NON PLAN SPILL OVER WORKS TENDERED NOT AGREED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PROTECTING THE BANKS OF MEENACHIL RIVER AT ARUPATHIL CHIRA BHAGOM IN WARD 13 OF THIRUVARPU PANCHAYATH
2017/58/IA IDKtm/2017/58/IA
Dated: 16-03-2018
16-03-2018
2711-01-103-98-34-03-00 5,57,000 5,57,000
2
PROTECTING THE LEFT BANK OF MEENACHIL RIVER (NEELIMANGALAM BRANCH) NEAR CHIRACKAL KADAVU IN KOTTAYAM MUNICIPALITY
2016/3320/IA IDKtm/2016/3320/IA
Dated: 08-03-2018
08-03-2018
2711-01-103-98-34-03-00 7,00,000 7,00,000
3
Protecting the eroded banks of Valiyakandom thodu in ward No 3 of Rajakkadu panchayath Reach -1
EST NO 2018 /556/IA IDKtm/2018/556/IA
15-03-2018
2711-01-103-98-34-03-00 12,00,000 12,00,000
4
Construction of protection wall at the Left bank of Periavarai Thodu in Munnar Grama panchayath,Ward no.8.
2018/3826/IA IDKtm/2018/3826/IA
26-02-2019
2711-01-103-98-34-03-00 7,25,000 7,25,000
5
ASE Work- Protection of sea coast using Gabion boxes for a length of 126m towards south from 131m south of CP stone 0116 near Vettucaudu
2020/3912/IA IDTvm/2020/3912/IA
11-08-2020
2711-02-103-99-34-3 1,00,00,000 1,00,00,000
6
Rectification of damaged Right Bank of Lapalam canal near Dr. Zakir Hussain Memorial Bharathiya Vidya Vihar school in Changanacherry Municipality (FD Work)
2019/11175/IA IDKtm/2019/11175/IA

15-02-2020
2711-01-103-98-34-03-00 6,00,000 6,00,000
7
FC-Protecting the both banks of Vamanapuram River downstream of checkdam at Sooryakanthi KWA Pump house Chettachal in Vithura Grama Panchayath
2018/4931/IA IDTvm/2018/4931/IA
10-02-2020
2711-01-103-99-00-34-3 15,00,000 15,00,000
8
FD PROTECTING THE ERODED BANK OF MURINJAPUZHA RIVER NEAR MURINJAPUZHA BRIDGE AT POOKAITHA THURUTH IN MARAVANTHURUTHU PANCHAYATH
2018/2468/IA IDKtm/2018/2468/IA
26-02-2019
2711-01-103-98-34-03-00 25,00,000 25,00,000
9
Urgent reformation work to the left bank of Kavvayi river near Oriyara Pulimuttu in Valiyaparamba grama panchayat of Hosdurg Taluk- Reach I
2020/4266/IA IDKgd/2020/4266/IA
24-08-2020
2711-02-103-99-34-3 25,00,000 25,00,000
10
Urgent reformation work to the left bank of Kavvayi river near Oriyara Pulimuttu in Valiyaparamba grama panchayat of Hosdurg Taluk- Reach-II
2020/4267/IA IDKgd/2020/4267/IA
24-08-2020
2711-02-103-99-34-3 25,00,000 25,00,000
11
ASE- Reformation of sea wall between CESCP stones 987 and 992 at various places from Gunduparambu to Malaghapady in Chellanam Panchayath of Ernakulam District.
2020/5322/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,58,00,000 1,58,00,000
12
ASE- Reformation of damaged and sunken sea wall using stones between CESCP stones 992 & 995 at various places from Malaghapady to Bazar of Chellanam Panchayath in Ernakulam District.
2020/5326/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,70,00,000 1,70,00,000
13
ASE- Reformation of damaged and sunken sea wall using stones fromCESCP stone 999 towards North of Velankanni of Chellanam Panchayath in Ernakulam District.
2020/5301/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,60,00,000 1,60,00,000
14
ASE -Reformation of damaged and sunken sea wall between CESCP stones 1016 & 1020 at various places including Reethalayam & Puthenthodu of Chellanam Panchayath in Ernakulam District.
2020/5330/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,88,40,000 1,88,40,000
15
ASE- Reformation of damaged and sunken sea wall using stones between CESCP stones 1024 & 1042 at various places at Kannamaly, Cheriyakadavu & Kattiparambu of Chellanam panchayath in Ernakulam District.
2020/5329/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 2,06,00,000 2,06,00,000
16
ASE -Reformation of damaged and sunken sea wall using stones between CESCP stones 1047 & 1052 at various places from Manassery to Saudi of Chellanam Panchayath in Ernakulam District.
2020/5328/IA G. O. ( Rt) No. 690
/2020/WRD
06-11-2020
2711-02-103-99-34-3 1,92,00,000 1,92,00,000
17
ASE- Emergency protection work using Geobags at Chalakadavu Malaghappady Kannamaly in Chellanam Panchayath in Ernakulam District
2020/3342/IA IDEkm/2020/3342/IA
07-08-2020
2711-02-103-99-34-3 30,00,000 30,00,000
18
PROTECTING THE LEFT BANK AND ERODED PORTION OF PAMBA RIVER AND RENOVATION OF KOCHUPURACKAL KADAVU IN WARD No. 8 OF PANDANADU PANCHAYATH IN CHENGANNUR ASSEMBLY CONSTITUENCY .
2016/3114/IA IDAlp/2016/3114/IA
26-02-2018
2711-01-103-98-34-03-00 19,00,000 19,00,000
19
Restoration of the protection wall on the downstream of pozhikkara regulator in Chathanoor Constituency
2199/2020/IA ISDKlm/2020/2199/IA

23-06-2020
2711-01-103-98-34-03-00 19,20,000 19,20,000
20
Putting up tidal bund in kadakkarappally panchayath for 2020-21
2020/229/KP KDDTm/2020-2021/202
0/229/KP
24-10-2020
2702-01-800-94-00-34-3 7,50,000 7,50,000
21
Putting up tidal bund in pattanakad Panchayath for 2020-21
2020/227/KP Putting up tidal bu
nd
24-10-2020
2702-01-800-94-00-34-3 6,90,000 6,90,000
22
Putting up tidal bund in Thuravoor panchayath for 2020-2021
KDDTm/2020/164/KP
24-10-2020
2702-01-800-94-00-34-3 5,70,000 5,70,000
23
Putting up tidal bunds in kuthiathodu panchayath 2020-21
KDDTm/2020-2021/2020/164/KP ORDER No. KDDTm/202
0/228/KP
24-10-2020
2702-01-800-94-00-34-3 3,90,000 3,90,000
24
Putting up tidal bund in various places of Kodamthuruth Panchayath for the year of 2020-21
ORDER No. KDDTm/202
0/165/KP
24-10-2020
2702-01-800-94-00-34-3 5,44,000 5,44,000
25
Putting up tidal bunds in various places of Ezhupunna Panchayath for 2020-2021
2020/231/KP ORDER No. KDDTm/202
0/231/KP
24-10-2020
2702-01-800-94-00-34-3 7,00,000 7,00,000
26
RLIS- Urgentrectification works to the collapsed pump house building and access to the kaduvakuzhi LI Scheme in Chungathara GP
2020/5152/IA MIDMpm/2020/5152/IA

