PLAN SPILL OVER WORKS - NOT TENDERED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Renovation of pond in Pampa river basin under Harithakeralam Renovation of Mundappally kulam in peringara panchayath
2017/3449/IA GO (Rt) No.974/2017
/WRD
01-12-2017
4702-00-101-63(00) 4,00,000 4,00,000
2
PREVENTING SALINITY INTRUSION AT PURAPILLIKAVU IN PERIYAR RIVER- OPERATION OF SHUTTERS
2016/1707/IA ORDER No. IDEkm/201
6/1707/IA
21-03-2017
2702-03-101-98-02-34-3 8,00,000 8,00,000
3
Urgent repair works to the Electrical panel Board,50HP motor damaged due to flood in the LI scheme at Chalayur-in Puthur panchayat in Palakkad District
2018/3295/IA G.O (Rt) No. 861
30-11-2018
4702-00-101-73(00) 27,400 22,000
4
Providing additional pump and motor for Chalayur LIS of Bhavani river in Puthur Grama Panchayath at Palakkad District
2019 2279 IA G.O (Rt) No.861
30-11-2018
4702-00-101-73(00) 20,00,000 20,00,000
5
Construction of Paloli palam SWE/VCB in Vatakara Municipality, Kozhikode District.
2020/3413/IA MIDKkd/2020/3413/IA

20-08-2020
4702-00-101-82-01-00-00 50,00,000 50,00,000
6
MI Class II Harithakeralam- Renovation of Puthanpurayil kulam in ward No.14 of Onchiyam Panchayat in Kozhikode District.
2019/7107/IA G.o(Rt)No.559/2019/
WRD
30-07-2019
4702-00-101-63(00) 30,00,000 23,17,000
7
Improvements to Ezhalichira Thodu in Ward No.1,2 in Puthur panchayath,Thrissur District. II nd Phase
2019/2737/IA GO (Rt)No.560/2019/
WRD
30-07-2019
4702-00-101-82-01-00-00 30,00,000 30,00,000
8
Rejunuvation of Ethankulam in Pariyarm Pt Kannur district
2020/3340/IA MIDKnr/2020/3340/IA

21-08-2020
4702-00-101-65-01-00-00 17,00,000 17,00,000
9
Maintenance of Moothasseerry Kaniyakad cross bar in Puliyanoor thodu in ward No.2 of Mutholy Panchayath
2018/3922/IA 143/2019/WRD
02-03-2019
2702-03-101-98-02-00-00 15,00,000 15,00,000
10
Providing Stainless steel Railing at Mahadeva Temple in Aluva Municipality.
2016/1687/IA GO(RT)NO 632/2016 W
RD
27-07-2016
4700-80-800-99(02) 19,30,000 19,30,000
11
Rejuvenation and protection of Varattar and Adipamba- Construction of walkway on the left bank from 0 to 4.00 km and on the right bank from 2.90 to 4.00 in Adipamba and 0 to 9.400 km on left bank and 6.600 km to 8.900 km on right bank of Varattar in Thiruvanvandoor Panchayath and Chengannur Munici
2017/2806/IA GO(RT)NO 729/2017/W
RD
22-08-2017
4711-01-103-99-01-00-00 4,80,00,000 4,46,20,000
12
Renovation of Nambi veettil Kulam in Koyilandy Municipality Kozhikode District.
2019/7126/IA GO(Rt)No.559/2019/W
RD
30-07-2019
4702-00-101-63(00) 30,00,000 30,00,000
13
Renovation of Kattilamuzhi SWE VCB in ManiyurPanchayath in Kozhikode District.
2018/3702/IA 143/2019/WRD9
02-03-2019
2702-03-101-98-02-34-3 15,00,000 15,00,000
14
ASE- Urgent protection works using Geo-synthetic tubes between CES CP 1537 and CES CP 1538 for a length of 100 m, from CES CP 1537 towards North in Ponnai Coast on experimental basis
2018/3105/IA G.O. (RT)No.890/201
9/WRD
03-12-2019
4711-02-103-99-01-00 75,00,000 75,00,000
15
ASE- Urgent protection works using Geo-synthetic tubes infront of CES CP 1531 for a length of 50 m, 13 m towards North and 37 m towards south in Ponnani Coast on experimental basis
2018/3104/IA G.O(RT)No.890/2019/
WRD
03-12-2019
4711-02-103-99-01-00 37,00,000 37,00,000
16
ASE- Urgent protection works using Geo-synthetic tubes for a length of 175m, 40 m towards South and for a length of 135 m north of CES CP 1532 in Ponnani Coast on experimental basis
2018/3106/IA GO(Rt)No890/2019/WR
D
03-12-2019
4711-02-103-99-01-00 1,31,25,000 1,31,25,000
17
ASE- Urgent protection works using Geo-synthetic tubes for a length of 50 m, 40 m towards North and 10 m towards South of CES CP 1530 in Ponnani Coast on experimental basis
2018/3107/IA GO(Rt)No890/2019/WR
D
03-12-2019
4711-02-103-99-01-00 37,50,000 37,50,000
18
MI Class I Haritha Keralam - Construction of salt water extrusion sluices in ward no I of Eriyad panchayth in thodu near Raktheswari temple North of Manappattuchal bridge in Eriyad panchayath.
2018/1676/IA ORDER No. MIDTsr/20
18/1676/IA
27-08-2020
4702-00-101-66(01) 30,00,000 30,00,000
19
Renovation of tanks and ponds under Harithakeralam Rejuvenation of Uoomankulam in Mala Panchayath
2018/2052/IA G.O (Rt)No.140/2019
/WRD
02-03-2019
4702-00-101-63(00) 8,00,000 8,00,000
20
MI Class II construction of outer bund of Mundakapadam padashekharam in puthuppally GP
2020/3389/IA MIDKtm/2020/3389/IA

19-08-2020
4702-00-101-82-01-00-00 5,00,000 5,00,000
21
Providing Steel Shutters for VCB at Mullanthode in Polpully Panchayath.
2018/29/MH GO(Rt) No. 798/2017
/WRD
27-09-2017
4702-00-101-82-01-00-00 24,83,40,000 11,30,000
22
Construction of sluice gate (1Nos) at Padannakari Padasekharam in Kumbalangi Panchayath, Kochi constituency
2020/80/MH MIDEkm/2020/3730/IA

26-08-2020
4702-00-101-99(01) 96,00,000 14,70,000
23
Construction of two numbers 1.8m(w)x2.4m(h)-1nos & 1.1m(w)x2.4m(h)-1nos sluice gates at Puthenpadam padasekharam, Pallipuram Gramapanchyath, Ernakulam district
2020/79/MH MIDEkm/2019/8155/IA

03-09-2020
2702-03-101-98-02-34-3 25,00,000 11,53,000
24
Renovation of Tanks and Ponds under Haritha Keralam for 2018-19 - Renovation of Parakulam at Kalloli Bhagom in Nedumkunnam Panchayath
2019/6494/IA G.O.(Rt)No.139/2019
/WRD
02-03-2019
4702-00-101-63(00) 5,00,000 5,00,000
25
ASE-Construction of 1 no (15m)Groynes between CP Stone 1128and 1124 at Edavanakkad Aniyil beach in Vypin Island
2019/3013/IA IDEKM/2019/3013/IA
29-01-2020
4711-02-103-99(00) 48,00,000 48,00,000
26
Micro Irrigation Project at Kanhiramuzhi in Mukkam Municipality, Kozhikode District (Micro Irrigation System).
2021/185/IA MIDKkd/2021/185/IA
16-01-2021
4702-00-101-66(01) 35,40,000 35,40,000
27
Sustainable Water Conservation Project for Chittur Region By Interlinking of Ponds and Traditional Storage Structures-Phase 1 Renovation of Public Ponds- Chakkarathulli Kulam at Ward 5,Kunnekkau in Peruvembu Grama Panchayath of Palakkad District.
2021/317/IA G.O(Rt)No.818/2019/
WRD
06-11-2019
4702-00-101-82-01-00-00 4,50,00,000 26,10,000
28
Sustainable Water Conservation Project for Chittur Region by Interlinking of Ponds and Traditional Storage Structures-Phase 1 Renovation of Public Ponds- Improvements to ManiyanKulam at Ward 13,Vazhakkode,in Peruvemba Grama Panchayath
2021/320/IA GO (Rt) NO. 818/201
9/WRD
16-11-2019
4702-00-101-82-01-00-00 4,50,00,000 20,30,000
29
Community Micro Irrigation at Ayyankavu- Valayamkund-Payanikkara in Kallar Panchayath - (Arranging micro irrigation facilities)
2021/161/IA MIDKgd/2021/161/IA
16-01-2021
4702-00-101-66(01) 30,00,000 30,00,000
30
MI class I Construction of Kulathada Sarvodaya Lift irrigation scheme in Thavinjal panchayath
2020/3372/IA G.O (Rt) No .12/202
1/WRD
05-01-2021
4702-00-101-99(01) 3,00,00,000 3,00,00,000
31
Sustainable Water conservation Project for Chittur Region by Inter linking of Ponds and Traditional Storage Structures-Phase1Renovation of Public Ponds- Improvements to Vadyarkulambu michabhoomikulam , Ward 8 Puthukudi, Polpully Grama Panchayath in Palakkad District
2019/7564/IA Go (Rt) 819/WRD
16-11-2019
4702-00-101-82-01-00-00 12,60,000 12,60,000
32
Sustainable Water Conservation Project for Chittur Region by Inter Linking of Ponds and Traditional Storage Structures - Phase1 Renovation of Public Ponds-Improvements to PAYYAKODUPOTTA Kulam in Ward 8 ,Puthukudi , Polpully Grama Panchayath in Palakkad District
2019/7556/IA Go (Rt) 819/WRD
16-11-2019
4702-00-101-82-01-00-00 3,50,000 3,50,000
33
Sustainable Water Conservation Project For Chittur Region By Interlinking of Ponds and Traditional Storage Structures- Phase 1 Renovation of Public Ponds -Improvemnts to Kannappankode 1 kulam, Ward 5 ,Verkoli , Polpully Grama Panchayath in Palakkad District
2019/7131/IA Go (Rt) 819/WRD
16-11-2019
4702-00-101-82-01-00-00 8,30,000 8,30,000
34
Sustainable Water Conservation Project for Chittur Region by Inter Linking of Ponds and Traditional Storage Structures -Phase 1- Improvements to Ittengapotta Kulam in Ward 8 Puthukudi , Polpully Grama Panchayath in Palakkad District
2019/7562/IA Go (Rt) 819/WRD
16-11-2019
4702-00-101-82-01-00-00 2,90,000 2,90,000
35
Sustainable Water Conservation Project for Chittur Region by Inter Linking of Ponds and Traditional Storage Structures -Phase 1 Renovation of Public Ponds - Improvements to Kavasseri Kulamb Kulam in ward 8,Puthukkudy ,Polpully Grama Panchayath in Palakkad District
2019/7559/IA Go (Rt) 819/WRD
16-11-2019
4702-00-101-82-01-00-00 9,60,000 9,60,000
36
Expansion of Attapilly pump house
2020/2868/IA MIDTsr/2020/2868/IA

