NON PLAN SPILL OVER WORKS WORKS TS NOT ISSUED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Karamana River - Scientific Management (Pilot) Project - (KSRM Project) an integrated solid waste management -Providing chain linked fencing n either sides of Thiruvallam Thodu
2016/471/IA GOMS112016STD
16-02-2016
4711-01-103-89(00) 55,00,000 0
2
Karamana River Scientific Management Project (KRSM) -Karamana River Scientific Management (Pilot project (New scheme).- Biodiversity Park at Karamana 11 phase- Walkway,Gate, Fencing , Lighting etc
2016385IA GOMS112016STD
16-02-2016
4711-01-103-89(00) 65,00,000 0
3
Supply and laying of DI pipes, supply and erection of motor and pumpset, electrification, and powerallocation to lift irrigation scheme at Kakkuppadi from Bhavani river in Agali Panchayath in Attappadi in Palakkad district. Rs 45 lakhs.
2018/982/IA MIDPkd/2018/982/IA
28-03-2018
4702-00-101-89-00-00-00 45,00,000 0
4
Construction of Konottu lift irrigation scheme in Kuruvattoor Panchayath
2018/130/IA MIDKkd/2018/130/IA
04-03-2019
4702-00-101-84-01-00-00 75,00,000 0
5
Annual Maintenance (Civil) to the Madambam RCB at Madambam in Sreekandapuram Muncipality in Kannur District for the year 2020-21
2020/1497/IA MIDKnr/2020/1497/IA

21-05-2020
2702-01-800-94-00-34-3 93,000 0
6
Annual maintenance (civil) to the Madambam RCB at Madambam in Sreekandapuram Municipality, Kannur District for the year 2019-20
2019/3702/IA MIDKnr/2019/3701/IA

20-06-2019
2702-01-800-94-00-34-3 98,000 0
7
CONSTRUCTION OF LI SCHEME AT KAYALAM IN PERUVAYAL PANCHAYATH
2016/2933/IA MIDKkd/2016/2933/IA

07-03-2019
4711-01-103-93(00) 75,00,000 0
8
Sabarimala Piligrimage 2020 2021 Providing temporary bund acros Azhutha River at Down stream of Azhuthakadavu in Erumely Panchayath
2020/4326/IA IDKtm/2020/4326/IA
14-10-2020
2711-01-103-99-00-34-3 3,45,000 0
9
Sabarimala Piligrimage 2020 2021 Providing temporary bund acros Manimala river at D/S of Orunkal Bridge in erumely panchayath
2020/4330/IA IDKtm/2020/4330/IA
14-10-2020
2711-01-103-99-00-34-3 5,10,000 0
10
Sabarimala piligremage 2020-2021Providing temporary bund acros Erumely thodu branch of Manimala river U/S of Erumely temple in erumely Panchayath
2020/4332/IA IDKtm/2020/4332/IA
14-10-2020
2711-01-103-99-00-34-3 4,15,000 0
11
MIPriority Renovation of Pillaveettil kulam and maintenance of leading channel inproviding in Chavara panchayath
2020/4992/IA MIDklm/2020/4992/IA

12-01-2021
4702-00-101-84-01-00-00 10,00,000 0
12
Urgent Rectification works to damaged sluices at Aryanpadam in Thodiyoor Panchayath
2021/570/IA . MIDklm/2021/570/I
A
24-02-2021
2702-03-101-98-03 25,00,000 0
13
MI Priority- Construction of Check Dam across Kanancheri Thodu at Aikkarapadi in Thariode Panchayat
2020/3054/IA MIDSby/2020/3054/IA

22-10-2020
4702-00-101-84-01-00-00 30,00,000 0
14
FD-Protecting the Right bank of Vamanapuram River including Reformation of Existing Kadavu near Subhramannyan Temple at Kezhattingal in Attingal Municipality
2019/11615/IA IDTvm/2019/11615/IA

19-09-2021
2711-01-103-98-34-03-00 33,50,000 0
15
Annual maintenance of LI Station kanjirathum kadavu in Sooranadu North Panchayath for the year 2021-22
2021/2036/IA MIDklm/2021/2036/IA

05-10-2021
2702-01-800-94-00-34-3 1,13,000 0
16
Sabarimala pilgrimage 2021-2022-Providing two temporary cross bunds across Karakkadu Thodu in vadasserikkara Panchayath
2021/4462/IA ISDKlm/2021/4462/IA

12-10-2021
2711-01-103-98-34-03-00 4,84,000 0
17
Sabarimala pilgrimage 2021-2022 Annual maintenance of Irrigation structures like check dam office building Etc
2021/4556/IA ISDKlm/2021/4556/IA

12-10-2021
2711-01-103-98-34-03-00 14,15,000 0
18
Putting up tidal bunds for the year 2021-2022- 1no. Regulator and 1no. Bund in Karthikappally Panchayath
2021/326/KP MIDCgr/2021/326/KP
23-11-2021
2702-01-800-94-00-34-3 4,30,000 0
19
Monsoon Preparedness 2021 - Disposal of Silt, Removed and Deposited at NC Canal Inspection Road between Ch 0/000km to 1/000km in Vatakara Municipality
2021/4841/IA MIDKkd/2021/4841/IA

30-11-2021
2702-03-101-98-03 77,000 0
20
Putting up Tidal bunds at various places in Panavally & Kanjikkuzhy Panchayath for the year 2021-22
2021/331/KP KDDTm/2021/331/KP
13-10-2021
2702-01-800-94-00-34-3 8,50,000 0
21
Repair and Renovation of L/B and R/B of kakkathode near koyikkal palace in kallingal jn ward no. 9 of Nedumangad Muncipality
2021/2537/IA MIDTvpm/2021/2537/I
A
24-09-2021
2702-03-101-98-03 13,24,000 0
22
PM-Urgent rectification work of the damaged bund of Chittar thodu at Kallarathalackal Mannadi in Thrippalavoor ward of Perunkadavila Panchayath
2019/10675/IA MIDTvpm/2019/10675/
IA
01-11-2021
2702-01-800-94-00-34-3 12,00,000 0
23
MIRPA 2020-2021 Urgent rewinding of Stator & Rotor Windings of 160 HP, No.2 Kirlosker Slip ring induction motor at Sreebhoothapuram No. 1 LIS
2020/5581/IA ORDER No. MIDEkm/20
20/5581/IA
08-09-2021
4702-00-101-88(00) 2,19,000 0
24
Maintenance of Various L I Schemes 2021-22 .Fully Comprehensive Annual Maintenance of Piravam LIS and Thalacode LIS, Under Electrical Lift Irrigation Section Ramamangalam
2021/2865/IA ORDER No. MIDEkm/20
21/2865/IA
15-09-2021
2702-01-800-94-00-34-3 2,72,000 0
25
Side Protection Works to the Left bank of Pannithodu Near Koanath junction in Ward - 23 of Kulasekharapuram Panchayath
2021/86/IA MIDklm/2021/86/IA
06-12-2021
2702-03-101-98-03 14,60,000 0
26
The construction of drains near Bhadrakali temple in Pazhanjiyilkavu ward of Chavara Panchayath
2021/4145/IA MIDklm/2021/4145/IA

10-12-2021
2702-03-101-98-03 15,00,000 0
27
Annual maintenance of 5 Nos. Pump Houses ( Madhupalam, Kanjirathadi, Pandarakari, Mankilikari and Nilamelkari) in Vellayani Padasekharam at Kalliyoor Panchayath in Thiruvananthapuram Corporation
2021/3171/IA MIDTvpm/2021/3171/I
A
29-12-2021
2702-01-800-94-00-34-3 12,70,000 0
28
MI Priority - Urgent maintenance and providing irrigation facilities to the right bank of Valiya thodu near Kidangayil kshethram ela bhagom in Vilakkudy panchayath.
2021/3399/IA MIDklm/2021/3399/IA

21-10-2021
4702-00-101-84-01-00-00 14,00,000 0
29
FD-Urgent repairs to damaged bund of Mooverikkara thodu in the down stream of Aravilakom bridge in Kunnathukal Panchayath
2019/8753/IA MIDTvpm/2019/8753/I
A
20-10-2021
2702-03-101-98-03 11,00,000 0
30
Urgent Removal of deposited silt and debris from the kadavus and rectification to the kadavu in thiruvabharana patha in Ayroor panchayath of Ranni constituency
2021/6003/IA ISDKlm/2021/6003/IA

31-12-2021
2711-01-103-99-00-34-3 1,91,000 0
31
Construction of Tidal bund (Salinity Barrier) across Manthara thodu in Purakkad Grama Panchayath for the year 2021-22
2021/345/KP MIDCgr/2021/345/KP
06-12-2021
2702-01-800-94(00) 14,07,000 0
32
PM-Protective Irrigation works for the year 2021-22 Putting up an earthern bund across KV Canal in Vaikom Municipality
2021/3165/IA MIDKtm/2021/3165/IA

05-10-2021
2702-01-800-94-00-34-3 3,20,000 0
33
Reconstruction of Kalpalam and side protection work of Vazhukkapara thodu in Parali Panchayat in Palakkad District
2020/4140/IA MIDPkd/2020/4140/IA

25-03-2022
4702-00-101-84-01-00-00 36,00,000 0
34
MIP Cauvery Basin-RainShadow 2021-22 Repair of canal at Malakkattuchalla in Kozhinjampara GP
2022/3852/IA MIDPkd/2022/3852/IA

30-03-2022
2702-01-800-94-00-34-3 15,00,000 0
35
Desilting and side protection work of Sree Subramanya swamy -Maha Bhadrakali kshetram temple pond in Kumbalangi panchayath
2021/6297 MIDEkm/2021/6297/IA
Dated: 31-03-2022
31-03-2022
4702-00-101-84-01-00-00 9,50,000 0
36
URGENT CONSTRUCTION TEMPORARY BUND ACROSS BHARATA PUZHA FOR MAINTAINING SUCTION HEAD OF LIS THIRUNAVAYA FIRST STAGE IN THIRUNAVAYA PT IN TIRUR ASSEMBLY CONSTITUENCY -MALAPPURAM DISTRICT
2022/3786/IA MIDMpm/2022/3786/IA

31-03-2022
2702-01-800-94-00-34-3 2,95,736 0
37
MIRPA LIS Urgent repairs to the suction pipes & repair to canal of LIS Kothupara in keezhuparamba Panchayath
2021/404/IA MIDMpm/2022/3611/IA

26-03-2022
4702-00-101-89-00-00-00 28,00,000 0
38
Rehabilitation of Muppini LIS in Chungathara PT
2019/1085/IA MIDMpm/2019/1085/IA