01-01-2021
4702-00-101-89-00-00-00 12,00,000 1,20,000
27
RMF - Protection of right bank of Kurumali river down stream of Vasupuram bund in Survey number 68/2 Nandipulam village,Varantharappilly Grama Panchayath.
2018/332/IA 2014/2020/Rev
02-06-2020
2059-01-051-96-00-17 21,00,000 20,86,000
28
AM- 2019-20. ANNUAL MAINTENANCE OF CHALIKKAPOTTY LIFT IRRIGATION SCHEME IN MOOTHEDAM GRAMA PANCHAYATH
2019/4881/IA . MIDMpm/2019/4881/
IA
17-03-2020
2702-01-800-94-00-34-3 8,00,000 8,00,000
29
Putting up tidal bunds at various places in Panavally Panchayath for the year 2019-20
2019/1188/KP KDDTm/2019/1188/KP
07-11-2019
2702-03-101-98-03 5,94,000 5,94,000
30
Putting up tidal bunds at various places in Arookutty pancayath for the year 2020-21
2020/254/KP KDDTm/2020/254/KP
24-10-2020
2702-01-800-94-00-34-3 6,50,000 6,50,000
31
Putting up tidal bunds at various places in Perumbalam Panchayath for the year 2020- 21
2020/257/KP KDDTm/2020/257/KP
24-10-2020
2702-01-800-94-00-34-3 9,10,000 9,10,000
32
PUTTING UP TIDAL BUNDS IN THYKATTUSSERY PANCHAYATH FOR 2019-20
2019/1144/KP KDDTm/2019/1144/KP
31-10-2019
2702-01-800-94-00-34-3 4,50,000 4,50,000
33
Protecting the right bank of Meenachil river(Thiruvatta branch) on the north side of Thiruvatta bridge in Aymanam Panchayath
2018/4717/IA IDKtm/2018/4717/IA
26-02-2019
2711-01-103-98-34-03-00 10,00,000 9,50,000
34
PROTECTING THE LEFT BANK OF MEENACHIL RIVER NEAR SHAPPUMPADY KANJIRAM ROAD IN THIRUVARPPU PANCHAYATH
2016/3325/IA IDKtm/2016/3325/IA
27-02-2019
2711-01-103-99-00-34-3 14,95,000 14,95,000
35
Protecting the bank of vembanad lake along Konginikkari-Vembanad kayaltheeram road in ward No.1 of Kumarakom panchayath
2018/3943/IA IDKtm/2018/3943/IA
27-02-2019
2711-01-103-99-00-34-3 4,75,000 4,75,000
36
Protecting the bank of Meenchil river near Arunoottymangalam colony in ward no 11 of Thiruvarpu panchayath
2017/2679/IA IDKtm/2017/2679/IA
27-02-2019
2711-01-103-99-00-34-3 20,80,000 20,80,000
37
Protecting the left bank of Malaruvi Thodu near Mukkadavu Chappath Bhagom in Ward N0 of Kanjirappally Pt
2018/3701/IA IDktm/2018/3701/IA
27-02-2019
2711-01-103-99-00-34-3 10,00,000 10,00,000
38
FC Works-2019-20.Rectification to the right bank of Meenachil river D/S of Pattarmadom bridge in ward no.9 of Ettumanoor Municipality
IDKtm/2019/10756/IA

27-02-2020
2711-01-103-99-00-34-3 8,10,000 8,10,000
39
PM-Rectification of MI structures and other allied works to Nellipally-Chandanassery Ela near Nellippally junction in ward no13 in Punalur Municipality
2019/10128/IA MIDklm/2019/10128/I
A
12-01-2021
2702-01-800-94-00-34-3 10,00,000 10,00,000
40
Maintenance of regulator shutters of Nambiarkal anicut in Kanhangad Municipality
2021/17/MH IMDmpa/2021/17/MH
15-05-2021
2702-01-800-94-00-34-3 15,80,000 15,80,000
41
Monsoon Preparedness 2021-Urgent desilting and jungle clearance in Varayante valappil thodu, in Chorode panchayat , Kozhikode District.
2021/2834/IA MIDKkd/2021/2834/IA

04-06-2021
2702-03-101-98-03 91,200 91,200
42
ASE -Urgent Reformation of sea wall and allied works in most vulenerable portion in Bazar using the stones dismantled from the Harbour in Chellanam Panchayath of Ernakulam District.
2020/2376/IA 514/2020
07-08-2020
2711-02-103-99-34-3 2,00,00,000 1,00,00,000
43
Emergency protection work using geo bags at north side of velankanni fishing gap between CESCP stone 997 and 999 in Chellanam Island
2019/3577/IA IDEkm/2019/3577/IA
04-05-2019
2711-02-103-99-34-3 10,10,000 10,10,000
44
Urgent protection works using geo bags at north end of Puthenthodu fishing gap between CESCP 1016 &1018 in Chellanam Island
2019/1027/IA ORDER No. IDEkm/201
9/1027/IA
28-02-2019
2711-02-103-99-34-3 15,00,000 14,85,000
45
Urgent protection work using Geo bags at Vachakkal fishing gap between CESCP stone 982 and 983 in Chellanam island
2018/945/IA ORDER No. IDEkm/201
8/945/IA
28-02-2019
2711-02-103-99-34-3 14,00,000 14,00,000
46
ASE-Urgent Reformation of damaged sunken sea wall using 300 to 400 kg stones for a length of 30 mts between cp stone 1035 and 1036 starting at north of cp 1035 at Cheriyakadavu in Chellanam Island. (Starting from 12 m south of cp stone 1035).
2016/3162/IA ORDER No. IDEkm/201
6/3162/IA
21-01-2017
2711-02-103-99-34-3 15,00,000 15,00,000
47
ASE-Urgent Reformation of damaged sea wall for a length of 42m between CP stone 998 and 999 at north side of Velankanni church in Chellanam Island. Starting of 17 m north of CP stone 998.
2016/3166/IA ORDER No. IDEkm/201
6/3166/IA
21-01-2017
2711-02-103-99-34-3 15,00,000 15,00,000
48
MI PRIORITY- Repairs to the banks of Madackal thodu at Tapuzha bhagom in Ayarkunnam GP
2020/5784 MIDKtm/2020/5784/IA

17-02-2021
4702-00-101-84-01-00-00 5,60,000 5,60,000
49
Annual maintenance of LI Scheme Kammukku for the year 2021-2022
2021/2222/IA MIDMpm/2021/2222/IA

