ACP 2Ol7-18- Rectification works between ch. 0/00O km and 0/ 1OO km of MBC including repairs to siphon in Villiappaliy panchayath including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc
2017/340/P1 KYIPDPa/2017/340/P1

20-09-2017
3,00,000 3,00,000
38
KyIP-ACP 2Ol7-18- Annual Mtce of Kizhur Dty , Kannan Kulam Dty and Iringal FB including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc.
2017/337/P1 KYIPDPa/2017/337/P1

15-10-2017
1,50,000 1,50,000
39
KyIP- ACP 2017-18 Urgent Rectification work to the breached portion between Ch 3/300 and 3/530km of Iringal branch canal including repairs of shutter, painting and lettering of scale, KM,HM stones, name boards etc.
2017/303/P1 KYIPDPa/2017/303/P1

15-09-2017
15,00,000 15,00,000
40
KyIP-ACP 2OI7-18- Rectification works for preventing leakage between ch 4/900 km and syphon of Iringal branch canal in Koyilandy Municipality including repairs of shutter, painting and lettering of scale, KM, HM stones, name boards etc.
2017/301/P1 KYIPDPa/2017/301/P1

15-09-2017
15,00,000 15,00,000
41
Kyip-ACP(NP)-2020-21 Urgent repair works to Water supply lines in Peruvannamuzhi Dam premise.
2020/1212/P1 KYIPDPa/2020/1212/P
1
29-10-2020
2700-13-101-98-00-18-00 3,00,000 3,00,000
42
GPS I - Engaging DLR Labour For Removing Debris And Floating Material From Canal During Water Distribution And Rainy Season From LB Main Canal Between Ch 0/000 To 10/000, Parakkalchalla, Pappanchalla, Kambrathchalla, Pothampadam, Kallukettichalla Canal And Poonthonichalla Canal
2020/758/P1 ORDER No IDCr/2020/
758/P1, Reg No 146/2020-21
29-09-2020
2700-05-101-98-00-18-00 75,000 75,000
43
GPS I - Annual Maintenance Of LB Main Canal Between Ch 5/000 Km To 10/000 Km For The Year 2020-2021
2020/756/P1 ORDER No. IDCr/2020
/756/P1, Reg No 144/2020-21
29-09-2020
2700-05-101-98-00-18-00 2,50,000 2,50,000
44
CPP-MLIS- Annual maintenance for the year 2019-20-Clearing jungle and silt removal of Manakkadavu, Kaikatty, Sarkarpathy, Karupputhuraikkadu branch canals and Ellakkadu distributory
EST NO: 2019/1943/P1 IDCr/2019/1943/P1
16-10-2019
2700-17-101-98-00-18-00 2,00,000 2,00,000
45
CPP-MLIS- Annual maintanence for the year 2019-20 -Emergency works in the canals, Pump houses, Transformers and labour engaging for removing obstructions in the canals during water distribution
EST NO: 2019/1949/P1 IDCr/2019/1949/P1
25-10-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
46
CPP-MLIS- Annual maintenance for the year 2019-20 -Clearing jungle and removing silt for Main Canal
EST NO:2019/1944/P1 IDCr/2019/1944/P1
03-10-2019
2700-17-101-98-00-18-00 1,50,000 1,50,000
47
GPS I - Annual Maintenance Of LB Main Canal Between Ch 0/000 Km To 5/000 Km For The Year 2020-2021
2020/755/P1 ORDER No. IDCr/2020
/755/P1, Reg No 145/2020-21
29-09-2020
2700-05-101-98-00-18-00 2,50,000 2,50,000
48
CPP -MLBC - General upkeep of canals during water distribution for the canals under Irrigation Subdivision No.II, Chittur for the year 2018-19
EST NO: 2019/89/P1 IDCr/2019/89/P1
19-01-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
49
GPS I - Annual maintenance of Meenkara-Chulliyar Feeder Canal From Ch 0/000 Km To Ch 4/200 Km For The Year 2020-21
2020/751/P1 ORDER No. IDCr/2020
/751/P1, Reg No 47/2020-21
20-08-2020
2700-05-101-98-00-18-00 2,50,000 2,50,000
50
GPS-1-RBC- Urgent rectification works to Koduvayur distributory between ch.0/000km to 0/120 km
2018/1388/P1 IDCr/2018/1388/P1
31-01-2019
2700-05-101-98-00-18-00 5,50,000 5,50,000
51
GPS 1-RBC-2019- Annual maintenance of RBC section office building & Construction of Compound wall at Oottara, Kollengode
2019/1594/P1 IDCr/2019/1594/P1
03-10-2019
2700-05-101-98-00-18-00 4,70,000 4,70,000
52
KyIP ACP 2019-2020 (NP)-Clearing of jungle in the premises of main dam
2019/205/p1 KyIPDPa/205/p1
06-12-2019
2700-13-101-98-00-18-00 3,00,000 3,00,000
53
CPP-TMS Urgent rectification of the danmaged Culvert at Ch -7/500km of Nallepilly branch canal
2018/848/P1 IDCr/2018/848/P1
22-01-2019
2700-17-101-98-00-18-00 2,00,000 2,00,000
54
KyIP FLOOD ACP 2018 19 Rectification works for canal at ch 1/300 km and 1/600 km of LBMC and 3/100 km of RBMC
2018/1049/p1 kYipdpA/2018/1049/P
1
10-12-2018
2700-13-101-98-00-18-00 3,00,000 3,00,000
55
CPP- TMS - Annual Maintenance Of TMS Main Canal Between Ch. 0/000 To 5/500 Km For The Year 2020 - 2021
2020/1022/P1 IDCr/2020/1022/P1
06-10-2020
2700-17-101-98-00-18-00 4,00,000 4,00,000
56
CPP - TMS Engaging Labour For Removing Obstructions During Water Distribution - 1/1 Section Main Canals And Branch Canals For The Year 2020-21
2020/1431/P1 IDCr/2020/1431/P1
12-10-2020
2700-17-101-98-00-18-00 1,50,000 1,50,000
57
CPP - TMS Reconstruction Of Pipe Culvert In The Road Cross Of Field Channel From Pothady Branch Canal For The Year 2020 - 2021
2020/4/P1 IDCr/2020/4/P1
05-10-2020
2700-17-101-98-00-18-00 2,50,000 2,50,000
58
CPP - TMS - Maintaining Of The Canals Under 1/1 Section For The Year 2020 - 2021
2020/1432/P1 IDCr/2020/1432/P1
12-10-2020
2700-17-101-98-00-18-00 75,000 75,000
59
KyIP - ACP (NP)-2019-20- Clearing jungle and Desilting of high cut area between Ch. 20/075 km to 20/300 km of KBC and between ch. 1/300 and 1/470 km of Cheekilode distributory.
2019/1531/P1 KYIPDPa/2019/1531/P
1
28-01-2020
2700-13-101-98-00-18-00 3,00,000 3,00,000
60
CPP-TMS- Providing protection works to Themparamadakku main canal off-take shutter arrangements for the year 2020-21
2020/1610/P1 IDCr/2020/1610/P1
12-12-2020
2700-17-101-98-00-18-00 3,70,000 3,70,000
61
CPP-TMS-Rectification works of damaged culvert in sluice no.36 (RHS) of Pothady branch canal
2020/1594/P1 IDCr/2020/1594/P1
08-12-2020
2700-17-101-98-00-18-00 1,50,000 1,50,000
62
CPP-TMS- Urgent rectification works to the damaged canal portion of Pothady branch canal between Ch 6/000Km and 6/200Km.
2020/1602/P1 IDCr/2020/1602/P1
12-12-2020
2700-17-101-98-00-18-00 4,00,000 4,00,000
63
KyIP - ACP -2018-19- Annual maintenance of Mokavoor sub distributary from ch. 0/000 km to 4/000 km
2019/13/P1 KYIPDPa/2019/13/P1
08-03-2019
2700-13-101-98-00-18-00 4,50,000 4,50,000
64
CPP-TMS-Annual maintenance of Thembaramadakku Main canal between Ch.5/500 KM and 9/600 KM
2019/2105/P1 IDCr/2019/2105/P1
05-10-2019
2700-17-101-98-00-18-00 2,20,000 2,20,000
65
CPP-TMS-Annual maintanance of Vakkode branch canal, College distributory canal,Mayamkulam distributory and Karukamani distributory canal for the year 2019-20.
2019/1974/P1 IDCr/2019/1974/P1
05-10-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
66
CPP-TMS-Engaging man mazdoor DLR labour for removing weeds and other obstructions(blocking materials, debris, fallen down trees etc.) Clearing the blocked culverts, closing leakage of water through shutter portion during water distribution etc. complete for Bazar distributory canal.
2019/2064/P1 IDCr/2019/2064/P1
05-10-2019
2700-17-101-98-00-18-00 1,80,000 1,80,000
67
CPP-TMS-Rectification works to the damages of Punnakode branch canal between Ch.0/300 KM and 0/400 KM
2019/2106/P1 IDCr/2019/2106/P1
05-10-2019
2700-17-101-98-00-18-00 8,00,000 8,00,000
68
CPP-TMS-Annual maintenance of TMS- main canal between Ch. 5/500 to 9/600 Km for the year 2020-21
2020/1345/P1 IDCr/2020/1345/P1
05-10-2020
2700-17-101-98-00-18-00 3,00,000 3,00,000
69
CPP-TMS-Annual maintenance of Vakkod branch, college distributory, Mayankulam, Muthukad, Karukamani for the year 2020-21
2020/1347/P1 IDCr/2020/1347/P1
05-10-2020
2700-17-101-98-00-18-00 3,00,000 3,00,000
70
CPP-TMS- Engaging labour for removing obstruction during water distribution 2/1 section main canals and branch canals for the year 20-21
2020/1348/P1 IDCr/2020/1348/P1
06-10-2020
2700-17-101-98-00-18-00 1,50,000 1,50,000
71
CPP-TMS- Urgent rectification works to Vakkode branch canal between ch.2/300 to 2/700 for the year 20-21
2020/1427/P1 IDCr/2020/1427/P1
12-10-2020
2700-17-101-98-00-18-00 2,00,000 2,00,000
72
CPP-TMS maintaining of the canals under 2/1 section for the year 20-21
2020/1429/P1 IDCr/2020/1429/P1
12-10-2020
2700-17-101-98-00-18-00 75,000 75,000
73
CPP-TMS urgent rectification works to Thernapallam branch canal between ch.1/080 km to 1/110 km for the year 20-21
2020/1486/P1 IDCr/2020/1486/P1
27-10-2020
2700-17-101-98-00-18-00 1,00,000 1,00,000
74
providing shutter to sluices in Thernapallam, vakkode, punnakkode, panayur and polpully branch canal for the year 20-21
2020/1601/P1 IDCr/2020/1601/P1
12-12-2020
2700-17-101-98-00-18-00 3,00,000 3,00,000
75
CPP-TMS- Engaging DLR labour removing debris and floating materials from bazar distributory canal during water distribution and rainy season for the year 20-21
2020/1349/P1 IDCr/2020/1349/P1
05-10-2020
2700-17-101-98-00-18-00 1,00,000 1,00,000
76
CPP-TMS- Rectification works to the damaged toe wall portion of Vakkode branch canal near Shanmugham cause way
2020/1488/P1 IDCr/2020/1488/P1
02-11-2020
2700-17-101-98-00-18-00 1,00,000 1,00,000
77
CPP-TMS- Urgent rectification works to the damaged Sluice portion at Ch.6/400Km of Themparamadakku main canal.
2020/1489/P1 IDCr/2020/1489/P1
02-11-2020
2700-17-101-98-00-18-00 1,00,000 1,00,000
78
CPP-TMS. Urgent rectification works to the damaged Sluice portion of Kaippakkode distributory canal at Ch.0/585Km.
2020/1487/P1 IDCr/2020/1487/P1
02-11-2020
2700-17-101-98-00-18-00 2,70,000 2,70,000
79
CPP-TMS- Annual maintenance of Vadakarapally and Chenamooli for the year 2020-21
2020/1471/P1 IDCr/2020/1471/P1
19-10-2020
2700-17-101-98-00-18-00 1,00,000 1,00,000
80
KPIP Annual maintanance LBMC removal of all obstructions and providing arrangements for ensuring smooth water distribution in LBMC and its distributaries between ch 2/500 km to 10/940 km for the year 2016- 2017
2016/166/P1 KPIPDKa/2016/166/P1

17-11-2016
2700-18-00-00(00) 2,00,000 2,00,000
81
MP LBC Maintenance of shutters at Thassrack, Kottekkad 1,2, Puthur, Kinasseri and Edathara branches, Direct sluices in main canal and Kodumthirappully regulator - Phase - 2
2018/45/MH IMDmpa/2018/45/MH
23-01-2019
2700-02-101-98-00-18-00 10,00,000 10,00,000
82
MP RBC Urgent rectification to Surplus Escape shutter sluice in main canal ch 13/500 Km
2017/97/MH IMDmpa/2017/97/MH
25-09-2018
2700-02-101-98-00-18-00 2,60,000 2,60,000
83
CPP-MRBC-Annual maintenance of Angarath canal
2020/451/P1 IDCr/2020/451/P1
08-10-2020
2700-25-101-98-00-18-00 4,00,000 4,00,000
84
CPP-MRBC- Annual maintenance of Valiyavallampathy branch canal
2020/455/P1 IDCr/2020/455/P1
18-08-2020
2700-17-101-98-00-18-00 2,00,000 2,00,000
85
CPP-MRBC- Annual maintenance of Kozhinjampara branch and Parumanchalla branch canal
2020/454/P1 IDCr/2020/454/P1
18-08-2020
2700-25-101-98-00-18-00 1,90,000 1,90,000
86
CPP-MRBC- Annual maintenance of RB main canal between ch 10/100km and 15/957km.
2020/456/P1 IDCr/2020/456/P1
18-08-2020
2700-17-101-98-00-18-00 3,50,000 3,50,000
87
CPP-MRBC- Upkeeping of Kozhinjampara branch , Parumanchalla branch, Valiyavallampathy branch and Angarath canal during water distribution for the year 2020-2021.
2020/452/P1 IDCr/2020/452/P1
18-08-2020
2700-25-101-98-00-18-00 1,80,000 1,80,000
88
CPP-MRBC- Upkeeping of RB Main canal from Ch 10/100- 15/957km during water distribution for the year 2020-2021.
2020/453/P1 IDCr/2020/453/P1
18-08-2020
2700-25-101-98-00-18-00 2,00,000 2,00,000
89
CPP-MRBC-Upkeeping of RB Main canal from Ch 10/100-15/957 km during water distribution for the year 2019 - 2020
2019/2163/P1 IDCr/2019/2163/P1
10-10-2019
2700-25-101-98-00-18-00 17,50,000 1,75,000
90
CPP-MRBC-Upkeeping of Kozhinjampara branch ,Paruammanchalla branch and Angarath canal during water distribution for the year 2019 - 2020
2019/2164/P1 IDCr/2019/2164/P1
10-10-2019
2700-25-101-98-00-18-00 1,50,000 1,50,000
91
CPP- MRBC - Increasing the height of side wall of Kozhinjampara branch canal near Ch 12/400 km of MRBC ( balance length )
2019/2133/P1 IDCr/2019/2133/P1
21-10-2019
2700-25-101-98-00-18-00 2,50,000 2,50,000
92
CPP-MRBC-Clearing jungle and silt removal from RB main canal between ch 10/100km and 15/957km
2019/2162/P1 IDCr/2019/2162/P1
10-10-2019
2700-25-101-98-00-18-00 2,50,000 2,50,000
93
CPP-MRBC-Clearing jungle and silt removal from Kozhinjmapara branch canal between Ch 12/075Km and 14/575Km and parumanchalla branch canal from 0/000Km to 0/850Km
2019/1975/P1 IDCr/2019/1975/P1
10-10-2019
2700-17-101-98-00-18-00 1,50,000 1,50,000
94
CPP- MRBC - Rectification to shutter supplying water to ISD Check dam from Angarath canal
2019/2165/P1 IDCr/2019/2165/P1
27-12-2019
2700-17-101-98-00-18-00 1,50,000 1,50,000
95
CPP-MRBC-Urgent rectification to drop and side wall between 12/600 km and 12/800km of Kozhinjmapara branch canal
2018/1364/P1 IDCr/2018/1364/P1
11-01-2019
2700-17-101-98-00-18-00 2,97,000 2,97,000
96
CPP-MRBC_Urgent rectification to main canal between 10/300km and 10/400km
2018/1355/P1 .IDCr/2018/1355/P1
11-01-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
97
Urgent rectification to drop near Ch 12/350km(neelmakachi drop) of Kozhinjmapara branch canal.
2018/1358/P1 IDCr/2018/1358/P1
11-01-2019
2700-17-101-98-00-18-00 1,60,000 1,60,000
98
CPP-MRBC-Rectification to breached portion of Angarath canal near Karimann
2018/1347/P1 IDCr/2018/1347/P1
14-01-2019
2700-25-00-00(00) 3,00,000 3,00,000
99
CPP-MRBC-Rectification to Kozhinjampara branch canal near Ch 14/500km
2018/1352/P1 IDCr/2018/1352/P1
11-01-2019
2700-25-00-00(00) 1,75,000 1,75,000
100
CPP-MRBC-Extension of MRBC from Korayar to Varatayar-Planting and painting boundry stone along canal alignment
2018/191/P1 IDCr/2018/191/P1
07-05-2018
2700-25-00-00(00) 2,00,000 2,00,000
101
CPP-Nurnee Sysytem- Removing floating bodies and weeds in Nurnee main canal and Vilayodi branch canal for the year 2020-21
2020/1354/P1 IDCr/2020/1354/P1
13-10-2020
2700-17-101-98-00-18-00 40,000 40,000
102
CPP-Nurnee System-Annual maintenance of Vilayodi branch canal.
2019/1694/P1 IDCr/2019/1694/P1
30-09-2019
2700-17-101-98-00-18-00 1,50,000 1,50,000
103
CPP-Nurnee Sysytem- Removing floating bodies and weeds in Nurnee main canal and Vilayodi branch canal during water distribution
2019/1714/P1 IDCr/2019/1714/P1
30-09-2019
2700-17-101-98-00-18-00 40,000 40,000
104
CPP-Nurnee System-Urgent Rectification of right bund of the main canal near ch.0/850km to ch.0/900km.
2018/606/P1 IDCr/2018/606/P1
23-01-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
105
CPP-Nurnee Sysytem- Removing floating bodies,weeds and blocks from Nurnee main and branch canals during water distribution for the year 2018-19
2018/1372/P1 IDCr/2018/1372/P1
23-01-2019
2700-17-101-98-00-18-00 25,000 25,000
106
CPP-Nurnee System- Urgent Rectification of right bund of the main canal near ch.2/000km to 2/250 km.
2018/607/P1 IDCr/2018/607/P1
23-01-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
107
CPP-Nurnee system Urgent Rectification of bund of the main canal near ch.6/700 km
2018/608/P1 IDCr/2018/608/P1
19-01-2019
2700-17-101-98-00-18-00 3,00,000 3,00,000
108
CPP-KKPS- Engaging labours for Removing of floating bodies, weeds and blocks from Kunnamkattupathy main canal and various branch canals for the year 2020-2021
2020/805/P1 ORDER No. IDCr/2020
/805/P1
12-10-2020
2700-17-101-98-00-18-00 1,75,000 1,75,000
109
KPIP-AM-LBMC-Removal of all obstructions and arrangements for ensuring smooth water distribution in LBMC and its distributaries btw ch 2/500km to 10/940 km for the year 2016-17
45/2016-17
17-11-2016
2700-18-00-00(00) 2,00,000 2,00,000
110
KPIP-AM-Removal of silt and other obstruction from LBMC between ch 32/400km to 33/000km for the year 2014-15
10/AEE/KA/14-15
22-01-2015
2700-18-00-00(00) 1,00,000 1,00,000
111
KPIP-AM-Construction of drain for arresting leakage between ch 23/600 km and 23/700 km of right bund of LBMC
09/AEE/KA/15-16
25-09-2015
2700-18-00-00(00) 2,92,632 2,92,632
112
SDRF-MP-RBC-Urgent repair work to kavilpad branch canal ch2/600km to 2/700km.(Nadakkave railway gate)
2020/1475/P1 IDMa/2020/1475/P1
02-11-2020
2700-02-101-98-00-18-00 7,00,000 7,00,000
113
KPIP-AM-LEAK PROOFING WORKS OF KARUMANAMKURISSI DISTRIBUTARY BETWEEN CH.5/600 KM TO 5/750 KM INCLUDING CANAL BUND RISING TO PREVENTING OVER FLOW OF CANAL.
KPIPDKa/2020/306/P1

25-03-2020
2700-18-101-98-00-18-00 3,50,000 3,50,000
114
KPIP-AM-Rectification works to Kulakad distributary between Ch.0/000 km and at tail end for the year 2018-2019
KPIPDKa/2018/1121/P
1
19-11-2018
2700-18-00-00(00) 3,30,000 3,30,000
115
KPIP-AM-Leak proofing works to the Vellinezhy distributary between Ch.1/000 km to 3/000 km of Vellinezhi grama panchayath for the year 2018-19
KPIPDKa/2018/1090/P
1
19-11-2018
2700-18-00-00(00) 4,00,000 4,00,000
116
KPIP-AM-Rectification works to Karumanamkurissi distributary between ch.1/500 to 4/000km in Vellinezhi Panchayath for the year 2018-19.
KPIPDKa/2018/1087/P
1
03-12-2018
2700-18-101-98-00-18-00 6,30,000 6,30,000
117
KPIP-AM-Emergency works-Re-construction of damaged side wall of UT at LBMC ch.40/800 at Pookkottukavu Grama Panchayath for the year 2018-19
KPIPDKa/2018/1192/P
1
02-02-2019
2700-18-101-98-00-18-00 1,87,000 1,87,000
118
KPIP-AM-Removal of slipped earth floating bodies ,clearing of blocked culverts putting up ring bunds,closing leakages and trenches using earth filled bags and engaging labours for ensuring smooth water distribution through LBMC b/w ch.33/000 to 42/000 km and its distributaries for the year 2018-19.
KPIPDKa/2018/1095/P
1
19-11-2018
2700-18-101-98-00-18-00 2,50,000 2,50,000
119
KPIP-AM- Improvement works to Kulapully distributary from ch 2/500km to 3/000km and canal restoration from ch 5/000 to 9/000km for the year 2018-19
2018/1061/P1 KPIPDKa/2018/1061/P
1
03-12-2018
2700-18-101-98-00-18-00 7,25,000 7,25,000
120
KPIP-AM-Leak proofing works to Kailiyad south distributary from ch 3/000km to 4/000km and Kuruvatoor distributary from ch 2/000km to 3/000km of Chalavara Gramma Panchayath for the year 2018-19
2018/1062/P1 KPIPDKa/2018/1062/P
1
19-11-2018
2700-18-101-98-00-18-00 1,50,000 1,50,000
121
KPIP-Annual maintenance -Leak proofing works in LBMC b/w ch.33/400 to 33/500 km in Vellinezhi Grama Panchayath for the year 2017-18.
KPIPDKa/2017/633/P1

05-12-2017
2700-18-101-98-00-18-00 2,00,000 2,00,000
122
KPIP-AM-Removal slipped earth, floating bodies, clearing of blocked culverts, putting up ring bund closing leakages and breaches using earth filled bags and engaging labour for ensuring smooth water distribution through LBMC between ch 52/000to Ch 61/700 and its distributaries for the year 2018-19
2018/1060/P1 KPIPDKa/2018/1060/P
1
19-11-2018
2700-18-101-98-00-18-00 2,50,000 2,50,000
123
K P I P 2017-18 Urgent Temporary rectification work at breached portion of L B M C between ch 58/000 to 60/000 km and to Kulapully distributory between ch 4/000 to 5/000 km
2018/48/P1 KPIPDKa/2018/48/P1
12-02-2018
2700-18-101-98-00-18-00 1,00,000 1,00,000
124
KPIP-Annual Maintenance -Leak proofing work in LBMC b/w ch.40/800 to 41/000 km in Pookkottukavu Grama Panchayath.
KPIPDKa/2017/635/P1

04-12-2017
2700-18-101-98-00-18-00 2,00,000 2,00,000
125
MP-RBC-Urgent rectification works to Inspection Bunglow (Malampuzha House)
2020/204/P1 IDMa/2020/204/P1
31-03-2020
2700-02-101-98-00-18-00 5,00,000 5,00,000
126
KPIP Annual Maintenance of office building, jungle clearing, maintenance of plumbing works and other maintenance works of office and quarters compound of Cherpulassery section for the year 2017-18
2017/629/P1 KPIPDKa/2017/629/P1

05-12-2017
2700-18-101-98-00-18-00 1,00,000 1,00,000
127
KPIP Annual Maintenance -Removal of slipped earth,floating bodies,clearing of blocked culverts,putting up ring bund and closing leakages and breaches using earth filled bags and engaging laboures for ensuring smooth water distribution through LBMC Canals between ch 52/000 to 61/700 km and its dist
2017/625/P1 KPIPDKa/2017/625/P1

05-12-2017
2700-18-101-98-00-18-00 3,00,000 3,00,000
128
KPIP-Annual Maintenance -Removal of slipped earth -floating bodies engaging labors for the smooth water distribution of water through LBMC canal b/w ch.33/000 to 42/000 km and distributaries for the year 2017-18
KPIPDKa/2017/641/P1

04-12-2017
2700-18-101-98-00-18-00 3,00,000 3,00,000
129
KPIP - Annual Maintenance - Leak proofing works in Kulappully distributory between Ch 2500 to 4000 m in Chalavara Grama Panchayath
2017/614/P1 KPIPDKa/2017/614/P1

05-12-2017
2700-18-101-98-00-18-00 2,50,000 2,50,000
130
KPIP-AM-2017-18- Emergency works Urgent rectification works to Kuruvattoor and Mundanattukara distributaries
2018/175/P1 KPIPDKa/2018/175/P1

28-03-2018
2700-18-101-98-00-18-00 70,000 70,000
131
KPIP-Annual Maintenance -Removal of slipped earth floating bodies clearing of blocked culverts syphons putting of ring bunds closing leakages and breaches using earth filled bags and engaging coolies for ensuring smooth water distribution through KPIP and b/w ch.37/000 to 42/000 km of LBMC and its d
KPIPDKa/2016/115/P1