26-03-2022
4702-00-101-89-00-00-00 55,00,000 0
39
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Purakkad Grama Panchayath for the year 2021 -22
2021/349/KP MIDCgr/2021/349/KP
23-11-2021
2702-01-800-94-00-34-3 3,39,000 0
40
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Punnapra North Grama Panchayath for the year 2021-22
2021/344/KP MIDCgr/2021/344/KP
23-11-2021
2702-01-800-94-00-34-3 3,66,000 0
41
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Punnapra North Grama Panchayath for the year 2021-22
2021/344/KP MIDCgr/2021/344/KP
23-11-2021
2702-01-800-94-00-34-3 3,66,000 0
42
Construction of Tidal bund (Salinity Barrier) across Kuruvapadom thodu in Punnapra North Grama Panchayath for the year 2021-22
2021/343/KP MIDCgr/2021/343/KP
23-11-2021
2702-01-800-94-00-34-3 5,23,000 0
43
Construction of Tidal bund (Salinity Barrier) across Kochuputhenkary, Unnithankary and Pannakkalam thodu in Purakkad Grama Panchayath for the year 2021-22
2021/348/KP MIDCgr/2021/348/KP
23-11-2021
2702-01-800-94-00-34-3 5,58,000 0
44
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Ambalappuzha South Grama Panchayath for the year 2021-22 (West Portion)
2021/346/KP MIDCgr/2021/346/KP
23-11-2021
2702-01-800-94-00-34-3 5,27,000 0
45
Construction of side protection wall to the left side of Chalakkudy river near Payathuruth bridge in ward No.1 of Kunnukara Grama Panchayath in Ernakulam district.
2021/3664/IA IDEkm /2021/3664/IA

31-03-2022
2711-01-103-98-34-03-00 31,40,000 0
46
Flood Damages- Side protection works to the Right bank of Periyar river near Illithode in ward no 6 of Malayattoor Neeleeswaram Panchayath.
2021/5455/IA IDEkm/2021/5455/IA
31-03-2022
2711-01-103-98-34-03-00 22,20,000 0
47
Putting up tidal bund for the year 2021-2022 in Pathiyoor Panchayath
2021/464/KP MIDCGR/2021/464/KP
16-11-2021
2702-01-800-94-00-34-3 2,52,200 0
48
Protection works of the Right bank of Nachar and its tributary near Snehabhavan and Kunnemuri purayidam bhagam in ward no 13 of Arakkulam Panchayath
2021/2473/IA IDKtm/2021/2473/IA
31-03-2022
2711-01-103-99-00-34-3 36,80,000 0
49
Protection works to the eroded banks of Meenachil river near Kalathukadavu bhagom in Thalappalam Panchayath
2021/5289/IA IDKtm/2021/5289/IA
31-03-2022
2711-01-103-98-34-03-00 40,00,000 0
50
Improvement to Anjillikudi Padashekaram by the construction of Culvert & side protection of Changananacherry-Kottayam Canal in Vazhapally panchayath
2021/4822/IA IDKtm/2021/4822/IA
31-03-2022
2711-01-103-98-34-03-00 27,00,000 0
51
protecting the damaged right bank of Pamba river at Moolakkayam bhagam near thoniyamkuzhy house in ward no 12 of Erumely Panchayath
2021/4132/IA IDKtm/2021/4132/IA
31-03-2022
2711-01-103-99-00-34-3 23,90,000 0
52
emoval of water hyacinth and desilting of Changanacherry -Kottayam canal near parekkadavu to Kuttiserikadavu in ward 21 of Vazhappally panchayath.
2020/5630/IA IDKtm/2020/5630/IA
31-03-2022
2711-01-103-98-34-03-00 23,00,000 0
53
Monsoon Preparedness 2022 - Emergency work - Construction of core wall over sunken return seawall at Azheekkal (North of CP Stone 2352) near old boat jetty in Azhikode Grama Panchayath
IRR IA EST 1729 2022 5 1 1 AS/59D/22/19864
16-06-2022
2711-02-103-99-34-3 20,00,000 0
54
GENERAL-MIC/Monsoon/2022- Clearing Kulavazha from Sreeraman chira thodu to Kannanchira thodu in Thannyam GP
IRR/IA/EST/3146/2022_5_1_1 AS/59D/22/20681
26-07-2022
2702-03-101-98-03-34-03 1,50,000 0
55
Annual Maintenance 2022-23 Post Monsoon Cleaning and Desiltation of Various Canals under MI Section Kodakara
IRR/IA/EST/2859/2022_5_1_1 AS/59D/22/22367
27-09-2022
2702-01-800-94-00-34-3 5,07,000 0
56
Annual Maintenance of Various LIS under MI Section Kodakara 2022-23 Maintenance of Canals
IRR/IA/EST/2862/2022_5_1_1 AS/59D/22/22370
27-09-2022
2702-01-800-94-00-34-3 8,00,000 0
57
Emergency work-Construction of rubble mount core wall for a length of 15m south of CP0002 at Kollamcode in Neyyattinkara LA
IRR/IA/EST/1519/2022_5_11_ G.O(Rt)No.418/2022/
WRD
19-05-2022
2711-01-103-99-00-34-3 20,00,000 0
58
Annual Maintenance of Malayattoor No I, No II, Neeleeswaram No I, No II, Manappattuchira, WHC schemes 2022-23
IRR/IA/EST/2841/2022_5_1_1 AS/59D/22/22451
29-09-2022
2702-01-800-94-00-34-3 9,00,000 0
59
Annual maintenance of Kanjoor - Edanad, Pallikkadav, Mooriamangalam, Thiruvilanchuzhi, Chengal and Puliyampilly schemes 2022-23
IRR/IA/EST/2844/2022_5_1_1 AS/59D/22/22447
29-09-2022
2702-01-800-94-00-34-3 8,00,000 0
60
Annual Maintenance of Avanamcode, Manikkamangalam, Nettinampilly, Piraroor, Nayathodu, Kottamamthodu and Akkunnu schemes 2022-23
IRR/IA/EST/2843/2022_5_1_1 AS/59D/22/22450
29-09-2022
2702-01-800-94-00-34-3 6,20,000 0
61
Annual Maintenance of Sreebhoothapuram, South Vellarappilly, Churulichira, Koonathankunnu, Mangattukara,Kodinjili and Alakkada schemes 2022-23
IRR/IA/EST/2846/2022_5_1_1 AS/59D/22/22452
29-09-2022
2702-01-800-94-00-34-3 6,50,000 0
62
Annual Maintenance of Avanamcode No.1 A LIS under M.I.Section Aluva for 2022-23 including cleaning of suction pit and canals.
IRR/IA/FL/2594/2022_5_1_1 . AS/59D/22/22602 :

03-10-2022
2702-01-800-94-00-34-3 5,00,000 0
63
Annual Maintenance of Kalamassery, Choornikkara, Muttom and Eloor North LIS under M.I.Section Aluva for 2022-23 including cleaning of suction pit and canals
IRR/IA/EST/2597/2022_5_1_1 AS/59D/22/22601
03-10-2022
2702-01-800-94-00-34-3 5,00,000 0
64
Annual Maintenance 2022-23 -Uliyannur & Kadungallur-Annual Maintenance of Uliyannur and Kadungallur LIS
IRR/IA//EST/2593/2022_5_1_1 . AS/59D/22/22603 D

03-10-2022
2702-01-800-94-00-34-3 6,00,000 0
65
Annual Maintenance LI Schemes under MI Section PerumbavoorEdavoorkara, Cheranallore, Kapirikad and Paniyeli LIS for the year 2022-23
IRR/IA/EST/2782/2022_5_3_1 AS/59D/22/22264
24-09-2022
2702-01-800-94-00-34-3 9,40,000 0
66
Annual Maintenance LI Schemes under MI Section Perumbavoor-Vallom, Chelamattom, Perumattom, Okkal and East Okkal LIS for the year 2022-23
IRR/IA/EST/2782/2022_5_1_1 AS/59D/22/22265
24-09-2022
2702-01-800-94-00-34-3 9,60,000 0
67
Annual Maintenance LI Schemes under MI Section Perumbavoor-Vallom, Chelamattom, Perumattom, Okkal and East Okkal LIS for the year 2022-23
IRR/IA/EST/2782/2022_5_1_1 AS/59D/22/22265
24-09-2022
2702-01-800-94-00-34-3 9,60,000 0
68
Annual Maintenance LI Schemes under MI Section Perumbavoor-Koodalapad,Pantheerazhipara, Vellaramugal, Vazhakkulathuchira, Kandanthara, Painkimala, Onamveli,Kannamkulam and Perumani LIS for the year 2022-23
IRR/IA/EST/2782/2022_5_2_2 AS/59D/22/22266
24-09-2022
2702-01-800-94-00-34-3 9,20,000 0
69
Annual maintenance of Puthenpadam bund - 2022-23-Annual maintenance of puthenpadam bund for the year of 2022-2023
IRR/IA/EST/2812/2022_5_1_1 AS/59D/22/22272
24-09-2022
2702-01-800-94-00-34-3 6,70,000 0
70
Annual Maintenance of Chowara Thekkumbhagam, Chowara No.I,II,III & IV LIS under M.I.Section Aluva for 2022-23 including cleaning of suction pit and canals.
IRR/IA/EST/2603/2022_5_1_1 AS/59D/22/22600
03-10-2022
2702-01-800-94-00-34-3 6,00,000 0
71
Annual Maintenance of Kuttamassery, Keezhmad and Chalackal LIS for 2022-23 under M.I.Section Aluva including cleaning of suction pit and canals.
IRR/IA/EST/2694/2022_5_1_1 AS/59D/22/22599
03-10-2022
2702-01-800-94-00-34-3 4,35,000 0
72
Annual maintenance of Chengamanadu No.1,No.2, Desom west, Muppathadom No.1, No.2, New LIS Edayattuchal dewatering scheme under M.I.Section Aluva for 2022-23 including cleaning of suction pit and canals
IRR/IA/EST/2697/2022_5_1_1 AS/59D/22/22598
03-10-2022
2702-01-800-94-00-34-3 5,00,000 0
73
GENERAL-SABARIMALA PILGRIMAGE 2022-2023-Providing temporary bunds across Karakkadu thodu in Vadasserikkara panchayath.-General Civil Work
6860/2022/5/3/2 AS/59D/22/22804
11-10-2022
2711-01-103-99-00-34-3 6,47,000 0
74
GENERAL-Annual Maintenance 2022-2023-Annual maintenance works to LIS Pallamthuruth in Lakkidi-Peroor Pyt.-General Civil Work
IRR/IA/EST/3440/2022_5_2_2 AS59D2222973
15-10-2022
2702-01-800-94-00-34-3 53,00,000 0
75
AM 2022-23 Annual Maintenanace LIS Thathanampully Kulakkalloor Panchayath
IRR/IA/EST/2449/2022 AS/59D/22/22962
15-10-2022
2702-01-800-94-00-34-3 5,30,000 0
76
AM 2022-23 Annual maintenanace LIS Nedumkayam Nellaya Panchayath
IRR/IA/EST/2651/2022 AS/59D/22/22963
15-10-2022
2702-01-800-94-00-34-3 5,30,000 0
77
Side wall protection in Chittamaruthu Thodu (Ambittanpotty colony road-Velumpiyanpadam) Pothukallu Panchayath Ward 6
2021/5621/IA MIDMpm/2021/5621/IA