25-09-2021
2702-01-800-94-00-34-3 9,300 9,300
50
Sabarimala Pilgrimage 2021-2022-Providing temporari bund across Erumely thodu branch of Manimala River U/S of Erumely temple in Erumely Panchayath
2021/4218/IA IDKtm/2021/4218/IA
08-10-2021
2711-01-103-99-00-34-3 5,10,000 5,10,000
51
PM- Providing irrigation facilities to Madathilazhikam ela and renovation of Tractor culvert in Keezhuthoni ward of Ittiva Panchayath
2021/4234/IA MIDklm/2021/4234/IA

30-10-2021
2702-01-800-94-00-34-3 10,00,000 10,00,000
52
Monsoon preparedness-Removing silt deposit fro Parakoottam leading chal in Koratty Panchayath
2021/5331/IA ORDER No. MIDTsr/20
21/5331/IA
20-11-2021
2702-03-101-98-03 50,000 50,000
53
FD-Urgent side protection works to the damaged bund of Nilamel thodu near Aikkaravila Manchira bridge in Athazhamangalam ward of Neyyattinkara Municipality
2021/3489/IA ORDER No. MIDTvpm/2
021/3489/IA
28-10-2021
2702-03-101-98-03 9,60,000 9,64,000
54
Desilting and Side protection of Veluthully ferry thodu in ward no.8 in Kumbalanghi Panchayath.
2020/3702/IA MIDEKM/2020/3702/IA

30-12-2021
2702-03-101-98-03 15,43,000 15,43,000
55
M.I.PRIORITY- IMPROVEMENTS TO THE KV CANAL REACH 2 VEMBANATTU KAYAL TO VALIYANAPPUZHA IN VAIKOM MUNICIPALITY
2020/2680/IA MIDKtm/2020/2680/IA

19-11-2021
4702-00-101-84-01-00-00 8,50,000 8,50,000
56
Side protection works to Naiplavu Vilakkumaruthu thodu in ward no.16 of Elikkulam Panchayath.
2020/5381/IA MIDKtm/2020/5381/IA

28-12-2021
2702-03-101-98-03 5,00,000 5,00,000
57
Protecting the banks of chettuthodu near bhajana madom colony in ward no.8 of thidanadu panchayath
2021/3123/IA MIDKtm/2021/3123/IA

20-01-2022
2702-01-800-94-00-34-3 3,50,000 3,50,000
58
EMERGENCY MONSOON PREPAREDNESS 2021 - URGENT REMOVAL OF ACCUMULATED SILT DUE TO LANDSLIDE IN KANJIKUZHY THODU D/S OF KANJIKUZHY BRIDGE AND CLEARING OBSTRUCTIONS IN VARIOUS PLACES OF KANJIKUZHY THODU IN KOTTAYAM MUNICIPALITY.
2021/2519/IA MIDKtm/2021/2519/IA

27-05-2021
2702-03-101-98-03 1,60,000 1,60,000
59
Urgent Restoration of Vempally Kattachira thodu in ward no 3 of Kanakkari panchayath
2021/2451/IA MIDKtm/2021/2451/IA

26-05-2021
2702-03-101-98-03 5,00,000 5,00,000
60
Urgent Restoration of Vempally Valiyathodu in Ward No.10 of Kuravilangad Panchayath
2021/2559/IA MIDKtm/2021/2559/IA

28-05-2021
2702-03-101-98-03 1,62,000 1,62,000
61
Side Protection Works to the Left bank of Pannithodu Near Koanath junction in ward -23 of Kulasekharapuram Panchayath.
86/2021/IA MIDKlm/2021/86/IA
06-12-2021
2702-03-101-98-03 14,60,000 14,60,000
62
ASE Urgent protection works to construct Rubble mount wall for a length of 100m south of CP1235 and towards south in SN Puram Panchayat in Kodungallur Taluk.
2021/4788/IA AIDTsr/2021/4788/IA

28-02-2022
2711-02-103-99-34-3 22,50,000 22,50,000
63
FD-Side protection works of Anithottam thodu in Anakkal bhagom in kanjirappally panchayath.
202/307/IA ORDER No. MIDKtm/20
20/307/IA
30-03-2022
2711-01-103-99-00-34-3 13,26,000 13,26,000
64
Side protection of Ayiroor valiyathodu near Cherukolpuzha bridge in ward no 13 of Ayiroor panchayath in Ranni constituency
2022/1987/IA MIDPta/2022/1987/IA

31-03-2022
2702-03-101-98-03 19,20,000 19,20,000
65
Urgent side protection work left bank of Pulamon thodu downstream of boxculvert near Marthoma Shalom Church in Kulakkada panchayath
2021/4271/IA MIDklm/2021/4271/IA

31-03-2022
2702-03-101-98-03 14,00,000 14,00,000
66
MIRPA Peelarmuzhi pipe Line extension -Final phase
2021/2831/IA MIDTsr/2021/2831/IA

25-03-2022
4702-00-101-89-00-00-00 20,00,000 20,00,000
67
FD-Widening and side protection of Ambazhachal thode in wardno.13 of Pallivasal Panchayath (Reach2)
2021/4708/IA MIDIki/2021/4708/IA

10-01-2022
2702-03-101-98-03 35,00,000 35,00,000
68
MIRPA-Rehabilitation of Muppini LI scheme in Chungathara GP-RLIS-General Civil Work
2019/1085/IA MIDMpm/2019/1085/IA

26-03-2022
4702-00-101-89-00-00-00 55,00,000 55,00,000
69
AM 2021-22 Maintenance works to the LIS Mampad in Mampad Panchayath. of Malappuram District.
2021/2122/IA MIDMpm/2021/2122/IA

25-11-2021
2702-01-800-94-00-34-3 1,50,000 1,50,000
70
ASE WORK Rectification of damaged seawall at various location in between CESCP 392 and CESCP395 near parimanom fishing colony in Neendakara Panchayat at chavara LAC
2022/3693/IA ISDKlm/2022/3693/IA

21-03-2022
2711-02-103-99-34-3 20,00,000 2,00,000
71
Construction of pump room in Edayattuchal LI Scheme in Kadungallur Panchayath and protection works to leading channel and thodu
2020/3244/IA MIDEkm/2020/3244/IA

11-02-2022
2702-01-800-94-00-34-3 10,00,000 10,00,000
72
Repairs and upgradation of departmental weigh bridge at Omanappuzha in Mararikkulam south panchayath in Alappuzha LAC.
2021/1158/IA IDAlp/2021/1158/IA
06-01-2022
2711-02-103-99-34-3 7,00,000 7,00,000
73
Repairs and upgradation of departmental weigh bridge at Thrikkunnapuzha in Thrikkunnapuzha panchayath in Haripad constituency.
2021/1159/IA IDAlp/2021/1159/IA
06-01-2022
2711-02-103-99-34-3 8,20,000 8,20,000
74
Cherukolpuzha Hindumatha parishathu 2022-Urgent cleaning works on both banks of Pampa River in the convention Nagar in Ayroor and cherukole Panchayath in Ranni Constituency.
2021/6002IA ISDKlm/2021/6002/IA