14-11-2016
2700-18-00-00(00) 2,50,000 2,50,000
132
KyIP ACP NP 2019 2020 Repair works tothe IB, canteen building and gate no 3 of KyIP
2019/1815/P1 KyIPDPa/2019/1815/P
1
29-03-2020
4,00,000 4,00,000
133
Cheramangalam Scheme-lmprovements of canal ch.13/100- 13/300 km of main canal
2018/1158/P1 IDMa 2018 1158 P
1
19-02-2019
2701-17-101-98-00-18-00 5,00,000 4,45,935
134
Cheramangalam Scheme-lmprovements of canal ch.12/300- 12/600 km of main canal
2018/1160/P1 IDMa 2018 1160 P
1
22-01-2019
2701-17-101-98-00-18-00 4,50,000 3,96,006
135
Cheramangalam scheme- urgent rectification of damaged spout at ch.12/390 km of mai canal
2018/46/P1 IDMa. 2018 .46 .
P1
26-02-2018
2701-17-101-98-00-18-00 4,30,000 4,30,000
136
Cheramangalam scheme Rectification and maintenance of Cheramangalam anicut and its compound
2018/60/P1 IDMa. 2018 .60 .
P1
14-03-2018
2701-17-00-00(00) 5,00,000 5,00,000
137
KPIP-AM-Removal of slipped earth,floating bodies and minor rectification works for ensuring smooth water distribution of Pallikurup distributory for the year 2018-19
2018/809/p1 KPIPDKa/2018/809/P1

19-11-2018
2700-18-00-00(00) 3,50,000 3,50,000
138
KPIP-Annual maintenance -Removal of slipped earth, floating bodies, clearing of blocked culverts, putting up ringbund and closing leakages and breaches using earth filled bags and engaging laboures for ensuring smooth water distribution through LBMC canal between chainage 42/000 to 52/000 km and
2017/644/P1 KPIPDKa/2017/644/P1

01-12-2017
2700-18-101-98-00-18-00 3,00,000 3,00,000
139
KPIP-Annual maintenance-Leak proofing works in Veeramangalam distributary between ch 1500 to 2500m in Thrikkadeeri Grama Panchayat.
2017/647/P1 KPIPDKa/2017/647/P1

05-12-2017
2700-18-101-98-00-18-00 2,00,000 2,00,000
140
KPIP- Annual maintenance-Raising canal side wall in Ottapalam distributary between ch. 800 to 1500m in Ananganadi Grama panchayat
2017/648/P1 KPIPDKa/2017/648/P1

05-12-2017
2700-18-101-98-00-18-00 2,00,000 2,00,000
141
KPIIP-Annual maintenance- Side protection work in Ottapalam distributory between ch 7000 to 7500 m in Ambalapara Grama panchayath
KPIPDKa/2017/646/P1

05-12-2017
2700-18-101-98-00-18-00 4,00,000 4,00,000
142
WP 2020 2021 Urgent rectification works to the breached portion of Thattan canal between ch .0/070 km to 0/100 km and the cross leading channel on the right bank of Thattan Anicut crossing the Thattan canal at ch 0/085 km including the damaged UT portion and outlet works
2020/1426/P1 IDCr/2020/1426/P1
04-02-2021
2700-03-101-98-00-18-00 23,00,000 23,00,000
143
Cheramangalam scheme-Improvements of canal bet. ch.3/500km and 3/700km of main canal.
2018/66/P1 IDMa. 2018 66 .P
1
22-03-2018
2701-17-101-98-00-18-00 6,50,000 6,50,000
144
Cheramangalam scheme-Urgent rectification of main canal bet.ch.0/000to0/300km
2018/65/P1 IDMa. 2018 65 .P
1
22-03-2018
2701-17-101-98-00-18-00 6,70,000 6,70,000
145
Cheramangalam Scheme Improvement of Erakulam branch canal tail end at ch.2/500 km
2018/67/P1 IDMa. 2018 67 .P
1
20-03-2018
2701-17-00-00(00) 5,50,000 5,50,000
146
KPIP AM RECTIFICATION WORKS FOR ARAKURISSY DISTRIBUTORY BETWEEN CH 3/0000 TO 4/000 KM AT PUNCHAKODE FOR THENKARA GP FOR THE YEAR 2018-19
2018/518/p1 KPIPDKa/2018/518/P1

18-11-2018
2700-18-00-00(00) 6,00,000 6,00,000
147
KPIP-AM-Rectification works for Arakkurussi distributory between Ch 0/800 to 0/900km for the year 2017-18.
2017/612/P1 KPIPDKa/2017/612/P1

27-11-2017
2700-18-00-00(00) 5,00,000 5,00,000
148
Mangalam Project - Improvement to the canal and closing leakage between Ch 0/150km to 0/250km of LBMC.
2018/144/P1 IDMa/2018/144/P1
22-03-2018
2700-04-101-98-00-18-00 6,00,000 6,00,000
149
Mangalam Project - Improvement to the canal and closing leakage between ch 1/050km to 1/120km of R.B.main canal including repairs to sluice no.ch 1/090km.
2018/94/P1 IDMa/2018/94/P1
26-03-2018
2700-04-101-98-00-18-00 6,60,000 6,60,000
150
Tourism Development Project Chamravattom Puzhayora Snehapatha at the right bank of Chamravattom RCB across Bharathapuzha (LAC-ADF) Electrical work
G.O.(Rt) No.183/201
5/WRD
11-03-2015
4700-80-800-89-00-00 30,00,000 30,00,000
151
Tourism development Project Chamravattom Puzhayora Snehapatha at Right bank of RCB at Chamravattom across Bharathapuzha (LAC-ADF) Phase II
G.O.(R.t)No.183/201
5/WRD
11-03-2015
4700-80-800-91(00) 3,00,00,000 41,50,000
152
MP - RBC-Annual Maintenance of M -Type Quarters at camp area
2020/1155/P1 Annual Maintenance
25-09-2020
2700-02-101-98-00-18-00 7,00,000 7,00,000
153
KyIP-ACP (NP) 2019-20 Re-writing of Letters to the existing name boards
2020/349/P1 KYIPDPa/2020/349/P1

28-03-2020
2700-13-101-98-00-18-00 1,00,000 1,00,000
154
KyIP Flood Damages 2018 Urgent rectification works between ch 0 /00 to 0 /200 km of FB starts from 18/825 Km of KBC
2018/1296/P1 KYIPDPa/2018/1296/P
1
09-12-2018
2700-13-101-98-00-18-00 2,00,000 2,00,000
155
KyIP-Flood damages-Desilting of High cut area of KBC Ch 20/075 km to 20/300 km
2018/1272/P1 KYIPDPa/2018/1272/P
1
09-12-2018
2700-13-101-98-00-18-00 1,00,000 1,00,000
156
KyIP-Flood damages de-silting of High cut area of KBC from Ch 7/650km to 7/750km, 7/900km to 8/000km
2018/840/P1 KYIPDPa/2018/840/P1

09-12-2018
2700-13-101-98-00-18-00 80,000 80,000
157
KyIP-Flood Damages 2018-Removal of sliped earth between Ch 1/300 and 1/400 Km of Cheekkilode distributary.
2018/1269/P1 KYIPDPa/2018/1269/P
1
09-12-2018
2700-13-101-98-00-18-00 3,00,000 3,00,000
158
KyIP Flood Damages 2018-Clearing UT s at ch 0/770, 2/080. 2/800 and syphon well at ch 2/200 Km of Narath distributary
2018/1310/P1 KYIPDPa/2018/1310/P
1
10-12-2018
2700-13-101-98-00-18-00 2,00,000 2,00,000
159
KyIP-Flood Damages 2018-Clearing UT s at ch 23/500, 23/600 and 23/700 Km of Kakkodi Branch Canal
2018/1309/P1 KYIPDPa/2018/1309/P
1
10-12-2018
2700-13-101-98-00-18-00 1,20,000 1,20,000
160
KyIP-Flood Damages-Removal of sliped earth between ch 2/400 and 2/500 km of Kakkodi BranchCanal
2018/1051/P1 KYIPDPa/2018/1051/P
1
26-12-2018
2700-13-101-98-00-18-00 95,000 95,000
161
KyIP-Flood damages 2018 Clearing Syphon wells at Ch 21/950 km of KBC (Edakkara Syphon) , Ch 1/000 km of Edakkara Distributory and Providing Shutters to Edakkara Distributory 0/000 km, at Ch 1/350 km for Edakkara FB and Patterpalam FB
2018/1267/P1 KYIPDPa/2018/1267/P
1
27-12-2018
2700-13-101-98-00-18-00 1,20,000 1,20,000
162
KyIP-Flood damages 2018 Rectification works to Kodassery Sub distributory between ch 1/915 and 2/125 km
2018/1306/P1 KYIPDPa/2018/1306/P
1
18-12-2018
2700-13-101-98-00-18-00 6,00,000 6,00,000
163
KyIP-Flood Damages 2018-Rectification works to Shutter at ch 23/250 km and Providing Shutters at ch 22/900 Km (U/S of kannankara Aqueduct)
2018/1328/P1 KYIPDPa/2018/1328/P
1
26-12-2018
2700-13-101-98-00-18-00 6,00,000 2,00,000
164
KyIP-Flood Damages 2018-Urgent rectification works to Kannankara Aqueduct
2018/1327/P1 KYIPDPa/2018/1327/P
1
13-12-2018
2700-13-101-98-00-18-00 4,00,000 4,00,000
165
KyIP-Maintenance of Cauvery House-Modifiction works to Suit rooms and allied works
2018/1239/P1 KYIPDPa/2018/1239/P
1
26-12-2018
2700-13-101-98-00-18-00 3,00,000 3,00,000
166
KyIP-Flood Damages 2018-Clearing UT s at ch 25/800 Km of Kakkodi Branch Canal
2018/1297/P1 KYIPDPa/2018/1297/P
1
21-12-2018
2700-13-101-98-00-18-00 70,000 70,000
167
KyIP-Flood Damages 2018-Rectification works between Ch 0/700 and 0/900 Km of Cheekkilode distributary.
2018/1268/P1 KYIPDPa/2018/1268/P
1
17-01-2019
2700-13-101-98-00-18-00 3,00,000 3,00,000
168
KyIPACP2O17 18 Rectification works to head wall and net at Ch 32600 KM of LBMC including repairs of shutterpainting and lettering of scale KMHM stonesname boards etc
2017/297/P1 KYIPDPa/2017/297/P1

08-11-2017
3,00,000 3,00,000
169
KyIP-ACP-2017-18 Silt removal at high cutting area between ch. 27/ 100 km and 27/550 km of LBMC including repairs of shutte painting and lettering of scale KMHM stone name boards etc
2017/314/P1 KYIPDPa/2017/314/P1

15-09-2017
2,30,000 2,30,000
170
KyIP-ACP 2Ol7- 18- Annual mtce of LBMC from ch. 38/450 krn 4O/O2O km including Naderi Dty from ch1/5OO km to 4/850 km including repairs of shutter painting and lettering of scale KM HM stones name bo
2017/313/P1 KYIPDPa/2017/313/P1

16-09-2017
3,00,000 3,00,000
171
KPIP-AM-Urgent rectification works to kuruvattoor distributary at ch. 1600 and at breached portion Ch 2600km.
KPIPDKa/2020/335/P1

24-03-2020
2700-18-101-98-00-18-00 1,81,000 1,81,000
172
GPS II Clearing jungle and Clearing silt from toe drain of masonry and earthen dam of chulliyar dam for the year 2020-2021
2020/960/P1 IDCr/2020/960/P1
29-09-2020
2700-05-101-98-00-18-00 1,00,000 1,00,000
173
GPS ll Annual maintenance of LB main canal between ch.10/000 to 15/000 km for the year 2020-2021
2020/948/P1 IDCr/2020/948/P1
09-10-2020
2700-05-101-98-00-18-00 1,50,000 1,50,000
174
GPS ll Annual maintenance of LB main canal between ch.15/000km to 20/581 km for the year 2020-2021
2020/949/P1 IDCr/2020/949/P1
09-10-2020
2700-05-101-98-00-18-00 2,50,000 2,50,000
175
GPS II Engaging DLR labour for removing obstructions, debris, floating material from LB main canal between ch-10/000km to ch-20/581km, Nandankizhaya, Kizhakkethara, Kollengode, Nenmeni, Vadakkemuri, Payyalore, Perungottukkavu and Karimkulam branch canal during water distribution and rainy season.
2020/1276/P1 IDCr/2020/1276/P1
29-09-2020
2700-05-101-98-00-18-00 75,000 75,000
176
GPS-II Construction Of Bore Well, Pump Set, Water Supply Arrangements At Chulliyar Dam Compound For The Year 2020-21.
2020/1517/P1 IDCr/2020/1517/P1
13-12-2020
2700-05-101-98-00-18-00 1,50,000 1,50,000
177
GPS II Clearing jungle and bushes at downstream and upstream of earthen dam and masonry dam of Chulliyar Dam for the year 2020-2021
2020/959/P1 IDCr/2020/959/P1
30-09-2020
2700-05-101-98-00-18-00 1,50,000 1,50,000
178
MP-Annual Maintenance of Buildings in the Camp Area for 2019-20
2020/327/P1 IDMa/2020/327/P1
30-03-2020
2700-02-101-98-00-18-00 50,000 50,000
179
GPS II Rectification works to the damaged well drop portion between Ch.0/700 km to 0/900 km of Kollengode branch canal for the year 2020-21
2020/899/P1 IDCr/2020/899/P1
28-09-2020
2700-05-101-98-00-18-00 5,50,000 5,50,000
180
Mangalam project - RB main canal improvement to the canal and closing leakage between 4/490 km to 4/550 km and repaires of sluice shutter
2019/83/P1 IDMa/2019/83/P1
22-01-2019
2700-04-101-98-00-18-00 5,00,000 5,00,000
181
GPS II - Construction of damaged canal portion at ch-5/500km to ch-5/600km of Kollengode branch canal Arivannurparambu
2020/1421/P1 IDCr/2020/1421/P1
22-10-2020
2700-05-101-98-00-18-00 5,75,000 5,75,000
182
GPS II Annual maintenance of Palakapandi diversion for the year 2020-2021
2020/957/P1 IDCr/2020/957/P1
29-09-2020
2700-05-101-98-00-18-00 30,000 3,00,000
183
GPS II - Improvement And Urgent Rectification Works Of Kollengode Branch Canal Between Ch-4/900 Km & Ch- 5/100 Km
2020/1562/P1 IDCr/2020/1562/P1
26-02-2021
2700-05-101-98-00-18-00 4,20,000 4,20,000
184
GPS II- Clearing jungle,removing silt and felling trees from the canals and canal bunds of LB main canal bet.Ch 16/000 km and 20/581 km for the year 2019 -2020
2019/2194/P1 IDCr/2019/2194/P1
04-10-2019
2700-05-101-98-00-18-00 1,50,000 1,50,000
185
GPS - II - Clearing jungle, removing silt and felling of trees from the canal and canal bund of LB main canal bet. Ch. 10/000km and 13/700km for the year 2019-20
2019/2192/P1 IDCr/2019/2192/P1
04-10-2019
2700-05-101-98-00-18-00 1,50,000 1,50,000
186
GPS- II- Clearing jungle,removing slipped earth from the LB main canal bet.Ch 13/700km and 16/000km for the year 2019 -2020
2019/2195/P1 IDCr/2019/2195/P1
04-10-2019
2700-05-101-98-00-18-00 1,50,000 1,50,000
187
CPP Nurnee Alamkadavu System Removing Floating bodies and weeds in Nurnee Alamkadavu canals during water distribution
2019/2149/P1 IDCr/2019/2149/P1
01-10-2019
2700-17-101-98-00-18-00 40,000 40,000
188
CPP- Nurnee- Alamkadavu System- Rectification works at the breached portion near ch.0/800 Km of the branch canal at Ch 3/200 of the Nurnee Alamkadavu Canal.
2019/1817/P1 IDCr/2019/1817/P1
01-10-2019
2700-17-101-98-00-18-00 3,50,000 3,50,000
189
CPP-Nurnee Alamkadavu System -Removing floating bodies and weeds in Nurnee Alamkadavu main canals and branch canals and engaging labours for various works for the year 2020-21
2020/483/P1 IDCr/2020/483/P1
13-10-2020
2700-17-101-98-00-18-00 50,000 50,000
190
GPS-II-Clearing jungle,removing silt and felling of trees from the canal and canal bund of Kollengode branch canal between ch.0/000 to 3/500km including Nenmeni distributory for the year 2019-20
2019/1837/P1 IDCr/2019/1837/P1
04-10-2019
2700-05-101-98-00-18-00 2,50,000 2,50,000
191
GPS-II-Clearing jungle,removing silt and felling of trees from the canal and canal bund of Kizhakkethara distributory canal for the year 2019-2020
2019/1840/P1 IDCr/2019/1840/P1
04-10-2019
2700-05-101-98-00-18-00 2,00,000 2,00,000
192
GPS-II - Clearing jungle and bushes at the U/S and D/S of the earth dam and masonry dam
2019/1842/P1 IDCr/2019/1842/P1
04-10-2019
2700-05-101-98-00-18-00 2,00,000 2,00,000
193
GPS II-Rectification works to the Right Bank of No I Field booth between ch. 0/350Km and 0/385 Km of Payyallore branch canal
2019/2193/P1 IDCr/2019/2193/P1
04-10-2019
2700-05-101-98-00-18-00 1,50,000 1,50,000
194
GPS-II-Clearing jungle,removing silt and felling of trees from the canal and canal bund of Payyalloor,Peringottukavu and Karinkulam branch canal for the year 2019-20
2019/1838/P1 IDCr/2019/1838/P1
04-10-2019
2700-05-101-98-00-82-00 3,00,000 3,00,000
195
GPS -II- Clearing jungle,removing silt and felling of trees from the canal and canal bund of Nandankizhaya branch canal for the year 2019 - 2020
2019/2196/P1 IDCr/2019/2196/P1
04-10-2019
2700-05-101-98-00-18-00 2,50,000 2,50,000
196
GPS-II-Engaging Man Mazdoor for removing weeds, debris, wastages during water distribution from LB main canal between Ch-10/000Km to 20/581Km, Nandankizhaya branch canal, Kizhakkethara branch canal, Kollengode branch canal, Nenmeni distributory, Vadakkemuri distributory, Payyallore branch canal, Per
2020/2/P1 IDCr/2020/2/P1
26-02-2020
2700-05-101-98-00-18-00 1,50,000 1,50,000
197
GPS II Rectification works to the fencing provided in the reservoir area and providing gate in the entrance of chulliyar dam
2020/347/P1 IDCr/2020/347/P1
24-03-2020
2700-05-101-98-00-18-00 3,00,000 3,00,000
198
GPS-II-Clearing jungle,removing silt and felling of trees from the canal and canal bund of Kollengode branch canal bet ween ch.3/500 to 7/200km including Vadakkemuri distributory for the year 2019-20
2019/1839/P1 IDCr/2019/1839/P1
04-10-2019
2700-05-101-98-00-18-00 3,00,000 3,00,000
199
GPS II - Providing fencing to the reservoir boundary of Chulliyar Dam in front of E - Cube Structural Company
2019/191/P1 IDCr/2019/191/P1
25-02-2019
2700-05-101-98-00-18-00 3,00,000 3,00,000
200
GPS-II - Special repairs to water supply and sanitary arrangements of Chulliyar dam camp area.
2018/1380/P1 IDCr/2018/1380/P1
04-02-2019
2700-05-101-98-00-18-00 4,80,000 4,80,000
201
GPS II - Urgent protection works to Kollengode branch canal between ch 4/050km to ch 4/100km.
2019/95/P1 Kollengode branch c
anal
13-02-2019
2700-05-101-98-00-18-00 4,00,000 4,00,000
202
GPS II - Urgent Leak Proofing to Palakapandy Canal between Chainage 0/040km to 0/400km.
2019/93/P1 IDCr/2019/93/P1
13-02-2019
2700-05-101-98-00-18-00 3,00,000 3,00,000
203
GPS-II Rectification to the breached portion and damaged culvert between Ch.3/550 KM. and 3/650KM of Nandankizhaya branch canal.
2018/1363/P1 IDCr/2018/1363/P1
30-01-2019
2700-05-101-98-00-18-00 6,20,000 6,20,000
204
GPS-II Rectification works to Kizhakkethara branch canal between Ch.2/100KM and 2/250KM
2018/1365/P1 IDCr/2018/1365/P1
29-01-2019
2700-05-101-98-00-18-00 5,00,000 5,00,000
205
CPP-TMS-Urgent rectification work to the damaged canal portion (in front of Chithranjali theatre) of bazar distributory at Ch-1/655km
2021/11/P1 IDCr/2021/11/P1
22-02-2021
2700-17-101-98-00-18-00 2,09,000 2,09,000
206
Sub- Pothundy Project - 2016-17 - Urgent rectification works between ch 8/130 km and 8/250km of Ayilur branch canal.
2016/222/P1 IDMa/2016/222/P1
28-01-2017
2701-11-00-00(00) 2,00,000 2,00,000
207
KPIP-Fabrication,painting and erection of new MS shutter with operating mechanism for canal no.7 of LBMC, Kanhirappuzha
2018/6/MH IMDmpa/2018/6/MH
14-03-2018
2700-18-101-98-00-18-00 39,500 39,500
208
KPIP-Annual Maintenance rectification works of canal surplus shutter at Ch.28/800 km of LBMC for the year 2016-17
2016/56/MH IMDmpa/2016/56/MH
01-03-2017
2700-18-00-00(00) 4,08,000 3,70,000
209
MP LBC Urgent rectification works to the field bothie no.5 of Thannerangad branch canal
2017/46/P1 IDMa/2017/46/P1
10-02-2017
2700-02-101-98-00-18-00 1,00,000 1,00,000
210
GPS I - RBC - Rectification works to the damaged sluices of RB Main canal of Malayampallam offtake, Neduvanchira, Kandanara,Onnurpallam, Vadavannur branch canaland Spillway shutter of Puliyanthoni anicut
2018/184/MH IMDmpa/2018/184/MH
01-02-2019
2700-05-101-98-00-18-00 3,00,000 2,95,000
211
CPP-Installation of individual water meter for quarters of CPP-colony - Ist Phase.
2021/1137/P1 IDCr/2021/1137/P1
30-11-2021
2700-17-101-98-00-18-00 6,79,000 6,79,000
212
Sub- Pothundy Project 2018-19 - Urgent rectification works between ch 3/950km and 4/000km of RBMC including repairs to the surplus sluice.
2018/938/P1 IDMa/2018/938/P1
25-10-2018
2701-11-101-98-00-18-00 3,35,000 3,35,000
213
Sub- Pothundy Project 2019-20 - Urgent rectification works between ch 0/250km and 0/350km of Vithanasserry branch canal.
IDMa/2019/2476/P1
27-02-2020
2701-11-101-98-00-18-00 2,50,000 2,50,000
214
Sub- Pothundy Project 2019-20 - Urgent rectification works between ch 0/250km and 0/350km of Vithanasserry branch canal.
IDMa/2019/2476/P1
27-02-2020
2701-11-101-98-00-18-00 2,50,000 2,50,000
215
Sub- Pothundy Project 2019-20 - Urgent rectification works between ch 1/550km to 1/650km of Chelluvadi branch canal.
2019/2474 IDMa/2019/2474/P1
17-02-2020
2701-11-101-98-00-18-00 6,00,000 6,00,000
216
Sub- Pothundy Project 2019-20 - Urgent rectification works between ch0/250km and 0/350km of Vithanasserry branch canal.
IDMa/2019/2476/P1
27-02-2020
2701-11-101-98-00-18-00 2,50,000 2,50,000
217
Pothundy Project 2017-18 - Annual maintenance of quarter no E/10A and E/10B at Pothundy camp area.
2018/106/P1 IDMa/2018/106/P1
17-03-2018
2701-11-101-98-00-18-00 2,00,000 2,00,000
218
Pothundy Project 2018-19 - Pothundy Garden - Annual Maintenance - Repairs and painting to the statues and compound wall, improvement works to the pathway, ornamental works inside the garden and supplying and spreading fertilizers to the garden.
2019/118/P1 IDMa/2019/118/P1
02-03-2019
2701-11-101-98-00-18-00 2,00,000 2,00,000
219
Pothundy Project 2018-19 - Maintenance and repairs to Dam and Head works - Clearing light jungle growth of Dam and periphery.
2019/115/P1 IDMa/2019/115/P1
27-02-2019
2701-11-101-98-00-18-00 3,00,000 3,00,000
220
CPP-TMS-AM- Extension of Sub-Division No.1 Office Building
2022/373/P1 IDCr/2022/373/P1
31-03-2022
2700-17-101-98-00-18-00 4,00,000 4,00,000
221
GPS-I-Urgent rectification and shutter fixing work of Poonthonichalla Anicut and rectification works of Poonthonichalla branch canal between ch 0/000 km and 0/800 km
IDCr/2022/288/P1
16-03-2022
2700-05-101-98-00-18-00 10,00,000 10,00,000
222
WP - 2021 - 22 - Electrical works - Urgent repair works to spillway motors, starters, electrical installation and providing spillway lights at Walayar Dam.
2022/247/P1 IDCr/2022/247/P1
19-03-2022
2700-03-101-98-00-18-00 1,58,000 1,58,000
223
CPP- Urgent rectifications and maintenance to Irrigation Sub division no I, Chittur
2022/358/P1 IDCr/2022/358/P1
25-03-2022
2700-17-101-98-00-18-00 2,62,000 2,62,000
224
Pothundy Project - Annual maintenance of 10 nos of quarters(7A, 7B, 10A, 10B, 11A, 11B, 12A, 12B, 13A & 13B) at Pothundy camp area
2019/122/P1 IDMa/2019/122/P1
15-02-2019
2701-11-101-98-00-18-00 5,00,000 5,00,000
225
CPP- MLBC - Annual Maintanance for the year 2020-21 - clearing jungle and removing silt in Kambalathara Distributory Canal.
2020/1502/P1 ORDER No. IDCr/2020
/1502/P1
29-10-2020
2700-17-101-98-00-18-00 1,20,000 1,20,000
226
CPP-MLBC _Annual maintenance for the year 2020-21- Engaging man mazdoor labor for removing weeds , waste, debrises and flow disturbing materials etc and saplings and grass in the canal bund from Ch 0/000 km to 12/600 km of main canal and its branches & distributeries
ORDER No. IDCr/2020
/1512/P1
29-10-2020
2700-17-101-98-00-18-00 3,00,000 3,00,000
227
CPP- MLBC - Anual Maintanance for the year 2020- 21 clearing jungle and removing silt in Meenkara No.2 Branch Canal
ORDER No. IDCr/2020
/1500/P1
29-10-2020
2700-17-101-98-00-18-00 1,20,000 1,20,000
228
CPP-MLBC -Annual maintenance for the year of 2020 -21 clearing jungle at Moolathara office compound and Meenakshipuram colony
ORDER No. IDCr/2020
/1507/P1
29-10-2020
2700-17-101-98-00-18-00 2,00,000 2,00,000
229
CPP- MLBC - Annual Maintanance for the year 2020-21- clearing jungle and removing silt in Meenkara No.1 Branch Canal.
ORDER No. IDCr/2020
/1499/P1
29-10-2020
2700-17-101-98-00-18-00 1,20,000 1,20,000
230
Annual Maintanance for the year 2020-21 - clearing jungle and removing silt in Mullamthodu Branch Canal.
ORDER No. IDCr/2020
/1501/P1
29-10-2020
2700-17-101-98-00-18-00 2,00,000 2,00,000
231
Annual maintanace for the year of 2020 -21 -clearing jungle and removing silt in main canal Ch 8/00 km to 12/600 KM & karadichal branch canal
ORDER No. IDCr/2020
/1505/P1
29-10-2020
2700-17-101-98-00-18-00 6,00,000 6,00,000
232
CPP- MLBC - Anual Maintanance for the year 2020-21 -clearing jungle and removing silt in Thimmenchetty Branch Canal.
ORDER No. IDCr/2020
/1498/P1
29-10-2020
2700-17-101-98-00-18-00 5,50,000 5,50,000
233
CPP- MLBC - Annual Maintenance for the year 2020-21 - Clearing jungle and removing silt in Kalyanapetta Branch Canal.
ORDER No. IDCr/2020
/1503/P1
29-10-2020
2700-17-101-98-00-18-00 7,00,000 7,00,000
234
CPP- MLBC - Annual Maintenance for the year 2020-21 - Clearing jungle and removing silt & weeds in High Level Canal Ch 0/000Km to 7/150Km
ORDER No. IDCr/2020
/1497/P1
29-10-2020
2700-17-101-98-00-18-00 8,50,000 8,50,000
235
Pothundy Project 2018-19 - Modification of roof including urgent repair works to the IB in Pothundy camp area.
2019/124/P1 IDMa/2019/124/P1
30-01-2019
2701-11-101-98-00-18-00 5,00,000 5,00,000
236
CPP MRBC Rectification works to Right Bank canal between Ch 4900m and Ch 5000 m
2017/272/P1 IDCr/2017/272/P1
14-01-2019
2700-25-00-00(00) 3,00,000 3,00,000