01-04-2022
2702-03-101-98-03-00 10,00,000 0
78
GENERAL-Anual maintenance-Anual maintenance to Ayyarathpalam SWECB at kuttikakam munambu in kannur corporation in kannur district-General Civil Work
IRR/IA/EST/2739/2022_5_1_1 AS/59D/22/23005
17-10-2022
2702-01-800-94-00-34-3 90,000 0
79
GENERAL- Floods 2022- Emergency work- Emergency removal of debris and obstructions at U/S .D/S and under Karimbukayam causeway ch.45/200
IRR/IA/EST/5641/2022_5_1_1 AS/59D/22/21671
27-08-2022
2702-03-101-98-03-34-03 1,20,000 0
80
GENERAL - AM 2022-23 Annual Maintenance of Kaduvakuzhi LIS in Chungathara GP - AM General Civil Work.
. AS/59D/22/23205
22-10-2022
2702-01-800-94-00-34-3 2,56,100 0
81
Putting up tidal bunds for the year 2022-23 near Eruva Sree Krishna Swami Temple across Karippuzha Thodu in Kayamkulam Municipality.
IRR/KP/EST/2706/2022_5_1_1 ORDER No. AS/59D/22
/23610 Dated: 09-11-2022
09-11-2022
2702-01-800-94-00-34-3 12,33,000 0
82
GENERAL-MI/KP/govindamuttom bund/2022-23-Putting up tidal bunds for the year 2022-2023 at Govinda muttom Regulator in Kayamkulam Municipality.-General Civil Work
IRR/KP/EST/3726/2022_5_1_1 ORDER No. AS/59D/22
/23611 Dated: 09-11-2022
09-11-2022
2702-01-800-94-00-34-3 12,98,000 0
83
MIRPA-Rehabilitation of Muppini LI scheme in Chungathara GP-RLIS-General Civil Work
IRR/IA/EST/6945/2022_5_1_1 MIDMpm/2019/1085/IA