03-01-2022
2711-01-103-99-00-34-3 6,05,000 6,05,000
75
FC-Urgent side protection to the damaged portion of right bankof Karamana river near Irumba in Nedumangadu LA Constituency.
2021/4486/IA IDTvm/2021/4486/IA
30-03-2022
2711-01-103-99-00-34-3 15,00,000 15,00,000
76
General Monsoon Preparedness Emergency Monsoon Preparedness cutting of trees for avoiding obstructions and which causes threat to life at different places under Irrigation section Irinjalakuda General Civil work
IRR IA 2022 615 5 4 3 G.O.(Rt)No.418/2022
/WRD
19-05-2022
2711-01-103-99-00-34-3 20,00,000 64,000
77
Natural Calamity -2022-23-Urgent Protection work to the houses for a length of 46m north side of CESCP 1535 (back side of MES college ) in Ponnani Municipality Malappuram(Dist)
IRR/IA//EST/2476/2022 AS/59D/22/19799
14-06-2022
2711-02-103-99-34-3 10,00,000 10,00,000
78
Annual maintenance of various LIS under minor irrigation section Mala 2022-23 Thrygram 1,Thrygram2,Thiruthikulangara and vanchipurathazham
IRR/IA/EST/2868/2022_5_1_1 AS/59D/22/22352
27-09-2022
2702-01-800-94-00-34-3 5,80,000 5,80,000
79
Annual maintenance 2022-23- Annual maintenance of Temporary Bund at Karichal Kadavu,and Cherulipuzha and Moyyukulam Bund of Vettikadavu L I S 2022-23
IRR/IA/EST/3234/2022_5_1_1 AS/59D/22/22675
07-10-2022
2702-01-800-94-00-34-3 5,00,000 4,00,000
80
Annual maintenance 2022-2023- Annual maintenance of pumphouse and Vettikadavu Bund for the year 2022-2023
IRR/IA/EST/3234/2022_5_2_1 AS/59D/22/22676
07-10-2022
2702-01-800-94-00-34-3 4,00,000 4,00,000
81
AM-NP-2022-23-Annual maintenance of Nellayi and Panthallurpadam LI Scheme in Pudukkad LAC for the pumping season in the year 2022-23
IRR/IA/EST/2712/2022_5_1_1 AS/59D/22/22508
01-10-2022
2702-01-800-94-00-34-3 3,16,000 3,16,000
82
Annual Maintenance of Cheruthuruthy LIS for 2022-23 in Vallatholnagar Grama panchayath-General Civil Wor
IRR/IA/EST/3155/2022_5_1_1 AS/59D/22/22677
07-10-2022
2702-01-800-94-00-34-3 9,00,000 9,00,000
83
GENERAL-Thekkenakara Canal-Side wall construction and laying slab over damaged portion of Thekkanakara canalinside Attukulangara central school in Trivandrum Constituency -General Civil Work.
IRR/IA/EST/1036/2022_5_1_1 AS/59D/22/21097
10-08-2022
2711-02-103-99-34-3 19,99,900 19,99,900
84
Protecting the right bank of Meenachil river at Cherikkal bhagom ( Re Sy No.186/2-5,186/2-3) in ward no 10 of Thiruvarppu panchayath in Kottayam district.
IRR/IA/FL/2068/2022 AS/59D/22/19709
08-06-2022
2711-01-103-99-00-34-3 5,90,000 5,90,000
85
Pre-Monsoon-Clearing of Thiruvatta River in Aymanam Panchayath in Kottayam district
IRR/IA/FL/6661/2022 AS/59D/22/21957
13-09-2022
2711-01-103-99-00-34-3 1,40,000 1,40,000
86
Annual Maintenance of Chettikkad Bund for the year 2022-23
IRR/IA/EST/391/2022_5_1_1 AS/59D/22/22515
01-10-2022
2702-01-800-94-00-34-3 3,80,000 3,80,000
87
Construction of Culvert across Madathumoozhi thodu near S.C higher secondary school in Pazhavangady Grama Panchayat Ranni constituency
2022/3423/IA MIDPta/2022/3423/IA