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PVIp-Leak proofing Paravoor Branch Canal between ch.6.5km to 8km.
2016/266/P2 PVIPDII/2016/266/P2

16-02-2017
2700-01-101-98-00-18 7,50,000 7,50,000
2
PVIP-Urgent special maintenance of paravoor branch canal from ch. 4.00 to 12.50 km
2016/238/P2 PVIPDII/2016/238/P2

25-10-2016
2700-01-101-98-00-18 5,00,000 5,00,000
3
PVIP-Engaging labour for collecting and disposing waste from nets of Paravoor Branch Canal
00 D1-1331/2008
09-11-2015
2700-01-101-98-00-18 7,25,000 7,25,000
4
PVIP-Urgent rectification works to Varapuzha Sub Branch Canal near Ch.0.500 KM
00 A5-1363/2015(34)
05-10-2015
2700-11-101-98-00-18 5,00,000 5,00,000
5
PVIP-Engaging labour for collecting waste from nets of Paravoor Branch Canal at F point ,Choondy and Aluva
00 A2.1216/2010
29-08-2014
2700-01-101-98-00-18 3,10,000 3,10,000
6
PVIP- Annual maintenance of Paravoor Branch Canal from Ch.6 KM to 10.60 KM
00 A2.1216/2010
30-09-2015
2700-01-101-98-00-18 3,10,000 3,10,000
7
PVIP-Urgent rectification works at Edayappuram Sub Branch Canal near Ch.0.200KM for the year 2015-16
00 A2.1216/2010
30-09-2015
2700-01-101-98-00-18 3,10,000 3,10,000
8
PVIP-Engaging labour for collecting and disposing waste from nets of Paravoor Branch Canal
2016/253/P2 PVIPDII/2016/253/P2

25-10-2016
2700-01-101-98-00-18 7,00,000 7,00,000
9
PVIP-MLA-LAC-ADS-2015-16 Renovation to Ammanchery field and Aylathumattom field channel of Erumathala sub branch canal at Ch. 3km
00 GO (Rt) No. 126/201
6 /WRD
12-02-2016
2700-01-101-98-00-18 60,00,000 60,00,000
10
PVIP - Improvements to Malayanpurathupady SBC near Beverage godown
00 DB-651(8)/2014
10-09-2014
2700-01-101-98-00-18 4,00,000 4,00,000
11
Repair to damages of aqueduct near 350 of mudikkal SBC
00 D1-1331/2008
10-09-2014
2700-01-101-98-00-18 7,00,000 7,00,000
12
PVIP - Improvement works to vettikkattukunnu sub branch canal near tail end
00 DB/651(03)/2014
10-09-2014
2700-01-101-98-00-18 5,00,000 5,00,000
13
Improvements works to marampilly sub branch canal near CH 2km
00 DB6519(05)/2014
10-09-2014
2700-01-101-98-00-18 4,00,000 4,00,000
14
PVIP- Improvements to manjapetty SBC beyond CITU kavala near ch 2.4 km
00 WP2/5356(3)/2015/D4

28-09-2015
2700-01-101-98-00-18 9,00,000 9,00,000
15
Reconstruction of box culvert at puliyambilly in Aluva bc near ch 3 km
00 WP25356(2)/15/D4
28-09-2015
2700-01-101-98-00-18 10,00,000 10,00,000
16
CRDS- Annual maintenance of RBMC bet. Ch.24/500 to 30/400km for 2016-2017
2016/185/P2 IIPDII/2016/185/P2
03-11-2016
2701-02-101-98-00-00-18 2,75,000 2,75,000
17
CRD Scheme - Annual Maintenance -Clearing and removing heavy blockages from all branch canals and distributories during water distribution under RBC section no. 1 Chalakudy for the year 2016-17
2016/187/P2 IIPDII/2016/187/P2
03-11-2016
2701-02-000-82(00) 1,50,000 1,50,000
18
CRDS-Annual maintenance of clearing and removing heavy blackages form main canal bet Ch.13/000km to 30/400km during water distribution under RBC section No-I, Chalakudy for the year 2015-16.
NIL A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,50,000 1,50,000
19
CRD Scheme - Annual maintenance of Chalakudy br. canal bet. Ch.0/000km to 3/000km for the year 2015-16.
NIL A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,00,000 1,00,000
20
CRDS-Annual maintenance of clearing and removing heavy blockages during water distribution in all branch canals and distributories under RBC section No-I, Chalakudy for the year 2015-16.
NIL A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,50,000 1,50,000
21
CRDS-Protection works to the outer bund of Areaswaram branch canal near ch; 6/200
NIL AAA1-1236/2014-15dt
19/09/14
19-09-2014
2701-02-101-98-00-00-18 4,20,000 4,20,000
22
CRDS-Rectification works of Mattathur branch canal between chainage 1/000 to 2/000km
NIL D2-1527/2014/dt.19/
09/14
19-09-2014
2701-02-101-98-00-00-18 6,80,000 6,80,000
23
CRDS - Urgent rectification works to Chalakudy branch canal from ch.1/800km to 2/000km.
NIL A1-1236/2014
19-01-2015
2701-02-101-98-00-00-18 1,70,000 1,70,000
24
CRDS-Annual maintenance of removing floating materials from canal during water distribution under Kodakara section for 2014-15
NIL D1-1144/44/dt 20/09
/14
20-09-2014
2701-02-101-98-00-00-18 50,000 50,000
25
CRDS- Construction of leading chal to CADA Canal from Chelakkattukara cross bar including side protection
NIL A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,20,000 2,20,000
26
CRDS - Urgent rectification works to Pariyaram br. canal bet. Ch.0/000km to 1/500km.
NIL D2-1861/2015
17-11-2015
2701-02-101-98-00-00-18 6,00,000 6,00,000
27
CRDS- Annual maintenance of RBMC bet. Ch. 24/500km to 30/400km for the year 2014-15.
NIL A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,50,000 2,50,000
28
CRDS - Annual maintenance of Pariyaram branch canal bet. ch.0/000 to 1/500km for the year 2014-15
NIL D1-1133/14
20-09-2014
2701-02-101-98-00-00-18 35,000 35,000
29
Rect. 27 -KIP RBMC- Vazhamuttom distributory- Urgent rectification and leak proofing works between ch. 2250m to2900m near SNDP School at V Kottayam.
2016/248/P2 KIPRBDII/2016/248/P
2
29-03-2017
2700-27-101-98-00-18 6,45,000 6,45,000
30
K IP- RBMC Rectification work of up and downstream transition and bund of aqueduct at ch 4400m 0f RBMC
2018/61/P2 KIPRBDII/2018/61/P2

22-03-2018
2700-27-101-98-00-18 11,35,000 11,35,000
31
CRDS-Urgent rectification works to the spout between ch.16/100km to 16/150km of RBMC.
NIL D1-1145/14
20-09-2014
2701-02-101-98-00-00-18 70,000 70,000
32
CRDS-Urgent rectification works to Mettippadam branch canal bet ch.1/200km to 1/500km
NIL 1236/2014
19-09-2014
2701-02-101-98-00-00-18 3,00,000 3,00,000
33
KIP(RB) Rectification of Breached portion of KONNI DISTRIBUTARY AT chainage seventy meter
2017/950/P2 KIPRBDII/2017/950/P
2
15-02-2018
2700-27-101-98-00-18 30,00,000 30,00,000
34
PVIP-Urgent Protection works to the Erumathalaa Sub Branch Canal at ch 3.5 km at Onodimoola
2017/302/P2 G.O. (Rt) No. 637/2
016/WRD
28-07-2017
2700-01-101-98-00-18 16,80,000 16,80,000
35
PVIP Rectification works near ch 7km of Edackkattuvayal M D
2018/365/P2 PVIPDII/2018/365/P2

22-10-2018
2700-01-101-98-00-18 5,92,000 5,92,000
36
KIP (RB) Punnala distributory- Rectification work to prevent leakage from Ch. 2980 m to 3610m (Vazhangodu bhagam) including aqueduct
2018/1168P2 KIPRBDII/2018/1168/
P2
02-03-2019
2700-27-101-98-00-18 10,00,000 10,00,000
37
PVIP Rectification works for preventing leakage near ch 11.5 km of Kolenchery branch canal
2018/364/P2 PVIPDII/2018/364/P2

23-10-2018
2700-01-101-98-00-18 5,90,000 5,90,000
38
PVIP Natural Calmity Rain damaes Providing side protection works to Kolenchery branch canal at ch 12.6KM
2018/742/P2 PVIPDII/2018/742/P2

25-10-2018
2700-01-101-98-00-18 14,15,000 14,15,000
39
PvIP Protection works to Kolenchery branch canal near ch 14.00 km and rectification works to damaged surplus escape
2018/362/P2 PVIPDII/2018/362/P2

25-10-2018
2700-01-101-98-00-18 20,25,000 20,25,000
40
KIP RB - Kalanjoor distributory- Rectification and leak proofing works between ch 15m to 450m including rectification of aquduct
2016/362/P2 KIPRBDII/2016/362/P
2
29-03-2017
2700-27-101-98-00-18 4,80,000 4,80,000
41
KIP(RBMC)_Vazhamuttom Distributory- Rectification works to masonry canal (Upstream and Down Stream portion) near 2nd Siphon well at Kolappara
2017/96/P2 KIPRBDII/2017/96/P2

29-03-2017
2700-27-101-98-00-18 6,90,000 6,90,000
42
PVIP-Rectification works to Thamarachalpuram SBC in the damaged portions at chainage 6.00km
2017/1008/P2 PVIPDII/2017/1008/P
2
23-03-2018
2700-01-101-98-00-18 4,99,999 4,99,999
43
PVIP-Upkeeping and maintenance of Inspection Bunglaw at Aluva 2018-2019
2018/412/P2 PVIPDII/2018/412/P2

11-10-2018
2700-01-101-98-00-18 2,00,000 2,00,000
44
PVIP-MLA-LAC-ADS-2018-19 -Construction of Bridge across Aluva branch canal at chainage 6 m
2018/204/P2 RD6/1132/18
22-10-2018
2700-01-101-98-00-18 27,21,000 27,21,000
45
PVIP Annual maintanance Clearing blockages in syphon, culvert, cut & cover etc. in Kizhakkambalam branch canal and its distributories, Poothrikka M D and its distributories.
2017/425/P2 PVIPDII/2017/425/P2

10-11-2017
2700-01-101-98-00-18 1,96,000 1,96,000
46
PVIP Annual maintanance to Peringala M D bet ch 0 to 6.60Km and Kaninad M D bet ch 0 to 1.62Km
2017/404/P2 PVIPDII/2017/404/P2

14-11-2017
2700-01-101-98-00-18 4,91,000 4,91,000
47
PVIP Annual maintenance to Link canal bet ch 0 m and 1200 m
2017/406/P2 PVIPDII/2017/406/P
10-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
48
PVIP Annual maintenance to Link canal bet ch 1200 m and 2500 m
2017/407/P2 PVIPDII/2017/407/P2

10-11-2017
2700-01-101-98-00-18 3,93,000 3,93,000
49
PVIP Annual maintanance to Vadayambady M.D.from0 to 3.65km , Pariyaram M.D.0-3.65km &Kurinji F.C.0 to 1.16km.
2017/481/P2 PVIPDII/2017/481/P2

10-11-2017
2700-01-101-98-00-18 3,43,000 3,43,000
50
PVIP Urgent side protection to prevent further damages in Link canal bund at Chengara in Kunnathunadu gramma Panchayat
2017/1005/P2 PVIPDII/2017/1005/P
2
15-11-2017
2700-01-101-98-00-18 2,50,000 2,50,000
51
PVIP Annual maintenance to Mamala MD from 0 to 2.95 km, Puttumanoor M D from 0 to 3.55 km & Veloor F.C from 0 to 1.25 km.
2017/448/P2 PVIPDII/2017/448/P2
Dated: 10-11-2017 A
10-11-2017
2700-01-101-98-00-82 3,43,000 3,43,000
52
PVIP Annual maintanance to Puthencruz M.D.from 0 to 8.50 Km
2017/449/P2 PVIPDII/2017/449/P2

10-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
53
PVIP Annual maintenance to Kizhakkambalam branch canal from 11 km. to 13 km.
2017/420/P2 PVIPDII/2017/420/P2

10-11-2017
2700-01-101-98-00-18 2,95,000 2,95,000
54
PVIP Annual maintenance to Pallikkara M D bet ch 0 m to 6.55 kM. and Erumely M D bet . ch 0 m. to 1.92 km.
2017/403/P2 PVIPDII/2017/403/P2

10-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
55
PVIP Annual maintenance to Kizhakkambalm branch canal from 7.80 km. to 9.50 km
2017/418/P2 PVIPDII/2017/418/P2

10-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
56
PVIP Annual maintenance to Vadavucode M D .from 0 to 3.60 km
2017/422/P2 PVIPDII/2017/422/P2

10-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
57
PVIP Annual maintenance to Kizhakkambalam branch canal from 9.50 km.to 11km
2017/419/P2 PVIPDII/2017/419/P2

10-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
58
PVIP Annual maintenance to Kizhakambalam branch canal from 6.30 km to 7.80 km
2017/414/P2 PVIPDII/2017/414/P2

10-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
59
PVIP Annual maintenance to Pinarmunda M D bet ch 0 to 5.93 km and Pinarmunda F .C bet ch 0 to 1.25 km.
2017/408/P2 PVIPDII/2017/408/P2

10-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
60
KIP(O&M)RBMC-Annual Maintenance of Canals-Municipal area-Jungle clearance and removal of silt from the bed of canal from ch.52105 m to 53105 m of RBMC and Ch.0m to 1560 m of Vallikkode distributary under KIP (O&M) section No. 1/1 Adoor in connection with Water distribution for the year 20
2018/1001/P2 KIPRBDII/2018/1001/
P2
26-12-2018
2700-27-101-98-00-18 2,85,000 2,85,000
61
PVIP Annual maintenance to Poothrikka M D bet ch 0 to 3.75 km & 1000 m Poothrikka M D bet ch 0 to 2.48 km Mangattoor MD bet ch 0 to 1.62 km and Mangattoor F C ch 0 to 1.04 km
2017/482/P2 PVIPDII/2017/482/P2

10-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
62
PVIP Annual maintenance between chainage 11 to 13 km of Kolenchery Branch canal and Nechoor MD 0 2.5km
2017/450/P2 PVIPDII/2017/450/P2

09-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
63
PVIP Natural calamity Rain damages to Pinarmunda M D Reconstruction of damaged canal portion at ch 3.50 Km
2017/1010/P2 PVIPDII/2017/1010/P
2
01-01-2018
2700-01-101-98-00-18 20,50,000 20,50,000
64
PVIP Annual maintenance to FACT Feeder canal from o to 3.50 km
2017/421/P2 PVIPDII/2017/421/P2

10-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
65
PVIP Annual maintenance to kolenchery Branch canal 13 16 km and Marangattully MD0 2 50km
2017/451/P2 PVIPDII/2017/451/P2

09-11-2017
2700-01-101-98-00-18 4,85,000 4,85,000
66
PVIP Annual Maintenance between ch 0 to 3 50 km of Edakkattuvayal MD
2017/454/P2 PVIPDII/2017/454/P2

09-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
67
PVIP Reconstructing damaged and breached portion between ch 1.06 km and 1.15 km of Pinarmunda F C
2018/92/P2 PVIPDII/2018/92/P2
25-10-2018
2700-01-101-98-00-18 15,50,000 15,50,000
68
KIP Dam at Parappar -Annual maintenance of Dam and Gallery-Upkeeping of gallery ,premises ,cleaning sump well and drain of gallery under kip RB section 3/2 Thenmala for the year 2018-19
2018/1091/P2 KIPRBDII/2018/1091/
P2
07-03-2019
2700-27-101-98-00-18 5,50,000 5,50,000
69
KIP LB -Poovathoor minor distrubutary- Rectification works from ch 0m to500m in kottarakkara municipality .
2017/242/P2 KIPRBDII/2017/242/P
2
22-03-2018
2700-27-101-98-00-18 15,28,000 15,28,000
70
PVIP Annual Maintenance between ch 2.5 km to 5.00 km of Kanjiramattom MD
2017/456/P2 PVIPDII/2017/456/P2

09-11-2017
2700-01-101-98-00-18 2,95,000 2,95,000
71
Urgent rectification works to the damaged canal portions at ch 37700m of LBMC near ponmanoor in Kottrakkara Municipality
2018/56/P2 KIPRBDII/2018/56/P2

05-02-2018
2700-27-101-98-00-18 12,25,000 12,25,000
72
PVIP Annual Maintenance to Thiruvankulam MD 2 4km
2017/457/P2 PVIPDII/2017/457/P2

09-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
73
KIP Dam at Parappar-Annual maintenance of Dam - Jungle clearing to Dam premises and approach roads and up keeping of Dam premises under KIP (RB) Section 3/2 Thenmalafor the year 2018-19
2018/1059/P2 KIPRBDII/2018/1059/
P2
26-02-2019
2700-27-101-98-00-18 6,00,000 6,00,000
74
PVIP - Rectification works to Edappally branch canal near ch. 9.8km including construction of watcher shed.
2016/263/P2 PVIPDII/2016/263/P2

16-02-2017
2700-01-101-98-00-18 4,00,000 4,00,000
75
KIPLB-Nellikunnam disrtibutary -Rectification and protection works from ch 1880m to ch2150m in kottarakkara Municipality.
2017/247/P2 KIPRBDII/2017/247/P
2
22-03-2018
2700-27-101-98-00-18 8,31,000 8,30,819
76
KIP LB -Annual maintenance of canal Municipal area -Jungle clearance and removal of silt from the bed of canal of poovathoor distributary from ch om to6000m, Poovathoor Minor from ch 0m to 1011m , Kannadikonam minor from ch om to 850m under KIP LB section 51/17 Kottarakkara for water distributi
2017/704/P2 KIPRBDII/2017/704/P
2
21-12-2017
2700-27-101-98-00-18 3,99,982 3,99,982
77
PVIP Annual maintenance to Edakkattuvayal MD 3.5 7km &Kalamboor MD 0 2km.
2017/459/P2 PVIPDII/2017/459/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
78
PVIP-Upkeeping and Maintenance of IB and PVIP compound at Aluva 2017-18
2017/291/P2 PVIPDII/2017/291/P2

09-11-2017
2700-01-101-98-00-18 2,95,000 2,95,000
79
PVIP Annual Maintenance to Kanjiramattom MD 5 9Km& Thuruthikkara MD 0 3km
2017/460/P2 PVIPDII/2017/460/P2

09-11-2017
2700-01-101-98-00-18 4,90,000 4,90,000
80
PVIPAnnual Maintenance to Thonnallur MD 07.55km
2017/462/P2 PVIPDII/2017/462/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
81
PVIP Annual Maintenance to Amballoor MD 0 3 km
2017/463/P2 PVIPDII/2017/463/P2

09-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
82
PVIP Annual Maintenance between ch 7km to 9km of Kolenchery Branch canal
2017/469/P2 PVIPDII/2017/469/P2

09-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
83
KIP-LBMC- Rectification of canal and lining at ch. 3900 m to 4000 m of LB main canal.
2017/1090/P2 KIPRBDII/2017/1090/
P2
22-03-2018
2700-27-101-98-00-18 10,61,000 10,61,000
84
PVIP-Annual maintenance of Aluva Branch canal from ch 7.50km to 10.55km
2017/318/P2 PVIPDII/2017/318/P2

09-11-2017
2700-01-101-98-00-18 3,93,000 3,93,000
85
K.I.P. (O&M) Annual maintenance of Canals- Municipal area-Jungle clearance and removal of silt from the bed of canals from ch. 52205m to 53105m of RBMC and Ch.o m to 1560 m of Vallikkode distributary under KIP(O&M) Section 1/1 ,Adoor in connection with water distribution for the year 2017
2017/845/P2 KIPRBDII/2017/845/P
2
26-12-2017
2700-27-101-98-00-18 4,00,000 4,00,000
86
KIP LB Adichanalloor distributory urgent rectification works between ch. 1095 m and 1175m
2018/143/P2 KIPRBDII/2018/143/P
2
20-03-2018
2700-27-101-98-00-18 5,10,000 5,10,000
87
K I P (O&M) Trippara minor distributory - rectification work from chainage 2857m to 3017m at tail end ,and constructing a silt basin at tail end
2016/301/P2 KIPRBDII/2016/301/P
2
29-03-2017
2700-27-101-98-00-18 3,75,000 3,75,000
88
PVIP Annual Maintenance between ch 0 to 2km of Thiruvankulam MD
2017/452/P2 PVIPDII/2017/452/P2

09-11-2017
2700-01-101-98-00-18 2,95,000 2,95,000
89
KIP Dam at parappar -Annual maintenance of dam -Jungle clearing to Dam premises and approach roads and up-keeping of Dam premises under KIP (RB )Section No 3/2 Thenmala for the year 2017-18
2017/680/P2 KIPRBDII/2017/680/P
2
12-01-2018
2700-27-101-98-00-18 6,50,000 6,50,000
90
PVIP Annual Maintenance between ch 0 to 2.5 km of Kanjiramattom MD
2017/453/P2 PVIPDII/2017/453/P2

09-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
91
PVIP-Annual Maintenance to Thiruvaniyoor MD 0-3 km
2017/461/P2 PVIPDII/2017/461/P2

09-11-2017
2700-01-101-98-00-18 1,96,000 1,96,000
92
PVIP Annual Maintenance Clearing blockages in culvert,cut and cover etc. in kolenchery branch canal from ch 4.6km and its distributories including Kanjiramattom MD,Edakkattuvayal MD ,Thiruvankulam MD and its distributories.
2017/477/P2 PVIPDII/2017/477/P2

09-11-2017
2700-01-101-98-00-18 1,96,000 1,96,000
93
KIP - RBMC -Kodumon West Minor Distributory - Rectification work of pipe syphon (Road Crossing) from Ch. 70m to 90m and rectification of pipe syphon aquaduct from Ch. 560m to 950m including providing manholes and new lining from Ch.0m to 70m and from Ch.950m to1050m.
2017/148/P2 KIPRBDII/2017/148/P
2
27-03-2017
2700-27-101-98-00-18 7,95,000 7,95,000
94
PVIP- Rectification works to Edappally Branch Canal ch. 0.9 km
2016/152/P2 PVIPDII/2016/152/P2

16-02-2017
2700-01-101-98-00-18 6,00,000 6,00,000
95
PVIP- Rectification works to Thengode MD near ch. 0.6 km
2016/256/P2 PVIPDII/2016/256/P2

16-02-2017
2700-01-101-98-00-18 6,00,000 6,00,000
96
PVIP-Maintenance of quarter No B4, C3, and colony Maintenance
2016/318/P2 PVIPDII/2016/318/P2

16-02-2017
2700-01-101-98-00-18 5,00,000 50,000
97
P I P Main canal Rectification works to the tunnel face at Uthimood including clearing boulders from tunnel bt. ch.10608 m &11038 m
2018/33/P2 PIPD/2018/33/P2
15-03-2018
2700-16-101-98-00-18 8,16,000 8,16,000
98
KIP-LBMC- Annual maintenance of canal - Municipal area - Jungle clearance and removal of sllt from the bed of canal of LBMC from Ch 33060m to ch 39200m .KIP(LB) Section no. 51/17 kottarakkara for water distribution 2017-18 in kottarakkara Municipality.
2017/262/P2 KIPRBDII/2017/262/P
2
03-01-2018
2700-27-101-98-00-18 6,00,000 6,00,000
99
KIP(LB) Adichanalloor distributory rectification works between Ch.5405m and 5516m, Ch.5550m and 5650m and ch.5700m and 5800m, repair of aquaduct at Ch.5942m and DR packing at ch.6230m and repair of cut and cover at ch.6282m
2017/146/P2 KIPRBDII/2017/146/P
2
27-03-2017
2700-27-101-98-00-18 6,46,000 6,46,000
100
PVIP - Special Maintenance to Aluva branch canal between Ch.2.50KM and 6.00KM
2016/235/P2 PVIPDII/2016/235/P2

25-10-2016
2700-01-101-98-00-18 4,25,000 4,25,000
101
PIP RBC Rectification works to Vallamkulam branch canal between ch. 550 m to 800 m
2018/19/P2 PIPD/2018/19/P2
13-03-2018
2700-16-101-98-00-18 5,00,000 5,00,000
102
PVIP-Improvements to Marampilly SBC near Ch.1.2 KM
2017/11/P2 PVIPDII/2017/11/P2
14-02-2017
2700-01-101-98-00-18 7,75,000 7,75,000
103
PVIP-Rectification works to the collapsed portion of LLC near ch. 21700m for the year 2018-19
2018/789/P2 PVIPD1/2018/789/P2
25-10-2018
2700-01-101-98-00-18 18,00,000 18,00,000
104
PVIP-AP-2016-2017-Improvements to the aqueduct at ch.3.5 km of Mudickal SBC- balance works
2017/44/P2 PVIPDII/2017/44/P2
14-02-2017
2700-01-101-98-00-18 7,00,000 7,00,000
105
PVIP -Protection works to the sliped portion near ch.2.10km and near 2.35kmof Kizhakkambalam Branch Canal.
2017/1000/P2 PVIPD1/2017/1000/P2