26-03-2022
4702-00-101-89-00-00-00 55,00,000 0
84
GENERAL-MI/kip/ pathiyoor/2022-23-Putting up Tidal bund for the year 2022-23 , 1 No. Regulator and 3 Nos Cross bund in Pathiyoor Panchayat.
IRR/KP/EST/2939/2022_5_1_1 ORDER No. AS/59D/22
/23911
26-11-2022
2702-01-800-94-00-34-3 12,73,000 0
85
Annual-Mace-MISP/7/AM/2022-Annual Maintenance of LI Scheme for the year 2022-2023 of Changaipadam LI Station in Venmony panchayath under MI section, Pandalam-General Civil Work
IRR/KP/EST/5457/2022_5_1_1 AS/59D/22/23915
26-11-2022
2702-01-800-94-00-34-3 3,11,000 0
86
Annual Maintenance of LI Scheme for the year 2022-2023 of Murinjapuzha LI station in Nooranad panchayath, under MI section, Pandalam.-General Civil Work
IRR/KP/EST/5453/2022_5_1_1 AS/59D/22/24136
08-12-2022
2702-01-800-94-00-34-3 2,45,000 0
87
Annual-Mace-MISP/4/AM/2022-Annual Maintenance to LI Scheme for the year 2022-2023, LI station No. 1 in Nooranad panchayath, under M.I.Section, Pandalam-General Civil Work.
IRR/KP/EST/5454/2022_5_1_1 AS/59D/22/24135
08-12-2022
2702-01-800-94-00-34-3 2,04,000 0
88
GENERAL-Temporory bund- Providing temporary bund across Achenkovil river dowostream of L I Scheme Padinjarepadam in Vallicodu panchayat for the year 2022-23 -General Civil Work
IRR/IA/EST/4977/2022_16_1_1 AS/59D/22/22747
10-10-2022
2702-01-800-94-00-34-3 1,21,000 0
89
General- Annual maintenance of Keezhvaipur No.1 L I Scheme(Mechanical works)-Annual maintenance of Keezhvaipur No.1 L I Scheme under M I Section Mallappally for the year 2022-2023 (Mechanical works-Repairs of pump motor and its accessories)-General civil work
IRR/IA/EST/5408/2022 _16_1_1 AS/59D/22/23728
16-11-2022
2702-01-800-94-00-34-3 1,18,000 0
90
General-Emergency monsoon preparedness-Cleaning works at Killi river upstream of Vazhayila bridge -General civil work
IRR/IA/EST_TS/3863/2022_5_3_1 AS/59D/22/20426 dtd
13/07/2022
13-07-2022
2711-01-103-99-00-34-3 3,00,000 0
91
LAC-ADS -Thiruvananthapuram -Protecting the left bank of Killi river in Thiruvananthapuram LA constituency at Thengakoodu phase III-General civil work
IRR/IA/TR/2392/2022_5_1_1 D1-986/2022
08-04-2022
8443-00-108-00-00-00-00 15,00,000 0
92
General-Annual maintenance 2022-23(Mechanical works)-Maintenance of Venpala 1 L I Station under M I Section Thiruvalla-General civil work-1
IRR/IA/EST/5424/2022 _16_8_8 AS/59D/22/22881
12-10-2022
2702-01-800-94-00-34-3 75,000 0
93
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Ambalappuzha South Grama Panchayath for the year 2022-23(West Portion)
IRR/KP/EST/5009/2022_5_1_1 AS/59D/22/23503
05-11-2022
2702-01-800-94-00-34-3 5,55,000 0
94
Construction of Tidal bund (Salinity Barrier) across Kochuputhenkary, Unnithankary and Pannakkalam thodu in Purakkad Grama Panchayath for the year 2022-23
IRR/KP/EST/5010/2022_5_1_1 AS/59D/22/23504
05-11-2022
2702-01-800-94-00-34-3 5,88,000 0
95
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Purakkad Grama Panchayath for the year 2022 -23
IRR/KP/EST/5011/2022_5_1_1 AS/59D/22/23506
05-11-2022
2702-01-800-94-00-34-3 3,57,000 0
96
Construction of Tidal bund (Salinity Barrier) across Manthara thodu in Purakkad Grama Panchayath for the year 2022-23
IRR/KP/EST/5013/2022_5_1_1 AS/59D/22/23763
18-11-2022
2702-01-800-94-00-34-3 8,30,000 0
97
Construction of Tidal bund (Salinity Barrier) across the thodu coming under the area of Ambalappuzha South Grama Panchayath for the year 2022-23(East Portion)
IRR/KP/EST/5008/2022_5_1_1 AS/59D/22/23572
08-11-2022
2702-01-800-94-00-34-3 2,60,000 0
98
Construction of Syphon in the main Canal of KC LIS to prevent flooding in the upstream reaches of the natural drain
IRR/IA/EST/5532/2022_5_1_1 AS/59D/22/26009
30-03-2023
2702-01-800-94-00-34-3 15,00,000 0
99
GENERAL-Protection Works-Protecting the right bank of Kanachukulam- Nalunnakkal Thodu in ward No. 7 of Madappally Panchayath in Changanassery LAC -General Civil Work-
IRR/IA/EST/1375/2022_5_1_1 ORDER No. AS/59D/22
/22628
07-10-2022
2702-03-101-98-03 19,50,000 0
100
MIRPA Revamping and Rejuvenation of LI Schemes Urgent Mechanical and Electrical maintenance work of Tharammal Kadavu Lift Irrigation scheme in Kodiyathur Panchayath Kozhikode district General Civil Work
IRR/IA/EST/442/2023_5_1_1 AS/59D/22/25340
09-03-2023
4702-00-101-89-00-00-00 10,00,000 0
101
GENERAL-Mannoor-MI priority Works-Improvements in Mannoor, Nelliyarathala Elahs in Perumkadavila Panchayath-General Civil Work
IRR/IA/EST/4141/2022_5_1_1 AS/59D/22/25931
29-03-2023
4702-00-101-84-01-00-00 19,00,000 0
102
GENERAL - Protection to the left bank Changalappalam-Manappuzha Manthara Valiya Thodu in ward no - 2 of Velloor Panchyath - General Civil Work-1
IRR/IA/EST/1129/2022_5_1_1 AS/59D/22/26004
30-03-2023
4702-00-101-84-01-00-00 20,00,000 0
103
GENERAL-KARAMANA RIVER BASIN-Construction of bathing ghats and allied works on left bank of Karamana river upstream of Mangattukadavu bridge in Trivandrum district-General Civil Work.
IRR/IA/EST/1883/2022_5_2_1 ORDER No. AS/59D/22
/25757 Dated: 24-03-2023
24-03-2023
2711-01-103-98-34-03-00 28,00,000 0
104
Emergency Work - Urgent rectification works to approach road of Chembikkal Lock cum Bridge in Kuttippuram Panchayath in Kottakkal LAC in Malappuram District
IRR/IA/EST/7697/2022_5_1_1 AS/59D/22/25855
28-03-2023
2702-01-800-94-00-34-3 1,90,000 0
105
GENERAL-Side protection of kuthirappuzha at kolakkandam in Nilambur Municippality - General Civil Work-1
IRR/IA/EST/4762/2022_5_1_1 AS/59D/22/26038
30-03-2023
2702-03-101-98-03-34-03 15,00,000 0
106
Construction of bathing ghats and allied works on left bank of Karamana river upstream of Mangattukadavu bridge in Trivandrum district
IRR/IA/EST/1883/2022_5_2_1 AS/59D/22/25757
24-03-2023
2711-01-103-98-34-03-00 28,00,000 0
107
GENERAL-Improvement of the connection canal between Muttom Chanaganachery canal and Muttar Neelamperoor canal near Kochithra kadavu in Vazhapally panchayath -Desiltation and side protection
IRR/IA/EST/5018/2022 AS/59D/22/25099
17-02-2023
2711-01-103-99-00-34-3 30,00,000 0
108
GENERAL-Annual Maintenance of Kaliyar Pindikayam LI scheme for the year 2022-23- Annual maintenance of Kaliyar Pindikayam LI scheme for the year 2022-23-General Civil Works
IRR/IA/EST/3001/2022_5_1_1 AS/59D/22/22289
26-09-2022
2702-01-800-94-00-34-3 15,00,000 0
109
GENERAL-Annual Maintenance of Marady LI scheme for the year 2022-23-Annual maintenance of Marady LI scheme for the year 2022-23-General Civil work
IRR/IA/EST/3000/2022_5_1_1 AS/59D/22/22406
29-09-2022
2702-01-800-94-00-34-3 15,00,000 0
110
GENERAL-Annual Maintenance of Kayanadu LI scheme for the year 2022-23-Annual maintenance of Kayanadu LI scheme for the year 2022-23-General Civil Work
IRR/IA/EST/3002/2022_5_1_1 AS/59D/22/22432
29-09-2022
2702-01-800-94-00-34-3 15,00,000 0
111
GENERAL-Protection works of thodu-Construction of side protection wall to Kambilikandom - Panamkootty thodu near Kottukkal house in ward no 11 of Konnathady Panchayath-General Civil Work
IRR/IA/EST/6953/2022_5_1_1 AS/59D/22/24746
13-01-2023
2702-03-101-98-03-34-03 18,50,000 0
112
GENERAL-Nadukani-Kozhippilly thodu -Side protection works in ward no 16 of Kothamangalam Municipality-General Civil Work
IRR/IA/EST/9269/2022_5_1_1 AS/59D/22/24810
21-01-2023
2702-03-101-98-03-34-03 16,21,000 0
113
GENERAL-Vazhapuzha maintenance- MIRPA - Improvements to Vazhapuzha LIS in Kollengode Grama Panchayath in Palakkad District-General Civil Work
IRR/IA/EST/8936/2022_5_1_1 AS/59D/22/25161
24-02-2023
4702-00-101-89-00-00-00 15,00,000 0
114
GENERAL-Rennovation of chemmanamthodu lis-Rennovation of Chemmanamthodu LIS in Muthalamada Gramapanchayath.-General Civil Work
IRR/IA/EST/4785/2022_5_1_1 AS/59D/22/25162
24-02-2023
2702-01-800-94-00-34-3 10,50,000 0
115
GENERAL-Thrithala LIS-2022-23-Renovation of left deviation of right main canal in Thrithala Panchayath-General Civil Work
IRR/IA/EST/1735/2022_5_1_1 AS/59D/22/25159
24-02-2023
4702-00-101-89-00-00-00 13,75,000 0
116
GENERAL-Non Plan-Protecting the bank of Azhively thodu near chittar church in ward no. 7 of Karoor Panchayath-General Civil Work-1
IRR/IA/EST/8711/2022_5_1_1 AS/59D/22/24882
28-01-2023
2702-03-101-98-03-34-03 9,00,000 0
117
GENERAL-Project for Maintenenc of LI Scheme 2022-23-Annual maintenance of Vadakara LI scheme - Velloor Panchyath.2022-23 in Vaikom Municipality-General Civil Work
IRR/IA/EST/4185/2022_5_1_1 AS/59D/22/25028
13-02-2023
2702-01-800-94-00-34-3 2,00,000 0
118
GENERAL-LIFT IRRIGATION SCHEME-Annual Maintenance of LI schemes in Kuruppanthara Section for the year 2022-2023-General Civil Work
IRR/IA/EST/5450/2022_5_1_1 AS/59D/22/25549
17-03-2023
2702-01-800-94-00-34-3 8,50,000 0
119
Edappally Somathuram padasekharam P M Construction of a Tractor road for Edappally somathuram padasekharam from Kallupurackal to Chavelikkalam in Ward No 10 of Kainakary panchayath
IRR/KP/EST/2918/2022_5_1_1/RC 1 MIDCgr/2020/275/KP
30-03-2022
2701-15-101-98(18) 50,00,000 0
120
GENERAL-Non Plan-Protecting the bank of Azhively thodu near chittar church in ward no. 7 of Karoor Panchayath-General Civil Work-1
IRR/IA/EST/8771/2022_5_1_1 AS/59D/22/24882
28-01-2023
2702-03-101-98-03-34-03 9,00,000 0
121
Putting up tidal bunds for the year 2022-23 in Chingoli Grama panchayath
IRR/KP/FL/3752/2022 AS/59D/22/23557
08-11-2022
2702-01-800-94-00-34-3 1,52,000 0
122
Putting up tidal bunds for the year 2022-23 near Eruva Sree Krishna Swami Temple across Karippuzha Thodu in Kayamkulam Municipality
AS/59D/22/23610
09-11-2022
2702-01-800-94-00-34-3 12,33,000 0
123
Putting up tidal bunds for the year 2022-2023 at Govinda muttom Regulator in Kayamkulam Municipality
IRR/KP/EST/3726/2022_5_1_1 AS/59D/22/23611
09-11-2022
2702-01-800-94-00-34-3 12,98,000 0
124
Putting up Tidal bund for the year 2022-23 in Kandalloor Panchayath
IRR/KP/EST/2458/2022_5_1_1 AS/59D/22/23498
05-11-2022
2702-01-800-94-00-34-3 3,68,300 0
125
Putting up of Tidal bund for the year 2022-23 in various thodu to protect Ullitta puncha of Cheppad panchayat
IRR/KP/EST/3828/2022_5_1_1 AS/59D/22/23500
05-11-2022
2702-01-800-94-00-34-3 6,64,000 0
126
Putting up Tidal bund for the year 2022-23 , 1 No. Regulator and 3 Nos Cross bund in Pathiyoor Panchayath
IRR/KP/EST/2939/2022_5_1_1 AS/59D/22/23911
26-11-2022
2702-01-800-94-00-34-3 12,73,000 0
127
Putting up of tidal bund for the year 2022-23, 1 No. regulator in Karippuzha thodu near kochupalam in Cheppad panchayat-
IRR/KP/EST/4565/2022_5_1_1 AS/59D/22/23501
05-11-2022
2702-01-800-94-00-34-3 4,74,000 0
128
Putting up tidal bund for the year 2022-23 1 No. regulator in Karippuzha thode to protect Ullittapuncha of Cheppad panchayath
RR/KP/EST/2968/2022_5_1_1 AS/59D/22/23609
09-11-2022
2702-01-800-94-00-34-3 10,03,000 0
129
Putting up tidal bund for the year 2022-23 in Muthukulam panchayath
IRR/KP/EST/5014/2022_5_1_1 AS/59D/22/23571
08-11-2022
2702-01-800-94-00-34-3 2,44,100 0
130
GENERAL-Protection work Perumba thodu -M.I Priority -Improving Irrigation facilities to Perumba Pazhinjam Ela in Ummannoor Panchayath-General Civil Work
IRR/IA/EST/730/2022_5_1_1 AS/59D/22/25669
22-03-2023
4702-00-101-84-01-00-00 10,00,000 0
131
Monsoon Preparedness Urgent rectification works to the damaged shutters of Chittumala Chira
IRR/IA/EST/4127/2022_5_1_1 AS/59D/22/20701
27-07-2022
2702-03-101-98-03 70,000 0
132
GENERAL-Renovation of canals-Left branch canal of Thirumittakode LIS in Thirumittakode Panchayath-General Civil Work
IRR/IA/EST/821/2022_5_1_1 AS/59D/22/25353
10-03-2023
4702-00-101-89-00-00-00 20,00,000 0
133
GENERAL-Renovation of Canals-Main canal of Thirumittakode LIS in Thirumittakode Panchayath-General Civil Work
IRR/IA/EST/820/2022_5_1_1 AS/59D/22/25354
10-03-2023
4702-00-101-89-00-00-00 19,40,000 0
134
GENERAL-PM-Renovation works to Canals of LIS Pallippuram in Ongallur Panchayath - Palakkad District-General Civil Work
IRR/IA/EST/2013/2022_5_5_4 AS/59D/22/25281
06-03-2023
2702-01-800-94-00-34-3 5,00,000 0
135
GENERAL-Kudallur LIS-Urgent maintenance to restart pumping from Kudallur LIS in Anakkara Panchayath-General Civil Work
IRR/IA/EST/7649/2022_5_1_1 AS/59D/22/25142
24-02-2023
2702-01-800-94-00-34-3 5,00,000 0
136
GENERAL-PM 2022-23-Urgent Rectification of Thenkara branch diversion canal near Ch 1/600Km u/s of Anakkatti road crossing in Thenkara GP in Palakkad District-General Civil Work
IRR/IA/EST/4603/2022_5_1_1 AS/59D/22/25351
10-03-2023
2702-01-800-94-00-34-3 21,20,000 0
137
GENERAL-Annual maintenance 2022-23 -of LIS Karalmanna, Cherpulassery municipality, Palakkad district-General Civil Work
IRR/IA/EST/2657/2022_5_1_1 AS/59D/22/22961
15-10-2022
2702-01-800-94-00-34-3 5,30,000 0
138
GENERAL-Construction of temporary bund to facilitate water distribution during pumping season 2022-23 for Meenachil Meenanthara River relinking project in Puthuppally Constituency.-Construction of temporary bund to facilitate water distribution during pumping season 2022-23 for Meenachil Meenanthara River relinking project in Puthuppally Constituency.-General Civil Work
IRR/IA/EST/5766/2022_5_1_1 AS/59D/22/24001
01-12-2022
2702-01-800-94-00-34-3 3,40,000 0
139
GENERAL-Kuttickal thodu ward no 12 of Pampady panchayath-Protecting the banks on the upstream of Kuttickal Bridge-General Civil Work
IRR/IA/EST/7706/2022_5_1_1 AS/59D/22/26039
30-03-2023
4702-00-101-84-01-00-00 15,00,000 0
140
GENERAL-Protecting the sides of Vaniyankeri thodu -to the d/s of Anjalkutty bridge in M.C Road in ward no:18 of Kurichy Panchayath .-General Civil Work-1
IRR/IA/EST/3266/2022_5_1_1 AS/59D/22/26206
31-03-2023
2702-03-101-98-03-34-03 3,80,000 0
141
GENERAL-FD 2022-23-Side protection work to left bank of Machanthodu in Thachampara GP in Palakkad-General Civil Work
IRR/IA/EST/4594/2022_5_1_1 AS/59D/22/25840
28-03-2023
4711-01-103-93(00) 26,00,000 0
142
GENERAL Vanjipuzha Ela MI Priority Improving Irrigation facilities of Vanjipuzha ela near Choorakkodu Junction in ward No 13 of Erathu Panchayath of Adoor Constituency General Civil Work
IRR/IA/EST/383/2023_5_1_1 AS/59D/22/25639
21-03-2023
4702-00-101-84-01-00-00 12,00,000 0
143
GENERAL FD Protection of damaged side bund of Paranthal Valiya thodu near St George Orthodox Aramanappally at Kalarikkal Jn Paranthal in Pandalam Thekkekkara Panchayath General Civil Work
IRR/IA/EST/1657/2022_5_1_1 AS/59D/22/22923
14-10-2022
2702-03-101-98-03-34-03 15,00,000 0
144
GENERAL-MIK/PREMONSOON/2022-02-Premonsoon work - Clearing & Desilting of Ezhamkulam Valiyathodu near Emson Auditorium.-General Civil Work
IRR/IA/EST/2901/2022_5_1_1 G.O.(Rt)No.418/2022
/WRD
19-05-2022
2702-03-101-98-03 80,000 0
145
GENERAL-AM-Odayikkal-P.M-Annual Maintenance works of Odayikkal Regulator Cum Bridge in Mampad Grama Panchayath. Malappuram Dt for the Financial year 2022-2023-General Civil Work
IRR/IA/EST/2537/2022_5_1_1 AS/59D/22/25284
06-03-2023
2702-01-800-94-00-34-3 9,50,000 0