31-03-2022
4702-00-101-84-01-00-00 45,00,000 45,00,000
88
GENERAL-Annual Maintenance 2022-2023-Annual maintenance works to LIS Pallarmangalam in Lakkidi-Peroor Pyt.-General Civil Work
IRR/IA/EST/3440/2022_5_1_1 AS59D2222972
15-10-2022
2702-01-800-94-00-34-3 5,30,000 5,30,000
89
GENERAL-Pre Monsoon-Desilting and removal of water hyacinth from Kadambrayar from Manakkakadavu bridge to upstream ecotourism –Reach-1 -General Civil Work
IRR/IA/EST/6387/2022_5_1_1 AS/59D/22/21898
06-09-2022
2711-01-103-99-00-34-3 10,25,600 10,29,500
90
Desilting and removal of water hyacinth from Edachira thodu from Brahmapuram bridge to Edachira road in Thrikkakara Muncipality
IRR/IA/EST/6394/2022_5_1_1 AS/59D/22/21897
06-09-2022
2711-01-103-99-00-34-3 9,74,300 9,74,300
91
Putting up tidal bund for the year 2022-23 1 No. regulator in Karippuzha thode to protect Ullittapuncha of Cheppad panchayath
IRR/KP/EST/2968/2022_5_1_1 ORDER No. AS/59D/22
/23609 Dated: 09-11-2022
09-11-2022
2702-01-800-94-00-34-3 10,03,000 10,03,000
92
Annual maintenance of Pazhayannur LIS for the year 2022-23- Maintenance works of pump house and rectification of main canal at damaged portion
IRR/IA/EST/3154/2022_5_7_6 AS/59D/22/23588
08-11-2022
2702-01-800-94-00-34-3 4,20,000 4,20,000
93
GENERAL-MIC/AM-Paruchal/2022-23-Annual maintenance of Paruchal LIS for the year 2022- 23-General Civil Work
IRR/IA/EST/2617/2022_5_1_1 AS/59D/22/23281
25-10-2022
2702-01-800-94-00-34-3 2,00,000 2,00,000
94
GENERAL-Removal of waste-Sabarimala Pilgrimage 2022-23 - Cleaning of Mithrakadavu of Chengannur Mahadeva temple before the pilgrimage season in Chengannur Muncipality of Chengannur LAC -General Civil Work
IRR/IA/TR/5564/2022_5_3_2/1 AS/59D/22/22/23350
27-10-2022
2711-01-103-99-00-34-3 2,50,000 2,50,000
95
Annual maintenance of Desamangalam LIS for 2022-23 in Desamangalam grama panchayath
IRR/IA/EST/3155/2022_5_3_3 AS/59D/22/22891
14-10-2022
2702-01-800-94-00-34-3 1,30,000 1,30,000
96
GENERAL-Removal of waste-Urgent removal of floating material and debris to clear the blockage near Perumankara Bridge across Pamba River in Cheruthana Panchayath of Harippad LAC-General Civil Work
IRR/IA/EST/5564/2022_5_1_1 AS/59D/22/20906
04-08-2022
2711-01-103-99-00-34-3 2,00,000 2,98,000
97
General-Annual maintenance 2022-23(Mechanical works)-Maintenance of Kuttoor L I Scheme under M I Section Thiruvalla-General Civil work
IRR/IA/EST/5424/2022_16_1_10 AS/59D/22/22817
11-10-2022
2702-01-800-94-00-34-3 65,000 63,000
98
GENERAL-Nenmeni South ward - Rectification of the Left bank of Puthanar (part of Kallada river) in Nenmeni South ward Manakadavu bhagham in Munrothuruthu Panchyath. -General Civil Work
IRR/IA/EST/1738/2023_5_1_1 AS/59D/22/25804
25-03-2023
2711-01-103-98-34-03-00 25,00,000 25,00,000
99
GENERAL-Side protection wall Ward No.14-Construction of Side Protection wall in the Right bank of Gangayar thodu in Ward no.14 of Venganoor Panchayath-General Civil Work
IRR/IA/EST/1339/2022_5_1_1 ORDER No. AS/59D/22
/20237
11-07-2022
2702-03-101-98-03-34-03 2,50,000 2,50,000
100
GENERAL-FD- Protection works for Left side (D/S) Abutment of Kallupalam Bridge in Vilavoorkal Panchayath-General Civil Work
IRR/IA/EST/4843/2022_5_1_1 ORDER No. AS/59D/22
/22624
07-10-2022
2702-03-101-98-03-34-03 9,50,000 9,50,000
101
GENERAL-Construction of damaged side wall of Puliyoorkulam in Kinavoor ward , Vattiyoorkavu LA Constituency-do-General Civil Work
IRR/IA/EST/4959/2022_5_1_1 AS/59D/22/26088
31-03-2023
4702-00-101-84-01-00-00 9,80,000 9,80,000
102
GENERAL-Neyyar River Basin-Urgent rectification for the damaged Left bund of Neyyar River at Sabarimuttom, U/S of Pirayammood Bridge in Neyyattinkara LA Constituency-General Civil Work
IRR/IA/EST/91/2022_5_8_7 AS/59D/22/25758
24-03-2023
2711-01-103-98-34-03-00 25,00,000 25,00,000
103
GENERAL-Protecting the eroded bank of Murinjapuzha River near Murinjapuzha Bridge at Pookaithathuruth in Chempu Panchayath
IRR/IA/EST/6883/2022_5_1_1 AS/59D/22/26105
31-03-2023
2711-01-103-99-00-34-3 15,00,000 15,00,000
104
GENERAL-ASE WORKS-Urgent protection works to construct Rubble mount wall for a length of 150m both side of CP1230 in SN Puram Panchayat in Kodungallur Taluk.-General Civil Work
IRR/IA/EST/1102/2022_5_15_14 AS/59D/22/25786
25-03-2023
2711-02-103-99-34-3 55,00,000 55,00,000
105
Rectification of breached portion of Erappenpara thode in ward no 4 of Kulanada panchayath in Aranmula constituancy.
IRR/IA/EST/659/2022_5_1_1 AS/59D/22/25857.
28-03-2023
2702-03-101-98-03-34-03 5,00,000 5,00,000
106
AM-2022-23-Annual Maintanance to Plazhy LIS In Pudukkode Panchayath in Palakkad District.-General Civil Work
IRR/IA/EST/4331/2022_5_1_1 AS/59D/22/26092
31-03-2023
2702-01-800-94-00-34-3 2,00,000 2,00,000
107
GENERAL-MI/TSR/MI Priority Edappalam Mandan chira-Construction of Edappalam Mandanchira Lift Irrigation Scheme In Pananchery Panchayath - Phase II - Laying delivery and distribution pipe lines-General Civil Work
IRR/IA/EST/4339/2022_5_1_1 AS/59D/22/25916
29-03-2023
4702-00-101-89-00-00-00 1,10,00,000 1,10,00,000
108
protecting the damaged right bank of Pamba river at Moolakkayam bhagam near thoniyamkuzhy house in ward no 12 of Erumely Panchayath
2021/4132/IA IDKtm/2021/4132/IA
31-03-2022
2711-01-103-98-34-03-00 23,90,000 23,90,000

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
KYIP ACP (NON PLAN)2020-21 Providing electrification works and Associated false ceiling work to first floor of perambra division office
2020/1645/P1 KYIPDPa/2020/1645/P
1
03-02-2021
2700-13-101-98-00-18-00 3,00,000 3,00,000
2
KPIP-Monsoon preparedness- Urgent Rectification to Damaged Canal bund at Alupuram Colony in Pallikurup Minor Distributory Ch. 0/600 to 1/1000 km 2021-22
2021/699/P1 KPIPDKa/2021/699/P1

15-07-2021
2700-18-101-98-00-18-00 1,31,000 1,31,000
3
WP-2021-2022-Rectification works to tail end right side field channel (Karingarappully field channel) of No.3 Distributory canal between Ch.0/100 km to 0/107 km, 0/177 km to 0/181 km, 0/190 km to 0/197 km and Rectification works to Offtake shutter of Pudussery branch canal( at Kunnachi) (Civil works only) and Supplying and fixing Iron Paddle shutters at Sluices at Ch. 9/194 km L/s, 10/422 km L/s, 11/382 km R/s, 11/671 km R/s, 11/861 km R/s - of No. 3 Distributory canal including Civil works
2021/1179/P1 IDCr/2021/1179/P1
19-03-2022
2700-03-101-98-00-18-00 4,31,000 4,31,000
4
CPP MRBC Rectification to Angarath Canal from Ch. 4/200 km to 4/700 km including demolishing of up stream and d/s canal covering slab and removal of waste from culvert across Palakkad Pollachi road
2022/383/P1 IDCr/2022/383/P1
30-03-2022
2700-17-101-98-00-18-00 7,50,000 7,50,000
5
CPP MRBC Rectification Kittupillai branch from Ch 0/790 km
2022/377/P1 IDCr/2022/377/P1
30-03-2022
2700-17-101-98-00-18-00 8,80,000 8,80,000
6
WP- 2021-2022- Construction of Tractor crossing slab at Ch. 0/395 km and rectification works between Ch.0/420 km to 0/445 km of the Field channel (Kindimukkan challa field channel) offtakes at Ch.04/530 km R/s of Walayar Main canal.
2021/1227/P1 IDCr/2021/1227/P1
11-03-2022
2700-03-101-98-00-18-00 1,61,000 1,61,000
7
CPP- Nurnee System- Urgent rectification of spout near at ch. 6/445 Km of Nurnee main canal
2022/357/P1 IDCr/2022/357/P1
25-03-2022
2700-17-101-98-00-18-00 1,00,000 1,00,000
8
- CPP-KKPS- Urgent Rectification works to Athikkattuchalla branch canal between Ch:0/600 to 0/750 m
2021/1175/P1 IDCr/2021/1175/P1
25-03-2022
2700-17-101-98-00-18-00 3,00,000 3,00,000
9
MPBDSMaintenance of Resort building near Malampuzha gardenphase1
2022/212/P1 IDMa/2022/212/P1
18-03-2022
2700-80-800-98(00) 14,90,000 14,90,000
10
KyIP ACP NP 2021 22 Rectification of Right Bank Main Canal in between Ch 28 600km and 28 800km in Puramery GP
KYIPDPa/2021/867/P1 KYIPDPa/2021/867/P1