20-10-2018
2700-01-101-98-00-18 5,00,000 5,00,000
106
PVIP-AP2016 17-Reclaiming and reconstructing the field channel of Thamarachalpuram sub branch canal near Etherikkavu
2017/29/P2 PVIPDII/2017/29/P2
14-02-2017
2700-01-101-98-00-18 7,00,000 7,00,000
107
MLA SDF 2016-17 Side Protection Work to Mudickal Sub Branch Canal near Ch. 5.5KM at Orna
2017/207/P2 rder No DCEKM/601/2
017-F3/PMB/12
14-02-2017
2700-01-101-98-00-18 4,95,000 4,95,000
108
MLA SDF 2016-17 Side Protection Work to Mudickal Sub Branch Canal near Ch. 5.5KM at Orna
2017/207/P2 rder No DCEKM/601/2
017-F3/PMB/12
14-02-2017
2700-01-101-98-00-18 4,95,000 4,95,000
109
KIP LBMC - Annual maintenance of canals - Removal of floating bodies and accumulated waste from various canals under KIP(LB) Section No.51/17 , Kottarakkara in connection with water distribution for the year 2017-18
2017/709/P2 KIPRBDII/2017/709/P
2
21-12-2017
2700-27-101-98-00-18 4,00,000 4,00,000
110
PVIP_Urgent rectification works to the collapsed SP of Valakom branch canal near ch.11300 m for the year 2018-2019.
2018/818/P2 PVIPD1/2018/818/P2
25-10-2018
2700-01-101-98-00-18 17,01,500 17,01,500
111
Urgent temporary work to arrest the earth slippage at Ch.17000m of RBMC
2018/867/P2 KIPRBDII/2018/867/P
2
10-01-2019
2700-27-101-98-00-18 7,32,384 7,32,384
112
KIP(O&M) - Enath II distributary - Rectification work between Ch.850m to 1100m
2016/299/P2 KIPRBDII/2016/299/P
2
28-03-2017
2700-27-101-98-00-18 7,00,000 7,00,000
113
PVIP-Block panchayath construction of public amenities for aged persons at Bhoothathankettu.
2018/259/P2 S 043/19 - 2018-201
9
13-07-2018
2700-01-101-98-00-18 36,00,000 36,00,000
114
Urgent rectification work of Kizhakkekkara minor distributory No I between Ch 0m to 1000m
2018/77/P2 KIPLBDV/2018/77/P2
20-03-2018
2700-27-101-98-00-18 8,00,000 8,00,000
115
KIP (O&M) Nariyapuram Minor Distributory-Rectification-Reconstruction Work of Flume Canal From Chainage 5180 m to 5225 m.
2017/922/P2 KIPRBDII/2017/922/P
2
22-03-2018
2700-27-101-98-00-18 10,53,000 10,53,000
116
KIP(O&M) -Annual Maintenance of Office building and quarters at KIP campus High School Junction , Adoor
2017/831/P2 KIPRBDII/2017/833/P
2
27-01-2018
2700-27-101-98-00-18 3,00,000 3,00,000
117
KIP(O&M) Supplying and installation of new Pumpset for KIP office at High School Junction Adoor.
15/03/2018 KIPRBDII/2017/890/P
2
16-03-2018
2700-27-101-98-00-18 1,33,000 1,33,000
118
KIP-LBMC-Kottiyam branch canal- Rectification works between ch.5884m and 6017m
2016/359/P2 KIPLBDV/2016/359/P2

28-03-2017
2700-27-101-98-00-18 4,39,000 4,39,000
119
KIP(LB) -Repairs to the well at ch. 9496m , relining workfrom ch. 10350m to 10500m, arresting leakage of openflume from ch.10897m to 10930m of Pulamondistributory.
2016/426/P2 KIPRBDII/2016/426/P
2
24-03-2017
2700-27-101-98-00-18 5,00,000 5,00,000
120
Urgent laying of new pipe line in place of old and blocked water supply line at KIP Ravinagor Colony Campus, Kottarkara.
2017/147/P2 KIPRBDII/2017/147/P
2
29-03-2017
2700-27-101-98-00-18 2,10,000 2,10,000
121
KIP(LB)- Reconstruction of fully damaged syphon barrel from ch. 180m to 190m , Repairs of Syphon well at ch. 190m and rectification work of open flume from ch. 190m to 250 of Pulamon minor I distributory
2017/144/P2 KIPRBDII/2017/144/P
2
27-03-2017
2700-27-101-98-00-18 6,10,000 6,10,000
122
Repairs and maintenance work to the KIP Office complex building in Ravinagar campus, Kottarakkara.
2017/183/P2 KIPRBDII/2017/183/P
2
28-03-2017
2700-27-101-98-00-18 14,00,000 14,00,000
123
KIP (LB) - Lining work and rectification work from ch. 1500m to 1700m and raising of open flume from ch. 0m to 30m of Kudavattoor Distributory.
2017/159/P2 KIPRBDII/2017/159/P
2
28-03-2017
2700-27-101-98-00-18 13,50,000 13,50,000
124
KIP (LB) Urgent rectification work to the aqueduct of Pulamon distributory from ch.9280m. to 9400m. and arresting of leakage from ch. 696m. to 756m of Pulamon minor II distributory.
2017/213/P2 KIPRBDII/2017/213/P
2
24-03-2017
2700-27-101-98-00-18 2,80,000 2,80,000
125
P. I. P. (R. B. C) canal bund raising for mitigating overflow of Kanjettukara branch canal bet. ch. 0 m and 500 m.
2018/186/P2 PIPD/2018/186/P2
26-10-2018
2700-16-101-98-00-18 4,40,000 4,40,000
126
KIP(O&M) RBMC- Annual maintenance of canal- muncipal area-jungle clearance and removal of silt from the bed of canal from ch 45500m-49000m of RBMC and Ikkadu distributory from ch 0m-2063m under KIP(O&M) Section No 2/1 Adoor in connection with water distribution for the year 2017-18
2017/846/P2 KIPRBDII/2017/846/P
2
21-12-2017
2700-27-101-98-00-18 5,00,000 5,00,000
127
KIP(LB) Mukhathala distributary-Protecting the eroded side from ch.454m to ch.510m
2016/364/P2 KIPLBDV/2016/364/P2

25-03-2017
2700-27-101-98-00-18 2,05,000 2,05,000
128
KIP (O&M) RBMC Annual maintenance of canals-Jungle clearance and removal of silt from ch.49000m to 52000m of RBMC under KIP (O&M) Section No. 2/1, Adoor in connection with water distribution for the Year 2016-17
2016/325/P2 KIPRBDII/2016/325/P
2
28-02-2017
2700-27-101-98-00-18 1,75,000 1,75,000
129
KIP (O&M) Rectification work of RB Main Canal from Ch. 48150m to 48230 m
2017/2018/P2 KIPRBDII/2017/218/P
2
30-03-2017
2700-27-101-98-00-18 14,35,000 14,35,000
130
KIP (O&M) Constructing aqueduct in place of collapsed flume and rectification of remaining section of flume in Mallika distributory of RBMC from ch. 2935m to 3105m.
2016/312/P2 KIPRBDII/2016/312/P
2
29-03-2017
2700-27-101-98-00-18 27,00,000 25,00,000
131
KIP(LB) Paravoor distributary Maintenance re-plastering to lining for a length of 85m between ch 10915m to 11000m
2016/392/P2 KIPLBDV/2016/392/P2

24-03-2017
2700-27-101-98-00-18 1,40,000 1,40,000
132
PIP LBC Urgent rectification works to Kannamkara sub distributory of Mavelikara East branch canal and allied works
2016/310/P2 PIPD/2016/310/P2
15-03-2017
2700-16-101-98-00-18 4,66,000 4,66,000
133
PIP LBC Urgent rectification work to Umbernad aquduct and allied works
2016/190/P2 PIPD/2016/190/P2
28-03-2017
2700-16-101-98-00-18 9,62,000 9,62,000
134
PIP- RBC- Rectification works to Thiruvanvandoor Branch Canal bet. CH. 700 M to 1130 M
2017/132/P2 PIPD/2017/132/P2
17-03-2017
2700-16-101-98-00-18 3,00,000 2,98,325
135
PIP LBC RECTIFICATION WORKS TO THE PULIYOR BRANCH CANAL BETWEEN CH 2500M AND 3000M
2016/201/P2 PIPD/2016/201/P2
28-03-2017
2700-16-101-98-00-18 5,74,000 5,74,000
136
PIP LBC rectification works to the canal bet CH 30900m to 30970m
EST NO 2018 14 P2 ORDER No. PIPD/2018
/14/P2
15-03-2018
2700-16-101-98-00-18 8,09,000 8,09,000
137
KIP LB Paravoor distributory urgent side protection work at ch.17740m
2016/361/P2 KIPLBDV/2016/361/P2

25-03-2017
2700-27-101-98-00-18 2,13,000 2,12,498
138
PIP- LBC rectification works to the canal bet Ch 19700 M to 19900 M
2017/201/P2 PIPD/2017/201/P2
28-03-2017
2700-16-101-98-00-18 6,59,000 6,59,000
139
PIP- RBC- Rectification works to Kuttoor Branch canal bet. ch. 3700 M to 4400 M.
2017/133/P2 PIPD/2017/133/P2
17-03-2017
2700-16-101-98-00-18 4,00,000 3,97,619
140
PIP LBC Rectification works to the canal bet CH 29000m to 29050m and 29150m to 29180
EST NO 2018 15 P2 printed on ORDER No. PIPD/2018
/15/P2
15-03-2018
2700-16-101-98-00-18 8,00,000 8,00,000
141
KIP Dam at parappar -Annual maintenance -KIP RB Secction No 3/2 Thenmala-Charges for Chemical analysis of Reservoir water by the Public health Laboratory,Thiruvananthapuram for the year 2016-17
2016/197/P2 KIPRBDII/2016/197/P
2
28-03-2017
2700-27-101-98-00-18 1,50,000 1,50,000
142
KIP-RB-Konny distributary -Ugent temporary arrangements for theRectification of the breached portion of the canal between CH.70 m and 200m.
2017/239/P2 KIPRBDII/2017/239/P
2
31-03-2017
2700-27-101-98-00-18 3,00,000 3,00,000
143
KIP RB-Removal of floating bodies, lubricating and controlling shutters etc.from Konny distributary from CH. 0m to 15000m under KIP RB Section No 3/2 Thenmala in connection with water distribution for the year 2016-17
2016/107/P2 KIPRBDII/2016/107/P
2
15-02-2017
2700-27-101-98-00-18 1,64,000 1,64,000
144
KIP Dam at parappar -Annual maintenance -KIP RB Secction No 3/2 Thenmala- Charges for Chemical analysis of Reservoir water by the Public health Laboratory,Thiruvananthapuram for the year 2016-17
2016/197/P2 KIPRBDII/2016/197/P
2
28-03-2017
2700-27-101-98-00-18 1,50,000 1,50,000
145
CRDS - Annual maintenance - Clearing and removing heavy blockages from branch canals and distributories during water distribution under RBC section No-1 Chalakudy for the year 2016-17
2016/187/P2 IIPDII/2016/187/P2
03-11-2016
2701-02-000-82(00) 1,50,000 1,50,000
146
CRDS - Annual maintenance - Clearing and removing heavy blockages from branch canals and distributories during water distribution under RBC Section No-1 for the year 2016-17.
2016/187/P2 IIPDII/2016/187/P2
03-11-2016
2701-02-101-98-00-00-18 1,50,000 1,50,000
147
Annual maintenance of Vazhappilly MD ,Mudavoor MD,Kadathy MD & Palakkattuchira FC
2017/360/P2 PVIPD1/2017/360/P2
13-11-2017
2700-01-101-98-00-18 5,65,000 5,65,000
148
PVIP- Annual maintenance of Nellad MD and Kunnikkurudi FC
2017/356/P2 PVIPDI/2017/356/P2
10-11-2017
2700-01-101-98-00-18 4,60,000 4,60,000
149
PVIP-Rectification works near ch 17 km for preventing leakage and side slip of Kodanad East Branch Canal.
2016/121/P2 PVIPDI/2016/121/P2
13-02-2017
2700-01-101-98-00-18 7,00,000 7,00,000
150
Annual maintenance of LLC 15300m to 18500m.
2017/387/P2 PVIPD1/2017/387/P2
13-11-2017
2700-01-101-98-00-18 7,65,000 7,65,000
151
PIP LBC URGENT RECTIFICATION WORKS TO PULIYUR BRANCH CANAL NEAR CH 1290m AT THE BREACHED PORTION
2016/382/P2 PIPD/2016/382/P2
20-12-2016
2700-16-101-98-00-18 10,46,000 10,46,000
152
PVIP -Annual maintenance of Kodanadu West B.C from Ch.0m-4000m
2017/352/P2 PVIPDI/2017/352/P2
10-11-2017
2700-01-101-98-00-18 7,60,000 7,60,000
153
PVIP -Annual maintenance of Vattakkattupady MD
2017/398/P2 PVIPDI/2017/398/P2
10-11-2017
2700-01-101-98-00-18 4,18,000 4,18,000
154
PVIP - Annual maintenance of Kodanadu West B.C fromCh.4000m-7000m
2017/346/P2 PVIPDI/2017/346/P2
10-11-2017
2700-01-101-98-00-18 7,12,000 7,12,000
155
PVIP Annual maintenance of Kodanadu west branch canal from 7.00 km to 10.670 km
2017/409/P2 PVIPDI/2017/409/P2
13-11-2017
2700-01-101-98-00-18 7,15,000 7,15,000
156
PVIP Annual maintenance of Mudakuzha west M D, Vadoopadam F C,Pralaikadu F C and Pandikadu FC
2017/348/P2 PVIPDI/2017/348/P2
10-11-2017
2700-01-101-98-00-18 5,74,000 5,74,000
157
PVIP Annual maintenance of Thurithy M.D, Puzhukadu F.C and Thuruthikara F.C.
2017/347/P2 PVIPDI/2017/347/P2
09-11-2017
2700-01-101-98-00-18 2,80,000 2,80,000
158
PVIP -Annual maintenance of Perumbavoor sub branch canal from ch. 0 to 2.50 km
2017/399/P2 PVIPDI/2017/399/P2
09-11-2017
2700-01-101-98-00-18 2,11,662 2,11,662
159
PVIP- Annual Maintenance to Karukapilly MD 4.05km -7 km &Kadamattom MD 0-2.50km
2017/443/P2 PVIPDII/2017/443/P2

10-11-2017
2700-01-101-98-00-18 4,40,000 4,40,000
160
PVIP-Annual Maintenance to HLC 24 Km-24.312 Km and Kolenchery Branch Canal from 0-2km
2017/434/P2 PVIPDII/2017/434/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
161
PVIP-Annual Maintenance to Mazhuvannor Branch Canal from 5.2 km to 8.5km
2017/439/P2 PVIPDII/2017/439/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
162
PVIP- Annual Maintenance to Karukapilly MD 4.05km -7 km &Kadamattom MD 0-2.50km
2017/443/P2 PVIPDII/2017/443/P2

10-11-2017
2700-01-101-98-00-18 4,40,000 4,40,000
163
PVIP-Annual Maintenance to Mangalathunada MD from 0 km to 5.07 km
2017/445/P2 PVIPDII/2017/445/P2

10-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
164
PVIP-Annual Maintenance to Mazhuvannoor Branch canal from 2.2km to 5.2 km
2017/438/P2 PVIPDII/2017/438/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
165
PVIP-Annual Maintenance to Mazhuvannor Branch Canal from 5.2 km to 8.5km
2017/439/P2 PVIPDII/2017/439/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
166
PVIP-Annual Maintenanace to Kolenchery Branch canal from ch 2km to 4.60km
2017/435/P2 PVIPDII/2017/435/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
167
PVIP-Annual Maintenance Valamboor MD (LLC)0-2.88km ,Mazhuvannoor F.C 0-1.58KM & Kadakkanad MD 0-1.96km
2017/442/P2 PVIPDII/2017/442/P2

10-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
168
PVIP-A nnual Maintenance to Mazhuvannoor Branch canal from 0 to 2.2km
2017/436/P2 PVIPDII/2017/436/P2

09-11-2017
2700-01-101-98-00-18 3,92,000 3,92,000
169
PVIP-Natural calamity-Rain damages-Urgent Rectification works in between ch 1.460km and 1.580 km of Kadamattom MD
2018/396/P2 PVIPDII/2018/396/P2

25-10-2018
2700-01-101-98-00-18 24,60,000 24,60,000
170
PVIP Annual maintenance of Alungappadom and Vachal Mundakom FC
2017/410/P2 PVIPDI/2017/410/P2
09-11-2017
2700-01-101-98-00-18 2,94,000 2,94,000
171
CRDS - Annual maintenance of RBMC between ch.31/700km to ch.35/000km for the year 2014-15
Nil A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,50,000 2,49,841
172
CRDS - Annual maintenance of RBMC between ch.30/400km & ch.31/700km for the year 2014-15
Nil A1-1236/2014 of EE
19-09-2014
2701-02-101-98-00-00-18 1,25,000 1,24,921
173
CRDS - Annual mace clearing and removing floating materials and heavy blockages from canal wherever necessary including railway siphon and trash trap during water distribution under RBC section no.2 for the year 2014-15
Nil A1-1236/2014 of EE
19-09-2014
2701-02-101-98-00-00-18 1,60,000 1,59,400
174
CRDS - Annual mace of clearing and removing blockages from canal wherever necessary during water distribution under RBC section no.2 for the year 2015-16
Nil A1-1236/2014 of EE
28-09-2015
2701-02-101-98-00-00-18 1,00,000 99,132
175
CRDS - Annual mace of RBMC between ch.35/200km & ch.42/000km for the year 2015-26
Nil A1-1236/2014 of EE
28-09-2015
2701-02-101-98-00-00-18 1,50,000 1,49,741
176
CRDS - Annual mace of RBMC between ch.31/700km & ch.35/000km for the year 2015-16
Nil A1-1236/2014 of EE
28-09-2015
2701-02-101-98-00-00-18 1,50,000 1,49,466
177
CRD Scheme - Formation and tarring of Aloor - Muriyad Padasekara canal bund road between ch.3/000km to ch.3/600km of Muriyad branch canal
Nil G.O.(Rt) No.97/2014
/WRD at Tvm
29-01-2014
2701-02-101-98-00-00-18 15,00,000 14,92,657
178
PVIP-Annual maintanance-Clearing blockages in U.T,Syphon, culvert,cut and cover etc,in Kizhakkambalam branch canal and its distributories
2016/234/P2 PVIPDII/2016/234/P2

24-10-2016
2700-01-101-98-00-18 1,49,967 1,49,967
179
P.V.I.P -Rectification works to the breached portion in 5th km of Puthencruz MD.
2016/244/P2 PVIPDII/2016/244/P2

02-03-2016
2700-01-101-98-00-18 2,50,000 2,50,000
180
PVIP Protection works to prevent leakage bet ch 750M to 850 M of Chithrapuzha M D
2017/55/P2 PVIPDII/2017/55/P2
22-02-2017
2700-01-101-98-00-18 5,00,000 5,00,000
181
PVIP Providing Lining near ch 3 km of kolenchery branch canal to prevent leakage
2017/49/P2 PVIPDII/2017/49/P2
25-03-2017
2700-01-101-98-00-18 13,49,914 13,49,914
182
PVIP Protection works near ch 500M of Pancode M D
2017/57/P2 PVIPDII/2017/57/P2
21-02-2017
2700-01-101-98-00-18 5,50,000 5,50,000
183
LAC ADS Providing chipping carpet to right bund of Kizhakkambalam branch canal from ch 6 /50KM to7/00Km including link road upto Mar Kourilose School
2017/243/P2 G.O.(Rt)No.254/2017
/WRD
29-03-2017
2700-01-101-98-00-18 10,00,000 10,00,000
184
PVIP- Removal of weeds blockage and slipped up earth from panely branch canal and its MD,S during water distribution for the year 2020-21
2020/664/P2 PVIPDI/2020/664/P2
21-10-2020
2700-01-101-98-00-18 2,00,000 2,00,000
185
PVIP- Rectification works to damaged culvert at ch 1200m of kottapppady sub branch canal
2020/590/P2 PVIPDI/2020/590/P2
21-10-2020
2700-01-101-98-00-18 5,00,000 5,00,000
186
PVIP-Rectification works to damaged portion of kodampilly M D canal from ch 2200m to 2300m
2020/591/P2 PVIPDI/2020/591/P2
21-10-2020
2700-01-101-98-00-18 5,00,000 5,00,000
187
MLA SDF Constructing a bridge across P V I P Vadavucode M D at Mullackathazhom in Vadavucode Puthencruz grama panchayat
2018/82/P2 F2-DCEKM /2127/2019

02-03-2019
2700-01-101-98-00-18 16,50,000 16,50,000
188
PVIP- Protection works in 1st km. of Karukappilly M.D.
2017/47/P2 PVIPDII/2017/47/P2
21-02-2017
2700-01-001-97(00) 6,00,000 6,00,000
189
PVIP-URGENT SPECIAL MAINTENANCE BETWEEN CH 3.5 TO 5 KM OF EDAKKATTUVAYAL MD
2016/252/P2 PVIPDII/2016/252/P2

27-10-2016
2700-01-101-98-00-18 3,98,763 3,98,763
190
PVIP-URGENT SPECIAL MAINTENANCE BETWEEN CH 5 KM TO TAIL END OF KANJIRAMATTOM MD
2016/251/P2 PVIPDII/2016/251/P2

24-10-2016
2700-01-101-98-00-18 3,47,876 3,47,876
191
PVIP-ANNUAL MAINTENANCE- CLEARING BLOCKAGE AND SLIPPED EARTH DURING WATER DISTRIBUTION IN KANJIRAMATTOM, EDAKKATTUVAYAL MD THIRUVANKULAM MD AND ITS DISTRIBUTORIES.
2016/245/P2 PVIPDII/2016/245/P2

27-10-2016
2700-01-101-98-00-18 1,49,287 1,49,287
192
PVIP-Urgent Special Maintenance Between ch 0 to Tail end of Amballoor MD
2016/246/P2 PVIPDII/2016/246/P2

24-10-2016
2700-01-101-98-00-18 3,49,161 3,49,161
193
PVIP- Rectification works at slipped portion of Thiruvankulam MD near ch 7km -balance work
2017/50/P2 PVIPDII/2017/50/P2
16-02-2017
2700-01-101-98-00-18 6,00,000 6,00,000
194
PVIP-Rectification works between ch 0 km to 1 km of Edakkattuvayal MD
2017/51/P2 PVIPDII/2017/51/P2
16-02-2017
2700-01-101-98-00-18 5,50,000 5,50,000
195
PVIP-Rectification works between ch 7km to tail end of Kanjiramattom Distributory
2017/52/P2 PVIPDII/2017/52/P2
16-02-2017
2700-01-101-98-00-18 6,50,000 6,50,000
196
PVIP-Rectification works to damaged portion of panely branch canal at ch 2400m
2020/1118/P2 PVIPDI/2020/1118/P2

10-11-2020
2700-01-101-98-00-18 9,70,000 9,70,000
197
PVIP-Annual maintenance of Vadasserry MD Canal from ch o km to tail end for the year 2020-2021.
2020/1111/P2 PVIPDI/2020/1111/P2

10-11-2020
2700-01-101-98-00-18 50,000 50,000
198
PVIP-Annual Maintenance of kottappady sub branch canal from ch okm to tail end for the year 2020-2021
2020/1115/P2 PVIPDI/2020/1115/P2

10-11-2020
2700-01-101-98-00-18 2,50,000 2,50,000
199
PVIP-Annual Maintenance of panely F C Canal from CH 0KM to tail end for the Year 2020-2021
2020/1116/P2 PVIPDI/2020/1116/P2

10-11-2020
2700-01-101-98-00-18 3,00,000 3,00,000
200
PVIP NATURAL CALAMITY RECONSTRUCTION OF WASHED OUT CULVERT AND SIDE PROTECTION WALL OF THE INSPECTION ROAD AT CH 22.500Km. OF H.L.C
2017/1012/P2 PVIPDII/2017/1012/P
2
25-10-2018
2700-01-101-98-00-18 54,40,000 41,00,000
201
KIP (LB) ANNUAL MAINTENANCE OF CANAL - REMOVAL OF FLOATING BODIES AND ACCUMULATED WASTE FROM VARIOUS CANALS IN THE SECTION OF LBMC 2 Km, PULAMON DISTRIBUTORY AND ITS DISTRIBUTARIES , KUDVATTOOR DISTRIBUTORY AND DISPOSE THE WASTE ECO-FRIENDLY ENVIRONMENT IN CONNECTION WITH WATER DISTRIBUTION F
2019/2497/P2 KIPRBDII/2019/2497/
P2
26-12-2019
2700-27-101-98-00-18 1,87,000 1,76,000
202
PVIP-Urgent rectification works to prevent seepage near Ch. 6.4km of Paravoor Branch canal.
2018/137/P2 PVIPDII/2018/137/P2

16-03-2018
2700-01-001-97(00) 21,40,000 21,40,000
203
PVIP-MLA-ADS-2018-19-Re -Construction of 2 Nos culvert near chainage 2.5km of Varapuzha Sub branch canal.
2018/154/P2 RD2-976/19
03-08-2019
2700-01-001-97(00) 13,77,000 13,77,000
204
Rectication works to preventing leakage near ch. 11.50km of paravoor branch canal and re construction of damaged foot bridge wing wall due to flood 2018 near ch.1.80 km 0f karumalloor sbc.
2018/380/P2 PVIPDII/2018/380/P2

25-10-2018
2700-01-001-97(00) 10,00,000 10,00,000
205
PVIP-Reconstruction of damaged flume due to flood 2018 in Kottappuram SBC near Ch. 4km
2018/794/P2 PVIPDII/2018/794/P2