08-09-2020
2702-03-101-98-02-34-3 10,00,000 10,00,000
37
Community micro irrigation at Pazhayannur - Construction of pump house, supplying and erection of motors & pumps and electrification works.
2021/295/IA MIDTsr/2021/295/IA
16-02-2021
4702-00-101-66(01) 80,00,000 80,00,000
38
Kabani Basin - Construction of RCB across Venniyode river at Malankara Parakadavu in Panamram Panchayath - Electrification work
2019/2658 GO(RT) 1000/2015/WR
D
28-01-2015
4702-00-101-77(00) 8,00,00,000 21,00,000
39
Construction of motor shed in Konari padam in Pallippad Panchayath.
2021/120/KP MIDCgr/2021/120/KP
28-05-2021
4702-00-101-66(01) 25,00,000 25,00,000
40
MI Class I -Rennovation works of Adichanalloor Chira - Renovation of inlet and outlet leading channels in Ithikkara river basin in Adichanalloor Panchayat
2018/2557/IA GO(Rt)No.562/2019/W
RD dt 01/08/2019
01-08-2019
4702-00-101-99(01) 40,00,000 40,00,000
41
Renovation to the banks of Andoor Pond , Construction of leading channel in ward no.7 of Marangattupally Panchayath
ORDER No. MIDKtm/20
21/3253/IA
18-08-2021
4702-00-101-82-01-00-00 27,90,000 27,90,000
42
Urgent rectification work to Irrigation canal of Beriyolika L.I.Scheme in Ichilangod village in Mangalpady panchayath
W6/22323/15/AS A
S No.692/CE I&A/2015-16
30-01-2016
2702-03-101-98-02-34-3 18,00,000 10,95,800
43
Renovation Tanks and ponds under Haritha Keralam for the Year 2018-19-Renovation of kura temple pond in Thalavoor Panchayath
:2017/2537/IA Go(Rt)139/2019/WRD
02-03-2019
4702-00-101-63(00) 15,00,000 15,00,000
44
Development of Rural Circuit -Malanad Malabar Cruise Project in Kerala under Swadesh Darshan Scheme- Muthappan & Malabari Cuisine Cruise - Construction of Boat jetty at Narath
2019/8259/IA G.O.(Rt) No 466/201
8/TSM
10-10-2018
5452-01-101-99-00-00-00 82,04,000 74,00,000
45
Investigation for the construction of Check Dam across Mangalampuzha at Thiruvadi in Puducode Grama Panchayath in Palakkad District
MIDPkd/2018/4802/IA

29-03-2021
2702-80-005-99(00) 4,55,000 4,55,000
46
MI Class II - HK - Renovation and allied works of Erattakulam (Punnamoodu) in Pallichal Panchayath
2021/1253/IA MIDTvpm/2021/1253/I
A
14-03-2022
4702-00-101-65-01-00-00 20,00,000 20,00,000
47
Cauvery Basin - Rain shadow area - Construction of Storage Tank and Canal at Thalavanchi in Vattavada Panchayath in Devikulam Constituency
2021/2737/IA MIDIki/2021/2737/IA

30-03-2022
4702-00-101-77(00) 45,00,000 45,00,000
48
MI Class I - Renovation of Umayanalloor chira and improvement of irrigation facilities to Umayanalloor ela in in Mayyanad Panchayath
1343 MIDklm/2021/1343/IA

08-02-2022
4702-00-101-99(01) 50,00,000 50,00,000
49
Reforming the semi permanent check dam to a permanent check dam to increase the storage capacity across Ithikkara river D/S of Aduthala Bridge in Kalluvathukkal Pt.
2017/4431/IA GO(Rt)No.14/2017/WR
D
11-01-2017
4711-01-103-99-01-00-00 1,25,71,00,000 45,00,000
50
HARITHA KERALAM- Rejuvenation of ponds- Rejuvenation of Vellamakkal Kulam in Karukachal pyt
G.O.(Rt)No.974/2017
/WRD
01-12-2017
4702-00-101-63(00) 3,00,000 3,00,000
51
FD Rectification of damages on causeway across Manimala river near Cheruvally Church in Chirakkadavu Panchayath
2018/3114/IA MIDKtm/2018/3114/IA

23-10-2018
2702-03-101-98-03-00 5,00,000 5,00,000
52
Construction of check dam and allied works near Aamachal LI scheme in Kattakada LA in Trivandrum District
IRR/IA/EST/91/2022_5_9_8 IDTvm/2022/3901/IA
31-03-2022
4702-00-101-99(01) 76,00,000 76,00,000
53
Rejuvenation of Kuttadam vayal thodu near SWE/VCB in Payyoli Municipality Koyilandy L A Kozhikode District
IRR/IA/EST/9145/2022 AS/59D/22/25450
15-03-2023
2702-03-101-98-02-34-3 15,00,000 15,00,000
54
GENERAL-Kadambrayar-NGT - Removal of water hyacinth from Edachira thodu from Brahmapuram bridge to Edachira road in Thrikkakara Municipality-General Civil Work
IRR/IA/EST/7111/2022_5_3_2 AS/59D/22/25787
25-03-2023
2702-01-800-86-00-00-00 6,80,000 6,80,000
55
GENERAL-MI class 1-Renovation to Outer bund of Velloor Eravukeri Padasekharam in Kottayam Municipality -General Civil Work
IRR/IA/EST/9197/2022 AS/59D/22/25859
28-03-2023
4702-00-101-99(01) 22,00,000 22,00,000
56
GENERAL-Plan 2022-23-Renovation of Anthi Mahakalan Kavu Temple Pond In Ward No :6 of Needoor Panchayath.-General Civil Work-1
IRR/IA/EST/347/2023 AS/59D/22/25800
25-03-2023
4702-00-101-63(00) 25,00,000 25,00,000
57
Urgent maintenance of side bund of Anakottoor Boat jetty ela thodu at Pullamala in Neduvathur Panchayath
IRR/IA/EST/9195/2022_5_1_1 AS/59D/22/25778
25-03-2023
4702-00-101-82-01-00-00 28,00,000 28,00,000
58
RENOVATION OF TANKS AND PONDS NGT IMPROVEMENTS TO POLACHIRA IN KUNNATHOOR PANCHAYATH-General Civil Work
9194 AS/59D/22/25784
25-03-2023
4702-00-101-63(00) 27,00,000 27,00,000
59
Renovation of Thottikattil kulam in Division 23 of Mukkam Muncipality, Thiruvambady LA Kozhikode District
IRR/IA/EST/133/2023_5_1_1 AS/59D/22/25678
22-03-2023
4702-00-101-63(00) 40,00,000 40,00,000

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
BSP Providing barbed wire fencing for protection of aquired land for main canal and various branch canals and distributaries From Ch 1390 m to 1490 m of VBC
2016/2/P1 GO No. 4/99/IRD Tvm

03-03-2016
4700-28-00-00(00) 37,88,00,000 2,25,000
2
KRP- Maintenance of Aqueduct from 480m to 590m of LBMC
2021/25/P1 WP3/2394/2020
09-10-2020
4701-13-00-00(00) 25,00,000 25,00,000
3
Repair works to operating platform and hand rails and overhauling of roller assembly of shutters of Chamravattom RCB in Malappuram district
2020/89/MH IMDmpa/2020/89/MH
13-10-2020
4701-18-800-87-00 31,80,000 31,80,000
4
KRP Drinking water arrangements for Cauvery Division office at Sulthan Bathery
2020/1414/P1 WP3/2394/2020
09-10-2020
4701-13-00-00(00) 1,00,000 1,00,000
5
KRP Strengthening of Damaged aqueduct piers of RBMC (RE CAST)
2019/ 2220/ P1 WP3/2014/2019(A)
06-06-2019
4701-13-00-00(00) 15,00,000 1,95,500
6
Kyip MLA LAC ADS Improvements to Cheekkilode Town in Nanminda Grama Panchayath
2018/1097/P1 Go(Rt)No.392/2019/W
RD
02-06-2019
4700-13-800-97-00-00-00 1,00,00,000 1,00,00,000
7
CPP-MRBC- Rectification to Aqueduct in paruammanchalla branch canal
2020/1524/P1 IDCr/2020/1524/P1
06-11-2020
4700-17-800-97-00-00-00 2,00,000 2,00,000
8
CPP-MRBC- Urgent rectification to side wall and drop beds between 13/800kM and 13/950km of Kozhinjampara branch canal
2020/1526/P1 IDCr/2020/1526/P1
05-11-2020
4700-17-800-97-00-00-00 3,00,000 3,00,000
9
CPP Nurnee system - CADA - Modernization of field channel from the spout near at ch. 1/265 km ( LHS ) of vilayodi branch canal.
2019/1229/P1 G.O(Rt)No.569/2019/
WRD
04-08-2019
4701-80-800-72(00) 5,00,00,000 6,40,000
10
CPP-MRBC-Urgent rectification to drop near ch1/050km of Valiyavallampathy branch canal
2020/585/P1 IDCR/2020/585/P1
09-10-2020
4700-17-800-97-00-00-00 2,50,000 2,50,000
11
KyIP ACP Plan-2020-21- Rectification works to Kodakkadu Distributary canal in between ch0/300 to ch0/800 km
2020/750/P1 KYIPDPa/2020/750/P1

16-10-2020
4700-13-800-97-00-00-00 13,00,000 13,00,000
12
KyIP- ACPPlan- 2020-2021- Rectification works to Nadakkuthazhe distributary canal between ch1/600 to ch2/000km
2020/770/P1 KYIPDPa/2020/770/P1