23-12-2021
2700-13-101-98-00-18-00 3,80,000 3,80,000
11
CPP TMS AM Rectification works to Watchman Quarters near Thembaramadakku Anicut
2022/404/P1 IDCr/2022/409/P1
31-03-2022
2700-17-101-98-00-18-00 4,00,000 4,00,000
12
KyIP ACP NP 2021 22 Clearing of weeds and silt removal during water distribution from ch 27 000km to 34 270km of RBMC including all the distributaries and Field bothies within the chainage
2021/869/P1 KYIPDPa/2021/869/P1

26-12-2021
2700-13-101-98-00-18-00 3,00,000 3,00,000
13
KyIP ACP NP 2021 22 Construction of protection wall to canal bund road of Thiruvangoor branch canal from ch 0 000 km to 0 050 km
2021/898/P1 KYIPDPa/2021/898/P1

05-01-2022
2700-13-101-98-00-18-00 4,50,000 4,50,000
14
KYIP-ACP(NP)-2021-2022-REMOVAL OF SILT IN RBMC DEEP CUTTING AREA IN BETWEEN CH.20/000 AND 22/000KM.
2021/868/P1 KYIPDPa/2021/868/P1

26-12-2021
2700-13-101-98-00-18-00 2,00,000 2,00,000
15
KYIP-ACP(NP)-2021-22-REMOVAL OF SILT IN HIGH CUTTING AREA IN BETWEEN CH.30/700 AND 31/000KM IN RBMC,KUTTIYADI LA
2021/873/P1 KYIPDPa/2021/873/P1

26-12-2021
2700-13-101-98-00-18-00 2,00,000 2,00,000
16
KYIP-ACP-(NP)-2021-22-REMOVAL OF SILT IN HIGH CUTTING AREA IN BETWEEN CH.24/200 AND 24/600KM IN RBMC,KUTTIYADI LA
2021/872/P1 KYIPDPa/2021/872/P1

26-12-2021
2700-13-101-98-00-18-00 2,00,000 2,00,000
17
GENERAL-Velliyankallu RCB-2022-23-Stabilizing temporary retaining wall D/S, left bank of Velliyankallu RCB-General Civil Work
IRR/IA/EST/1241/2022_5_1_1 (Edit Id 12) AS/59D/22/22327
27-09-2022
2701-20-101-98-00-18-00 2,00,000 2,00,000

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PIP LBC Leak Arresting works to Kotta Aqueduct and Escape near ch 17400m
2018/889/P2 PIPD/2018/889/P2
23-02-2019
2700-16-101-98-00-18 11,00,000 11,00,000
2
PIP LBC rectification works to main canal between ch29550m 29650m
2018/846/P2 PIPD/2018/846/P2
23-02-2019
2700-16-101-98-00-18 14,85,000 14,85,000
3
P. I. P. (R. B. C) Re-construction of hand rails of Thonippuzha aqueduct
2018/185/P2 PIPD/2018/185/P2
15-02-2019
2700-16-101-98-00-18 4,55,000 4,55,000
4
PVIP - Annual Maintenance to Karikode MD between ch. 0 km to 2.4 km.
2019/3017/P2 PVIPDII/2019/3017/P
2
04-12-2019
2700-01-101-98-00-18 2,00,000 2,00,000
5
PVIP-Upkeeping of I B for the year 2020-2021 at Bhoothathankettu
2020/573/P2 PVIPDI/2020/573/P2
03-12-2020
2700-01-101-98-00-18 1,50,000 1,50,000
6
PVIP -up keeping of Generator set installed at Bhoothathankettu Barrage(supply of Diesel,Electrition etc) for the year 2020-21
2020/576/P2 PVIPDI/2020/576/P2
05-11-2020
2700-01-101-98-00-18 1,50,000 1,50,000
7
PVIP-Removal of water weeds and all vegetation in under water condition using appropriate type of Weed Harvestor for Low level canal (LLC) from ch. 7.8km to 15.3km during water distribution for the year 2020-2021.
2020/1021/P2 PVIPDI/2020/1021/P2

07-12-2020
2700-01-101-98-00-18 4,00,000 4,00,000
8
PVIP Up keeping of Garden at Bhoothathankettu for the year 2020 21
2020/1165/P2 PVIPDI/2020/1165/P2

03-12-2020
2700-01-101-98-00-18 2,00,000 2,00,000
9
PIP-Headworks-Rectification works to the downstream of Thamarappally aqueduct near Ch. 4800m.
2020/791/P2 PIPD/2020/791/P2
30-10-2020
2700-16-101-98-00-18 10,00,000 10,00,000
10
KIP LB Main Canal Rectification work of Canal in between Ch 44020 m to 44200 m
2021/792/P2    KIPLBDV/2021/792/P2

25-06-2021
2700-27-101-98-00-18 9,45,000 9,45,000
11
KIPLB Urgent rectification work of kizhakkekkara minor 1 canal from ch 2700 to 2966m and Reconstruction of damaged compound wall.
2021/782/P2 KIPLBDV/2021/782/P2