31-01-2019
2700-01-001-97(00) 8,00,000 8,00,000
206
PVIP-MLA-LAC-ADS -Providing retaining wall and canal lining works-Thaikkattukara sub branch canal near ch. 900m .
2018/350/P2 RD2-103/19
29-01-2019
2700-01-001-97(00) 16,50,000 16,50,000
207
PVIP - ENGAGING LABOUR FOR COLLECTING AND DISPOSING WASTE OF pARAVOOR BRANCH CANAL cH.8KM TO 12.71km AND ITS DISTRIBUTORIES 2019 -20
2019/2128/P2 ORDER No. PVIPDII/2
019/2128/P2
27-11-2019
2700-01-101-98-00-18 1,50,000 1,50,000
208
PVIP - ENGAGING LABOUR FOR COLLECTING AND DISPOSING WASTE FROM NETS OF PARAVOOR BRANCH CANAL FROM CH 0 TO 8 KM AND ITS DISTRIBUTERIES 2019 -2020
2019/2124/P2 ORDER No. PVIPDII/2
019/2124/P2
16-11-2019
2700-01-101-98-00-18 8,00,000 8,00,000
209
M&R- Annual maintenance and operation of Illikkal,Ettumuna,Karanchira,Kottenkottuvalavu,Koothum akkal regulator and temporary bund at Koothumakkal for the year 2020-22
2020/3722/IA IDTsr/2020/3722/IA
17-12-2020
2701-80-800-97-34-03 2,63,000 2,63,000
210
N.I.P - Urgent rectification works at various chainages of Vizhinjam branch canal including cleaning of Railway well syphon and N.H.cut & cover.
2020/688/IA IDTvm/2020/688/IA
28-03-2020
2700-11-101-98-00-18 7,53,000 7,20,000
211
N.I.P.Proposed construction of a cut & cover at Ch.3200m of Marukil branch channel.
2020/1068/IA PLG/1425/2019-2-/DP
C/DPO/TVM
22-01-2020
2700-11-101-98-00-18 12,00,000 12,00,000
212
NIP Side protection work near ch 4600m of Vizhinjam Branch Channel.
2020/4640/IA  IDTvm/2020/4640/IA
07-12-2020
2700-11-101-98-00-18 3,00,000 3,00,000
213
P. I. P. -RBC- Rectification works of Kumbanad branch canal portion from Ch. 70 m to 1000 m
2018/196/P2 PIPD/2018/196/P2
02-11-2018
2700-16-101-98-00-18 11,00,000 11,00,000
214
NIP Construction of a cut and cover near Ch 2017 m of Chenkal minor branch channel at Madhavassery
2018/4682/IA IDTvm/2018/4682/IA
25-11-2019
2700-11-101-98-00-18 9,85,000 9,71,000
215
NIP Construction of a cut and cover near Ch 50 m of Ettichivila (Pazhukkad) subchannel after removing the existing damaged pipes
2018/4922/IA IDTvm/2018/4922/IA
25-11-2019
2700-11-101-98-00-18 8,26,000 8,26,000
216
Maintenance of K.D.Division office at Thanneermukkom
2018/58/KP KDDTm/2018/58/KP
06-03-2019
2701-80-800-97-34-03 12,00,000 12,00,000
217
NIP- Providing Toilet Block and other facilities
2019/7417/IA IDTvm/2019/7417/IA
20-02-2020
2700-11-101-98-00-18 18,10,000 18,10,000
218
Improvements to the basic facilities of Resort Buiding at Dam Campus
2019/10219/IA IDTvm/2019/10219/IA

28-11-2019
2700-11-101-98-00-18 4,50,000 4,50,000
219
NIP-Repairs to shutters in RBC at ch.1130,8150,14935.
2019/7423/IA IDTvm/2019/7423/IA
28-11-2019
2700-11-101-98-00-18 6,00,000 5,70,000
220
NIP-Side protection work at ch 10350m of RBC near Kamukinkodu temple
2019/7419/IA IDTvm/2019/7419/IA
28-11-2019
2700-11-101-98-00-18 8,00,000 7,90,000
221
M&R- Constructing and Maintaining Konthipulam Chira for the Period from 01-12- 2016 to 30-6-2017
2016/754/IA IDTsr/2016/754/IA
14-10-2016
2701-80-800-97-34-03 2,74,875 2,74,875
222
M&R Constructing and maintaining Karukulam chira for the period from 1/12/16 to 30/06/2017
2016/953/IA IDTsr/2016/953/IA
11-11-2016
2701-80-800-97-34-03 6,41,368 6,41,160
223
M&R Removal of obstructions of kolechal from Puthenthodu bridge to Thanissery for 2016-17
2016/858/IA 1008/2016/WRD DT 26
/12/2016
04-01-2017
2701-80-800-97-34-03 4,49,350 4,49,350
224
M&R Removal of obstructions in kolechal from Thommana to Konthipulam in Muriyad kayal for 2016-17
2016/832/IA 1008/2016/WRD DT 26
/12/2016
04-01-2017
2701-80-800-97-34-03 6,99,300 6,53,100
225
M&R Constructing and Maintaining Kanathodu chira for the period from 1-12-2017 to 30-06-2018
2017/2158/IA IDTsr/2017/2158/IA
24-11-2017
2701-80-800-97-34-03 16,10,000 16,10,000
226
M & R - REMOVAL OF OBSTRUCTIONS IN KOTTACHAL FROM TAIL END OF CHETTUPUZHA CHAL TO CHALADI PAZHAMKOLE BRIDGE AT KOTTACHAL FOR 2016-17
2016/897/IA IDTsr/2016/897/IA
14-10-2016
2701-80-800-97-34-03 3,50,000 3,26,550
227
M & R - REMOVAL OF OBSTRUCTIONS BETWEEN KIZHAKE KARIMPADAM AND PADINJARE KARIMPADAM KOLE PADAVU AND IN KANNOTH CHAL FROM MANALI PUZHA KANNOTH TO THE MOUTH OF CHEMEEN CHAL FOR 2016-17
2016/889/IA GO (Rt) No. 1008/20
16/WRD DT 26/12/2016
26-12-2016
2701-80-800-97-34-03 3,50,000 3,50,000
228
M&R-REMOVAL OF OBSTRUCTIONS IN MULLASSERY CANAL FROM PATHIYARKULANGARA JUNCTION TO MULLUR VALIYAPALAM FROM 2016-17
2016/853/IA GO (Rt) No. 1008/20
16/WRD
26-12-2016
2701-80-800-97-34-03 4,00,000 3,73,583
229
PVIP - Annual maintenance of Aluva branch canal from 2.800 Km to 3.100 Km and Removing obstructions during water distribution from canals, syphons, aqueducts etc of Aluva branch canal and its SBCs for the year 2020-21.
 2020/722/P2  PVIPDII/2020/722/P2

05-11-2020
2700-01-101-98-00-18 5,00,000 5,00,000
230
M & R - REMOVAL OF OBSTRUCTIONS IN MULLASSERY CANAL FROM PATHIYARKULANGARA JUNCTION TO PULLUR PALAM FOR 2016-17
2016/856/IA GO (Rt) No. 1008/20
16/WRDDATED 26-12-2016
04-01-2017
2701-80-800-97-34-03 4,50,000 4,50,000
231
NIP Side protection works in Vadacodu Branch Channel between Ch 5347M and 5437M
2019/6466/IA IDTvm/2019/6466/IA
26-11-2019
2700-11-101-98-00-18 5,62,300 4,11,000
232
KIPLB Kottiyam Branchcanal Construction of trashrack at ch 400m and urgent rectification of canal from Ch 265m to 410m for preventing leakage
2020/205/P2 KIPLBDV/2020/205/P2

02-02-2021
2700-27-101-98-00-18 8,00,000 8,00,000
233
M & R - Removal of obstruction of kole chal from Puthenthodu bridge to Thanissery for 2016-17
2016/858/IA GO (Rt) No. 1008/20
16/WRD
26-12-2016
2701-80-800-97-34-03 4,49,350 4,49,350
234
NIP Protection works between Ch 1950 m to 2000 m and 2600 m to 2640 m and construction of a foot bridge at Ch 2360 m of west branch channel
2017/253/IA IDTvm/2017/253/IA
27-03-2017
2700-11-101-98-00-18 16,00,000 15,99,789
235
NIP Maintenance of Sub-division and Section buildings at Neyyattinkara
2017/263/IA IDTvm/2017/263/IA
31-03-2017
2700-11-101-98-00-18 13,50,000 13,50,000
236
NIP Protection works between Ch2400 m and 2550 m of Chaikottukonam branch channel
2017/268/IA . IDTvm/2017/268/IA

27-03-2017
2700-11-101-98-00-18 16,00,000 16,00,000
237
NIP Restoration and bund protection of Poovar East branch channel between Ch 4750 m and 4850 m
2017/269/IA IDTvm/2017/269/IA
23-03-2017
2700-11-101-98-00-18 8,00,000 8,00,000
238
NIP Restoration and bund protection of Chaikottukonam branch channel from 0 m to 50 m Ch 1000 m to 1075 m and Ch 1500 m to 1600 m
2017/264/IA IDTvm/2017/264/IA
27-03-2017
2700-11-101-98-00-18 10,00,000 10,00,000
239
NIP Closing leakage from Ch 565 m to 600 m and maintenance of aqueduct at Ch 1900 m of Vadacode branch channel
2017/276/IA IDTvm/2017/276/IA
27-03-2017
2700-11-101-98-00-18 1,00,000 10,00,000
240
SDRF-Rectification works to the eroded bank of Kudavattoor Distributory in between Ch.1500m To Ch.2300m.
201/2109/P2 KIPRBDII/2019/2019/
P2
29-08-2019
2700-27-101-98-00-18 4,87,000 4,87,000
241
PVIP Supplying and fixing toys at Bhoothathankettu childrens park
2018/544/P2 PVIPDI/2018/544/P2
31-10-2018
2700-01-101-98-00-82 6,00,000 6,00,000
242
NIP- Reformation of works between Ch.14127M and 14192M of Poovar East Branch Channel
2019/6428/IA IDTvm/2019/6428/IA
26-11-2019
2700-11-101-98-00-18 2,93,000 2,37,000
243
PVIP Flood damages Rectification works to the breached portion of left side bund of main canal at ch 7250 m
2018/433/P2 PVIPDI/2018/433/P2
19-09-2018
2700-01-101-98-00-18 24,00,000 24,00,000
244
to be deleted
2019/ 2390/P2 PVIPDI/2019/2390/P2

28-11-2019
2700-01-101-98-00-18 3,50,000 3,50,000
245
PVIP Rectification works to the damaged UT and side protection works to the Kothamangalam branch canal near ch.4300mtr and side protection works at ch.6500mtr
2018/437/P2 PVIPDI/2018/437/P2
20-10-2018
2700-01-101-98-00-18 5,50,000 5,50,000
246
PIP Main canal-Urgent construction of side protection wall near ch. 16000m at Puthamon
2019/3221/P2 PIPD/2019/3221/P2
28-11-2019
2700-16-101-98-00-18 9,80,000 9,80,000
247
P I P Main canal Rectification works to the canal from ch- 12058 m to 12200 m
2018/35/P2 PIPD/2018/35/P2
15-03-2018
2700-16-101-98-00-18 8,16,000 8,16,000
248
PIP- Main canal breach at ch. 4200m - Construction of a temporary wall at the breached portion to facilitate emergency water supply
2016/412/P2 PIPD/2016/412/P2
03-03-2017
2700-16-101-98-00-18 3,00,000 3,00,000
249
NIP Restoration and bund protection of Poovar West Branch channel between Ch 8570 m to 8615 m
2017/262/IA IDTvm/2017/262/IA
23-03-2017
2700-11-101-98-00-18 8,00,000 8,00,000
250
NIP Maintenance of off take portion of Poovar West branch channel
2017/278/IA IDTvm/2017/278/IA
08-03-2017
2700-11-101-98-00-18 5,00,000 5,00,000
251
NIP Protective works and silt removal of SL 2/8 Ch 7398 m of CADA 0 m to tail end of Vadacode Branch Channel at Thozhukkal
2017/4703/IA IDTvm/2017/4703/IA
22-03-2018
2700-11-101-98-00-18 1,87,500 1,87,500
252
NIP Bund protection works between SP 4/6 at ch 5486 m to 5600 m of Vadacodu Branch Channel
2017/5201/IA IDTvm/2017/5201/IA
24-03-2018
2700-11-101-98-00-18 9,56,000 9,56,000
253
NIP Restoration of olathanni Branch channel from Ch 580 m to 800 m
2018/513/IA IDTvm/2018/513/IA
23-03-2018
2700-11-101-98-00-18 14,53,000 14,53,000
254
NIP Protection works of Olathanni Right Sub Channel between ch265m and 400m
2018/600/IA IDTvm/2018/600/IA
23-03-2018
2700-11-101-98-00-18 14,82,000 14,82,000
255
Restoration Poovar West Branch Channel from Ch 4120m to 4220m and 4400m to 4600m
2017/4519/IA IDTvm/2017/4519/IA
23-03-2018
2700-11-101-98-00-18 10,00,100 10,00,100
256
NIP Construction of Retaining wall from ch 16300 m to 16380m of Poovar West Branch Channel
2018/503/IA IDTvm/2018/503/IA
24-03-2018
2700-11-101-98-00-18 9,08,500 9,08,500
257
KIP(O&M)-Annual maintanence of Edakkadu I distributory from ch.0m to 2030.5m and its field boothies.
2020/1160/P2 KIPRBII/2020/1160/P
2
16-12-2020
2700-27-101-98-00-18 2,26,000 2,19,000
258
NIP Restoration of Poovar East Branch Channel from ch 490 m to 540 m and 2990 m to 3060m .
2018/546/IA IDTvm/2018/546/IA
20-03-2018
2700-11-101-98-00-18 3,39,000 3,39,000
259
NIP Constructing and stacking RCC boundary Posts at Neyyattinkara office compound for the use of boundary demarcation
2018/857/IA IDTvm/2018/857/IA
20-03-2018
2700-11-101-98-00-18 2,73,000 2,73,000
260
KIP(O&M)-Annual maintanence of Sasthamcotta branch canal from ch.15000m to 18650m.
2020/1322/P2 KIPRBDII/2020/1322/
P2
16-12-2020
2700-27-101-98-00-18 3,05,000 3,05,000
261
NIP Restoration of olathanni Branch Channel from ch 90m to 210m
2018/545/IA IDTvm/2018/545/IA
20-03-2018
2700-11-101-98-00-18 4,88,000 4,88,000
262
KIP(O&M)-Annual maintanence of Sasthamcotta Branch canal from ch.7000m to 11005m.
2020/1158/P2 KIPRBDII/2020/1158/
P2
16-12-2020
2700-27-101-98-00-18 3,31,000 3,31,000
263
KIP(O&M)- Annual maintenance of enath III distributory from ch o m to 2824m and its field boothies
2020/1153/P2 KIPRBDII/2020/1153/
P2
16-12-2020
2700-27-101-98-00-18 3,58,000 3,58,000
264
KIP ( O&M) jungle clearance of Sasthamcotta Branch Canal from ch 11005 to 15000m
2020/1159/P2 KIPRBDII/2020/1159/
P2
16-12-2020
2700-27-101-98-00-18 3,34,000 3,34,000
265
KIP (O&M)-Annual Maintenance of canals-Removal of floating bodies lubricating and controlling shutters etc. in Sasthamcotta Branch Canal from ch 7000m to 18650m Enath III distributary and its field boothies, Iverkala main distributory and its minor Iverkala 1st sub canal and its field booties,
2020/892/P2 KIPRBDII/2020/892/P
2
30-10-2020
2700-27-101-98-00-18 2,50,000 2,50,000
266
KIP(O&M) Annual maintenance of Edakkadu II distributary from om 2000m.
2020/1161/P2 KIPRBDII/2020/1161/
P2
16-12-2020
2700-27-101-98-00-18 1,00,000 1,00,000
267
KIP(O&M) providing temporary bund along the side of breached portion of Edakkadu II distributory at ch 3720m
2019/2471/P2 KIPRBDII/2019/2471/
P2
17-01-2020
2700-27-101-98-00-18 97,000 97,000
268
KIP(O&M) providing temporary bund along the side of breached portion of Edakkadu II distributory at ch 2010m at Ezhammile.
2019/2473/P2 KIPRBDII/2019/2473/
P2
22-01-2020
2700-27-101-98-00-18 56,000 56,000
269
KIP(O&M)-Annual maintenance of canals removal of floating bodies and debris from Sasthamcotta Branch Canal from 7000m to18650m, Enath III distributory its 9 field booties ( 8498m), Iverkala main distributary and minor1(6293), Iverkala Ist distributary and its 5 field booties(6810m), Iverkala II
2019/3182/P2 KIPRBDII/3182/P2
20-12-2019
2700-27-101-98-00-18 2,65,000 2,65,000
270
KIP(O&M)urgent rectification work of sasthamcotta Branch Canal due to a cavity formed on canal bund near the under tunnel at ch 7400m
2018/283/P2 KIPRBDII/2018/283/P
2
17-01-2019
2700-27-101-98-00-18 8,00,000 8,00,000
271
KIP(O&M)-Cherukunnam distributory -Urgent rectification work-Construction of Protection wall for erroded side bund of canal at ch 7740m
2020/270/P2 KIPRBD11/2020/270/P
2
30-03-2020
2700-27-101-98-00-18 2,60,000 2,60,000
272
NIP Annual maintenance Periodical removal of waste materials and garbages from the whole channels under Neyyattinkara Section for one year.
2018/833/IA IDTvm/2018/833/IA
20-03-2018
2700-11-101-98-00-18 2,99,000 2,99,000
273
NIP protection works of Off Take of Perumpazhuthoor Sub Channel and protection works of Thozhukkal field channel at ch 165m to 700m and new Grills of Vadacode branch Channel
2018/543/IA IDTvm/2018/543/IA
23-03-2018
2700-11-101-98-00-18 4,14,000 4,14,000
274
KIP(O&M) Annual maintenance of canals- Sathamcotta Branch canal -Municipal area-Clearing light jungle, silt removal from ch 3160m to 5890m
2020/863/P2 KIPRBD11/2020/863/P
2
28-10-2020
2700-27-101-98-00-18 3,00,000 3,00,000
275
NIP Restoration of Poovar East Branch Channel from Ch 7046 m to 7220 m
2018/903/IA IDTvm/2018/903/IA
24-03-2018
2700-11-101-98-00-18 7,65,000 7,65,000
276
NIP Restoration of Manalivila Subchannel U/S of Manalivila Venpakal Road crossing at Puthuveettukara
2018/1061/IA IDTvm/2018/1061/IA
31-03-2018
2700-11-101-98-00-18 5,96,000 5,96,000
277
NIP Restoration of Chaikottukonam Sub Channel from Ch 1675 m to 1750 m
2018/1659/IA IDTvm/2018/1659/IA
22-08-2019
2700-11-101-98-00-18 6,61,000 6,61,000
278
NIP Restoration of Manaloor Sub Channel and construction of Retaining wall D/S of Gurumandiram between ch 100m and 200m
2018/1861/IA IDTvm/2018/1861/IA
05-03-2019
2700-11-101-98-00-18 10,54,000 10,54,000
279
KIP(O&M) Ammakandakara distributory -Urgent rectification work from ch 625m and ch 1085m to 1255m
2020/262/P2 KIPRBD11/2020/262/P
2
30-03-2020
2700-27-101-98-00-18 3,00,000 3,00,000
280
NIP Restoration of Chaikottukonam Sub Channel from Ch740 m to830 m
2018/1786/IA IDTvm/2018/1786/IA
09-03-2019
2700-11-101-98-00-18 3,80,000 3,71,000
281
KIP(O&M)-RBMC-Annual maintenance of canals-Removal of floating bodies,lubricating shutters etc from RBMC from ch.43000 to 44015m,Kodumon distributory from ch.0m to 5315m,Sasthamcotta branch canal from ch.0m to 7000m,Enath 2 distributory from ch.0m to 6660m and minor IIA,Field boothies IIA and
2020/866/P2 KIPRBDII/2020/866/P
2
28-10-2020
2700-27-101-98-00-18 2,50,000 2,50,000
282
KIP(O&M)- Annual maintenance of canal 2020- 21 Kodumon distributory from ch 0m to 2580m and from ch 2580m to 5315m
2020/1356/P2 KIPRBDII/2020/1356/
P2
16-12-2020
2700-27-101-98-00-18 2,80,000 2,80,000
283
KIP(O&M)-Annual maintanance of canal-Municipal area-jungle clearance and removal of silt from bed of canal -Peringanad distributory from ch 2030m to 3270m(Adoor Municipality) in connection with water distribution for the year 2020-21
2020/862/P2 KIPRBDII/2020/862/P
2
28-10-2020
2700-27-101-98-00-18 1,00,000 1,00,000
284
KIP(O&M)- Annual maintenance of Enath II &IIA minor and field boothy IIA &IIB,Enath II distributary from ch 0m to 4578m, ch-4578m to 6660 m and enath IIA distributry from ch.0m to 1540 m
2020/1352/P2 KIPRBDII/2020/1352/
P2
16-12-2020
2700-27-101-98-00-18 3,00,000 3,00,000
285
KIP(O&M)-RBMC-Annual maintenance of canals-Removal of floating bodies,lubricating shutters etc from RBMC from ch.43000 to 44015m,Kodumon distributory from ch.0m to 5315m,Sasthamcotta branch canal from ch.0m to 7000m,Enath 2 distributory from ch.0m to 6660m and minor IIA,Field boothies IIA and
2020/866/P2 KIPRBDII/2020/866/P
2
28-10-2020
2700-27-101-98-00-18 2,50,000 2,50,000
286
KIP(O&M)- Annual maintenance-Enath I distributory -from ch.0m to 2950m
2020/1351/P2 KIPRBDII/2020/1351/
P2
16-12-2020
2700-27-101-98-00-18 1,60,000 1,60,000
287
Cutting felling down tree on the banks of Cherukunnam distributory
2020/531/P2 KIPRBDII/2020/531/P
2
27-08-2020
2700-27-101-98-00-18 6,600 6,600
288
Felling down of dangerous tree standing by the sides of Peringanad distributary at ch 2730m
2020/453/P2 KIPRBDII/2020/453/P
2
21-07-2020
2700-27-101-98-00-18 13,100 13,100
289
KIP(O&M) - Providing out door sign boards at various canal crossing points
2020/462/P2 KIPRBDII/2020/462/P
2
22-07-2020
2700-27-101-98-00-18 37,000 37,000
290
KIP(O&M) - Annual maintenance of canals - Municipal area - Clearing light jungle, silt remoaval from Sasthamcotta Branch Canal from ch.3160m to 5390m (Adoor municipality) in connection with water distribution for the year 2019-20
2019/3159/P2 KIPRBDII/2019/3159/
P2
20-12-2019
2700-27-101-98-00-18 2,75,000 2,75,000
291
KIP(O&M)-RBC- Annual maintenance of canal - Muncipal area- Jungle clearance and removal of silt from the bed of canal - Peringanadu distributory from ch.2030m to 3270m (Adoor Municipality) in connection with water distribution for the year 2019-20
2019/3160/P2 KIPRBDII/2019/3160/
P2
18-12-2019
2700-27-101-98-00-18 1,20,000 1,20,000
292
KIP (O&M) - Annual maintenance of canals-Removal of floating bodies, lubricating and controlling shutters etc. from RBMC from ch 43000 to 44015m, Kodumon distributary from ch 0m to 5315m, Sasthamcotta branch canal from ch.0m to 7000m, Enath 2 distributary from ch. 0m to 6660m and minor IIA, f
2019/3158/P2 KIPRBDII/2019/3158/
P2
20-12-2019
2700-27-101-98-00-18 2,50,000 2,50,000
293
KIP(O&M) -Annual maintenance of canals - Removal of floating bodies lubricating and controling shutters etc. from Peringanadu distributary from ch 0m to 3270m, Payyanalloor distri. from ch 0m to 4680m, Payyanallor minor from ch 0m to 1310m, Ammakandakara distributary from ch 0m to 2210m. Cher
2019/3157/P2 KIPRBDII/2019/3157/
P2
20-12-2019
2700-27-101-98-00-18 2,50,000 2,50,000
294
NIP Bund protection of Right Bank Main Canal downstream of S/P near Ch 20518 m at Keezhpattuvila colony
2017/274/IA IDTvm/2017/274/IA
27-03-2017
2700-11-101-98-00-18 10,00,000 10,00,000
295
NIP Restoration and bund protection of Vadacode branch channel between Ch 4500 m and Ch 4584 m
2017/277/IA IDTvm/2017/277/IA
08-03-2017
2700-11-101-98-00-18 4,00,000 4,00,000
296
NIP Protective works in Vandannoor Sub Channel between Ch 500M and 700M
2019/6463/IA IDTvm/2019/6463/IA
06-12-2019
2700-11-101-98-00-18 8,13,000 8,13,000
297
NIP Bund raising of Right Bank Main Canal from Ch 21850 m to 21950 m and construction of off take shutter of Vadacode branch channel
2017/275/IA IDTvm/2017/275/IA
08-03-2017
2700-11-101-98-00-18 5,00,000 5,00,000
298
NIP Closing leakage between Ch 176 m to 290 m of Punnakkadu subchannel and construction of off take shutter
2017/279/IA IDTvm/2017/279/IA
27-03-2017
2700-11-101-98-00-18 5,00,000 5,00,000
299
NIP Construction of Box culvert across Perumpazhuthoor NIP Sub channel
2017/3310/IA D1-3360/17
11-10-2017
2700-11-101-98-00-18 3,35,000 3,35,000
300
NIP Urgent removal of rocks blocked silt and jungle clearance in between Ch 725 m and 1200 m at Puthracadu colony in Vadacode branch channel
2017/2897/IA IDTvm/2017/2897/IA
10-11-2017
2700-11-101-98-00-18 2,50,000 2,50,000
301
NIP- Side protection works between Ch.15168M and 15318M of Poovar East Branch Channe
2019/6429/IA IDTvm/2019/6429/IA
06-12-2019
2700-11-101-98-00-18 5,66,000 4,52,000
302
NIP Annual Maintance Periodical removal of waste material and garbages from the whole channel under Neyyattinkara Section for One year
2019/6500/IA IDTvm/2019/6500/IA
27-11-2019
2700-11-101-98-00-18 3,00,000 3,00,000
303
NIP Restoration of Vandannoor Sub Channel between Ch 200M and 400M
2019/6464/IA IDTvm/2019/6465/IA
06-12-2019
2700-11-101-98-00-18 10,39,000 8,41,000
304
NIP Restoration of works between CH 16400M and 16550M of Poovar East Branch ChanneL
2019/6430/IA IDTvm/2019/6430/IA
26-11-2019
2700-11-101-98-00-18 4,20,000 3,43,000
305
NIP Restoration works between Ch 2513M and 2708M of Vadacodu Branch Channel
2019/6471/IA IDTvm/2019/6471/IA
26-11-2019
2700-11-101-98-00-18 6,46,000 6,46,000
306
NIP Restoration of Poovar West Branch Channel from Ch 9150 m to 9290 m
2018/1661/IA IDTvm/2018/1661/IA
26-11-2019
2700-11-101-98-00-18 6,84,000 6,84,000
307
NIP Restoration of Poovar East Branch channel from ch 7220 m to 7420 m
2018/1862/IA IDTvm/2018/1862/IA
18-02-2020
2700-11-101-98-00-18 7,63,000 7,63,000
308
NIPReformation work for Manalivila sub channel US and DS between Ch1550m and 1700m of Venpakal road crossing at Puthuveettukara
2019/6403/IA IDTvm/2019/6403/IA
10-12-2019
2700-11-101-98-00-18 3,53,000 3,53,000
309
MLA SDF Construction of a Box Culvert in Front of CSI Maruthomkoottom in Poovar west branch channel
2018/5258/IA D1-1658/20
26-06-2020
2700-11-101-98-00-18 4,81,000 4,81,000
310
KIP(O&M)--Rectification work of FB III and IV of Enath III distributory between ch.652.5m to 860m.
2021/1071/P2 KIPRBDII/2021/1071/
P2
28-05-2021
2700-27-101-98-00-18 4,50,000 4,50,000
311
KIP(O&M)-Monsoon preparedness- Felling of Accacia tree near SBC near ch.16070m at ESI Junction, Kadampanadu
2021/1073/P2 KIPRBDII/2021/1073/
P2
26-05-2021
2700-27-101-98-00-18 10,000 10,000
312
PVIP Rectification works to Aqueduct at 17/716 km and Aqueduct at ch 22/500 km of HLC by guniting
2020/658/P2 PVIPDII/2020/658/P2