16-10-2020
4700-13-800-97-00-00-00 3,60,000 3,60,000
13
CPP-MRBC-Urgent rectification to drop and sidewall between 13500 m and 13600m of Kozhinjampara branch canal
2020/535/P1 IDCr/2020/535/P1
09-10-2020
4700-17-800-97-00-00-00 5,20,000 5,20,000
14
CPP-MRBC-Rectification to CADA of Valiyavallmapthy branch canal on RHS at ch-0/950km
2020/604/P1 IDCr/2020/604/P1
09-10-2020
4701-80-800-72(00) 5,00,000 5,00,000
15
CPP-MRBC-Rectification to CADA of Kozhinjampara branch canal on LHS at ch-12/900km
2020/605/P1 IDCr/2020/605/P1
09-10-2020
4701-80-800-72(00) 10,00,000 10,00,000
16
CPP-MRBC-Rectification to CADA of Valiyavallmapthy branch canal on LHS at ch-2/000km
2020/606/P1 IDCr/2020/606/P1
09-10-2020
4701-80-800-72(00) 10,00,000 10,00,000
17
CPP-KKPS-Renovation & Modernization of Canals under Chitturpuzha project- KKPS-Renovation of of damaged pipe aqueduct of Vadakkepirivu branch canal between Ch 2/500 km and 3/500km
2018/1435/P1 743/2018/WRD Dated:
17-10-2018
17-10-2018
4700-17-800-97-00-00-00 14,00,000 14,00,000
18
Modernization of field channel from Sluice No.6 (LHS) of Vadakarappally distributory between Ch.0/080 KM to 0/0370 KM.
2019/1287/P1 GO(Rt)No.569/2019/W
RD
04-08-2019
4701-80-800-72(00) 10,93,000 10,93,000
19
Renovation and Modernization of Canals under Chitturpuzha Project -TMS- Rectification works to the damaged canal side walls of Thembaramadakku Main canal between Ch.6/450 KM to 6/550 KM.
2018/889/P1 WP4 3600/18
03-06-2019
4700-17-800-97-00-00-00 25,90,000 25,90,000
20
KyIP-Flood Damages 2018-Removal of sliped earth between Ch. 5/300 Km and 5/700 Km of Kakkodi Branch Canal
2018/1315/P1 GO(Rt)No.793/2018/W
RD
03-11-2018
4700-13-800-97-00-00-00 3,00,000 3,00,000
21
KyIP-Flood Damages 2018-Clearing Syphon wells at ch . 0/700 and 0/950 Km of Kodessery FB No.1.
2018/1308/P1 GO(Rt) No.793/2018/
WRD
03-11-2018
4700-13-800-97-00-00-00 80,000 80,000
22
KyIP-Flood Damages 2018-Removal of sliped earth near Ch . 15/800 Km of Kakkodi Branch Canal
2018/1282/P1 GO(Rt) No.793/2018/
WRD
03-11-2018
4700-13-800-97-00-00-00 70,000 70,000
23
KyIP-Flood Damages 2018-Clearing UTs at ch . 6/400, 7/550, 10/875, and 12/350 km of Kakkodi Branch Canal
2018/668/P1 GO(Rt)No.793/2018/W
RD
03-11-2018
4700-13-800-97-00-00-00 1,32,000 1,32,000
24
KyIP-ACP-2018-19 Rectification works for preventing leakage of Syphon at Ch. 25/000 km of KBC (8/2 Syphon) for Preventing leakage on experimental basis
2018/1281/P1 GO(Rt) No.793/2018/
WRD
03-11-2018
4700-13-800-97-00-00-00 2,00,000 1,35,000
25
KyIP-ACP-2018-19 Rectification works to Narayankulam FB and Shutter
2018/1283/P1 GO(Rt)No.793/2018/W
RD
03-11-2018
4700-13-800-97-00-00-00 1,20,000 1,20,000
26
KyIP-ACP 2018-19- Rectification works to Kannankara FB between ch . 0/150 and 0/250 and between ch . 0/670 and 0/850 km
2018/1266/P1 GO(Rt) No.793/2018/
WRD
03-11-2018
4700-13-800-97-00-00-00 3,00,000 3,00,000
27
KyIP-ACP-2018-19 Providing Lining between ch . 3/200 km and 3/300 km of Narath distributory and providing shutters to Ulliyery Sub distributory, Narath Sub distributory and Mundoth FB
2018/1271/P1 GO(Rt)No.793/2018/W
RD
03-11-2018
4700-13-800-97-00-00-00 2,41,000 2,41,000
28
CPP-MRBC-Rectification to CADA off take from Kozhinjmapara branch canal to Modampady pond(Balance length
2021/254/P1 IDCr/2021/254/P1
14-06-2021
4701-80-800-72(00) 1,83,000 1,83,000
29
CPP-MRBC-Rectification to CADA from LHS of kozhinjampara branch canal from ch 13/850km
2021/272/P1 IDCr/2021/272/P1
15-06-2021
4701-80-800-72(00) 8,00,000 8,00,000
30
CPP-MRBC-Rectification to CADA near ch 15/200km RHS of Kozhijampara branch canal
2021/287/P1 IDCr/2021/287/P1
14-06-2021
4701-80-800-72(00) 1,62,000 1,62,000
31
KRP-Repairs to 20 nos of canal shutters of LBC of Karappuzha Irrigation Project and fabrication of 2 nos of canal shutters and 2 nos of trash racks
2016/112/MH GO(Rt) No 730/2018/
WRD
10-10-2018
4701-13-800-91-00-00-00 1,28,56,000 7,40,800
32
KRP - Construction of leading channel near ch.3850m of LBMC and allied works.
2021/720/P1 WP8/2321/ACP/2021-2
2 of Chief engineer, irrigation
26-04-2021
4701-13-800-92-00-00-00 30,00,000 30,00,000
33
KRP- Repair and maintenance work to water supply arrangements at Division office colony, Kalpetta.
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-93-00-00-00 10,00,000 10,00,000
34
KRP-Reconstruction of Protection wall near Ch.4700m of LBMC and allied works
2021/630/P1 WP8/2321/ACP/2021-2
2 of Chief engineer, irrigation
26-04-2021
4701-13-800-92-00-00-00 35,00,000 31,20,000
35
KRP-Clearing light jungle and removal of silt from open canal Ch.6000m to Ch.7000m of LBMC including sealing of expansion joints.
WP8/2321/ACP/2021-2
2 of Chief engineer, irrigation
26-04-2021
4701-13-800-92-00-00-00 2,00,000 2,00,000
36
KRP-Clearing light jungle and removal of silt from open canal Ch.8000m to Ch.9200m of LBMC including sealing of expansion joints
2021/640/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-92-00-00-00 2,00,000 2,00,000
37
KRP-Construction of retaining wall near Ch. 6145m of Padinjareveedu branch canal including allied works.
2021/786/P1 WP8/2321/ACP/2021-2
2 of Chief engineer, irrigation
26-04-2021
4701-13-800-91-00-00-00 30,00,000 29,70,000
38
KRP-Providing guard posts on the right side of inspection road from Ch.3500m to Ch.4200m of LBMC
2021/760/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-92-00-00-00 10,00,000 10,00,000
39
KRP-Clearing light jungle and removal of silt from open canal Ch.6000m to Ch.7000m of LBMC including sealing of expansion joints.
2021/633/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-92-00-00-00 2,00,000 2,00,000
40
KRP- Repair and maintenance work to water supply arrangements at Division office colony, Kalpetta.
2021/981/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-93-00-00-00 10,00,000 10,00,000
41
Action Plan 2019-20, Study the requirement of cathodic protection for steel sheet piles to be used in rectification of Chamravattom RCB across Bharathapuzha by the CSIR-CECRI,Karikudi
2019/1212/IA WP5-2017/2019
01-06-2019
4701-18-800-87-00 5,00,000 5,00,000
42
Mangalam Project- improvement of karuprkudam- Elavampadam field channel off take ch. At 4/450km of RBMC
2019/33/P1 GO (Rt) No. 585/201
8/WRD
06-08-2018
4701-80-800-72-00-00-00 15,00,000 15,00,000
43
Cheramangalam scheme-Improvement and urgent rectification works to Ayyanpalayam field channel between 1/00 to 2/00
2019/105/P1 Go Rt 585 . 2018.WR
D
06-08-2018
4701-80-800-72-00-00-00 20,00,000 20,00,000
44
Mangalam Project-Renovation of vaniyamkode -kozhakully field channel offtake chainage at 3/500 km of Elavampadam distributory of RBMC
2019/17/P1 585/2018/WRD
06-08-2018
4701-80-800-72-00-00-00 15,00,000 15,00,000
45
Mangalam Project- Renovation of Elavampadam field channel offtake ch 3/500 km of Elavampadam distributory of RBMC
2019/35/P1 585/2018/WRD
06-08-2018
4701-80-800-72-00-00-00 15,00,000 15,00,000
46
PP - Rennovation and modernisation works to field bothie starting from ch 0/850km of Thiruvazhiyad branch canal of LBMC.
569/2019/WRD,Thiruv
ananthapuram
04-08-2019
4701-80-800-72(00) 25,00,000 25,00,000
47
PP-Rennovation and modernisation works to Poolaykkalparambu field bothie of Paliyamangalam branch canal of LBMC.
569/2019/WRD,Thiruv
ananthapuram
04-08-2019
4701-80-800-72(00) 35,00,000 35,00,000
48
MP Dam safetyUpkeeping rectification maintenance of earth dam DRAINAGE including repair of VNOTCH and Pathway to measurement reading area.
2021/943/P1 IDMa/2021/943/P1
19-01-2022
4700-80-800-97(00) 13,62,000 13,62,000
49
KRP-Investigation of Padinjareveedu Branch Canal after cut & cover near Ch.4000m
2021/1151/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 7,00,000 7,00,000
50
KRP - Fixing of stiffener plates for radial gates
2022 10 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-97-00-00-00 2,00,000 1,50,000
51
KRP- Sub soil investigation of Chikkalloor distributory
2022 55 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 3,00,000 3,00,000
52
KRP- Providing covering slab on both ends of cross drain at Adivaram Junction of Karapuzha- Ambalavayal road.
2022 73 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-93-00-00-00 30,000 30,000
53
General-BSP-Maintenance Works to Dormitory and demolition of Damaged Type-III quarters at Vellamunda
IRR/P1/EST/5143/2023_5_1_1 GO(Rt)No.335/2023/W
RD
29-03-2023
4700-28-800-93-00-00-00 3,00,000 3,00,000