13-09-2021
2700-27-101-98-00-18 11,50,000 11,50,000
12
PSM 2021-22-AM of Mudikkode branch Canal from Ch 0/000 km to 6/700 km for the year 2021-22
2021/684/IA IDTsr/2021/684/IA
11-07-2021
2701-01-101-98-00-18-00 3,15,000 3,15,000
13
KIP - Kallada Dam - Monsoon preparedness 2021-22 - Works related to Felling down of dangerously standing trees and branches of trees situated in dam premises
2021/1047/P2 KIPRBDII/2021/1047/
P2
02-06-2021
2700-27-101-98-00-18 73,000 73,000
14
PVIP-Annual maintenance of HLC from Ch . 0/000 km to 6/500 km for the year 2021-22
2021/239/P2 PVIPDI/2021/239/P2
31-05-2021
2700-01-101-98-00-18 2,50,000 2,50,000
15
PIP LBC annual maintenance to Malakkara branch canal from ch. 0m to 5500m for the year 2021-22
2021/220/P2 PIPD/2021/220/P2
22-05-2021
2700-16-101-98-00-18 2,85,000 2,85,000
16
PIP LBC Annual Maintenance from ch 0m to 3000m for the year 2021-22
2021/215/P2 PIPD/2021/215/P2
16-05-2021
2700-16-101-98-00-18 2,00,000 2,00,000
17
PIP - LBC - Annual maintenance to LB Canal from Ch. 3000 m to 6000 m for the year 2021-22
2021/217/P2 PIPD/2021/217/P2
17-05-2021
2700-16-101-98-00-18 4,00,000 4,00,000
18
PIP - LBC - Annual maintenance to LB Canal from Ch. 6000 m to 9000m for the year 2021-22
2021/213/P2 PIPD/2021/213/P2
16-05-2021
2700-16-101-98-00-18 2,00,000 2,00,000
19
PIP LBC Annual maintenance to LB Canal between ch 9000m to 12000m for the year 2021-22
2021/218/P2 PIPD/2021/218/P2
17-05-2021
2700-16-101-98-00-18 3,00,000 3,00,000
20
PIP LBC Annual Maintenance to LBMC ch 12000 to 16140m for the year 2021-22
2021/219/P2 PIPD/2021/219/P2
17-05-2021
2700-16-101-98-00-18 3,00,000 3,00,000
21
PIP- RBC- Annual maintenance to RB canal from Ch. 0m to 6000m for the year 2021-22
2021/349/P2 PIPD/2021/349/P2
27-05-2021
2700-16-101-98-00-18 3,80,000 3,80,000
22
PIP- RBC- Annual maintenance to RB canal from Ch. 6000m to 13500m for the year 2021-22
2021/348/p2 PIPD/2021/348/P2
12-05-2021
2700-16-101-98-00-18 3,90,000 3,90,000
23
P. I. P. -RBC-Annual maintenance to Kaviyoor Branch Canal from Ch. 0m to 3605 m for the year 2021-22
2021/347/P2 PIPD/2021/347/P2
22-05-2021
2700-16-101-98-00-18 3,00,000 3,00,000
24
PIP- LBC- Annual maintenance to LB canal from Ch. 31500m to 38000 m for the year 2021-22
2021/371/P2 PIPD/2021/371/P2
12-05-2021
2700-16-101-98-00-18 5,10,000 5,10,000
25
PIP- Annual maintenance to PIP Main canal from CH.0m to 5000m for the year 2021-22
2021/506/P2 PIPD/2021/506/P2
12-05-2021
2700-16-101-98-00-18 3,70,000 3,70,000
26
PIP- Annual maintenance to PIP Main canal from CH5000 m to 10000m for the year 2021-22
2021/510/P2 PIPD/2021/510/P2
19-05-2021
2700-16-101-98-00-18 3,70,000 3,70,000
27
PIP Head works - Action plan 2021- 22 Rectification works of main canal between Ch.12750m and 12900m
2021/354/P2 ORDER No. PIPD/2021
/354/P2
17-05-2021
2700-16-101-98-00-18 15,00,000 15,00,000
28
PIP Head works - Action plan 2021- 22 Rectification works of main canal between Ch.12950m and 13070m
2021/358/P2 PIPD/2021/358/P2
27-05-2021
2700-16-101-98-00-18 15,00,000 15,00,000
29
PIP Head works - Action plan 2021- 22 Rectification works of main canal between Ch:16480m and 16580 m
2021/476/P2 PIPD/2021/476/P2
18-05-2021
2700-16-101-98-00-18 8,00,000 8,00,000
30
PSM 2021-22-Improvement works to Puthur Diversion canal in between 3/400 to 5/000Km
2021/493/IA IDTsr/2021/493/IA
18-08-2021
2701-01-101-98-00-18-00 15,00,000 15,00,000
31
PSM-Putting up and maintaining Kainur Chira in Manali river for 2021-22
EST NO:2021/491/IA IDTsr/2021/491/IA
06-08-2021
2701-01-101-98-00-18-00 1,25,000 1,25,000
32
PSM -Annual maintenance of Kallur Branch canal from Ch.0/000 to 5/200KM and urgent maintenance to spouts for the year 2021-22
2021/488/IA 2021/488/IA
06-08-2021
2701-01-101-98-00-18-00 2,50,000 2,50,000
33
KIP LB SbDn 13 Kollam Urgent rectification work of Chavara distributary from ch 9800 to 9845m
2021/126/P2 KIPLBDV/2021/126/P2

14-09-2021
2700-27-101-98-00-18 2,60,000 0
34
KIP(O and M)-Annual Maintenance of Canals jungle clearence, removal of silt and floating bodies from Vallikkode Minor Distributary From ch.0 m to 2285 m.
2021/1021/P2 KIPRBDII/2021/1423/
P2
23-09-2021
2700-27-101-98-00-18 1,20,000 1,20,000
35
KIP(O and M)-Annual Maintenance of Canals-jungle clearence, removal of silt and floating bodies fromThrippara Minor Distributary From ch.0 m to 3017 m.
2021/1020/P2 KIPRBDII/2021/1422/
P2
23-09-2021
2700-27-101-98-00-18 1,50,000 1,50,000
36
KIP-Annual maintenance of KIP Ravinagar Campus,Kottarakkara
:2021/1029/P2 KIPRBDII/2021/1029/
P2
16-09-2021
2700-27-101-98-00-18 1,00,000 1,00,000
37
Urgent leak rectification works to Minor irrigation Subdivision office in Ravinagar campus, Kottarakkara
2021/1282/P2 KIPRBDII/2021/1282/
P2
22-10-2021
4701-80-800-76-02-00 8,70,000 8,70,000
38
Protecting the sides of Panayampala thodu at Madathummuri bhagam in ward no 7 of Karukachal panchayath
2021/822/IA MIDKtm/2021/822/IA
23-10-2021
2702-01-800-94-00-34-3 12,00,000 12,00,000
39
KYIP-ACP(NP)2021-22 RECTIFICATION OF NADAKKUTHAZHA DISTRIBUTARY CANAL BETWEEN CH. 3.100 KM TO 4.600 KM
2021/862/P1 KYPDPa/2021/862/P1
21-12-2021
2700-13-101-98-00-18-00 1,70,000 1,70,000
40
PVIP-Urgent rectification works to the right bund of okkal branch canal at Ch.2350m
2021/1678/P2 PVIPD1/2021/1678/P2