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
MP LBC Urgent rectification works of Kodunthirappully branch canal between ch 5/150km to 5/194km
2020/958/P1  IDMa/2020/958/P1
12-07-2021
2700-02-101-98-00-18-00 2,10,000 0
2
CPP- TMS Engaging labour for removing obstruction during water distribution 2/I Section main canals and branch canals for the year 2021-22
2021/837/P1 IDCr/2021/837/P1
06-09-2021
2700-17-101-98-00-18-00 2,00,000 0
3
CPP - TMS - Urgent rectification works to Polpully branch canal between ch. 0/000 to 0/050Km
2021/836/P1 IDCr/2021/836/P1
07-09-2021
2700-17-101-98-00-18-00 1,00,000 0
4
CPP- TMS Engaging labour for removing obstruction during water distribution 2/I Section main canals and branch canals for the year 2021-22
2021/837/P1 IDCr/2021/837/P1
06-09-2021
2700-17-101-98-00-18-00 2,00,000 0
5
CPP-TMS Annual maintenance of Venkalakayam eri for the year 2021-22
2021/674/P1 IDCr/2021/674/P1
20-07-2021
2700-17-101-98-00-18-00 2,00,000 0
6
CPP - TMS - Engaging labour for removing obstruction during water distribution 1/1 section main canals and branch canals for the year 2021 - 22
2021/673/P1 IDCr/2021/673/P1
20-07-2021
2700-17-101-98-00-18-00 1,50,000 0
7
CPP-TMS-Annual maintenance of TMS- main canal between ch.0/000 to 5/500 Km for the year 2021-22
2021/670/P1 IDCr/2021/670/P1
13-08-2021
2700-17-101-98-00-18-00 4,00,000 0
8
GPS 1-RBC-2020-Maintenacne of RB Main Canal between Chainage0/000km to3/000 km.( Jungle clearence and silt removal)
2021/681/P1 IDCr/2021/681/P1
20-07-2021
2700-05-101-98-00-18-00 2,00,000 0
9
GPS 1-RBC-2020-Maintenacne of RB Main Canal between Chainage 6/000km to 9/000 km.(Jungle clearence and silt removal)
2021/683/P1 IDCr/2021/683/P1
20-07-2021
2700-05-101-98-00-18-00 2,00,000 0
10
GPS 1-RBC-2020-Maintenacne of RB Main Canal between Chainage 6/000km to 9/000 km.(Jungle clearence and silt removal)
2021/683/P1 IDCr/2021/683/P1
20-07-2021
2700-05-101-98-00-18-00 2,00,000 0
11
GPS 1-RBC-2020-Maintenacne of RB Main Canal between Chainage 9/000km to 12/000 km.(Jungle clearence and silt removal)
2021/684/P1 IDCr/2021/684/P1
20-07-2021
2700-05-101-98-00-18-00 2,00,000 0
12
GPS 1-RBC-2020-Maintenacne of RB Main Canal between Chainage 12/000km to 15/000 km.(Jungle clearence and silt removal)
2021/685/P1 IDCr/2021/685/P1
20-07-2021
2700-05-101-98-00-18-00 2,00,000 0
13
GPS1 - RBC - 2020 - Engaging Man mazdoor km during water distribution for removing weeds, debris, wastage and wooden shutter fixing , bund removing in puliyamthoni Ana, RB canal and branch canal
2021/686/P1 IDCr/2021/686/P1
20-07-2021
2700-05-101-98-00-18-00 70,000 0
14
GPS 1 - Annual maintanance of LB main canal between ch:0/000km to 10/000km for the year 2021-2022
2021/688/P1 IDCr/2021/688/P1
13-08-2021
2700-05-101-98-00-18-00 4,50,000 0
15
GPS II - Annual maintanance of LB main canal between ch:10/000km to 20/581km for the year 2021-2022
2021/834/P1 IDCr/2021/834/P1
03-09-2021
2700-05-101-98-00-18-00 4,00,000 0
16
GPS 1 - Engaging DLR labour for removing debrises and floating material from canal during water distribution and rainy season from LB main canal between ch:10/000km to ch:20/581km,Nandankizhaya, Kizhakkethara, Kollengode, Payalur, Perungottukkavu and Karimkulam branch canals for the year 2021-22
2021/677/P1 IDCr/2021/677/P1
27-08-2021
2700-05-101-98-00-18-00 75,000 0
17
MP-RBC-Emergency Works- Urgent rectification works to the breached portion of RB main canal bt ch. 31/450 to 31/550 km
2017/630/P1 IDMa/2017/630/P1
23-12-2017
2700-02-101-98-00-18-00 70,000 0
18
CPP - TMS - Annual maintenance of TMS main canal between Ch. 5/500 and 9/900 Km for the year 2021 - 2022
2021/828/P1 IDCr/2021/828/P1
11-08-2021
2700-17-101-98-00-18-00 3,00,000 0
19
CPP - TMS - Annual maintenance of Vakkode branch, College distributory, Mayankulam, Muthukad, Karukamani, for the year 2021 - 2022
2021/829/P1 IDCr/2021/829/P1
13-08-2021
2700-17-101-98-00-18-00 3,50,000 0
20
KyIP-Monsoon preparedness-2021-22-Removal of silt from UT at ch:22/200km of RBMC
2021/505/P1 KYIPDPa/2021/505/P1

24-05-2021
2700-13-101-98-00-18-00 40,000 0
21
KyIP-Monsoon preparedness-2021-22-Removal of silt from UT at ch:23/550km of RBMC
2021/509/P1 KYIPDPa/2021/509/P1

24-05-2021
2700-13-101-98-00-18-00 40,000 0
22
KyIP-Monsoon preparedness-2021-22-Removal of silt from UT at ch:23/700km of RBMC
2021/510/P1 KYIPDPa/2021/510/P1

24-05-2021
2700-13-101-98-00-18-00 40,000 0
23
KyIP-Monsoon preparedness-2021-22-Removal of silt from UT at ch:26/700km of RBMC
2021/508/P1 KYIPDPa/2021/508/P1

24-05-2021
2700-13-101-98-00-18-00 40,000 0
24
KyIP 2021 MONSOON- PREPAREFNESS- Removal of silt from UTs between ch 0/500 to 1/500 km in Velom BC
2021/525/P1 KYIPDPa/2021/525/P1

24-05-2021
2700-13-101-98-00-18-00 30,000 0
25
MP-Dam-Maintenance of Spillway Shutter (Mechanical Work)
2021/116/MH IMDmpa/2021/116/MH
11-08-2021
2700-02-101-98-00-18-00 2,00,000 0
26
KYIP 2021 MONSOON PREPAREDNESS - Silt removal in 2 Nos. UT between ch 36/000 to 40/000 km in LBMC
2021/524/P1 KYIPDPa/2021/524/P1

24-05-2021
2700-13-101-98-00-18-00 35,000 0
27
KyIP 2021 Monsoon Preparedness - Silt removal in 3 Nos. UT between ch 0/000 to 4/600 km in Thiruvalloor Distributory
2021/522/P1 KYIPDPa/2021/522/P1

24-05-2021
2700-13-101-98-00-18-00 35,000 0
28
WP-2021-22-Urgent rectification works to the field channel of Sluice No.3 of Vengodi branch canal in between Ch. 0/070 km to 0/200 km. ( Eliyapadam field channel).
2021/273/P1 IDCr/2021/273/P1
30-11-2021
2700-03-101-98-00-18-00 49,50,000 0
29
Monsoon preparedness - Urgent repair works to spillway motors, starters, electrical installation and providing spillway lights at Walayar Dam.
2021/621/P1 IDCr/2021/621/P1
08-09-2021
2700-03-101-98-00-18-00 1,58,000 0
30
CPP-MLIS-Urgent repair works to 150 Hp motor pump sets at Meenakshipuram LIS No.1 and 2 for the year 2021-2022.
2021/433/P1 IDCr/2021/433/P1
25-09-2021
2700-17-101-98-00-18-00 3,00,000 0
31
GPS - I - Improvement to Tourism Facilities in Meenkara Dam
2021/761/P1 IDCr/2021/761/P1
14-02-2022
2700-80-800-98(00) 8,60,800 0
32
GPS1 -RBC- Rectification works tp Pallassena distributary between Ch. 1/160km to 1/240 km
2022/272/P1 IDCr/2022/272/P1
16-03-2022
2700-05-101-98-00-18-00 4,70,000 0
33
GPS1 - RBC-Rectification works to RBMC at Ch.11/800 km , rectification works to drop at ch.1/844km and side wall between ch. 1/850km to 1/900km in Oottara distributary.
2022/275/P1 IDCr/2022/275/P1
16-03-2022
2700-05-101-98-00-18-00 5,00,000 0
34
GPS II- Rectification works of field channel ( Poruthankode) between ch. 0/100km to 0/350km that offtakes from the 6/175 km (LHS ) of Kollengode branch canal in Elavenchery grama panchayat.
2022/332/P1 IDCr/2022/332/P1
16-03-2022
2700-05-101-98-00-18-00 6,50,000 0
35
GPS 1- Urgent rectification works of LB main canal between ch. 7/950km to 8/100 km.
2022/289/P1 IDCr/2022/289/P1
16-03-2022
2700-05-101-98-00-18-00 6,00,000 0
36
GPS 1- Urgent rectification and shutter fixing work of Poonthaonichalla anicurt and rectification works of Poonthonichalla branch canal between Ch. 0/000 and 0/800 km.
2022/288/P1 IDCr/2022/288/P1
16-03-2022
2700-05-101-98-00-18-00 10,00,000 0
37
CPP - MLBC - Urgent rectification works to Ayyappankavu Branch canal between Ch. 0/000 km to 0/130 km.
2022/359/P1 IDcr/2022/359/P1
26-03-2022
2700-17-101-98-00-18-00 4,00,000 0
38
CPP - MLBC - Providing trash guard and enhancing height of Koduvayur distributory at Ch. 0/250 km.
2022/360/P1 IDCr/2022/360/P1
26-03-2022
2700-17-101-98-00-18-00 3,56,000 0
39
CPP - MLBC - Urgent rectification work to the breached portion of Vilayanchathannur branch canal at Ch. 6/000 km.
2022/361/P1 IDCr/2022/361/P1
26-03-2022
2700-17-101-98-00-18-00 3,50,000 0
40
CPP - MLBC - Renovation of field channel offtakes from Koduvayur branch canal 0/850 km between ch.0/220 km to 0/370 km at Chembothukulambu.
2022/362/P1 IDCr/2022/362/P1
26-03-2022
2700-17-101-98-00-18-00 8,00,000 0
41
CPP MRBC Rectification to Angarath Canal from Ch. 4/200 km to 4/700 km including demolishing of up stream and d/s canal covering slab and removal of waste from culvert across Palakkad Pollachi road
2022/383/P1 IDCr/2022/383/P1
30-03-2022
2700-17-101-98-00-18-00 7,50,000 0
42
CPP MLBC Renovation and Modernization of field channel offtakes from ch 23/100km of MLBC (RHS)
2022/363/P1 IDCr/2022/363/P1
26-03-2022
2700-17-101-98-00-18-00 7,30,000 0
43
CPP MLBC Urgent rectification works to the damaged portion of Kambalathara distributory between ch 0/350km to 0/370km and ch 0/910km to 0/940km
2022/367/P1 IDCr/2022/367/P1
26-03-2022
2700-17-101-98-00-18-00 3,70,000 0
44
CPP MLBC Urgent rectification works to Karikulam distributory between ch 0/670km to 0/720km
2021/1131/P1 IDCr/2021/1131/P1
26-03-2022
2700-17-101-98-00-18-00 4,70,000 0
45
CPP - MLBC - Urgent Rectification works to Vembra Branch canal between Ch.2/800 km to 2/900 km.
2021/1130/P1 IDCr/2021/1130/P1
29-03-2022
2700-17-101-98-00-18-00 4,70,000 0
46
KPIP Action plan Lighting arrangement for approach road for Police Aid Post
2022/218/P1 KPIPDKa/2022/218/P1