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
IIP- Engaging labourers for watching the canal and clearing obstructions including removal of slipped earth and clearing light jungle during water distribution for the year 2017-18 between Ch. 0 m to 9000m of LLC including maintenance of shutter
2017/1089/P2 G.O.(Rt) No.987/201
7/WRD
11-12-2017
4700-20-800-92(00) 2,00,000 1,51,288
2
IIP-UP keeping and maintanance of division office angamaly
00000 2/EE/IIP/14-15
28-02-2015
4700-20-001-97(00) 5,00,000 5,00,000
3
IIP-LLC engaging labour for clearing obstruction from canal and canal watching during water distribution for the year 2016-17 including maintenance of the shutter.
2017/83/P2 G.O.(Rt) No.9/2017/
WRD
04-01-2017
4700-20-800-92(00) 3,00,000 1,51,288
4
IIP-Construction of Flush escape for tail end discharge at Ch 14623M of Low Level Canal and leading channel to Manjali thodu
2018/1118/P2 GO(Rt)N0.810/2018/W
RD dt TVM 12/11/2018
12-11-2018
4700-20-800-92(00) 15,00,000 70,00,000
5
IIP-LLC-0 to 9000 m Engaging labour for clearing obstructions from canal and canal watching during water distribution for the year 2018-19 including maintenance of shutter
2018/1142/P2 GO(Rt ) no.810/2018
/WRD
12-11-2018
4700-20-800-92(00) 2,00,000 1,83,884
6
IIP -Water distribution during 2016-17 Engaging labours for canal watching, operating shutter and clearing the light jungle at ch.0m to 16km
2017/98/P2 G.O.(Rt)No.9/2017/W
RD
04-01-2017
4700-20-001-97(00) 15,00,000 14,63,850
7
MVIP - Rectification works to Mulakkulam branch canal from ch 2600m and 3700m
2017/484/P2 G.O. (Rt) No.643/20
17/WRD
28-07-2017
4700-22-800-91(00) 5,49,60,000 9,00,000
8
MVIP - Annual Maintenance to Mulakkulam Branch canal from Ch. 0m to 6770m
2017/486/P2 G.O. (Rt) No.643/20
17/WRD
28-07-2017
4700-22-800-91(00) 5,49,60,000 3,00,000
9
MVIP - LBMC Engaging labour to water distribution works through LBMC 25600m to 37110m, Mulakkulam branch, Piravom branch, Onakkoor distributory, south kakkad distributory, kuthattukulam distributory for the year 2017-18
2017/487/P2 G.O. (Rt) No.643/20
17/WRD
28-07-2017
4700-22-800-92(00) 5,49,60,000 3,00,000
10
MVIP - Annual Maintenance to Koothattukulam distributory from Ch.0m to 3725m for 2017-18
2017/489/P2 G.O. (Rt) No.643/20
17/WRD
28-07-2017
4700-22-800-90(00) 5,49,60,000 3,00,000
11
MVIP-Upkeeping muttom colony for the year 2017-18
2017/800/P2 G.O.(Rt)No. 643/201
7/WRD
28-07-2017
4700-22-800-97(00) 5,49,60,000 3,00,000
12
MVIP Rectification works for prevention of leakage to south Kakkad distributory from Ch 2050m to Ch 2150m
2017/780/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 4,00,000 4,00,000
13
M.V.I.P Annual maintenance to Piravom branch canal Ch 0.00m to 4150m
2017/790/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 3,00,000 3,00,000
14
MVIP maintenance of quarters at Muttom
0000 D2-3007/14
30-03-2015
4700-22-800-93(00) 1,07,75,000 5,40,000
15
MVIP URGENT SPECIAL MAINTANANCE OF OFFICE BUILDING AT MUTTOM
0001 D2-3007/14
30-03-2015
4700-22-800-93(00) 8,00,000 8,00,000
16
MVIP-Maintenance of type III quqrters at Muttom colony
0000 G.O(RT)No.1110/215/
WRD
19-12-2015
4700-22-800-93(00) 3,00,000 3,00,000
17
MVIP -Canal Clearing and jungle clearance for water distribution proposed for ch: 14000 m to 17000 m for the year 2018-19
2018/864/P2 521/2018/WRD
18-07-2018
4700-22-800-97(00) 3,00,000 3,00,000
18
UPKEEPING MUTTOM COLONY
0000 No.16/AS/EE/MVIP-II
I/14-15
20-03-2015
4700-22-800-97(00) 1,00,000 1,00,000
19
MVIP Rectification works for prevention of leakage to southKakkad distributory from Ch 5700m to CH 5800m
2017/778/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 3,00,000 3,00,000
20
MVIP Rectification Works to South Kakkad distributory from Ch 3350 to Ch 3400
2017/792/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 3,00,000 3,00,000
21
MVIP-LBMC Urgent rectification works to main canal from ch 27739m to ch 28000m for the year 2016-17
2016/400/P2 G.O(Rt) No.1000/201
6/WRD
21-12-2016
4700-22-800-92(00) 7,47,00,000 10,00,000
22
MVIP - Protection works to Kizhumury MD from ch.1300m to 1330m to prevent bund collapsing.
2017/734/P2 GO(Rt)No.643/2017 W
RD
28-07-2017
4700-22-800-90(00) 5,49,60,000 5,30,000
23
MVIP - Rectification works to Mulakkulam branch canal from Ch. 650m and 720m
2017/485/P2 G.O. (Rt) No.643/20
17/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-91(00) 5,49,60,000 4,00,000
24
MVIP Annual maintenance to Peruva distributory from Ch 0m to 6800m for 2017-2018
2017/794/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 5,49,60,000 4,00,000
25
Malankara Tourism - Destination development- Children's park- Supply and erection of water purifier and planting of Lawn.
2019/9/P2 DTPC/A1/172/2005
30-06-2018
4700-22-800-98(00) 15,00,000 2,25,000
26
Constructing Madakkathnam minor Distributary from chainage 0m to 3765m including Flume,cut & cover and CD works except Aquiduct and Flume between chainage 690m t0 1522m
000000 Go(Rt)No.643/2017/W
RD
28-07-2017
4700-22-800-90(00) 5,49,60,000 4,69,97,122
27
MVIP rectification works for prevention of heavy leakage to South Kakkad distributory from ch 7900m to Ch 8200m
2017/779/P2 G.O(Rt) No. 643/201
7/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-90(00) 15,00,000 15,00,000
28
MVIP-Urgent Rectification works and protection works to Piravom Branch Canal near ch.2900m
2016/395/P2 1000/2016/WRD dtd.2
1.12.2016
21-12-2016
4700-22-800-91(00) 15,00,000 15,00,000
29
MVIP - Urgent Rectification works to South Kakkad Distributory between Ch. 3100m to 3250m
2016/413/P2 1000/2016/WRD
21-12-2016
4700-22-800-90(00) 15,00,000 15,00,000
30
MVIP-Urgent special maintenance to South Kakkad Distributory from ch.7250m to 11340m
2016/368/P2 ORDER No. MVIPDIV/2
016/368/P2
28-03-2017
4700-22-800-90(00) 5,00,000 5,00,000
31
MVIP - Annual Maintenance to Mulakkulam Branch canal from Ch. 0m to 6770m
2017/486/P2 G.O. (Rt) No.643/20
17/WRD Dtd 28/07/2017
28-07-2017
4700-22-800-91(00) 5,49,60,000 3,00,000
32
MVIP-LBMC -Canal from ch.0 to 8000m for cutting and removing of trees in the side slopes and either bunds of canal
823416 GORT NO 1110/215/WR
D
19-12-2015
4700-22-800-92(00) 2,00,000 2,00,000
33
MVIP-LBMC -Canal clearing and jungle clearance from Ch:5850m to 8000m
823416 NO.MVIPDIII/2016/39
6/P2
02-03-2017
4700-22-800-92(00) 3,00,000 3,00,000
34
SDRF-MVIP-RBMC-Urgent rectification of U.T near ch 6200 m to prevent leakage
2019/280/P2 MVIPDIII/2019/280/P
2
06-03-2019
4700-22-800-92(00) 1,48,000 1,48,000
35
Connactivity with IIP canal -Construction of Lift irrigation Scheme at Thenkulam.
2020/199/P2 WP2-4718/96/D7
30-10-2020
4700-20-800-92(00) 15,00,000 24,36,000
36
IIP-LLC 0 to 9000 m Engaging labour for clearing obstructions from canal and canal watching during water distribution for the Year 2019-2020 including maintenance of shutter.
2019/1777/P2 WP2-4718/96/D7
09-07-2019
4700-20-800-92(00) 2,00,000 2,00,000
37
Connectivity with IIP canal -Construction of Lift irrigation Scheme at Ambattuchal
2020/216/P2 WP2-4718/96/D7
30-10-2020
4700-20-800-92(00) 15,00,000 38,53,000
38
IIP_Low Level Canal Engaging labour for clearing obstruction from canal and canal watching during water distribution from ch.0 to 14623m for the year 2020-21 including maintenance for shutter.
2020/959/P2 WP2-4718/96/D7
30-10-2020
4700-20-800-92(00) 2,00,000 2,00,000
39
MVIP-LBMC-Shutter operation -Engaging labour and other connected works for water distribution for the year 2019-20.
2019/2216/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 2,00,000
40
MVIP-Palakkuzha LI Scheme-Engaging labours for water distribution for the year 2019-2020
2019/2254/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 2,00,000
41
MVIP- Annual maintenance of LBMC from ch 12000 to 16000m (including urgent rectification) for the year 2019- 2020
2019/2256/2019 WP2/3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 4,99,800
42
MVIP-Annual Maintenance of LBMC from Ch. 8000m to 12000m (including urgent rectification) for the year 2019- 2020.
2019/2255/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 5,00,000
43
MVIP- Maintenance of Palakkuzha LI scheme pump House
2019/2260/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 1,00,000
44
MVIP-Annual maintenance of LBMC from Ch. to 22275m to 25624m for the year 2019-20.
2019/2377/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 5,00,000
45
MVIP Annual maintenance of LBMC from Ch. 16000m to 22275m for the year 2019-20
2019/2511/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,21,50,000 7,00,000
46
MVIP-Maintenance of watchman shed near Parakkadavu aqueduct.
2020/80/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 2,00,000
47
MVIP-Reconstruction of collapsed boundary wall, retaining wall near IB at Koothattukulam.
2020/190/P2 WP2/3574/96/D5(3)/V
ol.III
16-10-2019
4700-22-800-92(00) 2,12,50,000 4,00,000
48
MVIP- Urgent rectification works of Palakuzha distributary (before lift) 0 to 1870 m to prevent leakage
2019/2257/P2 WP2-3574/96/D5(3)/V
ol.III
16-10-2019
4700-20-800-92(00) 2,15,00,000 3,00,000
49
MVIP- Kurumulloor distributory -Urgent Rectification works to the damaged lining between Ch. 0.0 m to Ch.125.0m for the year 2021-22
2021/958/P2 ORDER NO.WP2-1403/2
021/D10
01-04-2021
4700-22-800-90(00) 10,00,000 10,00,000
50
MVIP- Maintenance of building and repair of plumping and sanitary installations in MVIP office building at Koothattukulam.
2021/1165/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-93(00) 4,50,000 4,50,000
51
MVIP-Anicadu east distributory - Providing lining between ch. 1520 m- 1630 m, 1667 m - 1697 m ,1706 m - 1855 m of Anicadu East (Nadukkara) distributory
2021/752/P2 WP2-1403/2021/D10
20-07-2021
4700-22-800-90(00) 9,40,000 9,40,000
52
Annual Maintenance of IIP- LLC from ch 9000 m to 12000 m for the year 2021-22.
2021/877/P2 WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 6,00,000 6,00,000
53
IP- Providing service connection to IIP watchman house at Malayatoor
WP2-4718/96/D7
30-10-2020
4700-20-800-92(00) 9,00,00,000 9,00,00,000
54
MVIP-Overhauling of motor pump set and starter units in LIS Palakuzha
2021/1175/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-90(00) 1,26,000 91,339
55
Urgent leak rectification works to Minor irrigation Subdivision office in Ravinagar campus,Kottarakkara
. KIPRBDII/2021/128
2/P2
22-10-2021
4701-80-800-76-02-00 8,70,000 8,70,000
56
MVIP CADA Construction of field channel from sluice at Ch 18040m of LBMC
2019/3124/P2 41/2019/WRD
16-10-2019
4700-22-800-84-00-00-00 10,00,00,000 11,50,000
57
MVIP CADA Construction of field channel from sluice at Ch 260m Marika Distributory
2020/255/P2 41/2019/WRD
16-10-2019
4700-22-800-84-00-00-00 10,00,00,000 4,48,000
58
MVIP CADWM Construction of field channel from sluice at Ch 1200m(after lift) of Palakkuzha distributory
2019/3121/P2 GO (MS) No- 41/2019
/WRD Dated:16-10-2019
16-10-2019
4700-22-800-84-00-00-00 10,00,00,000 5,62,000
59
MVIP- CADA Construction of Field Channel from spout at Ch 900m of Kurukkunapuram MD
2019/50/P2 GO(Rt)No888/2018/WR
D
12-12-2018
4700-22-800-84-00-00-00 7,40,000 7,40,000
60
MVIP-CADA Construction of field channel Kakkattoor Padashekaram in the ayacut of Varappetty Distrybutory
2019/53/P2 G.O.(Rt)No.888/2018
/WRD
12-12-2018
4700-22-800-84-00-00-00 8,14,000 8,14,000
61
Testing of Soil samples for Pattissery Earthen Dam
2021/1636/P2 WP2-1537/2021/D4
27-04-2021
4701-25-800-97(00) 70,000 70,000
62
Model study of the proposed Lower Chattamunnar dam in Thalayar Scheme (Spill way, canal sluice etc.)
2021/1635/P2 WP2-1537/2021/D4
27-04-2021
4701-25-800-97(00) 5,50,000 5,50,000
63
MVIP-CADWM-Construction of field channel at chainage 4000.0m of Kidangoor Distributory for Irrigating Varila Mangalam and Cheruvanam Padasekharams
2020/1095/P2 MVIPDIV/2020/1095/P
2
25-01-2021
4700-22-800-84-00-00-00 25,20,000 25,00,000
64
MVIP-CADA- Construction of field channel from vilayamcode distributory spout at ch 850m to punnamthanam padassekharam.
2018/89/P2 GO (Rt) No.888/2018
/WRD
12-12-2018
4700-22-800-84-00-00-00 10,31,000 10,31,000
65
IIP_LLC-Fabrication, Painting and erecction of shutter and hoisting arrangement at Ch. 11500m- Mechanical works
2022/31/MH wp2-4718/96/D7
30-10-2020
4700-20-800-92(00) 9,00,00,000 1,52,000
66
GENERAL-IIP-Low Level Canal-Engaging labour for clearing obstruction from canal and canal watching during water distribution from Ch.0 to 14863 for the year 2022-2023 including maintenance of shutter
IRR/PII/EST/1889/2022_5_1_1 WP2-1877/2022/D5
22-06-2022
4700-20-800-92(00) 2,50,000 2,50,000
67
MVIP overhauling and annual maintenance of Radial Spillway shutter at Malankara Dam Mechanical 2022 23
IRR/MH/EST/867/2022_16_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 8,00,000 8,00,000
68
MVIP Annual maintenance of Marady major and minor distributories for the year 2022 23
IRR/PII/EST/541/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 3,00,000
69
MVIP Annual maintenance of Arakkuzha,Thottakkara, Maniyankallu and perumballoor minor distributories for the year 2022 23
IRR/PII/EST/561/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 3,00,000
70
MVIP Annual maintenance of Kurukunnapuram Major and minor distributories for the year 2022 23
IRR/PII/EST/663/2022 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 3,00,000
71
MVIP Annual maintenance of Peringazha Muvattupuzha minor and Kayanadu minor distributories for the year 2022 23
IRR/PII/EST/674/2022 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 2,50,000 2,50,000
72
GENERAL MVIP Peruva distributory canal Annual maintenance from ch 0m to 6900m for the year 2022 23 general civil work
IRR/PII/EST/72/2022_ 5_ 1_ 1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 5,00,000 5,00,000
73
Rectification works to -Elanjimel distributory canal between ch.0 m to 1000 m
IRR/PII/EST/6110/2022_5_5_4 264/2022/WRD
31-03-2022
4700-16-800-97(00) 17,00,000 17,00,000