30-10-2020
2700-01-101-98-00-18 8,00,000 8,00,000
313
KIP LB Kulakkada Branch canal Construction of trash net at ch5500m and urgent rectification relining of canal from Ch6455m to 6977m
2021/796/P2 KIPLBDV/2021/796/P2

06-07-2021
2700-27-101-98-00-18 7,00,000 7,00,000
314
KIP(RB ) Installation of name boards near to KIP structures and at road crossing points
2020/500/P2 KIPRBDII/2020/500/P
2
17-08-2020
2700-27-101-98-00-18 22,400 22,400
315
PVIP - Upkeeping and maintenance of IB at Aluva PVIP compound for the year 2020-21.
 2020/729/P2  PVIPDII/2020/729/P2

29-03-2021
2700-01-101-98-00-18 2,50,000 2,50,000
316
PVIP - Annual maintenance of Aluva branch canal and Removing obstructions during water distribution from canals, syphons, aqueducts etc of Aluva branch canal and its SBCs for the year 2021-22.
 2021/177/P2  PVIPDII/2021/177/P2

30-06-2021
2700-01-101-98-00-18 4,50,000 4,50,000
317
PIP LBC urgent desilting works of Pandanadu branch canal from ch. 2000m to 2500m
2021/666/P2 PIPD/2021/666/P2
25-02-2021
2700-16-101-98-00-18 41,000 41,000
318
PIP-LBC-Maintenance of office building of section no 9 & 10 at Angadikal South
2020/738/P2 PIPD/2020/738/P2
15-10-2020
2700-16-101-98-00-18 6,00,000 6,00,000
319
PIP - RBMC - Rectification works to Main canal from ch. 13150m to 13300 m.
2019/1136/P2 PIPD/2019/1136/P2
05-02-2020
2700-16-101-98-00-18 10,60,000 10,60,000
320
PIP - Maintenance of Sub division office building at PIP Campus Chengannur
2019/1165/P2 PIPD/2019/1165/P2
10-02-2020
2700-16-101-98-00-18 8,93,000 8,93,000
321
PIP- Maintenance of PIP Division office building at PIP campus Chengannur
2019/1164/P2 PIPD/2019/1164/P2
25-01-2020
2700-16-101-98-00-18 5,00,000 5,00,000
322
PIP - Maintenance of AEE Quarters at PIP Campus Chengannur
2019/2279/P2 PIPD/2019/2279/P2
10-02-2020
2700-16-101-98-00-18 2,50,000 2,50,000
323
PVIP-MLA-ADS 2019-20 Construction of Bridge across Aluva branch canal at Ch. 9.60km in ward No. 19 of Vazhakulam gramapanchayath
2019/3140/P2  RD6-1009(2)/2020
22-05-2020
2700-01-101-98-00-18 27,00,000 27,00,000
324
P.I.P. (L.B.C.) Annual maintenance- clearing jungles and removing silt from LB Main canal from ch.35000m to 38150m
2019/2335/P2 PIPD/. PIPD/2019/23
35/P2
25-11-2019
2700-16-101-98-00-18 4,00,000 4,00,000
325
PIP SDRF PIP RBC) Urgent rectification to Mangalam branch canal from ch 0 m to 1000 m
2019-219-P2 PIPD-2019-219-P2
02-05-2019
2700-16-101-98-00-18 1,50,000 1,50,000
326
NIP-Restoration of Chowara branch channel in between Ch. 16000m to 21000m including canal bund protection works
2020/5602 IDTvm/2020/5602/IA
23-01-2021
2700-11-101-98-00-18 3,00,000 3,00,000
327
NIP-Construction of retaining wall near Ch.19700m of Vizhinjam branch channel
2020/5609 IDTvm/2020/5609/IA
23-01-2021
2700-11-101-98-00-18 10,00,000 10,00,000
328
NIP-Annual cleaning of channels under NIP Pallichal section for one year -RBMC, Branch Channels and Channel Section Pallichal Office compound.
2020/5756/IA . IDTvm/2020/5756/I
A
06-02-2021
2700-11-101-98-00-18 3,00,000 3,00,000
329
NIP-Maintenance work at Channel Section Pallichal office and installing sliding gate in office compound
2020/5607IA IDTvm /2020/5607/IA

06-02-2021
2700-11-101-98-00-18 3,00,000 3,00,000
330
NIP-Providing 3 shutters and allied works in field boothies (Ramapuram field boothy, Peruvilakam field boothy, and Moolachalkonam field boothy) in RBMC
2020/5757/IA IDTvm/2020/5757/IA
01-02-2021
2700-11-101-98-00-18 5,00,000 5,00,000
331
N.I.P.Right side bund protection near ch. 8500 m of Vizhinjam Branch Channel.
2017/2766/IA IDTvm/2017/2766/IA
11-03-2019
2700-11-101-98-00-18 9,31,000 9,31,000
332
NIP-Left bund side protection of retaining wall Nannankuzhy ch. 8000m in Chowara branch channel and providing 2 nos. shutters.
2018/5548/IA IDTvm/2018/5548/IA
06-03-2019
2700-11-101-98-00-18 6,90,000 6,90,000
333
PIP RBC Rectification works to main canal between ch 19000 m to 19200 m
PIPD/2019/2089/P2
05-02-2020
2700-16-101-98-00-18 13,00,000 13,00,000
334
NIP_Removing the Boulders from ch. 2400m to 7000m of Vellayani West Branch channel and providing a retaining wall at Ch.6050m in Venganoor Grama panchayath
2018/5166/IA IDTvm/2018/5166/IA
09-03-2019
2700-11-101-98-00-18 22,000 2,20,000
335
NIP-protecting the damaged right bund portion of vellayani north branch channel at ch. 6950m in thiruvananthapuram corporation
2018/5793/IA IDTvm/2018/5793/IA
09-03-2019
2700-11-101-98-00-18 2,80,000 2,80,000
336
PIP- RBC-Rectification works to the piers of Kaduvanpara aqueduct between CH. 1920 m and 2200 m of Kuttoor Branch Canal
2019-1192-P2 PIPD/2019/1192/P2
24-02-2020
2700-16-101-98-00-18 16,00,000 16,00,000
337
NIP Side protection works near Chitticode Temple Ch 1200m of Marukil branch channel
2018/3040/IA IDTvm /2018/3040/IA

09-03-2019
2700-11-101-98-00-18 4,51,000 4,20,000
338
NIP-Right Side protection works near Ch.2200m of Vellayani west branch channel
2019/8906/IA IDTvm/2019/8906/IA
07-12-2019
2700-11-101-98-00-18 6,23,000 6,23,000
339
NIP - Side protection works near ch. 15700m right bund of Chowara branch channel
2019/8612/IA IDTvm/2019/8612/IA
07-12-2019
2700-11-101-98-00-18 6,91,000 6,91,000
340
NIP-Restoration of canal from ch. 6900m to 7900m of Vellayani west Branch channel
2019/8903/IA IDTvm/2019/8903/IA
27-11-2019
2700-11-101-98-00-18 1,65,000 1,65,000
341
NIP_protecting the Right Bank side of Chowara branch channel near ch. 7100m at Attaramoola in Kottukal Gramapanchayath
2018/5297/IA IDTvm/2018/5297/IA
13-11-2019
2700-11-101-98-00-18 5,39,000 5,39,000
342
NIP_ Proposed construction of a bridge at ch. 5900m of chowara branch channel
2019/8461/IA IDTvm/2019/8461/IA
07-12-2019
2700-11-101-98-00-18 4,60,000 4,60,000
343
NIP-Restoration of canal from ch.29000m to 30750 of RB main canal
2019/9059/IA IDTvm/2019/9059/IA
18-12-2019
2700-11-101-98-00-18 6,75,000 6,75,000
344
N.I.P - Prevention of leakage near CH.4600m and de-silting the canal from Ch.3200m to 4800m of Vellayani north branch channel
2019/9024/IA IDTvm/2019/9024/IA
07-12-2019
2700-11-101-98-00-18 3,35,000 3,35,000
345
NIP_Protecting the damaged left bund of chowara branch channel at ch.10m and allied works.
2019/6799/IA IDTvm/2019/6799/IA
05-12-2019
2700-11-101-98-00-18 8,16,000 8,16,000
346
N I P -Prevention of leakage near Ch.750m of Vellayani North branch channel.
2019/9061/IA IDTvm/2019/9061/IA
07-12-2019
2700-11-101-98-00-18 4,25,000 4,25,000
347
NIP-Annual cleaning of canals under pallichal section for one year including clearing light jungle at pallichal office compound.
2019/8892/IA IDTvm/2019/8892/IA
18-12-2019
2700-11-101-98-00-18 3,93,000 3,93,000
348
N.I.P-Proction works at the top of existing cut and cover and construction of retaining wall D/S left side at chainage 9300 of vellayani west branch channel.
2019/10106/IA D1-3291/19
18-11-2019
2700-11-101-98-00-18 4,90,000 4,90,000
349
N.I.P Protecting the right bund of Marukil branch channel near Ch.1000m
2019/8900/IA IDTvm/2019/8900/IA
07-12-2019
2700-11-101-98-00-18 7,70,000 7,70,000
350
N.I.P -Re- Constructon of damaged sluice and breached portion of canal left bund near ch.160m of Marukil Branch Channel
2019/6383/IA IDTvm/2019/6383/IA
07-12-2019
2700-11-101-98-00-18 13,80,000 13,78,000
351
N.I.P-RE-CONSTRUCTION OF NARROW LAND BARREL AT CH.13050M OF CHOWARA BRANCH CHANNEL.
2019/9321/IA IDTvm/2019/9321/IA
07-12-2019
2700-11-101-98-00-18 6,35,000 6,35,000
352
NIP-Protecting the Right bund of Vizhinjam branch channel near ch.5500m
2019/8627/IA IDTvm/2019/8627/IA
16-12-2019
2700-11-101-98-00-18 4,25,000 4,24,000
353
NIP-Re construction of retaining wall and sluice near ch.1950m of marukil branch channel
2018/872/IA IDTvm/2018/872/IA
23-03-2018
2700-11-101-98-00-18 1,62,000 1,62,000
354
PIP-LBC- Annual maintenance of Venmony branch canal from Ch.0 m to 5870 m for the year 2021-22
2021/260/P2 PIPD/2021/260/P2
12-05-2021
2700-16-101-98-00-18 2,00,000 2,00,000
355
NIP-Prevention of leakage in Vellayani East branch channel near Ch.1216m.
2020/182/IA IDTvm/2021/182/IA
31-03-2021
2700-11-101-98-00-18 2,53,000 2,20,000
356
PVIP-Urgent rectification works to the breached portion of pipe syphon of Madathipady MD near ch. 3100m
2021/314/P2 A3-2021/314/P2
12-02-2021
2700-01-101-98-00-18 2,27,000 2,27,000
357
NIP-Restoring clogged tunnels, cut and covers, slabs, wells and syphon etc. of various canals under channel section, Pallichal.
2021/1114/IA WP2-2745/19/D7
19-02-2021
2700-11-101-98-00-18 6,00,000 6,00,000
358
NIP-Maintenance of channel shutters under NIP channel section, Pallichal.
2021/833/IA WP2-2745/19/D7
19-02-0021
2700-11-101-98-00-18 5,50,000 5,50,000
359
N.I.P-Annual maintenance -periodical removal of waste materials and garbage from the whole channels under pallichal section for one year
2018/893/IA IDTvm/2018/893/IA
23-03-2018
2700-11-101-98-00-18 3,20,400 3,20,400
360
N I P Proposed construction of Retaining wall Near ch 5400 m at collapsed portion of Vellayani north branch channel
2017/4982/IA IDTvm /2017/4982/IA

02-02-2018
2700-11-101-98-00-18 17,10,000 17,08,226
361
N I P. proposed construction of Retaining wall near ch. 4400m breached portion of chowara branch channel
2017/4668/IA IDTvm/2017/4668/IA
20-03-2018
2700-11-101-98-00-18 6,20,000 6,20,000
362
NIP-Side protection of retaining wall Nannamkuzy ch-8000m in Chowara branch channel
2017/2641/IA IDTvm/2017/2641/IA
24-03-2018
2700-11-101-98-00-18 8,85,000 8,85,000
363
N I P Reconstruction of Breached portion at ch 3000 of in Vizhinjam branch channel
2017/4679/IA IDTvm /2017/4679/IA

13-03-2018
2700-11-101-98-00-18 6,00,000 6,00,000
364
NIP- Constructing and stacking R C C boundary posts at Pallichal office compound for the use of boundary demarcation
2018/894/IA IDTvm/2018/894/IA
23-03-2018
2700-11-101-98-00-18 3,46,000 3,46,000
365
NIP Side Protection works near ch 15500 of Chowara Branch channel
2017/2588/IA IDTvm /2017/2588/IA

24-03-2018
2700-11-101-98-00-18 11,60,000 11,60,000
366
NIP-Side protction works of vizhinjam branch channel at ch.3900m
2018/873/IA IDTvm/2018/873/IA
23-03-2018
2700-11-101-98-00-18 3,34,000 3,34,000
367
N I P Prevention of leakage near Ch 7600 m of Vizhinjam branch Channel
2018/679/IA IDTvm /2018/679/IA
23-03-2018
2700-11-101-98-00-18 3,73,000 3,73,000
368
MPLADS-2017-18 WORK PROPOSED BY Sri.SURESH GOPI, Honorable MP OF RAJYASABHA N.I.P-CONSTRUCTION OF A BRIDGE ( BOX CULVERT NEAR CH8000 M) AT VELLAYANI WEST BRANCH CHANNEL IN WARD No. 19 , KALLIYOOR GRAMA PANCHAYATH .
2017/4209/IA 765/2017/DPO/TVPM/M
PLADS/SG/20
20-12-2017
2700-11-101-98-00-18 4,90,000 4,90,000
369
NIP Restoration of canal from ch 16800m to 18500m of vizhinjam branch channal
2018/871/IA IDTvm /2018/871/IA
31-03-2018
2700-11-101-98-00-18 2,79,700 2,79,700
370
NIP Protection of Damaged sluices in ch.14000, 14100, 14150 in Vizhinjam Branch canal
2018/879/IA IDTvm/2018/879/IA
23-03-2018
2700-11-101-98-00-18 3,08,000 3,08,000
371
NIP-emergency side protection work at the breached portion near aqueduct 1/1 at ch.1000m of Vizhinjam Branch Channel
2016/1612/IA IDTvm/2016/1612/IA
06-10-2016
2700-11-101-98-00-18 6,07,075 6,02,993
372
NIP Annual maintenance Periodical removal of waste materials and garbage from the whole channels under Pallichal section for one year
2016/1613/IA IDTvm /2016/1613/IA

13-10-2016
2700-11-101-98-00-18 2,97,054 2,97,054
373
NIP-restoration of canal from Ch.28000m to 29000m of Right Bank Main canal
2017/143/IA IDTvm/2017/143/IA
10-02-2017
2700-11-101-98-00-18 3,62,526 3,62,526
374
NIP prevention of leakage near Ch 4800mof Vizhinjam Branch Channel
2017/376/IA IDTvm /2017/376/IA
08-03-2017
2700-11-101-98-00-18 3,99,844 3,97,670
375
NIP- Rectification of leading channel from the sluice at ch.6850m of Vizhinjam branch channel
2017/358/IA IDTvm/2017/358/IA
08-03-2017
2700-11-101-98-00-18 4,99,095 4,99,095
376
NIP cleaning the tunnel near Ch 2000m prevention of leakage near ch 2100m and providing shutters at Ch 0m of Marukil Branch channel
2017/435/IA IDTvm /2017/435/IA
06-03-2017
2700-11-101-98-00-18 6,99,847 6,95,818
377
NIP- rising height near and prevention of leakage near ch.13500m of Chowara branch channel
2017/415/IA IDTvm/2017/415/IA
27-03-2017
2700-11-101-98-00-18 3,99,586 3,99,586
378
NIP-Prevention of leakage and side protection near ch.27300m of RB Main canal
2017/346/IA IDTvm/2017/346/IA
27-03-2017
2700-11-101-98-00-18 26,99,631 26,99,631
379
NIP cleaning well syphon near ch 25000 providing shutter, prevention of leakage and rising height near ch 26000m of RB main canal
2017/348/IA IDTvm /2017/348/IA
28-03-2017
2700-11-101-98-00-18 10,38,206 10,38,206
380
NIP-Side protection works near Ch.19600m of Vizhinjam Branch Channel.
2017/357/IA IDTvm/2017/357/IA
31-03-2017
2700-11-101-98-00-18 16,81,121 16,81,121
381
NIP Restoration of canal from Ch 6000m to 7000m of Vellayani North branch channel
2017/979/IA IDTvm /2017/979/IA
31-03-2017
2700-11-101-98-00-18 12,48,833 12,48,833
382
PVIP- Annual maintenance of Thengode MD, Thevakkal MD, Kuzhikkala MD and Ponvelipadam MD 2021-2022
2021/185/P2 PVIPDII/2021/185/P2

07-07-2021
2700-01-101-98-00-18 3,00,000 3,00,000
383
Prevention of leakage near ch 0m to 60m of Vellayani East Branch Channel
2017/890/IA IDTvm /2017/890/IA
31-03-2017
2700-11-101-98-00-18 5,07,896 5,07,896
384
PIP-LBC- Urgent desilting works of Venmony branch canal from Ch.1000 m to 2500m.
2021/665/P2 PIPD/2021/665/P2
25-02-2021
2700-16-101-98-00-18 58,000 58,000
385
PVIP- Removing obstructions from canal and various nets of Edappally branch canal during water distribution period 2021-22
2021/184/P2 PVIPDII/2021/184/P2

05-07-2021
2700-01-101-98-00-18 5,00,000 5,00,000
386
PVIP Rectification works of Edappally branch canal at Ch 5km
2021/251/P2 PVIPDII/2021/251/P2

01-06-2021
2700-01-101-98-00-18 4,00,000 4,00,000
387
PVIP- Maintenance of PVIP quarters and Extension work for Office room of MI subdivision Aluva
2021/37/P2 PVIPDII/2021/37/P2
28-05-2021
2700-01-101-98-00-18 3,40,000 3,40,000
388
PVIP- Maintenance of PVIP Division Office at Aluva-2021-2022
2021/265/P2 PVIPDII/2021/265/P2

16-06-2021
2700-01-101-98-00-18 5,00,000 5,00,000
389
PIP RBC Rectification works to kuttoor branch canal at Ch 7700 m and providing improvements to road crossing portion
2021/855/P2 PIPD/2021/855/P2
31-03-2021
2700-16-101-98-00-18 45,000 45,000
390
NIP-Urgent rectification works to Viyannoor branch canal at ch.2200m, 2900m and 3175m
2018/5952/IA IDTvm/2018/5952/IA
08-03-2019
2700-11-101-98-00-18 14,00,000 14,00,000
391
NIP- Urgent protection work at ch.750m of LBC
2019/7414/IA IDTvm/2019/7414/IA
28-11-2019
2700-11-101-98-00-18 10,00,000 10,00,000
392
NIP-Protective worKs and closing leakage between ch.1800.00M & 2800.00M of LB Main Canal
2017/3275/IA IDTvm/2017/3275/IA
23-03-2018
2700-11-101-98-00-18 18,46,809 18,46,809
393
NIP-Urgent restoration/desilting works bet ch 3000m to 4500m of Viyannoor branch canal
2020/5721/IA IDTvm/2020/5721/IA
01-02-2021
2700-11-101-98-00-18 3,00,000 3,00,000
394
NIP-Urgent restoration/desilting works bet ch 1000m to 2750m of Edaval Branch canal
2020/5723/IA IDTvm/2020/5723/IA
14-12-2020
2700-11-101-98-00-18 3,00,000 3,00,000
395
NIP-Providing partitions inside the Irrigation Museum at Neyyar Dam, Maintenance and Conveyance of items to be displayed
2019/6950/IA IDTvm/2019/6950/IA
14-02-2020
2700-11-101-98-00-18 15,00,000 15,00,000
396
NIP-Construction of bridge near ch.1750m of RBC at Perinjamkadavu-Pattaikonam
2019/7420/IA IDTvm/2019/7420/IA
28-11-2019
2700-11-101-98-00-18 9,50,000 9,50,000
397
NIP-Urgent protection work at ch.14900m and leak proofing arrangements at ch.15150m of LBC
2019/7413/IA IDTvm/2019/7413/IA
04-12-2019
2700-11-101-98-00-18 15,00,000 15,00,000
398
NIP-Providing Compound wall and other facilities near Swimming Pool
2020/2232/IA IDTvm/2020/2232/IA
13-10-2020
2700-11-101-98-00-18 6,20,000 6,20,000
399
NIP- Annual maintenance periodical removal of waste materials and garbage from the LB main canal and whole branch canals under Neyyardam section for one year
2019/7415/IA IDTvm/2019/7415/IA
27-11-2019
2700-11-101-98-00-18 1,50,000 1,50,000
400
NIP-Urgent repairs to the foot bridge at ch.4065m of LBC and allied works
2019/8953/IA IDTvm/2019/8953/IA
28-11-2019
2700-11-101-98-00-18 7,60,000 7,60,000
401
NIP-Urgent protection works and closing leakage at ch 7700m of LBC
2020/5719/IA IDTvm/2020/5719/IA
14-12-2020
2700-11-101-98-00-18 7,00,000 7,00,000
402
NIP-Urgent protection works and closing leakage near ch 3100m of LBC
2020/5718/IA IDTvm/2020/5718/IA
14-12-2020
2700-11-101-98-00-18 10,00,000 10,00,000
403
NIP-Urgent protection works and closing leakage of Vadakara branch canal at chainages 150m, 200m, 250m, 1000m and 1100m.
2020/5722/IA IDTvm/2020/5722/IA
06-02-2021
2700-11-101-98-00-18 10,00,000 10,00,000
404
NIP-Repair and maintenance of old post office building at Neyyar Dam
2020/5728/IA IDTvm/2020/5728/IA
14-12-2020
2700-11-101-98-00-18 4,00,000 4,00,000
405
NIP-Renovation of internal roads of VIP Campus at Nedumangad
2020/5791/IA IDTvm/2020/5791/IA
17-02-2021
2700-11-101-98-00-18 12,00,000 12,00,000
406
NIP, Reformation of cut and cover at Chulliyoor subcanal, ch. 380m
2021/392/IA WP2-2745/19/D7
19-02-2021
2700-11-101-98-00-18 6,00,000 6,00,000
407
NIP- Maintenance of watcher shed near ch 16800m of LBC at Palkulangara (Alathoor)of Perukadavila
2021/790/IA WP2-2745/19/D7
19-02-2021
2700-11-101-98-00-18 6,00,000 6,00,000
408
NIP Renovation of Amaravila Sub Channel from Ch 782 m to Ch 2220 m and replacing damaged shutters
2018/840/IA IDTvm/2018/840/IA
20-03-2018
2700-11-101-98-00-82 3,05,000 3,05,000
409
Mansoon preparedness 2021-2022 KIP(RB) Canal - works related to felling down of dangerously standing trees and branches .
2021/1056/P2 KIPRBDII/2021/1056/
P2
26-05-2021
2700-27-101-98-00-18 80,000 80,000
410
KIP LB Taking fly levels and clearing jungles of Paravoor Disributory between between ch 23000m and 32330 and other minor distributories.
GO (RT) No 903/2019
/WRD
04-12-2019
2700-27-101-98-00-18 13,70,00,000 2,56,000
411
PVIP - Rectification works to Aluva Branch canal near Ch. 1 Km.
PVIPDII/2021/175/P2

04-06-2021
2700-01-101-98-00-18 5,00,000 5,00,000
412
PIP LBC Rectification works to Chennithala branch canal fromCh - 7632m to ch - 8032m
2019/2283/P2 PIPD/2019/2283/P2
30-11-2019
2700-16-101-98-00-18 10,00,000 10,00,000
413
SDRF -PIP - LBC -FD Rectification to Chennithala distributory between ch - 1000 m - 2500 and 3500 7000
2019/2237/P2 PIPD/2019/2237/P2
14-02-2020
2700-16-101-98-00-18 10,00,000 10,00,000
414
SDRF - PIP - LBC FD Rectification works to Main canal between ch - 26200m - 26330m
2019/1632/P2 PIPD/2019/1632/P2
22-11-2019
2700-16-101-98-00-18 15,00,000 15,00,000
415
SDRF PIP LBC FD Rectification to main canal between ch -26330m - 26460m
2019/1634/P2 PIPD/2019/1634/P2
14-11-2019
2700-16-101-98-00-18 15,00,000 15,00,000
416
SDRF -PIP - SDRF - PIP (LBC) Rectification works to the canal portion from ch-0m to 1658 m of Mambra branch canal
2019/1173/P2 PIPD/2019/1173/P2
20-09-2019
2700-16-101-98-00-18 7,00,000 7,00,000
417
PIP SDRF PIP LBC Rectification works to main canal between ch-28600m - 28730m
2019/1638/P2 2019/1638/P2
20-09-2019
2700-16-101-98-00-18 15,00,000 15,00,000
418
PIP SDRF PIP LBC Rectification works to main canal between ch -30500m - 30600m
2019/1644/P2 PIPD/2019/1644/P2
20-09-2019
2700-16-101-98-00-18 11,50,000 11,50,000
419
PIP SDRF PIP LBC Rectification works to main canal between ch-28900m - 29000m
2019/1639/P2 PIPD/2019/1639/P2
20-09-2019
2700-16-101-98-00-18 11,50,000 11,50,000
420
PIP Sub division Chengannur- SDRF - PIP - LBC - Rectification works to Sub distributory of Kanjirathom distributory Ch 0 M to 200M
2019/848/P2 PIPD/2019/848/P2
10-07-2019
2700-16-101-98-00-18 1,50,000 1,50,000
421
P I P L B C -Rectification works to the canal from ch 6460m to6550m and 6730m to6800m
2017/627/P2 PIPD/2017/627/P2
15-03-2018
2700-16-101-98-00-18 11,76,000 11,76,000
422
PIP- LBC- PROVIDING AND ERRECTING w METAL BEAM CRASH BARRIER ALONG THE LEFT SIDE OF CANAL NEAR CH.5580M
2017/174/P2 PIPD/2017/174/P2
28-03-2017
2700-16-101-98-00-18 1,41,000 1,41,000
423
PIP LBC Repair works to Naranganam branch canal bt. ch.0m to 260m
2017/115/P2 PIPD/2017/115/P2
18-03-2017
2700-16-101-98-00-18 2,96,353 2,96,353
424
P I P L B C Rectification works to the canal bt. ch 12650 m to 12780 m and 12990 m to 13100 m
2017/1029/P2 PIPD/2017/1029/P2
15-03-2018
2700-16-101-98-00-18 14,28,000 14,28,000
425
P I P L B C Rectification works to the canal bt. ch 1800 m to 1950 m
2017/1028/P2 PIPD/2017/1028/P2
15-03-2018
2700-16-101-98-00-18 8,67,000 8,67,000
426
PIP LBC - Annual maintenance to Main canal between ch -25022m - 28000m for the year 2020-21
2020/734/P2 PIPD/2020/734/P2
13-10-2020
2700-16-101-98-00-18 3,00,000 3,00,000
427
PIP-Chengannur -Sub division-SDRF- PIP LBC Rectification to main canal between ch 30970 m - 30990 m
2019/788/P2 PIPD/2019/788/P2
25-07-2019
2700-16-101-98-00-18 1,50,000 1,50,000
428
PIP LBC Rectification and leak arresting works to the upstream portion of Alacod aquaduct at ch 12330 m.
2018/51/P2 PIPD/2018/51/P2
15-03-2018
2700-16-101-98-00-18 13,15,000 13,15,000
429
P I P L B C Rectification and leak arresting works to the canal bt ch 12070 m to 12145 m
2018/50/P2 PIPD/2018/50/P2
15-03-2018
2700-16-101-98-00-18 12,39,000 12,39,000
430
PIP sub division Chengannur-SDRF- PIP LBC- Rectification works to main canal between ch-30422 M - 30442M
2019/787/P2 PIPD/2019/787/P2
27-07-2019
2700-16-101-98-00-18 1,50,000 1,50,000
431
PIP-Chengannur Sub Division - SDRF -PIP -LBC Rectification to main canal between ch-30447M- 30467 M
2019/786/P2 PIPD/2019/786/P2
10-07-2019
2700-16-101-98-00-18 1,50,000 1,50,000
432
PIP Chengannur Sub division - SDRF - PIP - LBC - Rectification to main canal between ch-30472m - 30492m
2019/785/P2 PIPD/2019/785/P2
10-07-2019
2700-16-101-98-00-18 1,50,000 1,50,000
433
PIP- SDRF - PIP LBC -Rectification works to Chennithala Branch Canal from ch 0m - 1000 M,2500-3500,7000-8000 M
2019/711/P2 PIPD/2019/711/P2
02-05-2019
2700-16-101-98-00-18 4,50,000 4,50,000
434
PVIP-Rectification works to preventing leakage from Ch.50m to 2.70Km of Erumathala Sub branch canal
2021/187/P2 PVIPD11/2021?187/P2