25-03-2022
2700-18-101-98-00-18-00 1,30,000 0
47
CPPMLBC-urgent rectification works to Edayankulambu branch canal between ch 1990 m to ch 2100 m
2021/1129/P1 IDCr/2021/1129/P1
29-03-2022
2700-17-101-98-00-18-00 13,60,000 0
48
CPPMLBCUrgent rectification works to Old Arampadam Distributory between ch.1000m and 1900m
2021/1142/P1 IDCr/2021/1142/P1
29-03-2022
2700-17-101-98-00-18-00 10,86,000 0
49
CPPMLIS Rectification works to Karupputhuraikkadu branch canal between ch. 230 and 330 m.
2021/427/P1 IDCr/2021/427/P1
30-03-2022
2700-17-101-98-00-18-00 13,40,000 0
50
CPP TMS Rectification works to the Thernapallam branch canal between ch 0/000 km and 0/100 km
2022/368/P1 IDCr/2022/368/P1
30-03-2022
2700-17-101-98-00-18-00 1,48,000 0
51
CPP TMS AM Demarcation of canal boundary and fixing the boundary stones for the year 2022 23
2022/31/P1 IDCr/2022/31/P1
31-03-2022
2700-17-101-98-00-18-00 5,50,000 0
52
KyIP ACP NP 2021 22 Annual maintenance of Kodassery Sub Distributory various chainages fromCh 0 000 and 0 650 Km from 1 300 to 2 500 Km from 2 500 to 3 160 Km desilting of Ulliyeri sub distributory from 0 000 to tail end Mundoth FB from 0 000 to 0 800 Km Ullur FB from 0 000 to tail end Modakkallur FB Puthoorvattom and Theruvathkadavu FB
2022/129/P1 KYIPDPa/2022/129/P1

04-03-2022
2700-13-101-98-00-18-00 4,20,000 0
53
KyIP ACP NP 2021 22 Rectification works for Annassery aqueduct near ch 0 100 Km and between ch 0 100 and 0 800 Km of Annassery FB
2021/1226/P1 KYIPDPa/2021/1226/P
1
04-01-2022
2700-13-101-98-00-18-00 7,50,000 0
54
KYIP NP 2021 22 Rectification work to Naduvathur branch canal between ch 01 00 to 01 200km
2021/886/P1 KYIPDPa/2021/886/P1

04-01-2022
2700-13-101-98-00-18-00 5,00,000 0
55
KyIP ACP NP 2021 22 Clearing jungle and desilting of Kakkodi Branch Canal at ChL 5 650 and 5 850 km 7 650 and 7 700 and 7 900 and 8 000 km and Rectification works in between Ch 8 650 and 8 800 km of KBC
2021/889/P1 KYIPDPa/2021/889/P1

30-12-2021
2700-13-101-98-00-18-00 5,45,000 0
56
KyIP ACP NP 2021 22 Emergency Labour engaging for removing obstacles during water distribution period
2021/921/P1 KYIPDPa/2021/921/P1

23-12-2021
2700-13-101-98-00-18-00 3,00,000 0
57
KyIP ACP NP 2021 22 Urgent rectification works to LBMC between CH 9 300KM TO 9 500KM
2019/1813/P1 KYIPDPa/2019/1813/P
1
04-01-2022
2700-13-101-98-00-18-00 3,00,000 0
58
KyIP ACP NP 2021 22 Rectification of Nadakutazha distributary canal between ch 0 400 km to ch 0 600 km
2021/878/P1 KYIPDPa/2021/878/P1