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Investigation work for boat jetty at Kotti in Kotti-Kottappuram water way in Payyannur Muncipality in Kannur District.
2017/4471/IA INDKnr/2017/4471/IA

30-11-2017
3056-00-001-96-00-00 4,75,000 4,50,000
2
Soil Investigation for the construction of a boat terminal at Thayyil in Valiyaparamba Panchayath in Kasaragod District
2017/4765/IA INDKnr/2017/4765/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 5,00,000
3
Investigation work for boat jetty at Edayilakkad munumpu in Kotti-Kottappuram waterway in Valiyaparamba panchayath in Kasaragod District
2017/4469/IA INDKnr/2017/4469/IA

30-11-2017
3056-00-001-96-00-00 4,75,000 4,50,000
4
Soil Investigation for the construction of a boat terminal at Cheroor in Chengala Panchayath in Kasaragod District.
2017/4766/IA INDKnr/2017/4766/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 5,00,000
5
Investigation work for boat jetty at Kadinjimoola in KottiKottappuram waterway in Nileswaram Muncipality in Kasaragod District.
2017/4208/IA INDKnr/2017/4208/IA

30-11-2017
3056-00-001-96-00-00 5,00,000 4,80,000
6
Investigation work for boat jetty at Thaikkadappuram in Kotti-Kottappuram waterway in Nileswaram Muncipality in Kasaragod District
2017/4466/IA INDKnr/2017/4466/IA

07-12-2017
3056-00-001-96-00-00 5,00,000 4,80,000
7
Investigation work for boat jetty at Orkalam in KottiKottappuram waterway in Cheruvathur Panchayath in Kasaragod District.
2017/4467/IA INDKnr/2017/4467/IA

07-12-2017
3056-00-001-96-00-00 4,75,000 4,50,000
8
Soil Investigation work for the construction of boat terminal at Kariyangod in Nileswaram Muncipality in Kasaragod District.
2017/4761/IA INDKnr/2017/4761/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 4,75,000
9
Soil Investigation for the construction of boat terminal at Azhithala in Nileswaram Muncipality in Kasaragod District
2017/4762/IA INDKnr/2017/4762/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 4,75,000
10
Soil Investigation for the construction of a boat terminal at Thalankara in Kasaragod Muncipality in Kasaragod District.
2017/4763/IA INDKnr/2017/4763/IA

06-12-2017
3056-00-001-96-00-00 4,75,000 4,50,000
11
Soil Investigation for the construction of a boat terminal at Thekkil in chengala Panchayath in Kasaragod District.
2017/4756/IA INDKnr/2017/4756/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 4,75,000
12
Soil Investigation for the construction of a boat terminal at Valiyaparamba Central in Valiyaparamba panchayath in kasaragod District.
2017/4755/IA INDKnr/2017/4755/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 4,75,000
13
Investigation work Boat Terminal at Mavilakadappuram in Kotti-Kottappuram waterway in Valiyaparamba Panchayath in Kasaragod District.
2017/4629/IA INDKnr/2017/4629/IA

30-11-2017
3056-00-001-96-00-00 5,00,000 4,80,000
14
Investigation work for boat jetty at Thekkekad Munumpu in Kotti-Kottappuram waterway in Valiyaparamba Panchayath in Kasaragod District.
2017/4475/IA INDKnr/2017/4475/IA

30-11-2017
3056-00-001-96-00-00 4,75,000 4,50,000
15
Investigation work for boat jetty at Ayitti in KottiKottappuram waterway in Trikaripur panchayath in Kasaragod District.
2017/4474/IA INDKnr/2017/4474/IA

07-12-2017
3056-00-001-96-00-00 4,75,000 4,50,000
16
Soil Investigation for the construction of a boat terminal at korakkodu kadavu in Kasaragod Muncipality in Kasaragod District.
2017/4757/IA INDKnr/2017/4757/IA

06-12-2017
3056-00-001-96-00-00 5,00,000 4,75,000
17
Investigation for soil exploration for the reconstruction of Puthen palam Bridge across Parvathy Puthanar including retaining wall and approach road at chainage 9.64 Km in Thiruvananthapuram Corporation
ESTNO2017 4529 IA INDKlm 2017/4529/IA

31-03-2018
3056-00-001-96-00-00 3,65,000 3,65,000
18
Temporary protection to western side of Parvathy Puthanar with sand bag for a length of 200 m from ch 4185 m to 4385 m at Kunnumanal
17/2013 1546/P4/KRFB/2015
07-05-2015
5075-60-800-94(00) 10,00,000 10,00,000
19
Investigation of Soil Exploration
2017/4559/IA INDKlm/2017/4559/IA

31-03-2018
3056-00-001-96-00-00 3,79,000 3,79,000
20
CSIN- Cleaning of canal from Veli to Poundukadavu
00000 26/2014/CSIND
30-09-2014
5075-60-800-94(00) 5,70,00,000 3,26,00,000
21
Investigation work for boat terminal at Kariyad-Kidanji in Mahe Valapattanam water way in Mahe river in Kannur District
2017/4551/IA INDKnr/2017-2018/20
17/4551/IA
30-11-2017
3056-00-001-96-00-00 4,75,000 4,60,000
22
Development of Waterways and Canals - Investigation works for dredging of Anjarakkandy River from Company matta to Chambad
2018/1015/IA INDKnr/2018/1015/IA

28-03-2018
3056-00-001-96-00-00 5,00,000 5,00,000
23
Development of Waterways and Canals - Investigation works for dredging of Anjarakkandy River from Muzhappilangad to Parapram
2018/1013/IA INDKnr/2018/1013/IA

28-03-2018
3056-00-001-96-00-00 4,95,000 4,95,000
24
Development of Waterways and Canals - Investigation works for dredging of Anjarakkandy River from Parappuram to Company matta
2018/1014/IA INDKnr/2018/1014/IA

28-03-2018
3056-00-001-96-00-00 4,92,000 4,92,000
25
Soil investigation for the construction of boat terminal at cherikkal in Pinarayi Panchayath.
2018/164/IA INDKnr/2018/164/IA
27-03-2018
3056-00-001-96-00-00 4,40,000 4,40,000
26
Investigation work for boat jetty at Peringathur in Mahe river in Kannur District
2017/4554/IA INDKnr/2017/4554/IA