22-09-2021
2700-01-101-98-00-18 8,00,000 8,00,000
435
KIP (LB)-Annual maintenance -Clearing light Jungle of KIP Campus and Kallada House.
2021/781/P2 KIPLBDV/2021/781/P2

09-08-2021
2700-27-101-98-00-18 80,000 80,000
436
Annual maintenance of canals-Removal of floating bodies- Chavara distry from Ch.8500 m to 14767 m,Pattathanam minor distry,Chavara minor distry,Thlamugal distry,Menampally distry,kovilthottam distry,Kollaka distry,mukkuthodu distry,Kulangara bhagom distry,Poroorkkara distry,Kizhakkekara minor no.1di
2021/779/P2 KIPLBDV/2021/779/P2

09-08-2021
2700-27-101-98-00-18 1,60,000 1,60,000
437
NIP Restoration of Chowara branch canal between Ch 0m to 6150m
2021/4072/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
438
NIP - Restoration of Marukil branch canal between Ch: 3330mto 3940mand Ch:6150m to 8450m
2021/4073/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
439
NIP Prevention of leakage to Marukil Branch Canal fromCh 3440m to 3520m and 4030m to 4150m
2021/1171/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
440
NIP Clearing Vellayani North canal between Ch 4800m to 7000m
2021/4075/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
441
NIP Construction of retaining wall to Right bank canal at Ch 27950m
2021/4076/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
442
Annual maintenance of chira in Survey No. 131 of Virupakka village in Wadakkanchery river for the year 2021-22
2021/1412/IA IDTsr/2021/1412/IA
30-05-2021
2701-80-800-97-34-00 28,000 28,000
443
NIP Reformation works to Poovar east branch channel in various reaches Ch 860m, Ch 1600m, Ch 4950m
2021/3134/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 9,00,000 9,00,000
444
NIP Reformation works to Poovar west branch channel near ch 2000m
2021/3135/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 4,00,000 4,00,000
445
NIP Construction of a bridge across Left Bank Main Canal near Ch 18769 m
2020/2840/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 12,00,000 12,00,000
446
NIP Side protection works in poovar east branch channel near Ch 9250m
2021/3428/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 11,00,000 11,00,000
447
NIP Restoration of Kavuvila channel from Ch 250m to 700m
2020/2712/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 2,00,000 2,00,000
448
CRDS-Annual maintenance clearin syphon and well drops of all canals under RBC Section No.III for 2015-16
D2-542/RBC III/C/20
15
28-09-2015
2701-02-101-98-00-00-18 30,000 30,000
449
CRDS-Annual mace of Perambra distributory I & II for the year 2015-16
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,10,000 1,10,000
450
CRDS-Annual maintenance removing heavy blockages from canal wherever necessary during water distribution for 2014-15 under RBC Section No.III,Chalakudy
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 1,00,000 1,00,000
451
CRDS- Rectification woks to kaduppassery branch canal including side raising between ch. 0/300 to 1/00 km
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 1,20,000 1,20,000
452
CRDS-Rectification works to Parayanthodu branch canal between ch.1/600 km to 2/100 km and well drop near 2/100 km
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,00,000 2,00,000
453
CRDS- Annual maintenance of RBMC between ch.30/400 & 31/700 km for the year 2015-16
A1.1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,40,000 1,40,000
454
CRDS- Rectification work of RBMC between Ch. 31/800 and 31/950 Km
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 2,00,000 2,00,000
455
NIP Desilting side protection works between Ch 31500m to Ch 32000m and ch 32076m to Ch 32184 m of both side lining of LBC main channel
2021/4156/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 10,00,000 10,00,000
456
NIP Side protection works between Ch 370m to Ch 415m of kottakkakam sub channel
2021/4157/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
457
NIP Side protection works near ch 3100m of Nochiyoor branch channel
2021/4158/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 2,00,000 2,00,000
458
NIP Both side lining in Arayoor sub channel near Ch 1600m and fixed the off take shutter at Venkadanbu branch channel
2021/4160/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 4,00,000 4,00,000
459
NIP Side protection works in left bank of kollamcode branch channel at ch 19230m
2021/4161/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 10,00,000 9,90,000
460
NIP Left side protection works near Ch 1800m right side lining of mariyapuram sub channel
2021/4162/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 3,00,000
461
NIP construction of a retaining wall in the right side of kollamcode near ch 14665m
2021/4163/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 8,00,000 8,00,000
462
NIP Open canal Keezhambhagam East channel from ch 50m to 80m
2021/4165/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 5,00,000
463
CRDS-Annual maintenance of clearing and removing heavy b lockages during water distribution all branch canal and distributories under RBC Section No-1, Chalakudy
WP2/3033/2014/D12(a
)
18-09-2014
2701-02-101-98-00-00-18 1,00,000 1,00,000
464
CRD Scheme -RBMC - Annual maintenance of canal shutters under head works section Thumboormuzhy
D2-1110/14
20-09-2014
2701-02-101-98-00-00-18 50,000 50,000
465
CRDS Scheme -Annual maintenance of Kodakara Br. canal &Muriad br.canal for the year 2017-18
2017/724/P2 IIPDII/2017/724/P2
09-11-2017
2701-02-101-98-00-00-18 3,63,000 3,63,000
466
CRDS-Annual maintenance of RBMC from ch 35/200 km to 46/800km for the year 2017-18
2017/723/P2 IIPDII/2017/723/P2
09-11-2017
2701-02-101-98-00-00-18 4,80,000 4,80,000
467
PVIP-Providing and constructing slab over the Paravoor branch canal at Ch 7.600km for depositing waste
2021/210/P2 PVIPD11/2021/210/P2

29-09-2021
2700-01-101-98-00-18 6,70,000 6,70,000
468
PSM- Maintenance works for Shop buildings for the year 2021-2022
2021/540/IA IDTsr/2021/540/IA
11-07-2021
2701-01-101-98-00-18-00 10,00,000 10,00,000
469
CRD Scheme - Annual maintenance of clearing and removing the floating materials from the canal during water distribution through Attara, Karukuttikkara and Azhakam branch canal for the year 2014-15
D1-303/2014
19-09-2014
2701-02-101-98-00-00-18 75,000 75,000
470
KIP(LB) Annual Maintenance of canal- Removal of floating bodies and accumulated waste from Poovattoor distributory, Poovattor minor and Oyoor branch canal from ch o m to 3320 m, Nellikkunnam, Villangara, Plappally distributaries, Nellikkunnam minor distributory in connection with water distribution for the year 2021-22.
2021/1437/P2 KIPRBDII/2021/1437/
P2
22-10-2021
2700-27-101-98-00-18 6,00,000 6,00,000
471
KIP-LBMC- Annual maintenance of canal - Removal of floating bodies and accumulated waste from LBMC from Ch 29000 m to ch 41762 m in connection with water distribution 2021-22
2021/1438/P2 KIPRBDII/2021/1438/
P2
22-10-2021
2700-27-101-98-00-18 7,00,000 7,00,000
472
KIP (LB) Muttakkavu distributary lining of canal and Rectification of flume between ch. 2200m to 2500m
2021/868/P2 ORDER No. KIPLBDV/2
021/868/P2
14-09-2021
2700-27-101-98-00-18 4,55,000 4,55,000
473
Construction of canal bund road starting from the backside of Kanakkary Temple to Athirampuzha rout(ch,0/000m to 0/285m)
2018/1099/P2 D1/4645/18/M.J
02-01-2019
4700-80-800-89-00-00 10,70,000 10,70,000
474
NIP- Urgent protection of leakage occurred and protection of damaged bund near ch 4500 of RBC and providing sluice arrangements in the portion.
2021/4252/IA WP2-2264/2021/D7
23-09-2021
2700-11-101-98-00-18 3,00,000 2,99,100
475
NIP-Restoration of Vellayani west branch canal between Ch 7800m to11000m
2021/4071/IA WP2/2264/2021/D7
09-08-2021
2700-11-101-98-00-18 8,00,000 8,00,000
476
NIP- Reformation works including desilting in Olathanni branch channel from Ch. 0m to 5600m (including preventing leakage in aquiduct) and 6250m to 6425m, Olathanni left (350m)and right (980m) branch channel.
2021/2546/IA F.P.5-1686/2021
07-10-2021
2700-11-101-98-00-18 10,00,000 10,00,000
477
NIP-Restoration of Chaikottukonam sub channel from ch 3800 m to 3890 m
2021/4322/IA F.P.5-1686/2021
07-10-2021
2700-11-101-98-00-18 4,00,000 4,00,000
478
NIP-Annual canal maintenance of Parassala Section
2021/4762/IA FP5-1686/2021
07-10-2021
2700-11-101-98-00-18 3,00,000 3,00,000
479
Concreting of Cashew factory Mannarkonam Mullukadu KIP canal road in Town ward no.4 of Pooyappally Grama panchayath in Chathannoor Constituency
EST NO:2019/3316/P2 Plg.1103/MPLADS/17t
hLS/2019-20/DPO/KLM/NKP-FF,KIP(
04-01-2020
2700-27-101-98-00-18 10,00,000 10,00,000
480
CRD Scheme Annual Mace of Upkeeping of Head Regulator of LBMC at Ezhattumugham for the year 2014-15
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,00,000 2,00,000
481
CRD Scheme Annual Mace of LBMC 0/000 to 5/200 km for the year 2014-15.
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,50,000 2,50,000
482
CRD Scheme Annual Mace of Clearing and Removing the Floating Materials Clearing Water Distribution through the main canal amd Branch canals Including Watching Charges Under Irrigation LBC Section Chalakudy
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 2,50,000 2,50,000
483
CRD Scheme Urgent rectification works to Meloor branch canal bet Ch. 2/400 to 2/700 km
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 3,00,000 3,00,000
484
CRDS-Annual Mace of Clearing and Removing the Floating Materials from the canal during water Distribution Including Urgent Mace works to K.V main Koratty Branch , Konoor Branch Canal , M.V Branch Canal and K.V Branch Canal for the year 2014-2015.
A1-1236/2014
19-09-2014
2701-02-101-98-00-00-18 1,00,000 1,00,000
485
Urgent repairs and renovation of Guest House building in KIP Ravi Nagar Campus, Kottarakkara
2020/1080/P2 KIPRBDII/2020/1080/
P2
20-12-2021
2700-27-101-98-00-18 5,90,000 5,90,000
486
NIP - Investigation work for Construction of check dams in Neyyar Reservoir for Elephant Rehabilitation Center at Kottoor
2021/18/IA IDTvm/2021/18/IA
23-10-2021
2700-11-101-98-00-18 4,10,000 4,10,000
487
MLA SDF-Construction of KIP canal road in Velinalloor grama panchayath.
2021/1828/P2 D6-84/2022
14-01-2022
2700-27-101-98-00-18 5,00,000 5,00,000
488
Renovation of KIP Office complex building in Ravinagar campus,Kottarakkara
2021/1785/P2 KIPRBDII/2021/1785/
P
02-02-2022
2700-27-101-98-00-18 4,00,000 4,00,000
489
SC Development corpus Fund 2021-22 Mekkonam Sijo sound Thachonam Canal road concreting.
2022/812/P2 A7-4176/21
21-03-2022
2700-27-101-98-00-18 11,46,000 11,46,000
490
SDRF - KIP(LB) Sub Division no 19, Kottiyam - Rectification work in the Adichanalloor distributary in between ch 8600 to 9100m
2021/908/P2 KIPLBDV/2021/908/P2

06-07-2021
2700-27-101-98-00-18 14,60,000 14,60,000
491
GENERAL-CRDS/KTY/63/Tree&Branches/22-23-Cutting branches or trees standing dangerously on the canal bund under irrigaton section koratty for the year 22-23-General Civil Work
IRR/PII/EST/1319/2022_5_1_1 AS/59D/22/19691
07-06-2022
2701-02-101-98-00-00-18 1,00,000 1,00,000
492
PVIP-Action plan 2022 23 Urgent rectification of Rayamangalam MD near ch 900m
IRR/PII/EST_TS/1523/2022_5_7_4 AS/59D/22/20055
24-06-2022
2700-01-101-98-00-18 2,00,000 2,00,000
493
PVIP-Annual Maintenance of Mulavoor Branch Canal from ch 11/000km to 14/300km for the year 2022-23
IRR/PII/EST/1472/2022_5_1_1 AS/59D/22/20479
16-07-2022
2700-01-101-98-00-18 2,70,000 2,70,000
494
PVIP-Annual maintenance of Perumattom MD for the year 2022-23
IRR/PII/EST/1478/2022_5_1_1 AS/59D/22/20478
16-07-2022
2700-01-101-98-00-18 3,20,000 3,20,000
495
PVIP - Desilting of Mudakkuzha East M D between ch 5.00 km to 9.50 km including chiselling hard rock for maintaining the proper gradient of canal for the year 2022-23
IRR/PII/EST/2058/2022_5_1_1 AS/59D/22/20393
12-07-2022
2700-01-101-98-00-18 3,00,000 3,00,000
496
PVIP-Annual maintenance of Mulavoor Branch Canal from ch 0/600km to 5/000km for the year 2022-23
IRR/PII/EST/1468/2022_5_1_1 AS/59D/22/20480
16-07-2022
2700-01-101-98-00-18 3,50,000 3,50,000
497
GENERAL-CRDS/ANGLY/WD/KMain(9/400-12/400)/22-23-clearing and removing floating materials from the canal during water distribution through Kalady main canal between Ch. 9/400 km to 12/400 km, Vengoor branch canal, Kalady branch canal, Chengamanad branch canal, Thottakom branch canal for the year 2022-2023-General Civil Work.
IRR/PII/EST/1564/2022_5_1_1 AS/59D/22/21383
17-08-2022
2701-02-101-98-00-00-18 2,80,000 2,80,000
498
GENERAL-CRDS/ANGLY/WD/Kmain(0/000-9/400)/22-23-Clearing and removing floating materials from the canal during water distribution through Kalady main canal between Ch. 0/000 km to 9/400 km, South Bhoothamkutty Branch canal, Manjapra branch canal, Anappara branch canal, Manjapra distributory canal, Mundoppilly branch canal, Komarappadam branch canal and Naduvattom branch canal for the year 2022-2023-General Civil Work
IRR/PII/EST/1563/2022_5_1_1 AS/59D/22/21386
17-08-2022
2701-02-101-98-00-00-18 3,00,000 3,00,000
499
KIP DAM at Parappar - Annual maintenance of Residential and Non Rwsidential building at Thenmala Dam premises under KIP RB Section 3/2, Thenmala for the year 2021-22
2021/1322/P2.. KIPRBDII/2021/1322/
P2
14-10-2021
2700-27-101-98-00-18 2,50,000 2,50,000
500
K IP(LB) Rectification of damaged portion of Padinjattinkara distributary between chainage 2800m and 2900 m in Veliyam panchayath
. KIPRBDII/2021/137
3/P2
10-01-2022
2700-27-101-98-00-18 1,04,000 1,04,000
501
NIP-Preventing earth slipping and protection works at Ch 7050m of Chowara branch channel at Attaramoola.
2020/5531/IA WP2-2745/19/D7
19-02-2021
2700-11-101-98-00-18 3,00,000 3,00,000
502
NIP-Protection of damaged sluices in Ch 6550m Ch 14634m Ch 14819m of Vizhinjam Branch Channel including maintenance of flush escape at Ch 13500m and allied works
2020/5604/IA IDTvm/2020/5604/IA
01-02-2021
2700-11-101-98-00-18 3,60,000 3,60,000
503
NIP-Desilting and Reformation works to Vadacodu branch channel from ch:58m to Ch:3100 m and near ch:3455 m , Side protection works to Thozhukkal field channel near Ch:100 m
IRR/IA/EST/763/2022_5_1_1 WP2-3511/2022/D7
05-12-2022
2700-11-101-98-00-18 15,35,000 15,30,000
504
NIP- Desilting works to Poovar west branch channel at Ch: 0m to 20845m.
IRR/IA/EST/771/2022_5_1_1 WP2-3511/2022/D7
05-12-2022
2700-11-101-98-00-18 19,70,000 19,70,000
505
KIP Annual maintanance of canals-RBMC from ch 34320m to 43000m during waterdistribution for the year 2022-23
IRR/P2/EST/3770/2022/5_2_1 AS/59D/22/23466
03-11-2022
2700-27-101-98-00-18 3,00,000 3,00,000
506
PVIP - Removing obstructions from Aluva Branch Canal near Pattippara Aqueduct at Ch.6.1 Km.
2022/45/P2 .PVIPDII/2022/45/P2

08-03-2022
2700-01-101-98-00-18 1,17,000 1,17,000
507
PVIP- Urgent Rectification works to Thamarachalpuram Sub Branch Canal at the starting point of canal.
2021/1792/P2 PVIPDII/2021/1792/P
2
18-01-2022
2700-01-101-98-00-18 1,00,000 1,00,000
508
PIP-RBC- Urgent rectification works to Thiruvanvandoor Branch Canal from Ch. 0 m to 50 m
2022/1132/P2 PIPD/2022/1132/P2
24-03-2022
2700-16-101-98-00-18 1,50,000 1,50,000

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
CSIND- Improvements and Modernisation of Inland waterways-Development of feeder route of Kotti-Kottappuram waterway-Improvements to the bank of feeder route Mayicha river at Anakkaranmottakku in continuation of existing protection work in Cheruvathur panchayath
2016/1986/IA INDKnr/2016/1986/IA

28-12-2016
3075-60-800-97(00) 15,00,000 15,00,000
2
Development of Kotti-Kottappuram water way-Improvements to the bank of water way at the southern side of Ayitti boat jetty in Padanna Panchayth in Kasaragod District.-Reach-II
2017/2066/IA INDKnr/2017/2066/IA

31-03-2018
3075-60-800-97(00) 14,25,000 14,25,000
3
CSIND-IMPROVEMENTS AND MODERNISATION OF INLAND WATERWAYS-DEVELOPMENT OF FEEDER ROUTE OF KOTTI-KOTTAPPURAM WATERWAY-SIDE PROTECTION WORK AT SOUTHERN SIDE OF THEKKEKKAD BUND IN PADANNA PANCHAYATH
2016/1986/IA INDKnr/2016/1987/IA

28-12-2016
3075-60-800-97(00) 15,00,000 15,00,000
4
Karkkidaka vavu bali Reopening the flow of Parvathy Puthanar near Kunnumanal area at Poonthura between Ch 4265m to 4440m in Thiruvananthapuram district
ESTNO2016511IA INDKlm/2016/511
15-07-2016
3075-60-800-97(00) 9,19,000 9,19,000
5
Bund Removal near highway bridge at Akkulam
2017/1059/IA INDKlm/2017/1059/IA

30-05-2017
3075-60-800-97(00) 7,65,000 7,65,000
6
Formation of Temperory Passage at Km 458.930 and 459.060 of Badagara Mahe canal for solving hardship faced by Public
2017/3385/IA INDKnr/2017/3385/IA

22-09-2017
3075-60-800-97(00) 8,00,000 8,00,000
7
Maintenance of Ponnarimangalam boat Jetty in Ernakulam district
2018/5393/IA IDEkm/2018/5393/IA
01-02-2019
3075-60-800-97(00) 3,50,000 3,50,000
8
Urgent maintenance for office buildings of Inland navigation, Minor- Major Irrigation offices at Varkala
2019/10988/IA INDKlm/2019/10988/I
A
26-02-2020
3075-60-800-97(00) 19,60,000 19,50,000
9
Providing access to the boat jetty at Parassinikkadav
2019/67/IA INDKnr/2019/67/IA
03-10-2019
3075-60-800-97(00) 15,00,000 15,00,000
10
Maintenance of Mulavukadu Sub station Jetty in Ernakulam district.
2018/5403/IA IDEkm/2018/5403/IA
31-01-2019
3075-60-800-97(00) 3,00,000 3,00,000
11
CSIND- Removal of Water hyacinth from Changanacherry-Allapuzha boat route canal from Changanacherry boat Jetty to Vettithuruthu Jetty
2021/710/IA IDKtm/2021/710/IA
24-02-2021
3075-60-800-97-00-00-00 1,00,000 1,00,000
12
Sivagiri Theethadanam 2017 18 Urgent maintenance of bathing ghat drainage and Office compound at Sivagiri
INDKlm/2017/2343/IA

17-11-2017
3075-60-800-97(00) 4,85,000 4,85,000

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
KIP Dam at Parapar -Dam Safety works-Maintenance of step provided at the left side of Dam for the year 2016-17
2016/257/P2 KIPRBDII/2016/257/P
2
14-12-2016
2700-80-800-98(00) 6,79,991 6,79,991
2
STUDY OF KERALA COASTAL BELT Conducting Physical Survey and Collecting the Field data under coastal engineering section Thiruvananthapuram for the year 2018-19
2018/64/IDRB ORDER No. CEFSTsr/2
018/64/IDRB
27-02-2019
2711-02-800-99-03 4,28,000 4,28,000
3
Estimate for annual routine work (part) under coastal Erosion studies section Kozhikode for the year 2016-17 ( Shoreline measurements limited for 6 months period ie. from April to September 2016)
2017/10/IDRB CEFSTsr/2017/10/IDR
B
18-03-2017
2711-02-800-99-03 1,94,390 1,94,390
4
Estimate for annual routine work under Coastal Erosion Studies Section Kozhikode for the year 2017-18
2017/82/IDRB CEFSTsr/2017/82/IDR
B
09-01-2018
2711-02-800-99-03 3,82,312 3,82,312
5
Annual routine work under Coastal Erosion Studies Section, Parappanangadi for the year 2016-17
2017/9/IDRB CEFSTsr/2017/9/IDRB

18-03-2017
2711-02-800-99-03 1,99,495 1,99,495
6
Annual routine work under Coastal Erosion Studies Section, Parappanangadi for the year 2017-18
2017/81/IDRB CEFSTsr/2017/81/IDR
B
09-01-2018
2711-02-800-99-03 2,23,463 2,23,463
7
Annual routine work under Coastal Erosion Studies Section, Thalassery (Part) for the year 2016-17 (Kannur District) (Shore line measurements limited for 4months period (from April to July 2016)
2017/7/IDRB CEFSTsr/2017/7/IDRB

18-03-2017
2711-02-800-99-03 50,883 50,883
8
Annual routine work under Coastal Erosion Studies Section, Thalassery for the year 2017-18(Kannur District)
2017/83/IDRB CEFSTsr/2017/83/IDR
B
10-01-2018
2711-02-800-99-03 1,72,524 1,72,524
9
CES annual Estimate for conducting physical survey and collection of field data of coastal Engineering Section Ernakulam for the financial year 2015-16
NA/2015-16/IDRB DB/AS/36/2008(A)/DD
/Ekm
09-03-2020
2711-02-800-99-03 1,65,000 1,65,000
10
CES Annual Estimate for conducting physical survey and collection of field data of CES Section Cherthala for the year 2015-16
NA/2015-16/IDRB D2-225/2015(3)
09-03-2020
2711-02-800-99-03 2,07,000 2,07,000
11
Estimate for annual routine Works under coastal engineering section Thiruvananthapuram for the year 2016-17
CEFSTsr/2017/25/IDR
B
17-03-2017
2711-02-800-99-03 2,00,000 2,00,000
12
PSM- ANNUAL MAINTENANCE OF PEECHI DAM FOR THE YEAR 2020-2021
2020/1949/IA IDTsr/2020/1949/IA
06-09-2020
2702-03-101-98-03 2,50,000 2,50,000
13
PSM- Annual Maintenance of Peechi House & Rest House for the year 2020-2021
2020/3368/IA IDTsr/2020/3368/IA
06-09-2020
2701-01-101-98-00-18-00 4,00,000 4,00,000
14
PSM- Annual Maintenance of Swimming Pool for the year 2020-2021
2020/3373/IA IDTsr/2020/3373/IA
06-09-2020
2701-01-101-98-00-18-00 2,00,000 2,00,000
15
PSM- Annual maintenance of Peechi KERI Quarters and Pump House for the year 2020-2021
2020/3418/IA IDTsr/2020/3418/IA
08-09-2020
2701-01-101-98-00-18-00 4,50,000 4,50,000
16
PSM- Annual maintenance of Peechi garden for the year 2020-2021
2020/3812/IA IDTsr/2020/3812/IA
06-09-2020
2701-01-101-98-00-18-00 3,50,000 3,50,000
17
Estimate for annual routine work under Coastal Erosion Studies Section Thalassery (Part) for the year 2016-17( Kasaragod) ( Shore line measurements limited for 4 months period i.e from April to July 2016)
2017/8/IDRB CEFSTsr/2017/8/IDRB