23-12-2021
2700-13-101-98-00-18-00 3,50,000 0
59
CPP TMS Rectification works to the damages of Chenamooli distributory canal between Ch 0/540 Km and 0/555 Km
2022/382/P1 IDCr/2022/382/P1
30-03-2022
2700-17-101-98-00-18-00 2,00,000 0
60
CPP TMS AM Rectification works to the damages of Panayur branch canal between Ch 0/550 KM to 0/750 KM
2022/381/P1 IDCr/2022/381/P1
30-03-2022
2700-17-101-98-00-18-00 3,00,000 0
61
KPIP-Monsoon Preparedness work-Urgent canal cleaning of Karumanamkurissi between Ch:1/200km to 1/550km and kulakkad distributary between ch:1/800km to 2/100km
IRR/PI/FL/5556/2022 AS/59D/22/21923
12-09-2022
2700-18-101-98-00-18-00 55,000 0
62
GENERAL-KPIP-AM- Jungle clearance, desilting removal of slipped earth ,floating bodies and minor rectification works to RBMC- in kanhirapuzha and thenkara grama panchayathsfor the year 2022-23-General Civil Work
IRR/P1/EST/3327/2022_5_1_1 AS/59D/22/21299
16-08-2022
2700-18-101-98-00-18-00 1,00,000 0
63
KPIP-AM-Jungle clearance desilting removing of slipped earth floating bodies and minor rectification works to Pallikurup and Chooriyode distributory
IRR/PI/EST/3364/2022_5_1_1 AS/59D/22/21294
16-08-2022
2700-18-101-98-00-18-00 1,00,000 0
64
GENERAL MP LBC Monsoon preparedness for Ch 0.000 km to 12.800 km of Chulannur canal along with its branches and 0.000 to TD of Kurissi Pampadi canal its branches and its all field bothies General Civil Work
IRR/PI/EST/6057/2022_5_1_1 AS/59D/22/21786
31-08-2022
2700-02-101-98-18-00-00 99,000 0
65
GENERAL-MP-LBC- Monsoon preparedness for -Ch 12/800 km to TD of Chulannur canal along with its branches and its all field bothies.-General Civil Work
IRR/PI/EST/6057/2022_5_2_1 AS/59D/22/21790
31-08-2022
2700-02-101-98-18-00-00 99,000 0
66
GENERAL-MP-LBC- Monsoon Preparedness-For Peringottukurussi main canal Ch 13/350Km to 24/000Km, Pullinelli Branch canal, Kottayi 1 and 2 Branch Canal, Bemmanore Branch Canal, Paruthipully Branch Canal and its field Channels-General Civil Work
IRR/PI/EST/6191/2022_5_2_1 AS/59D/22/21793
31-08-2022
2700-02-101-98-18-00-00 98,000 0
67
GENERAL-MP-LBC- Monsoon Preparedness-For Peringottuttukurussi main canal Ch 0/000Km to 13/350Km, Kannadi 1,2 and 3 Branch canal,Kannanoor Branch Canal,Odanoor Branch Canal, Thaneerangade Branch Caanal, Chenganiyoor 1 and 2 Branch canal and its Field Channels.-General Civil Work
IRR/PI/EST/6191/2022_5_1_1 GENERAL-MP-LBC- Mon
soon Preparedness-For Peringott
31-08-2022
2700-02-101-98-18-00-00 98,000 0
68
GENERAL-MP-LBC- Monsoon preparedness for-Erimayur branch canal ch 8/600km to TD, Kunissery No 1,2,3, Pallavur No 2, Manjalur, Vemballur, Kuthanur branch No 1,2, Pudukkode, Kuzhalmannam branch canal and its all field bothies-General Civil Work
IRR/PI/EST/6058/2022_5_2_1 AS/59D/22/21791
31-08-2022
2700-02-101-98-18-00-00 99,000 0
69
GENERAL-MP-LBC- Monsoon preparedness for-LB Main canal ch 20/200km to 31/600km, Ethanur, Koduvayur, Kakkayur, Pallavur No 1, Kudallur, Kunissery No 4, Erimayur branch canal 0/000km to 8/600km and its all field bothies-General Civil Work
IRR/PI/EST/6058/2022_5_1_1 AS/59D/22/21792
31-08-2022
2700-02-101-98-18-00-00 99,000 0
70
GENERAL-MP-LBC-Monsoon Preparedness-For LBC Main Canal Ch 0/300Km to 10/000Km, Kottekkad 1 and 2 Branch Canal, Puthur Branch Canal, Edathara Branch canal and its field Channels-General Civil Work
IRR/PI/EST/6179/2022_5_2_1 AS/59D/22/21782
31-08-2022
2700-02-101-98-18-00-00 99,000 0
71
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Annual Maintenance of LB Main canal from Ch 0/300Km to 10/000Km for the year 2022-23-General Civil Work
IRR/PI/EST/3192/2022_5_2_1 AS/59D/22/20897
04-08-2022
2700-02-101-98-18-00-00 5,40,000 0
72
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Annual Maintenance of LB Main canal from Ch 10/000Km to 20/200Km for the year 2022-23-General Civil Work
IRR/PI/EST/3192/2022_5_5_5 AS/59D/22/20936
05-08-2022
2700-02-101-98-18-00-00 5,40,000 0
73
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC-Annual maintenance of LBMC from ch 20/200km to 31/600km for the year 2022-2023-General Civil Work
IRR/PI/EST/4208/2022_5_2_1 AS/59D/22/20874
04-08-2022
2700-02-101-98-18-00-00 8,00,000 0
74
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Urgent Rectification Works to LB Main canal from Ch 0/300 Km to 20/200Km and its branches for maintaining canals, Engaging Pump operators and assistants to pump house and Urgent repairs to pumps and motors for maintaining the water distribution under Palakkad Section for 2022-23- General Civil Work
IRR/PI/EST/3192/2022_5_1_1 AS/59D/22/21743
31-08-2022
2700-02-101-98-18-00-00 5,10,000 0
75
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Urgent Rectification Works of Kodunthirapully Branch Canal between Ch 7/293Km to Ch 7/318Km - General Civil Work
IRR/PI/EST/3192/2022_5_8_6 AS/59D/22/21744
31-08-2022
2700-02-101-98-18-00-00 4,00,000 0
76
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Annual Maintenance of Edathara Branch Canal from Ch 0/000Km to 3/850Km and Urgent removal of water borne plants and weeds and maintaining Edathara branch canal from Ch 0/000Km to TD for 2022-23-General Civil Work
IRR/PI/EST/3192/2022_5_10_9 AS/59D/22/20898
04-08-2022
2700-02-101-98-18-00-00 6,50,000 0
77
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Annual maintenance of Pirayiri branch canal from Ch 1/200Km to 5/200Km and Puthur branch canal from Ch 0/000Km to TD for 2022-23-General Civil Work
IRR/PI/EST/3192/2022_5_4_3 AS/59D/22/22185
19-09-2022
2700-02-101-98-18-00-00 3,00,000 0
78
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Annual Maintenance of Kodunthirapully Branch canal from Ch 0/000Km to Ch 7/000 Km and urgent removal of water born plants and weeds and maintaining Kodunthirapully branch canal from Ch 0/000 Km to TD for 2022-23-General Civil Work
IRR/PI/EST/3192/2022_5_6_7 AS/59D/22/20880
04-08-2022
2700-02-101-98-18-00-00 6,50,000 0
79
GENERAL-MP-LBC-MS-ANNUAL MAINTENANCE -2022-23-MP-LBC-Maintaining peringottukurussi canal and its branches maintaining water distribution ,urgent rectification works, removal of garbages, restoration of branches for maintaining water distribution cutting of fallen and dangerous trees and branches etc for 2022-23-General Civil Work
IRR/PI/EST/3221/2022_5_7_2 AS/59D/22/22218
22-09-2022
2700-02-101-98-18-00-00 3,75,000 0
80
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC-Removal of obstructions and providing arrangements for ensuring smooth water distribution, placing name board in all NH, SH, MDR, ODR &amp major junction, cutting of dangerous branches/trees and other works of LBMC from ch 20/200km to TD and its all branches under Koduvayur section including Kuthanur branch canal for the year 2022-23-General Civil Work
IRR/PI/EST/4208/2022_5_1_1 AS/59D/22/21525
22-08-2022
2700-02-101-98-18-00-00 5,25,000 0
81
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC- Urgent rectification Works to the UT leak correction in bet ch 24/000km to 24/150km of LB Main canal-General Civil Work
IRR/PI/EST/4208/2022_5_3_2 AS/59D/22/21175
11-08-2022
2700-02-101-98-18-00-00 5,00,000 0
82
GENERAL-ES- ANNUAL ACTION PLAN 2022-23-MP-LBC-Removal of all obstruction and providing arrangements for ensuring smooth water distribution, cutting of dangerous branches/trees and other works between ch 0/000 to 12/800km of chulannur canal along with its branches and 0/000 to TD of kurissi canal and its branches for the year 2022-23-General Civil Work
IRR/PI/EST/4163/2022_5_2_1 AS/59D/22/22184
19-09-2022
2700-02-101-98-18-00-00 3,00,000 0
83
GENERAL-ES- ANNUAL ACTION PLAN 2022-23-MP-LBC-Removal of all obstruction and providing arrangements for ensuring smooth water distribution, cutting of dangerous branches/trees and other works between ch 12/800 to TD of chulannur canal and its branches for the year 2022-23-General Civil Work
IRR/PI/EST/4163/2022_5_3_2 AS/59D/22/22183
19-09-2022
2700-02-101-98-18-00-00 3,00,000 0
84
GENERAL-MP-LBC-MS-ANNUAL MAINTENANCE -2022-23-MP-LBC-Urgent rectification works to the weak and vulnerable portion of canal between ch 12/800 km to12/900 km of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3221/2022_5_6_3 AS/59D/22/22027
15-09-2022
2700-02-101-98-18-00-00 5,50,000 0
85
GENERAL-MP-LBC-MS-ANNUAL MAINTENANCE -2022-23-MP-LBC-Urgent Rectification works to the weakand vulnerable portion of canal between ch. 6/920 km to 7/000 km of Odanur branch canal of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3221/2022_5_4_5 AS/59D/22/22029
15-09-2022
2700-02-101-98-18-00-00 6,10,000 0
86
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC- Urgent rectification works to the weak and vulnerable portion of the canal bund in bet ch 4/950km to TD of Pallavur branch canal-General Civil Work
IRR/PI/EST/4208/2022_5_7_6 AS/59D/22/21526
22-08-2022
2700-02-101-98-18-00-00 6,25,000 0
87
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC- Urgent rectification works to the weak and vulnerable portion of the canal bund in bet ch 12/100 km to 12/600 km of Kuthanur branch canal-General Civil Work
IRR/PI/EST/4208/2022_5_5_4 AS/59D/22/22014
15-09-2022
2700-02-101-98-18-00-00 5,50,000 0
88
GENERAL-KS- ANNUAL ACTION PLAN 2022-23-MP-LBC- Urgent rectification works to the weak and vulnerable portion of the canal bund in bet ch 9/800 km to 10/100 km of Erimayur branch canal.-General Civil Work
IRR/PI/EST/4208/2022_5_4_3 AS/59D/22/21529
22-08-2022
2700-02-101-98-18-00-00 5,50,000 0
89
GENERAL-MP-LBC-KS-URGENT BRANCH km and Koduvayur branch canal from ch 0/000km to 2/939km for 2nd(2022-23) and Ist crop(2023-24) water distribution. CANAL CLEANING WORKS 2022- MPLBC - Urgent canal cleaning works of Ethanur branch canal from ch 0/000km to 2/650km, Kakkayur branch canal from ch 0/000km to 1/938-General Civil Work
IRR/PI/EST/8641/2022_5_2_1 AS/59D/22/23895
25-11-2022
2701-02-101-98-00-00-18 4,20,000 0
90
GENERAL-CANAL CLEANING WORKS-ANNUAL MAINTENANCE OF PERINGOTTUKURISSI BRANCH CANAL CH 0/000KM TO CH 8/000KM FOR 2ND AND 1ST CROP WATER DISTRIBUTION-General Civil Work
IRR/PI/EST/8637/2022_5_1_1 AS/59D/22/23899
25-11-2022
2700-02-101-98-18-00-00 4,70,000 0
91
GENERAL-CANAL CLEANING WORKS UNDER PANCHAYATH AREA-MP-LBCANNUAL MAINTENANCE OF KADALAKURUSSI BRANCH CANAL CH 0/000KM TO CH 8/400KM IN KANNADI PANCHAYATH FOR 2ND AND 1ST CROP WATER DISTRIBUTION-General Civil Work
IRR/PI/EST/8602/2022_5_4_3 AS/59D/22/23896
25-11-2022
2700-02-101-98-18-00-00 5,00,000 0
92
GENERAL-CANAL CLEANING WORKS-ANNUAL MAINTENANCE OF PERINGOTTUKURISSI BRANCH CANAL CH 8/000KM TO CH 16/000KM FOR 2ND AND 1ST CROP WATER DISTRIBUTION-General Civil Work
IRR/PI/EST/8637/2022_5_2_1 AS/59D/22/23900
25-11-2022
2700-02-101-98-18-00-00 0,.45 0
93
GENERAL-MP-LBC-KS-URGENT BRANCH CANAL CLEANING WORKS 2022- MPLBC - Urgent canal cleaning works of Pallavur branch canal from ch 0/000 km to 5/550 km for 2nd(2022-23) and Ist crop(2023-24) water distribution. -General Civil Work
IRR/PI/EST/8641/2022_5_3_2 AS/59D/22/23916
26-11-2022
2700-02-101-98-18-00-00 2,75,000 0
94
GENERAL-MP-LBC-KS-URGENT BRANCH CANAL CLEANING WORKS 2022- MPLBC - Urgent canal cleaning works of Erimayur branch canal from ch 0/000 km to 15/035 km for 2nd(2022-23) and Ist crop(2023-24) water distribution.-General Civil Work
IRR/PI/EST/8641/2022_5_1_1 AS/59D/22/23897
25-11-2022
2700-02-101-98-18-00-00 7,70,000 0
95
GENERAL-CANAL CLEANING WORKS-ANNUAL MAINTENANCE OF PERINGOTTUKURISSI BRANCH CANAL CH 16/000KM TO CH 24/200KM 2ND AND 1ST CROP WATER DISTRIBUTION-General Civil Work
IRR/PI/EST/8637/2022_5_3_2 AS/59D/22/23898
25-11-2022
2700-02-101-98-18-00-00 4,60,000 0
96
GENERAL-MP-LBC-MS-ANNUAL MAINTENANCE -2022-23-MP-LBC-Urgent rectification works to the works to the weak and vulnerable portion of canal between ch 18/250km to 18/350km of perigottukurussi canal.-General Civil Work
IRR/PI/EST/3221/2022_5_3_6 AS/59D/22/22030
15-09-2022
2700-02-101-98-18-00-00 10,00,000 0
97
GENERAL-ES- ANNUAL ACTION PLAN 2022-23-MP- LBC - Rectification works to the canal between Ch. 11/650 km to 11/750 km of Chulannur canal.-General Civil Work
IRR/PI/EST/4163/2022_5_5_4 AS/59D/22/21523
22-08-2022
2700-02-101-98-18-00-00 4,00,000 0
98
GENERAL-ES- ANNUAL ACTION PLAN 2022-23-MP-LBC-Rectification works to sluice offtake from Ch.14/080 of Chulannur canal-General Civil Work-1
IRR/PI/EST/4163/2022_5_1_1 AS/59D/22/22219
22-09-2022
2700-02-101-98-18-00-00 3,50,000 0
99
GENERAL-MP-LBC-MS-ANNUAL MAINTENANCE -2022-23-MP- LBC-Urgent Rectification works to the weak and vulnerable portion of canal between ch .15/790 Km to 15/840 Km (flume type canal encasing and top grill)of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3221/2022_5_2_1 AS/59D/22/22031
22-09-2022
2700-02-101-98-18-00-00 5,00,000 0
100
Walayar Project- Monsoon Preparedness- 2022-2023-Urgent temporary rectification works of breached , weak and vulnerable canal bunds under Walayar Canal Section, Para.
IRR/PI/EST/5778/2022_5_1_1 AS/59D/22/21479
20-08-2022
2700-03-101-98-00-18-00 3,26,000 0
101
WP-Annual maintenance for 2022-2023 - Clearing and Removing grass, jungle and Silt for Nettu iyer canal between Ch.0/000 km to 6/000 km (including Neelippara and Naduchaal branches upto tail ends) and Vadassery canal between Ch. 0/000 km to 5/000 km (tail end).
IRR/PI/EST/4824/2022_5_1_1 AS/59D/22/21033
08-08-2022
2700-03-101-98-00-18-00 2,70,000 0
102
WP-2022-2023 -Urgent works for clearing weeds and Obstructions , during the water distribution , Emergenycey Tree cutting , Emergencey bund Strengthening using earth bags etc for various Canals under Walayar canal section,Para.
IRR/PI/EST/4819/2022_5_1_1 AS/59D/22/20996
06-08-2022
2700-03-101-98-00-18-00 1,25,000 0
103
WP-Annual maintenance for 2022-2023 - Clearing and Removing grass, jungle and Silt for Thattan Canal in between Ch.0/000 km to 3/500 km(tail end) and Kovilakam Canal in between Ch.0/000 km to 0/800 km (tail end).
IRR/PI/EST/4816/2022_5_1_1 AS/59D/22/20997
06-08-2022
2700-03-101-98-00-18-00 2,50,000 0
104
GENERAL-ES- ANNUAL ACTION PLAN 2022-23-MP- LBC - Rectification works to sluice no.52 offtake from Ch. 24/460 km of Chulannur canal.-General Civil Work
IRR/PI/EST/4163/2022_5_7_6 AS/59D/22/21522
22-08-2022
2700-02-101-98-18-00-00 3,50,000 0
105
GENERAL-MP-LBC-PS-ANNUAL MAINTENANCE-2022-23-MP-LBC Urgent Rectification works of Edathara Branch canal between Ch 3/970 Km to Ch 3/995 Km-General Civil Work
IRR/PI/EST/3192/2022_5_7_4 AS/59D/22/24928
02-02-2023
2700-02-101-98-18-00-00 2,50,000 0