30-11-2017
3056-00-001-96-00-00 4,50,000 4,50,000
27
Soil investigation work for terminal boat jettty at Muzhappilangad
2018/1012/IA INDKnr/2018/1012/IA

27-03-2018
3056-00-001-96-00-00 4,60,000 4,60,000
28
Investigation work for boat terminal at Parapram along anjarakkandy river
2017/4478/IA INDKnr/2017/4478/IA

30-11-2017
3056-00-001-96-00-00 4,70,000 4,50,000
29
Investigation work for boat terminal at Pinarayi Company Metta along anjarakkandy river
2017/4479/IA INDKnr/2017/4479/IA

30-11-2017
3056-00-001-96-00-00 4,75,000 4,60,000
30
Investigation work for the construction of boat terminal at dharmadam along anjarakkandy river
INDKnr/2017/4477/IA INDKnr/2017/4477/IA

30-11-2017
3056-00-001-96-00-00 4,77,000 4,70,000
31
Investigation work of boat jetty at Champadu along anjarakkandy river
2017/4480/IA INDKnr/2017/4480/IA

30-11-2017
3056-00-001-96-00-00 4,79,000 4,60,000
32
Investigation for Soil Exploration for the Construction of Road Bridge at Thekke Arayathuruthu across T.S Canal at Ch. 35.97 Km in Chirayinkeezhu panchayath
2017/1180/IA INDKlm/2017/1180/IA

23-05-2014
5075-60-800-94(00) 4,60,000 4,60,000
33
Soil investigation work to the construction of a Boat Jetty at Pappinissery Parakkal in Pappinissry Panchayath.
2018/122/IA INDKnr/2018/122/IA
27-03-2018
3056-00-001-96-00-00 3,00,000 3,00,000
34
Soil investigation work to the construction of a Boat Jetty at Pappinissery Parakkal in Pappinissry Panchayath.
2018/122/IA INDKnr/2018/122/IA
27-03-2018
3056-00-001-96-00-00 3,00,000 3,00,000
35
Investigation for Soil Exploration for the Construction of Retaining Wall and Approach Road for Vadakke Arayathuruthu Bridge across T.S Canal at Ch. 36.56 Km in Chirayinkeezhu panchayath
2017/1263/IA INDKlm/2017/1263/IA

25-05-2017
5075-60-800-94(00) 4,96,000 4,96,000
36
Investigation for Soil exploration for the Construction of Retaining Wall and Approach Road for Kadakam Bridge across T.S Canal at Ch. 35.23 Km in Chirayinkeezhu panchayath
2017/1262/IA INDKlim/2017/1262/I
A
25-05-2017
5075-60-800-94(00) 4,96,000 4,96,000
37
Investigation work for boat jetty at Kacheri in Mahe River in Kozhikode District
2017/5008/IA INDKnr/2017/5008/IA

14-12-2017
3056-00-001-96-00-00 4,50,000 4,50,000
38
Soil Investigation for the construction of a Major boat terminal at Perumba in Perumba River in Payyannur Muncipality
2017/4642/IA INDKnr/2017/4642/IA

07-12-2017
3056-00-001-96-00-00 4,90,000 4,90,000
39
Soil Investigation for the construction of a Major boat terminal at Perumba in Perumba River in Payyannur Muncipality
2017/4642/IA INDKnr/2017/4642/IA

07-12-2017
3056-00-001-96-00-00 4,90,000 4,90,000
40
Soil Investigation work for boat jetty in Valapattanam Kotti Navigation Route in Perumba River at Moolakeel Kadavu in Madayi Panchayath
2017/4637/IA INDKnr/2017/4637/IA

07-12-2017
3056-00-001-96-00-00 4,60,000 4,40,000
41
Soil Investigation for the construction of a boat terminal in Thekkumbad island in Mattool Panchayath.
2017/4453/IA INDKnr/2017/4453/IA

07-12-2017
3056-00-001-96-00-00 4,85,000 4,85,000
42
Investigation work for boat jetty at Kallacherikadavu in Mahe River in Kozhikode District
2017/5007/IA INDKnr/2017/5007/IA

14-12-2017
3056-00-001-96-00-00 4,50,000 4,50,000
43
Soil Investigation for the construction of Boat Terminal at Kakkad in Valapattanam River.
2017/4565/IA INDKnr/2017/4565/IA

07-12-2017
3056-00-001-96-00-00 4,80,000 4,80,000
44
Investigation work for boat jetty at Monthal in Mahe Valapattanam water way in Mahe river in Kannur District
2017/4553/IA INDKnr/2017/4553/IA

05-12-2017
3056-00-001-96-00-00 4,50,000 4,30,000
45
Soil Investigation for the construction of a Boat Terminal at Malappattam Munambu kadavu in Valapattanam River
2017/4566/IA INDKnr/2017/4566/IA

07-12-2017
3056-00-001-96-00-00 4,80,000 4,80,000
46
Soil Investigation for the Construction of a Boat Terminal at Mattool South in Mattool Panchayath.
2017/4635/IA INDKnr/2017/4635/IA

07-12-2017
3056-00-001-96-00-00 4,50,000 4,50,000
47
Soil Invetigation work for the Construction of a Boat terminal at Pattuvam Kottakkeel kadavu in Ezhome Panchayath
INDKnr/2017/4635/IA INDKnr/2018/107/IA
27-03-2018
3056-00-001-96-00-00 4,38,000 3,55,000
48
Investigation work for boat jetty at Punnakkadavu in Palakkode Perumba River in Ramanathali Panchayath in Kannur
2018/999/IA INDKnr/2018/999/IA
27-03-2018
3056-00-001-96-00-00 3,35,000 3,30,000
49
Investigation work for Boat Terminal at New Mahe in Mahe River in Kannur District
2018/110/IA INDKnr/2018/110/IA
27-03-2018
3056-00-001-96-00-00 3,35,000 3,35,000
50
Soil investigation work for- North Malabar River Cruise Tourism-Boat Jetty and Walkway at Kakkadavu in Chokli Panchayath in Kannur Distict
2018/957/IA INDKnr/2018/957/IA
27-03-2018
3056-00-001-96-00-00 3,35,000 3,30,000
51
Investigation Work for the proposed foot bridge across Sulthan Canal between Vadikkal and Kozhibazar in Kannur District
2017/5009/IA INDKnr/20170/5009/I
A
14-12-2017
3056-00-001-96-00-00 1,50,000 1,50,000
52
Investigation work for the proposed new Kannankutty foot bridge across Badagara mahe canal
2018/1068/IA INDKnr/2018/1068/IA

28-03-2018
3056-00-001-96-00-00 1,95,000 1,95,000
53
Soil Investigation for the construction of boat jetty at Pamburuthy island near Pamburuthy AUP school in Kolachery Panchayath
2018/1097/IA INDKnr/2018/1097/IA

31-03-2018
3056-00-001-96-00-00 3,20,000 3,20,000
54
Soil Investigation work for the construction of boat jetty at AKG island in Andoor Municipality
2018/1098/IA INDKnr/2018/1098/IA

31-03-2018
3056-00-001-96-00-00 3,20,000 3,20,000
55
Soil Investigation work for the Construction of a Boat Terminal at Kuppam in Taliparamba Municipality
2018/108/IA INDKnr/2018/108/IA
27-03-2018
3056-00-001-96-00-00 4,10,000 3,20,000
56
Soil Invesigation works for the construction of Boat Terminal at Vadikkal in Madayi Panchayath.
2018/109/IA INDKnr/2018/109/IA
27-03-2018
3056-00-001-96-00-00 4,40,000 3,45,000
57
Investigation for the construction of additional span of road bridge with foot path across Badagara Mahe canal at Kottappally
2017/4561/IA INDKnr/2017/4561/IA

18-11-2017
3056-00-001-96-00-00 2,30,000 2,30,000
58
Soil investigation work for North Malabar River cruise Tourism Boat Jetty at Pathikkal in Chokil Panchayath in Kannur District
2018/1835/IA INDKnr/2018/1835/IA

08-06-2018
3056-00-001-96-00-00 3,20,000 3,20,000
59
Soil investigation work to the construction of a Boat Terminal at Valluvankadavu in Chirakkal Panchayath.
2018/1100/IA INDKnr/2018/1100/IA

31-03-2018
3056-00-001-96-00-00 4,10,000 4,10,000
60
Soil investigation work for North Malabar River Cruise Tourism Boat Jetty at Puthiya Puzhakkara in Valapattanam Kotti Navigation Route in Perumba River
2018/2197/IA INDKnr/2018/2197/IA

07-07-2018
3056-00-001-96-00-00 3,80,000 3,80,000
61
Soil investigation work to the construction of a Boat Terminal at Muttil Cherukunnu Panchayath.
2018/120/IA INDKnr/2018/120/IA
27-03-2018
3056-00-001-96-00-00 4,25,000 3,30,000
62
Development of waterways and canals - Investigation works for dredging of Kuppam river from Kottakkeel to Pazhayangadi
2018/1101/IA INDKnr/2018/1101/IA

31-03-2018
5075-60-800-94(00) 5,00,000 5,00,000
63
Soil investigation work to the construction of a Boat Jetty at Muthukuda in Pattuvam Panchayath.
2018/121/IA INDKnr/2018/121/IA
27-03-2018
3056-00-001-96-00-00 3,25,000 3,25,000
64
Development of waterways and canals - Investigation works for dredging of Kuppam river from Kuppam to Kottakkeel
2018/1099/IA INDKnr/2018/1099/IA

31-03-2018
5075-60-800-94(00) 4,00,000 3,90,000
65
Development of Rural Circuit - Malanad Malabar Cruise Tourism Project in Kerala under Swadeshi Darshan Scheme - Construction of Boat Jetty at Azheekkal Ferry
2019/1469/IA G.O.(Rt) 466/2018/T
SM
10-10-2018
5075-60-800-94(00) 70,79,000 70,79,000
66
CSIND-CLEANING AND DEVELOPMENT OF WCC FROM CH 33.63 KM TO CH 35.23 KM (BETWEEN AZHOOR BRIDGE AND KADAKAM ROAD CROSSING) IN CHIRAYINKEEZH PANCHAYATH
2019/6598/IA INDKlm/2019/6598/IA

11-06-2019
5075-60-800-94(03) 84,00,000 74,30,000
67
Desilting of Kodoor Thodu and Raising of the Existing outer bund of Gravu Padasekharam at Kottayam Muncipality
2020/36/KP KDDKtm/2020/36/KP
30-05-2020
4711-01-103-84(00) 27,00,000 27,00,000
68
Sub- Revamping of Boat Jetty including deepening at Fortkochi in Ernakulam District.
2019/10984/IA IDEkm/2019/10984/IA