18-03-2017
2711-02-800-99-03 1,55,195 1,55,195
18
CES Annual estimate for conducting physical survey and collection of field data of CES Section, Kozhikode for the year 2015-16
Dummy/2016 D2-225/2015(2)
09-03-2020
2711-02-800-99-03 3,13,000 3,13,000
19
CES Annual estimate for conducting physical survey and collection of field data of CES Section, Parappanangadi for the year 2015-16
Dummy/2016 DB-120/2020/CESSDKK
D
11-03-2020
2711-02-800-99-03 1,80,000 1,80,000
20
CES Annual estimate for conducting physical survey and collection of field data of CES Section, Thalassery for the year 2015-16
Dummy/2016 D2-225/2015(2)
09-03-2020
2711-02-800-99-03 4,80,000 4,80,000
21
Estimate for the study of sea coast -2018-19- Physical survey and collection of field data of Coastal Engineering Section Ernakulam
2018/104/IDRB Dummy
01-04-2018
2711-02-800-99-03 2,10,000 2,10,000
22
Annual estimate for conducting physical survey and collection of field data of Coastal Engineering Section Chavakkad for the year 2019-2020
2019/170/IDRB Dummy
01-03-2020
2711-02-800-99-03 4,20,000 4,20,000
23
Estimate for the study of sea coast-Conducting physical survey and collection of field data of Coastal Engineering Section Chavakkad for 2018-19
2018/95/IDRB Dummy
01-03-2019
2711-02-800-99-03 4,16,000 4,16,000
24
CES-Annual Estimate for conducting physical survey and collection of field data of Coastal Engineering Section Chavakkad for the year 2020-2021
2020/122/IDRB Dummy
01-04-2020
2711-02-800-99-03 3,20,000 3,20,000
25
Conducting Field studies by taking periodical measurements of shoreline changes from Paravoor pozhi to Kayamkulam Pozhi under Coastal Engineering Section Kollam for the year 2016-2017
2017/24/IDRB CEFSTsr/2017/24/IDR
B
18-03-2017
2711-02-800-99-03 2,00,000 2,00,000
26
Conducting field studies by taking periodical measurements of shoreline changes from Paravoor pozhi to Kayamkulam pozhi under Coastal Engineering section Kollam for the year 2017-2018
2017/88/IDRB CEFSTsr/2017/88/IDR
B
29-11-2017
2711-02-800-99-03 3,51,747 3,51,747
27
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Koyilandi to Moorad river -Reach 2 ( CP 1939 to 2042) under Coastal Erosion Studies Section, Kozhikode for the year 2020-21.
2020/116/IDRB CEFSTsr/2020/116/ID
RB
20-02-2021
2711-02-800-99-03 1,13,000 1,13,000
28
PSM-Putting up and maintaining Kainur Chira in Manali river for the year 2019-20.
2019/8299/IA IDTsr/2019/8299/IA
07-09-2019
2701-01-101-98-00-18-00 1,25,000 1,25,000
29
PSM-2019-20-Improvement works to LBMC and aqueduct in between ch.9/200 km and 10/000 Km and ch.19/500 Km.
2019/9294/IA IDTsr/2019/9294/IA
23-03-2020
2701-01-101-98-00-18-00 15,00,000 15,00,000
30
PSM - 2019-20 - Maintenance of Puthur Diversion Canal And Providing Shutter.
2020/806/IA IDTsr/2020/806/IA
23-03-2020
2701-01-101-98-00-18-00 2,90,000 2,90,000
31
Peechi Scheme maintenance 2019-20-Annual maintenance of Vellanikkara branch canal from ch- 0/000 Km to 4/700 Km for the year 2019-20
2019/7309/IA IDTsr/2019/7309/IA
07-09-2019
2701-01-101-98-00-18-00 3,00,000 3,00,000
32
- Peechi scheme maintenance 2019-20-Repair works to Thanippadam staff quarters for the year 2019-20
2019/7318/IA IDTsr/2019/7318/IA
20-03-2020
2701-01-101-98-00-18-00 3,00,000 3,00,000
33
- Peechi Scheme Maintenance-2019-20-Improvement works to Kozhukully Branch
2019/8295/IA IDTsr/2019/8295/IA
17-10-2019
2701-01-101-98-00-18-00 5,00,000 5,00,000
34
Peechi Scheme maintenance 2019-20-Maintenence work to Chuvannamannu Aquduct in between ch-9/700 Km to 9/900 Km for the year 2019-20
2019/7319/IA IDTsr/2019/7319/IA
14-03-2020
2701-01-101-98-00-18-00 25,00,000 25,00,000
35
- PSM-2019-20-Removal of slipped earth and urgent protection works to RBMC 8/000 to 37/300 Km and branch canal.
2019/9291/IA IDTsr/2019/9291/IA
29-11-2019
2701-01-101-98-00-18-00 10,00,000 10,00,000
36
Peechi Scheme Maintenance-2020-21-Annual maintenance of Mudikkode branch canal from ch.0/000 to 6/700 Km for the year 2020-21
2020/3321/IA IDTsr/2020/3321/IA
08-09-2020
2701-01-101-98-00-18-00 3,15,000 3,15,000
37
Peechi Scheme Maintenance-2020-21-Annual maintenance of Vazhukkumpara branch canal from ch.0/000 to 4/200 Km and Thekkumpadam branch canal from 0/000 to 1/050 Km for the year 2020-21
2020/3322/IA IDTsr/2020/3322/IA
06-09-2020
2701-01-101-98-00-18-00 3,00,000 3,00,000
38
Peechi Scheme Maintenance-2020-21-Improvement works to RBMC between Ch.18/770 and 18/950 Km
2020/3326/IA IDTsr/2020/3326/IA
06-09-2020
2701-01-101-98-00-18-00 14,00,000 14,00,000
39
Peechi Scheme Maintenance-2020-21-Improvement works to Mudikkode Branch Canal between Ch.2/050 and 2/150 Km
2020/3327/IA IDTsr/2020/3327/IA
06-09-2020
2701-01-101-98-00-18-00 8,20,000 8,20,000
40
Peechi Scheme Maintenance-2020-21-Improvement works to Mudikkode Branch Canal between Ch.2/500 and 2/600 Km
2020/3323/IA IDTsr/2020/3323/IA
08-09-2020
2701-01-101-98-00-18-00 12,00,000 12,00,000
41
PSM-Maintenance various type Quarters,offices and premises for the year 2019-20
2019/10155/IA IDTsr/2019/10155/IA

14-03-2020
2701-01-101-98-00-18-00 20,00,000 20,00,000
42
PSM-Shifting of section and subdivision office to new building and purchase of office items for the year 2019- 20
2019/8670/IA IDTsr/2019/8670/IA
17-02-2020
2701-01-101-98-00-18-00 3,00,000 3,00,000
43
PSM-Renewal of Plumbing Lines KERI Campus 2019-2020.
2019/10252/IA IDTsr/2019/10252/IA

16-03-2020
2701-01-101-98-00-18-00 8,00,000 8,00,000
44
Hydraulic model studies for the design of coastal protection work at Parappal in Ariyallur beach in Vallikunnu panchayath in Malappuram District kerala.
2020/877/IA 0/VRD G.0.(Rt)No.76
7/202
17-12-2020
2711-02-800-99-03 9,30,000 9,30,000
45
Emergency monsoon preparedness and Flood damages- LBMC- Cutting of trees that pose to threat to life and property under the ambit of Head Works Sub Division, Peechi
2020/3335/IA IDTsr/2020/3335/IA
08-07-2020
2701-01-101-98-00-18-00 60,000 60,000
46
Monsoon preparedness and flood damages-Urgent rectifications to the left bund of Puthur branch Canal -Formation of left bund
2020/3337/IA IDTsr/2020/3337/IA
08-07-2020
2701-01-101-98-00-18-00 2,50,000 2,50,000
47
Peechi scheme- Painting and other rectification works of Peechi dam including warning boards and direction boards for the year 2016-17
2016/3135/IA IDTsr/2016/3135/IA
27-03-2017
2701-01-101-98-00-18-00 5,00,000 5,00,000
48
Peechi Scheme - Annual maintenance of Puthur Branch canal from Ch. 0/000 KM to 11/260 KM for the year 2017-18
2017/1783/IA IDTsr/2017/1783/IA
13-10-2017
2701-01-101-98-00-18-00 2,95,122 2,95,122
49
Peechi scheme- Annual maintenance of RBMC from Ch.8.000 to 37.300 Km, OBC from Ch. 0.000 to 8.000 Km, Nettissery, Kozhukkully, Vellanikkara, Mudikkode, Pattikkad, Vazhukkumpara and Thekkumpadam branch canal-Engaging labours for summer water distribution for the year 2017- 2018
2017/2354/IA IDTsr/2017/2354/IA
06-03-2018
2701-01-101-98-00-18-00 1,00,000 1,00,000
50
Peechi scheme-Improvement works to OBC between Ch.5/750 to 5/850 Km for the year 2017 -2018
2017/2361/IA IDTsr/2017/2361/IA
23-03-2018
2701-01-101-98-00-18-00 9,79,152 9,79,152
51
PSM ANNUAL MAINTENANCE AND OPERATION OF ODENCHIRA REGULATOR FOR THE YEAR 2016-2017
2016/829/IA IDTsr/2016/829/IA
26-10-2016
2701-01-101-98-00-18-00 3,98,895 3,94,844
52
Revamping and modernisation of Instrumentation division.
2020/328/IDRB CMFEPi/2020/328/IDR
B
18-09-2020
4701-80-800-99-00-34-03 2,50,000 2,50,000
53
Fundamental studies using Smart Station for the year 2020-21-Topographical investigation of KIP (RB) Main canal earth slippage at ch.17000m
2020/358/IDRB ORDER No. HRKERIPi/
2020/358/IDRB
23-10-2020
4701-80-800-99-00-34-03 1,40,000 1,40,000
54
Establishing MSL at various stations along Meenachil river in Meenachil Taluk - 2020-21
2021/162/IDRB ORDER No. HRKERIPi/
2021/62/IDRB
06-03-2021
4701-80-800-99-00-34-03 24,000 24,000
55
Maintenance of model area of Coastal Engineering Division and the office surroundings forthe year 2020-21
2020/161/IDRB ORDER No. HRKERIPi/
2020/161/IDRB
05-08-2020
4701-80-800-99-00-34-03 40,000 40,000
56
Topographical investigation in connection with the holistic linking of Idamalayar Irrigation Project (IIP) and Chalakudy River Diversion Scheme (CRDS) -2020-21
2020/372/IDRB ORDER No. HRKERIPi/
2020/372/IDRB
13-11-2020
4701-80-800-99-00-34-03 66,000 66,000
57
Routine activities of the Coastal Engineering Division office and the Offices of Director, F &AR and Joint Director, Hydraulic Research for the year 2020-21
2020/160/IDRB ORDER No. HRKERIPi/
2020/160/IDRB
05-08-2020
4701-80-800-99-00-34-03 1,50,000 1,50,000
58
Topographical investigation for the proposed Checkdam at Chundakkadu across Gayathri Puzha in Kavassery Panchayath 2020-21
2020/276/IDRB ORDER No. HRKERIPi/
2020/276/IDRB
11-08-2020
4701-80-800-99-00-34-03 1,15,000 1,15,000
59
Annual Maintenance and purchase of accessories for Smart station for the year 2020-21
2020/162/IDRB ORDER No. HRKERIPi/
2020/162/IDRB
05-08-2020
4701-80-800-99-00-34-03 1,50,000 1,50,000
60
Topographical investigation for demarcating submersible area of proposed Attappady Valley Irrigation Project- 2020-21
2020/340/IDRB ORDER No. HRKERIPi/
2020/340/IDRB
06-10-2020
4701-80-800-99-00-34-03 6,35,000 6,35,000
61
Routine activities of Coastal Engineering Division and offices of Director, F & AR and Joint Director, Hydraulic Research for the year 2019-20
2019/367/IDRB ORDER No. HRKERIPi/
2019/367/IDRB
01-08-2019
4701-80-800-99-00-34-03 1,80,000 1,800
62
Fundamental Studies using Smart Station for the year 2019-20 - Various Investigation survey works in Irrigation Department using Smart station-Conducting Topographic survey for construction of check dam across Thoothapuzha
2019/324/IDRB ORDER No. HRKERIPi/
2019/324/IDRB
10-07-2019
4701-80-800-99-00-34-03 1,80,000 1,80,000
63
Sedimentation Study of Malampuzha Reservoir using IBS & Sub Bottom Profiler
2019/311/IDRB HRKERIPi/2019/311/I
DRB
10-07-2019
4701-80-800-99-00-34-03 4,00,000 4,00,000
64
Sedimentation study of Peechi Reservoir using IBS and SubBottom Profiler
2018/193/IDRB HRKERIPi/2018/193/I
DRB
06-08-2018
4701-80-800-99-00-34-03 2,00,000 2,00,000
65
Sedimentation study of Kuttiadi Reservoir using IBS & Sub Bottom Profiler
2018/197/IDRB HRKERIPi/2018/197/I
DRB
07-09-2018
4701-80-800-99-00-34-03 3,50,000 3,50,000
66
Routine activities of Sedimentation division
2016/84/IDRB HRKERIPi/2016/84/ID
RB
26-07-2016
4701-80-800-99-00-34-03 2,00,000 2,00,000
67
Routine activities of sedimentation division including up gradation of survey equipments and accessories
2017/129/IDRB HRKERIPi/2017/129/I
DRB
29-08-2017
4701-80-800-99-00-34-03 2,35,000 2,35,000
68
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station -Topographical Survey for the Construction of a Checkdam across Gayathri River at Kalleppadam-Kallamkadavu in PazhayannurGramapanchayath
2017/365/IDRB HRKERIPi/2017/365/I
DRB Dated: 28-11-2017
28-11-2017
4701-80-800-99-00-34-03 1,90,000 1,90,000
69
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station - Survey of site at Vandipperiyar for connecting to MSL
2017/257/IDRB HRKERIPi/2017/257/I
DRB
18-08-2017
4701-80-800-99-00-34-03 70,000 69,678
70
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station-Fixing FRL of Neyyar Reservoir near Kerala Tamil Nadu Boundary
2018/3/IDRB HRKERIPi/2018/3/IDR
B
29-01-2018
4701-80-800-99-00-34-03 72,000 72,000
71
Maintenance of the model area of the Coastal Engineering Division for the year 2017-18
2017/351/IDRB HRKERIPi/2017/351/I
DRB
31-10-2017
4701-80-800-99-00-34-03 30,000 30,000
72
Establishing TBM with respect to MSL at various stations in Attappadi for the proposed new dam in 2019-2020
2019/425/IDRB HRKERIPi/2019/425/I
DRB
29-10-2019
4701-80-800-99-00-34-03 1,10,000 1,10,000
73
Fundamental studies using smart station for the year 2019-20-Conducting Topographic survey for construction of check Dam across Thoothapuzha at Mundorssikadavu in Sreekrishnapuram Panchayath of Palakkad District
2019/390/IDRB HRKERIPi/2019/390/I
DRB
21-08-2019
4701-80-800-99-00-34-03 1,30,000 1,30,000
74
Maintenance of the model area of the Coastal Engineering Division and the office surroundings for the year 2019-20
2019/351/IDRB . HRKERIPi/2019/351
/IDRB
10-07-2019
4701-80-800-99-00-34-03 40,000 40,000
75
Balance work of topographical investigation for demarcating submersible area of proposed Attappady Valley Irrigation Project- 2020-21
2021/55/IDRB HRKERIPi/2021/55/ID
RB
23-02-2021
4701-80-800-99-00-34-03 2,00,000 2,00,000
76
Annual maintenance and purchase of accessories for smart station
2019/350/IDRB HRKERIPi/2019/350/I
DRB
11-07-2019
4701-80-800-99-00-34-03 1,50,000 1,50,000
77
Maintenance of the model area of the Coastal Engineering Division and the office surroundings for the year 2018-19
2018/162/IDRB HRKERIPi/2018/162/I
DRB
05-07-2018
4701-80-800-99-00-34-03 40,000 40,000
78
Conducting topographic survey for the right and left bank canal distributaries of Karappuzha Irrigation Project
2018/161/IDRB HRKERIPi/2018/161/I
DRB
10-07-2018
4701-80-800-99-00-34-03 3,00,000 3,00,000
79
Fundamental Studies using Smart Station for the year 2018-19-Various Investigation Survey works in Irrigation Department using Smart Station-Conducting topographical survey for the Seetharkundu waterfall diversion scheme using smart station
2018/176/IDRB HRKERIPi/2018/176/I
DRB
16-07-2018
4701-80-800-99-00-34-03 5,00,000 5,00,000
80
Coastal Studies including model studies surveys in coordination with Coastal Engineering Field studies Division and other agencies
2019/174/IDRB HRKERIPi/2019/174/I
DRB
19-03-2019
4701-80-800-99-00-34-03 7,00,000 7,00,000
81
Fundamental Studies using Smart Station -Investigation using Smart Station to find the profile of Chulliyar dam.
2016/91/IDRB HRKERIPi/2016/91/ID
RB
28-07-2016
4701-80-800-99-00-34-03 1,50,000 1,50,000
82
Upgradation of Meteorological station
2018/179/IDRB HRKERIPi/2018/179/I
DRB
17-07-2018
4701-80-800-99-00-34-03 1,80,000 1,80,000
83
Calibration of notches for the year 2018-19
2018/178/IDRB HRKERIPi/2018/178/I
DRB
16-07-2018
4701-80-800-99-00-34-03 15,000 15,000
84
Maintenance of model area I & II of Hydraulic division for the year 2018-2019-Routine Works
2018/228/IDRB HRKERIPi/2018/227/I
DRB
14-09-2018
4701-80-800-99-00-34-03 85,000 85,000
85
Upgradation computer system capacity augmentaion , Improvement of infrastructure - Firewall protection for regulation of BSNL FTTH internet usage, security system withrouter etc
2019/34/IDRB HRKERIPi/2019/34/ID
RB
01-02-2019
4701-80-800-99-00-34-03 1,80,000 1,80,000
86
Fundamental Studies using Smart Station - other Investigation works using Smart Station.
2016/73/IDRB HRKERIPi/2016/73/ID
RB
22-07-2016
4701-80-800-99-00-34-03 1,20,000 1,20,000
87
Routine activities of the Coastal Engineering Division for the year 2016-17 - Maintenance of the model area of the Coastal Engineering Division.
2016/72/IDRB HRKERIPi/2016/72/ID
RB
21-07-2016
4701-80-800-99-00-34-03 30,000 30,000
88
PSM 2021-22-Protection works and leak proofing works to the Aqueduct at RBMC Ch 37/100-37/300 km for the year 2021-22
2021/686/IA IDTsr/2021/686/IA
11-07-2021
2701-01-101-98-00-18-00 9,00,000 9,00,000
89
Peechi scheme maintenance -2021-2022-Annual maintenance of pattikkad branch canal from ch.0/000 to 5/2000 for the year 2021-2022
EST NO:2021/699/IA IDTsr/2021/699/IA
11-07-2021
2701-01-101-98-00-18-00 3,05,000 3,05,000
90
- Peechi scheme maintance -2021-2022-Annual maintenance of RBMC from ch.18/000 to 28/000 for the year 2021-2022
EST NO:2021/698/IA IDTsr/2021/698/IA
11-07-2021
2701-01-101-98-00-18-00 8,40,000 8,40,000
91
Peechi scheme maintenence -2021-2022-Annual maintenance of vazhukkumpara 0/000 to 4/200 ,thekkumpadam 0/000km to 1/050 for the year 2021-2022
EST NO:2021/700/IA IDTsr/2021/700/IA
11-07-2021
2701-01-101-98-00-18-00 3,10,000 3,10,000
92
Peechi Scheme Protection Works and Leak Proofing Works of LBMC from Ch.0/300 to 0/500 Km
2020/3883/IA ORDER No. IDTsr/202
0/3883/IA
28-12-2020
2701-01-101-98-00-18-00 10,00,000 10,00,000
93
Establishing TBM with respect to MSL at various stations in Thrissur Kole land in 2019-2020
2019/377/IDRB HRKERIPi/2019/377/I
DRB
29-07-2019
4701-80-800-99-00-34-03 27,000 27,000
94
Fundamental Studies using Smart Station for the year 2019-20 Various survey woks in Irrigation Department using Smart station-Conducting topographic survey for data collection associated with coastal model studies
2019/398/IDRB HRKERIPi/2019/398/I
DRB
26-08-2019
4701-80-800-99-00-34-03 4,40,000 4,40,000
95
Fundamental studies using Smart station for the year 2019-20-Conducting topographic survey for ensuring the measurement precision, accuracy and reliability of Leica GS-14 Survey equipment of Coastal Engineering Division
2019/455/IDRB HRKERIPi/2019/455/I
DRB
26-12-2019
4701-80-800-99-00-34-03 80,000 80,000
96
Fundamental studies using Smart station 2018-19- Various Investigation works in Irrigation Department FIxing temporary benchmarks with respect to MSL for Investigation of Kaviyurpuncha in Thiruvalla constituency
2019/44/IDRB HRKERIPi/2019/44/ID
RB
05-02-2019
4701-80-800-99-00-34-03 69,000 69,000
97
Fundamental Studies using Smart Station for the year 2018-19-Various survey woks in Irrigation Department using Smart station-Conducting topographic survey for data collection associated with coastal model studies
2019/161/IDRB HRKERIPi/2019/161/I
DRB
12-03-2019
4701-80-800-99-00-34-03 2,81,000 2,81,000
98
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station - Topographical Survey for the construction of a Check Dam across Puzhakkal River at Thrissur
2017/244/IDRB HRKERIPi/2017/244/I
DRB
23-08-2017
4701-80-800-99-00-34-03 1,38,000 1,38,000
99
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station-Topographical Survey for estimating capacity of Pathazhakundu reservoir in Thekkumkara panchayath of Thrissur District
2018/77/IDRB HRKERIPi/2018/77/ID
RB
04-03-2018
4701-80-800-99-00-34-03 1,40,000 1,40,000
100
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station -Topographical Survey for the construction of a regulator in downstream of Enamakkal regulator at Kolumad
2017/274/IDRB HRKERIPi/2017/274/I
DRB
18-09-2017
4701-80-800-99-00-34-03 2,85,000 2,85,000
101
Routine activities of the Coastal Engineering Division office and the Offices of Director, F & AR and Joint Director, Hydraulic Research for the year 2017-18
2017/356/IDRB HRKERIPi/2017/356/I
DRB
20-11-2017
4701-80-800-99-00-34-03 2,30,000 2,30,000
102
Fundamental Studies using Smart Station for the year 2017-18 - Various Investigation survey works in Irrigation Department using Smart station - Topographical Survey for estimating capacity of Asurakkundu Reservoir in Mullurkkara Panchayath of Thrissur
2018/78/IDRB HRKERIPi/2018/78/ID
RB
04-03-2018
4701-80-800-99-00-34-03 1,00,000 1,00,000
103
Fundamental Studies using Smart Station.- Investigation of Bharathappuzha River basin
2016/86/IDRB HRKERIPi/2016/86/ID
RB
26-07-2016
4701-80-800-99-00-34-03 4,00,000 4,00,000
104
Routine Activities of Coastal Engineering Division for the year 2016-17 - Routine activities of the Office of the Director, F & AR and Joint Director, Hydraulic Research.
2016/37/IDRB HRKERIPi/2016/37/ID
RB
13-07-2016
4701-80-800-99-00-34-03 1,00,000 1,00,000
105
Routine activities of the Coastal Engineering Division for the year 2015-16 -Routine activities of the Coastal Engineering Division office
2016/93/IDRB HRKERIPi/2016/93/ID
RB
28-07-2016
4701-80-800-99-00-34-03 1,20,000 1,20,000
106
Peechi scheme-providing L T metering panel in KERI in connection with converting HT connection to LT connection in KERI,Thrissur Dt
2019/9167/IA IDTsr/2018/1765/IA
Dated: 16-11-2018
16-11-2018
2701-01-101-98-00-18-00 5,60,000 5,60,000
107
Fundamental Studies using Smart Station for the Year 2019-20 Topographycal survey for Seetharkundu waterfalls -Stage II
2020/105/IDRB HRKERIPi/2020/105/I
DRB
20-03-2020
4701-80-800-99-00-34-03 2,10,000 2,10,000
108
PSM - 2020-21 improvement works to canal bund of LBMC Between Ch. 20/200 to 20/600 KM.
2019/3000/IA IDTsr/2019/3000/IA
08-12-2020
2701-01-101-98-00-18-00 18,00,000 18,00,000
109
GPS-I-Improvement to Tourism facilities in Meenkara dam
IDCr/2021/761/P1
14-02-2022
2700-80-800-98(00) 8,60,800 8,60,800
110
GENERAL-PSM 2022-23 -Improvement works to Kallur Branch Canal in between ch. 2/100 km to 2/300 km-General Civil Work
IRR/IA/EST/4329/2022_5_12_11 AS/59D/22/25116
21-02-2023
2701-01-101-98-00-18-00 12,00,000 12,00,000
111
Beautification Works and Landscaping Landscaping Near Snack bar and Infront of Main Entrance Gate at KIP Thenmala Dam General Civil Work
IRR/PII/EST/2059/2022 AS/59D/22/25076
15-02-2023
2700-80-800-98(00) 12,10,000 12,10,000

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Repair,maintenance and painting of spillway shutters of Chulliyar Dam at Palakkad district
2020/8/MH IMDmpa/2020/8/MH
26-05-2020
2700-05-00-00(00) 4,50,000 4,50,000
2
ESTIMATE FOR 7 DAYS PUMPING FRESH WATER FROM ACHANCOVIL RIVER AT KAVUMPATTU BY USING DEPARTMENT DREDGER NO 5
2020/38/MH IMDAlp/2020/38/MH
22-04-2020
2711-01-103-98-34-03-00 2,90,000 2,90,000
3
CLEANING OF KOLARAYAR RIVER IN THIRUVALLA LA CONSTITUENCY USING IRRIGATION DEPARTMENT WEED HARVESTER FOR 15 DAYS
2017/75/MH IMDAlp/2017/75/MH
03-01-2018
2711-01-103-99-00-34-3 4,00,000 4,00,000
4
KIP-Mechanical-LBMC-Kulakkada Branch canal at Ch-3800m-Maravoor distribtery offtake shutter(Mannoorkavu)-Annual maintenance of single shutter,single screw rod mechanism-Painting ,patch work,overhauling of operating mechanism
2016/62/MH IMDAlp/2016/62/MH
25-03-2017
2700-27-101-98-00-18 17,500 16,624
5
KIP-Supply and erection of new cable,Rectification works of Electrical accessories and overhauling , Replacement of bevel gear and Pinion for the smooth operation of Disperser valve at Parappar Dam, Thenmala
2020/73/MH IMDAlp/2020/73/MH
04-08-2020
2700-27-101-98-00-18 2,70,000 2,70,000
6
Anti salinity bund work at Kanakkankadavu,Ernakulam dist.2020-21(Mechanical works)
2020/116/MH IMDAlp/2020/116/MH
16-11-2020
2711-01-103-98-34-03-00 21,00,000 21,00,000