22-03-2022
2700-01-101-98-00-18 4,40,000 4,40,000
41
GENERAL-CSM 2022-23-CSM - Urgent Rectification to the spouts from ch.0/000km to 22/650km-General Civil Work
IRR/IA/EST/1856/2022_5_7_6 AS/59D/22/21521
22-08-2022
2701-03-101-98-00-18 3,00,000 3,00,000
42
GENERAL-KIP(LB) Annual maintenance of canals-Removal of floating materials from canals:Paravoor distributory Ch: 0m to 23000m, Kalluvathukkal distributory Ch: 0m to 3505m, Chathannoor Minor distributory Ch: 0m to 4950m and Chathannoor Thazham Minor distry Ch: 0m to 1820m in connection with water distribution during the year 2022-23-General Civil Work
IRR/PII/EST/3575/2022_5_1_1 AS/59D/22/22977
15-10-2022
2700-27-101-98-00-18 5,50,000 5,50,000
43
KIP (O&M) Annual Maintenance of KIP Campus under Adoor Sub Division
IRR/PII/EST/3551/2022_5_3_2 AS/59D/22/23112
20-10-2022
2700-27-101-98-00-18 50,000 50,000
44
KIP(O&M)- Monsoon Preparedness- Emergency cutting of trees standing dangerous to KIP Office Building near High School Junction, Adoor
IRR/PII/EST/3792/2022_5_1_1 AS/59D/22/20865
03-08-2022
2700-27-101-98-00-18 31,000 31,000
45
KIP(O&M)-Monsoon prepareness-Felling of trees near SBC at Ch.15900m,18500m and Enath III distributory at Ch.560m .
IRR/PII/EST/2921/2022_5_1_1 AS/59D/22/20833
03-08-2022
2700-27-101-98-00-18 25,000 25,000
46
Felling trees dangerously standing in the banks of KIP canal under jurisdiction of KIP(O and M) Section 2/1,Adoor
IRR/PII/EST/6204/2022_5_1_1 AS/59D/22/21900
06-09-2022
2700-27-101-98-00-18 44,000 44,000
47
KIP(O&M)-Monsoon prepareness-Protection work of damaged pipe culvert at Edakkadu II distributory at Ch.720m in Neythushala Junction,Kadampanadu Panchayath.
IRR/PII/EST/7473/2022_5_1_1 AS/59D/22/23636
10-11-2022
2700-27-101-98-00-18 68,000 68,000
48
GENERAL-Cutting Trees-Monsoon Preparedeness- Cutting Trees on the bank of Peringanad distributary, Ammakandakara distributary and Sasthamcotta Branch Canal for the year 2022-23-General Civil Work
IRR/PII/EST/7201/2022_5_1_1 AS/59D/22/22617
06-10-2022
2700-27-101-98-00-18 25,100 25,100
49
KIP O M Removal of floating materias in various canals under the jurisdiction of KIP section.13 4 Charummoodu during water distribution period for the year 2022 2023
IRR/PII/EST/3613/2022_5_1_1 AS/59D/22/22239
01-09-2022
2700-27-101-98-00-18 2,00,000 2,00,000
50
GENERAL-Urgent Rectification-Emergency work during water distribution for the year 2022-23-General Civil Work
IRR/PII/EST/1225/2023_5_1_1 ORDER No. AS/59D/22
/25631
21-03-2023
2700-27-101-98-00-18 1,00,000 1,00,000
51
-Monsoon preparedness-KIP- Melila east distributory-Rectification work of refilling the eroded soil in the earth bund and removing the block in the canal portion between ch 10000 and 10500m.
IRR/PII/EST/8414/2022_5_1_1 AS/59D/22/24624
06-01-2023
2700-27-101-98-00-18 97,000 97,000
52
GENERAL-PVIP-Urgent re-construction works to the collapsed pipe aqueduct at Ch 330 m of Thottuva MD-General Civil Work-1
IRR/PII/EST/1134/2023_5_2_1 AS/59D/22/25554
17-03-2023
2700-01-101-98-00-18 4,95,000 4,95,000
53
GENERAL PVIP Removing obstructions during water distribution from canals syphons aqueducts etc of Aluva branch canal and its SBCs and MDs for the year 2022 23 General Civil Work
IRR/PII/FL/1578/2022 AS/59D/22/22259
24-09-2022
2700-01-101-98-00-18 1,50,000 1,50,000

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PM-construction of retaining wall for vellorthara thodu of 9th block padasekharam in ward no. 18 of Chennithala Panchayath
2020/335/KP MIDCgr/2020/335/KP
24-12-2021
2702-03-101-98-03 5,00,000 4,94,000

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
PSM-Annual maintenance and operation of Odenchira regulator for the year 2019-20
2019/9329/IA IDTsr/2019/9329/IA
16-10-2019
2701-01-101-98-00-18-00 5,00,000 5,00,000
2
Annual Maintenance of Various Buildings in ICC compound.
2020/5392/IA IDTsr/2020/5392/IA
21-12-2020
2701-01-101-98-00-18-00 5,00,000 5,00,000
3
Purchasing DGPS and Antenna for Sedimentation division
2017/375/IDRB HRKERIPi/2017/375/I
DRB
01-01-2018
4701-80-800-99-00-34-03 3,40,000 3,40,000
4
Peechi Scheme Maintenance-2020-21-Surveying and fixing boundary stones to RBMC from 8/000 Km to 37/300 Km
2020/3324/IA IDTsr/2020/3324/IA
20-01-2021
2701-01-101-98-00-18-00 14,00,000 14,00,000
5
Emergency monsoon preparedness and Flood damages-Cutting of trees that pose to threat to life and property under the ambit of Head Works Sub Division, Peechi
2020/3091/IA IDTsr/2020/3091/IA
08-07-2020
2701-01-101-98-00-18-00 66,000 66,000
6
Urgent rectification works of RBMC Valve for the year 2020-21
2021/237/IA ORDER No. IDTsr/202
1/237/IA
15-02-2021
2701-01-101-98-00-18-00 2,90,000 2,90,000
7
PEECHI SCHEME- Protection Works and Leak Proofing Works of RBMC from Ch.0/200 to 0/300 Km
2020/3866/IA ORDER No. IDTsr/202
0/3866/IA
01-01-2021
2701-01-101-98-00-18-00 15,00,000 15,00,000
8
PEECHI SCHEME-Protection works and Leak proofing works of RBMC from Ch.0/320 to 0/420 KM
2020/3867/IA ORDER No. IDTsr/202
0/3867/IA
29-12-2020
2701-01-101-98-00-18-00 10,00,000 10,00,000
9
PSM 2020-21-Improvement works to puthur branch canal in between 0/000 to 0/200km
2018/4273/IA IDTsr/2018/4273/IA
20-01-2021
2701-01-101-98-00-18-00 15,00,000 15,00,000
10
PSM-Improvement worksto canal bund e LBMC between ch.14/000 to 14/120 KM.
2019/7002/IA IDTsr/2019/7002/IA
20-01-2021
2701-01-101-98-00-18-00 10,00,000 10,00,000
11
GENERAL-PSM 2022-23-Peechi Scheme Maintenance- Improvement works to RBMC between Ch. 10/400 and 10/500 km-General Civil Work
IRR/IA/EST/3894/2022_5_5_4 AS/59D/22/21448
19-08-2022
2701-01-101-98-00-18-00 14,00,000 14,00,000
12
GENERAL-PSM-Annual Maintenance of Koottala Branch Canal from 0/000 km to 6/330 km for the year 2022-2023-PSM-Annual Maintenance of Koottala Branch Canal from 0/000 km to 6/330 km for the year 2022-2023-General Civil Work
IRR/IA/EST/5752/2022_5_1_1 AS/59D/22/21932
12-09-2022
2701-01-101-98-00-18-00 3,00,000 3,00,000
13
Monsoon Preparedness - RBMC and branch canals - Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition under Thanippadam Section
IRR/IA/EST/3894/2022_5_1_1 AS/59D/22/21207
12-08-2022
2701-01-101-98-00-18-00 2,00,000 2,00,000