10-03-2020
5075-60-800-94(03) 95,00,000 91,00,000
69
DREDGING OF SULTHAN CANAL
EST NO:2019/5882/IA ORDER No. INDKnr/20
19/5882/IA
28-09-2019
5075-60-800-94(03) 55,00,001 55,00,000
70
K P - Rectification work to Cheruvallikkari Padasekharam in Vechoor Panchayath
2019/763/KP KDDKtm/2019/763/KP
07-06-2019
4711-01-103-84(00) 35,00,000 35,00,000
71
Removal of water hyacinth and other water weeds from vellayani lake, Thiruvanathapuram by using weed harvester
No.589/2019-2020 IMDAlp/2019/346/MH
24-01-2020
5075-60-800-94(03) 21,25,000 21,25,000
72
CSIND - Construction of compound wall , Providing gate for inland subdivsion office at Chackai and providing chain linked fencing on both sides of Chackai Bridge
EST NO:2020/3422/1A INDKlm/2020/3422/IA

24-12-2020
5075-60-800-94-03-00 19,00,000 19,00,000
73
Deepening the SWTD Boat route from Fortkochi to Mattanchery in ERnakulam District-Reach III
2019/11284/IA IDEkm/2019/11284/IA

12-03-2020
5075-60-800-94(03) 1,98,00,000 1,98,00,000
74
Construction of retaining wall for Elambanam thodu near Ariyodichal padasekharam in Mannar panchayath Reach 2
2021/97/KP MIDCgr/2021/97/KP
20-05-2021
4711-01-103-84(00) 40,75,000 40,75,000
75
CSIND-Improvements to the feeder canal from Panmana boat jetty in Vattakkayal to National waterway III at Karunagappally Assembly Constituency
2020/321/IA INDKlm/2020/321/IA
02-03-2020
5075-60-800-94(03) 1,70,00,000 59,00,000
76
CSIND - Renovation of boat jetty in Kochuthuruth at Thekkumbhagom Panchayath in Chavara Constituency
2020/5642/IA INDKlm/2020/5642/IA

08-02-2021
5075-60-800-94-03-00 15,00,000 15,00,000
77
SOIL INVESTIGATION WORK FOR THE CONSTRUCTION OF A STEEL FOOTBRIDGE ACROSS BADAGARA-MAHE CANAL AT KELOTHKANDI THAZHE
2021/4096/IA INDKnr/2021/4096/IA

27-10-2021
3056-00-001-96-00-00 3,60,000 3,60,000
78
IWT- Removing the silt & debris accumilated in Changanacherry Allappuzha boat route canal from Koyippally boat jetty to Parambusserry jetty in Changanacherry taluk
IDKtm/2021/566/IA
27-10-2021
5075-60-800-94-03-00 22,00,000 22,00,000
79
IWT-Construction of boat jetty at Kocheede jetty in ward no. V of Arattupupuzha panchayath in Harippad LAC
2021/4455/IA ORDER No. IDAlp/202
1/4455/IA
22-10-2021
5075-60-800-94-03-00 40,00,000 40,00,000
80
CSIND- Kollam thodu Reach - 6- Urgent rectification at the right bank of Kollam Thodu part of WCC in between Ch. 73.10 to Ch. 73.50 km
2022/282/IA INDKlm/2022/282/IA
01-02-2022
5075-60-800-94-03-00 25,40,000 25,40,000
81
Development of Waterways and Canals-Feasibility study for Inland Water Transport between Chambad and Keezhallur in Anjarakkandy River(Ch.1700 To 3400)
2019/5207/IA INDKnr/2019/5207/IA

30-03-2019
3056-00-001-96-00-00 4,98,000 4,82,000
82
Sedimentation study of Kunduvakkadavu Puzha (from Chettuva Bridge to Kalamana kayal) and Chettuva Puzha (from Pulikkakadavu Bridge to Chettuva Azhimugam)
2022/3874/IA AIDTsr/2022/3874/IA

31-03-2022
3056-00-001-96-00-00 3,52,000 3,52,000
83
construction of bridge across Parvathy puthanar at ch 1.8 KM at panathura including retaining wall and approach road in Thiruvananthapuram corporation (steel lattice vehicular bridge with lifting facility
2021/4391/IA 34/2018/CSIND
21-02-2018
5075-60-800-94-03-00 3,50,00,000 3,24,00,000
84
CSIND-Reconstruction of Karikkakom temple bridge across Parvathy Puthanar at Ch 14.32km including retaining wall and approach road in Thiruvananthapuram Corporation (steel lattice vehicular bridge with lifting facility )
2020/5111/IA GO(Rt) NO 31/2018/C
SIND
25-09-2018
5075-60-800-94-03-00 3,12,61,127 3,40,00,000
85
Construction of steel lattice Vehicular bridge with lifting Facility across Parvathy Puthanar at Puthenpalam (ch 9.64 km in Thiruvananthapuram
2021/4312/IA 29/2018/CSIND
22-09-2018
5075-60-800-94-03-00 3,50,00,000 3,22,10,000
86
Soil investigation for the construction of a bridge over the existing VCB at karingalimukk
. INDKnr/2021/4800/
IA
17-11-2021
3056-00-001-96-00-00 6,80,000 6,80,000
87
soil investigation work for the construction of a steel footbridge across badagara mahe canal at kelothkandi thazhe.
INDKnr/2021/4096/IA

27-10-2021
3056-00-001-96-00-00 3,60,000 3,60,000
88
Revamping of Boat Jetty including deepening at Fortkochi in Ernakulam District.
IDEkm/2019/10984/IA ORDER No. IDEkm/201
9/10984/IA
10-03-2020
5075-60-800-94(03) 95,00,000 95,00,000
89
CSIND-Revamping and deepening of Vypen Boat Jetty in Ernakulam District.
IDEkm/2019/10983/IA ORDER No. IDEkm/201
9/10983/IA
30-01-2020
5075-60-800-94(03) 38,00,000 38,00,000
90
GENERAL-Infrastructure Facilities-Construction of boat jetty along TS canal at the mouth of Kadinamkulam kayal in Kadinamkulam panchayath-General Civil Work
IRR/KP/EST/3468/2022_5_4_3 AS/59D/22/21029
08-08-2022
5075-60-800-94-03-00 70,00,000 66,30,000
91
GENERAL-Improving Agricultural facilities in Pachilaveli Padasekharam-Improving Agricultural facilities in Pachilaveli Padasekharam in ward No.5 of Budhanoor panchayath -General Civil Work
IRR/KP/EST/1745/2022_5_1_1 AS/59D/22/20910
04-08-2022
4711-01-103-84-01-00-00 1,20,00,000 1,20,00,000

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Malampuzha Dam - Dam Safety- Installation of new Handrail and Platform on dam top, Replacement of Sluice well platform and other miscellaneous works
2018/79/MH IMDmpa/2018/79/MH
31-03-2020
4700-80-800-97(00) 18,10,000 18,10,000
2
Procurement of computer and allied accessories for Quality control subdivision Muvattupuzha and quality control section offices.
2020/377/IDRB QCDTsr/2020/377/IDR
B
27-01-2021
2701-80-005-93(00) 1,90,000 1,90,000
3
CONSTRUCTION OF A REGULATOR CUM BRIDGE ACROSS KUMBLA RIVER AT KANCHIKKATTA IN KUMBLA PANCHAYATH OF KASARAGOD DISTRICT- INVESTIGATION WORK.
2017/1766/IA ORDER No. MIDKgd/20
17/1766/IA
03-02-2018
4700-80-005-99-01-00 5,35,000 5,35,000
4
Repair and Modification of exiting two no of pontoons and platform used for Soil Investigation Works in streams.
2021/48/IDRB CMFEPi/2021/48/IDRB

22-02-2021
4701-80-800-99-00-34-03 3,50,000 3,50,000
5
MHIS-Supplying and installation Manual observation equipments for the proposed Fully Climatic station at Kozha under Hydrology Section Kottayam for 2020-21
2020/263/IDRB HDCgr/2020/263/IDRB

15-10-2020
2701-80-005-92(00) 1,90,000 1,90,000
6
Fabrication, supply , erection, painting , testing and satisfactory commissioning of 15 Nos. fixed wheel type vertical lift gates in structural steel conforming to IS2062grade consisting of skin plate (IS2062 gr B), supply and fixing of bogie wheel assembly and chain assembly, removing the slab
DRIP/BKT 110/2013/WRD
06-02-2013
4701-80-800-77(00) 20,00,00,000 18,50,00,000
7
PVIP Dam safety Rectification of damaged Piers and sides of Head Regulator
PVIPDI/2017/1077/P2

27-03-2018
4700-80-800-97(00) 3,50,000 3,50,000
8
Fundamental studies using Smart station for the year 2020-21 Topographical survey for Seetharkundu waterfalls- Stage II
2020/154/IDRB ORDER No. HRKERIPi/
2020/154/IDRB
03-07-2020
4700-80-005-99-02-00 2,10,000 2,10,000
9
Fundamental studies using Smart Station for the year 2019-20-Conducting topographic survey for assessing the sedimentation in Velliyamkallu RCB at Thrithala
2019/447/IDRB ORDER No. HRKERIPi/
2019/447/IDRB
21-12-2019
4700-80-005-99-02-00 7,00,000 7,00,000
10
Fundamental Studies using Smart Station for the year 2019-20 - Various Investigation surveyworks in Irrigation Department using Smart station-Conducting Topographic survey for investigation of Bharathapuzha irrigation Scheme in Muthuthala Panchayath
2019/399/IDRB ORDER No. HRKERIPi/
2019/399/IDRB
22-10-2019
4700-80-005-99-02-00 1,42,000 1,42,000
11
Sedimentation Study of Neyyar Reservoir Using IBS & Sub Bottom Profiler
2019/332/IDRB HRKERIPi/2019/332/I
DRB
28-09-2019
4700-80-005-99-02-00 3,50,000 3,50,000
12
Revamping and Modrenization of Sedimentation division -Purchasing new Hydrographic software-QINSY
2016/95/IDRB HRKERIPi/2016/95/ID
RB
01-08-2016
4701-80-800-99-00-34-03 3,00,000 3,00,000
13
MHIS-Urgent repairs to Koottupuzha River gauge station under Hydrology section Thalassery for the year 2021-22
2021/134/IDRB HDTsr/2021/134/IDRB

18-05-2021
2701-80-005-92(00) 2,52,000 2,52,000
14
PURCHASE OF OFFICE FURNITURE FOR QUALITY CONTROL SECTION , IDUKKI.
2021/124/IDRB QCDKka/2021/124/IDR
B
16-06-2021
2701-80-005-93(00) 40,000 40,000
15
Maintenance of model area of Coastal Engineering Division and cleaning the surroundings of Coastal Engineering Division office and Director office for the year 2021-22
2021/225/IDRB HRKERIPi/2021/225/I
DRB
05-06-2021
4701-80-800-99-00-34-03 50,000 50,000
16
Topographical investigation for finding out the variations in bed levels in the upstream 600m of Velliyamkallu Regulator at Thrithala - 2021-22
2021/227/IDRB HRKERIPi/2021/227/I
DRB
04-06-2021
4701-80-800-99-00-34-03 1,60,000 1,60,000
17
Modernisation of Quality Control Section, Thiruvananthapuram- Computer andaccessories for setting up new laboratory.
2021/221/IDRB QCDKka/2021/221/IDR
B
15-06-2021
2701-80-005-93(00) 14,600 14,600
18
Supplying and installation of Automatic Compression Testing Machine for QualityControl Section, Thiruvananthapuram
2021/230/IDRB QCDKka/2021/230/IDR
B/
14-06-2021
2701-80-005-93(00) 7,22,600 7,22,600
19
Sand budgeting of Chaliyar River-2018-19
2018/226/IDRB HRKERIPi/2018/226/I
DRB
26-01-2019
4701-80-800-88(00) 33,00,000 33,00,000
20
Conducting topographical investigations in connection with the rectification works of Karapuzha Irrigation Project under DRIP Phase-II-Appendices A & L of Part A
2020/158/IDRB HRKERIPi/2020/158/I
DRB
17-07-2020
4700-80-800-97(00) 75,000 75,000
21
Hiring Vehicle for Irrigation Quality Control Section, Kollam
2021/200/IDRB ORDER No. QCDKka/20
21/200/IDRB
15-06-2021
2701-80-005-93(00) 75,000 75,000
22
Dam Safety - Fencing of chulliyar dam catchment area.
2020/1161/P1 IDCr/2020/1161/P1
14-10-2020
4700-80-800-97(02) 8,50,000 8,50,000
23
Modernization of Hydrology Information System- Construction of Equipment room of size 3m x 4m for keeping Sedimentation sampler,filtration unit, current meter etc at Chittur attapad
2019/259/IDRB HDTsr/2019/259/IDRB

18-07-2019
2701-80-005-93(00) 1,65,000 1,65,000
24
MHIS- Procurement of Automatic weather station (AWS) at Chittur Attapady station including chain link fencing, for Attapady Valley Irrigation Project (AVIP)
2019/261/IDRB HDTsr/2019/261/IDRB

17-08-2019
2701-80-005-93(00) 18,02,000 17,00,000
25
Topographical investigation for Chundampatta Branch Canal of Thathanampully Lift Irrigation Scheme in Palakkad District-2021-22
2021/296/IDRB HRKERIPi/2021/296/I
DRB
30-06-2021
4701-80-800-99-00-34-03 1,11,000 1,11,000
26
Construction of Regulator at Parapram across Anjarakandy river in Pinarayi Grama Panchayath in Kannur District
2017130/IDRB HRKERIPi/2017/130/I
DRB
28-07-2017
4700-80-005-99-01-00 1,95,000 1,95,000
27
Construction of a regulator across Manimala river at Pullukuthy on the downstream side of intake well of RWSS to Mallappally,Anikkadu and Kottangal(part) panchayath phase
2017/122/IDRB HRKERIPi/2017/122/I
DRB
24-07-2017
4700-80-005-99-02-00 1,70,000 1,70,000
28
Construction of regulators across Manimala river on the downstream side of Paduthodu bridge for the benefit of RWSS to Puramuttom and Ezhumattoor
2017/118/IDRB HRKERIPi/2017/118/I
DRB
21-07-2017
4700-80-005-99-01-00 1,75,000 1,75,000
29
Construction of Regulator across Manimala River on the downstream side of intake well of RWSS to Nedungunnam and Kangazha at Kulathoormuzhy,Kottangal panchayath in Ranni constituency
2017/119/IDRB HRKERIPi/2017/119/I
DRB
21-07-2017
4700-80-005-99-01-00 1,70,000 1,70,000
30
Construction of Regulator across Ummenchira puzha at Chekkupalam in Pinarayi panchayath, Kannur District
2017/132/IDRB HRKERIPi/2017/132/I
DRB
28-07-2017
4700-80-005-99-01-00 1,60,000 1,60,000
31
Investigtion for the Construction of regulator cum bridge across Neyyar River at Mavilakadavu, downstream of KWA pump house to prevent salinity intrusion
2017/139/IDRB HRKERIPi/2017/139/I
DRB
28-07-2017
4700-80-005-99-01-00 1,65,000 1,65,000
32
Conducting training on Smart Station to the Engineers of Irrigation Department
2018/177/IDRB HRKERIPi/2018/177/I
DRB
29-11-2018
2701-80-005-93(00) 2,00,000 2,00,000
33
WP -DSO-Rectification works such as plastering,Painting, Jungle clearance and maintenance works to Walayar Dam.
2020/1167/P1 ORDER No. IDCr/2020
/1167/P1
14-10-2020
4700-80-800-97(02) 9,00,000 9,00,000
34
Investigation work for the construction of a storage dam across Chalakudy river at Kannankuzhy (12Kms upstream of Thumburmuzhy weir) in Athirapilly Panchayath
2016/381/P2 G.O.(Rt)No.273/2017
/WRD
30-03-2017
4700-80-005-99-01-00 10,00,000 10,00,000
35
Dam safety -Plastering and Painting of chulliyar masonry dam and earthen dam parapet
2020/1157/P1 IDCr/2020/1157/P1
14-10-2020
4700-80-800-97(02) 3,00,000 3,00,000
36
Dam Safety-KPIP-Fabrication,painting and erection of new sluice shutter with hoisting arrangements for Thampan canal in Kanhirappuzha dam
2017/125/MH IMDmpa/2017/125/MH
20-03-2018
4700-80-800-97(00) 4,65,000 4,60,000
37
Dam safety-Fabrication and Erection of sill beam pad, changing of bottom and side rubber seals,reconditioning guide rollers and maintenance of operating platform of the Spillway shutters and overhauling and painting of emergency shutters ans gantry crane at Walayar dam.
2016/48/MH IMDmpa/2016/48/MH
27-03-2018
4700-80-800-97(00) 14,28,009 14,00,000
38
Rejuvenation of Meenachil river basin-Renovation of streams & ponds-Rejuvenation of Kozhungaloor chira & restoration of Chathanattu thodu in Nedunkunnam GP
2021/12/IDRB HDCgr/2021/12/IDRB
31-01-2021
4701-80-800-88(00) 22,60,000 22,60,000
39
Supply and demonstration of Smart station for IWR Division Palakkad
2021/118/IDRB IDPkd/2021/118/IDRB

09-12-2021
4701-80-800-88(00) 41,32,000 41,32,000
40
Malampuzha Dam - Emergency Repairs - Providing additional lighting at spillway, LBC & RBC control room of Malampuzha Dam
2021/504/P1 IDMa/2021/504/P1
27-05-2021
4700-80-800-97(02) 1,14,000 1,14,000
41
MP-Dam safety-Dismantling ACP sheets, GI sheets, solar panels and steel frame works from spillway of Malampuzha Dam
2022/32/P1 IDMa/2022/32/P1
07-02-2022
4700-80-800-97(02) 2,11,000 2,11,000
42
Hiring of Vehicle for site inspection ,sample collection and other departmental use for Quality Control Section ,Malappuram for the year 2022-23
xxx QCDTSR/01/06/D2-204
4/2022-23
29-09-2022
2701-80-005-93(00) 3,00,000 3,00,000
43
Routine activities of Quality Control Lab at Palakkad including annual maintenance and calibration of lab equipments (Compression testing machine, weighing balances etc.) for the financial year 2022-23
XXXX QCSD/PKD/2022/01/AE
E
28-09-2022
2701-80-005-93(00) 20,000 20,000
44
Routine Activities of Quality Control section Tvpm for the year 2022-23.
DS/AD3-Gel/5/2022/IDRB 04/QCS/TVM/AS/2022-
23
30-09-2022
2701-80-005-93(00) 1,00,000 1,00,000
45
Purchasing of Furniture for Newly setting up Lab under Quality control section Tvpm.
DS/AD3/IDRB 05/QCS/TVM/AS/2022-
23
30-09-2022
2701-80-005-93(00) 1,00,000 1,00,000
46
2022-23 Maintanence of Office building of Hydrology section Aluva-Phase II and fixing bench marks at CGO stations in Periyar and Muvattupuzha basin
IRR/IDRB/EST/1123/2022_5_1_1 AS/59D/22/22479 Dat
ed: 30-09-2022
30-09-2022
2701-80-005-92(00) 11,20,000 11,20,000
47
GENERAL-Meenachil River -MHIS 2022-23 -Maintenance of river gauge stations under Hydrology Section Kottayam & fixing of BM stones at CGO stations in Meenachil river in Kottayam district .-General Civil
IRR/IDRB/EST/884/2022_5_1_1 AS/59D/22/22299 Dat
ed: 26-09-2022
26-09-2022
2701-80-005-92(00) 8,92,000 8,92,000
48
Training of smart station in Coastal Engineering Division for the year 2022-23
CE/TRAINING/2022_23 CE /2022/05/DDCE
30-09-2022
2701-80-005-93(00) 1,00,000 1,00,000
49
Hiring of Vehicle for coastal Engineering Division
CE/Hiring of vehicle/2022-23 CE /2022/10/DDCE
07-03-2023
2701-80-005-93(00) 2,00,000 2,00,000

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
DELTA REMOVAL IN PAMBA RIVER. PART I- FROM ANJILIMOOTTILKADAVU TO PARAPPUZHAKKADAVU USING DREDGER NO.5 AND PART II- FROM CHERUKOLPUZHA BEDBAR TO PUTHANMON THODU USING DREDGER NO.3
2017/51/MH G.O (Rt) No. 723/20
17/WRD
22-08-2017
4711-01-103-99-01-00-00 2,82,00,000 2,54,00,000
2
CPP-KKPS-Repair &Maintenance of four numbers of shutters of Kunnamkattupathy regulator
2017/132/MH IMDmpa/2017/132/MH
22-01-2019
2700-17-00-00(00) 5,00,000 5,00,000
3
Emergency Maintenance of 3rd and 4th gate of Maniyar Barrage (PIP) at Pathanamthitta District
2018/117/MH GO(Rt)No-673/2018/W
RD
18-09-2018
4700-80-800-97(00) 1,12,90,000 25,00,000
4
Fabrication, Erection, Painting and Trial run of 1 no. Mattappally cross Regulator shutters ( size 3.36 m X 3.00m ) and hoisting mechanism with both manual operation mechanism at TV Puram Panchayat, Vaikom
2020/154/MH G.O (Rt) No.821/201
9/WRD
18-11-2019
2702-03-101-98-02-34-3 30,00,000 14,89,000