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
KIP (RB)- Mukkutmon distributory Rectification work for preventing leakage from Ch. 75m to 200m and repairing shutter at the off take point.
2018/1166/P2 KIPRBDII/2018/1166/
P2
30-03-2019
2700-27-101-98-00-18 4,08,900 0
2
PVIP Rectification works Side protection to the left bund of canal at ch 0/85 km of Pariyaram MD
2019/2881/P2 PVIPDII/2019/2881/P
2
20-03-2020
2700-01-101-98-00-18 3,65,000 0
3
NIP-Garden Maintenance of Neyyar Dam for the year 2020-21
2020/5729/IA IDTvm/2020/5729/IA
14-12-2020
2700-11-101-98-00-18 10,00,000 0
4
NIP-Annual maintenance-Periodical maintenance of waste materials and garbage from LB & RB main Canals (0 to 17000m each) and 5 branch canals under Neyyar Dam Section for one year
2020/5725/IA IDTvm/2020/5725/IA
03-02-2021
2700-11-101-98-00-18 2,00,000 0
5
PIP LBC Rectification and Maintanance of Chingoli south distributory and crossing slab at Arunappuram
2018/1065/P2 885/2018/WRD
05-12-2018
2700-16-101-98-00-18 170 0
6
PIP LBC Urgent rectification works to Karthikapally 3rd distributary between ch 500m and 1000m
2018/1105/P2 885/2018/WRD
05-12-2018
2700-16-101-98-00-18 1,70,27,800 0
7
PVIP Annual maintenance of Muthankuzhi FC for the year 2021 22
2021/653/P2 PVIPDI/2021/653/P2
07-06-2021
2700-01-101-98-00-18 1,00,000 0
8
PIP RBC Urgent Rectification work of Section office at Eraviperoor
2019-1223-P2 PIPD-2019-1223-P2
17-02-2020
2700-16-101-98-00-18 5,28,000 0
9
KIP(LB)- Annual Maintenance of canals - Removal of floating bodies from Kulakkada Branch Canal from Ch 4000m to 21725m Cherumanadu Distributory, Attuvaserry Distributory, Mylamkulam Distributory Thenguvila Distributory and Thazhathu Kulakkada Distributory in connection with water distribution f
2021/786/P2 KIPLBDV/2021/786/P2

13-08-2021
2700-27-101-98-00-18 3,00,000 0
10
PVIP - Filling in slipped portion of Maramangalam MD at Ch: 250m
2021/1146/P2 PVIPD1/2021/1146/P2

02-09-2021
2700-01-101-98-00-18 1,70,000 0
11
PIP-Annual maintenance to PIP Main cana froom ch:15000m 19168m for the year 2021-22
2021/515/P2 PIPD/2021/515/P2
27-05-2021
2700-16-101-98-00-18 3,70,000 0
12
PIP- Annual maintenance to PIP Main canal from CH:10000m to 15000m for the year 2021-22
2021/514/P2 PIPD/2021/514/P2
19-05-2021
2700-16-101-98-00-18 3,70,000 0
13
PVIP Providing temparary support to the existing RCC hume pipes providedd by Alangad Panchayath(2020) in Varappuzha branch canal at Ch 1.50 KM
2021/585/P2 PVIPDII/2021/585/P2

20-04-2021
2700-01-101-98-00-18 5,80,000 0
14
KIP(LB) Annual maintenance of canal-Removal of floating bodies from Kulakkada Branch Canal ch 0m to 4000m,Maravoor Distributory and Maravoor Minor Distributory in connection With water distribution for the year 2021-2022
2021/788/P2 KIPLBDV/2021/788/P2

13-08-2021
2700-27-101-98-00-18 2,30,000 0
15
KIP LB SbDn 13 Kollam Urgent rectification work of Chavara distributary from ch 9800 to 9845m
2021/126/P2 KIPLBDV/2021/126/P2

14-09-2021
2700-27-101-98-00-18 2,60,000 0
16
NIP - Restoration of Peruvilakam field boothy and otherallied works between Ch: 1000m to tailend.
2021/4074/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
17
NIP Prevention of leakage near Ch 7000m of Marukil Branch canal
2021/4078/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 9,00,000 0
18
PVIP Annual Maintenance engaging labour for clearing and cleaning obstructions in canal under Aluva Sub division No:4 in Water distribution during the year 2021-22
2021/834/P2 PVIP D11/2021/103/P
2
04-06-2021
2700-01-101-98-00-18 1,00,000 0
19
NIP Prevention of leakage near Ch 4500m of Chowara Branch canal
2021/4079/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 0
20
C.R.D- Scheme-Upkeeping of head regulator of LBMC at Ezhatumugam for the year 2021-22
2021/412/P2 ORDER No. IIPDII/20
21/412/P2 Dated: 20-
20-05-2021
2701-02-101-98-00-00-18 3,00,000 0
21
CRD Scheme- Annual Maintenance of Adichily branch canal bet ch.0/00Km to 7/700 km for the year 2021-22
2021/414/P2 ORDER No. IIPDII/20
21/414/P2 Dated: 31-
31-08-2021
2701-02-101-98-00-00-18 3,20,000 0
22
NIP Reformation works to Vadacodu Branch channel at reaches from ch 3100m to 4800m 6000m to 8000m including leakage Prevention in Aqueducts
2021/2567/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 10,00,000 0
23
NIP Annual Maintenance of cleaning under channel section Neyyattinkara
2021/4154/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
24
NIP Side protection works near Ch 1700m right side lining of Mariyapuram sub channel
2021/4159/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
25
NIP Repair and maintenance the damaged pressure pipe near Ch 14km of Kollamcodu branch channel at Karode
2021/4164/IA WP2-2264/21/2021
09-08-2021
2700-11-101-98-00-18 2,00,000 0
26
NIP Side protection works near Ch 6500m of LB main canal at Mampazhanada
2021/4339/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 4,00,000 0
27
NIP desilting works at Ch 12000m to 12200m of LB main canal at Kuttiyanikkadu
2021/4340/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 2,00,000 0
28
NIP Side protection works at Ch 14600m of LB Main canal (Keezharoor temple back side)
2021/4341/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 0
29
NIP Protection works near Ch 16800m of LBC(Palkulangara)
2021/4342/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 8,00,000 0
30
NIP desilting works and protection works at Ch 3700m to 4000m of LB main canal (Near Aaduvally bridge)
2021/4343/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
31
NIP Protection works and Closing leakage near Ch 3000m of Perumkadavila subcanal
2021/4344/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 6,00,000 0
32
NIP desilting works near Ch 9500m of LB main canal at Ottasekharamangalam
2021/4345/IA WP2-2264/20/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
33
NIP Protection work and Closing leakage near Ch 3900m of RB main canal
2021/4349/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 7,00,000 0
34
NIP Protection work and Closing leakage near Ch 4600m of RB main canal
2021/4351/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 5,00,000 0
35
NIP Construction of side Retaining wall and Cleaning of SP at Ch 5500m of RB main canal
2021/4352/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 2,00,000 0
36
NIP Bund Restoration works near Ch 6900m of RB main canal
2021/4353/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 14,50,000 0
37
NIP Providing Solar lamp post at Neyyar Dam Campus
2021/4354/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 7,00,000 0
38
NIP Providing and Fixing roof to be benches in the dam and pavilion area
2021/4355/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
39
NIP Maintenance of damaged portion of project house road drain both side at dam campus
2021/4356/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-18 3,00,000 0
40
NIP-Garden Maintenance of Neyyar Dam and Supplying Ornamental Plants for the year 2021-22
2021/4358/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-82 12,00,000 0
41
NIP-Renovation of Rose garden founden with tank at dam campus and cleaning LBC side
2021/4360/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-82 3,00,000 0
42
Maintenance of swimming pool
2021/4361/IA WP2-2264/21/D7
09-08-2021
2700-11-101-98-00-82 5,00,000 0
43
PSM-Repair and rectification works of Swimming Pool including painting and wire fencing for year 2021-2022
2021/541/IA IDTsr/2021/541/IA
12-07-2021
2701-01-101-98-00-18-00 15,00,000 0
44
KIP(LB) Clearing light in jungle in KIP Campus Kottiyam and Maintanence of assets of KIP Campus for the year 2021-22
2021/859/P2 ORDER No. KIPLBDV/2
021/859/P2
14-09-2021
2700-27-101-98-00-18 3,00,000 0
45
PSM - Annual Mainteneance of Peechi Rest House for the year 2021-2022
2021/535/IA IDTsr/2021/535/IA
02-07-2021
2701-01-101-98-00-18-00 2,00,000 0
46
Mangalam project improvement of Pulimkoottam manjapara chara field channel off take of 0/432 of manjapara distributary of LBMC at offtake 16/646 of LBMC
2021/202/P1 IDMA/2021/202/P1
07-06-2021
2700-04-101-98-00-18-00 10,00,000 0
47
Mangalam project improvement of pulimkottam manjapara chara field channel off take of 0/432 of manjapara distributory of LBMC at offtake 16/646km of LBMC
2021/202/P1 IDMA/2021/202/P1
07-06-2021
2700-04-101-98-00-18-00 10,00,000 0
48
Mangalam project improvement of paruvassery field channel off take ch at 18/550km to LBMC (Challiparambu thenidukku)
2021/193P1 IDMA2021/193/P1
07-06-2021
2700-04-101-98-00-18-00 10,00,000 0
49
Mangalam project dam section improvement of cherumkode field bothiee ch 8/540 from ch 0/150 to 0/730 km of RBMC
2021/227/P1 IDMA/2021/227/P1
07-06-2021
2700-04-101-98-00-18-00 10,00,000 0
50
Mangalam project dam section improvement of kalavampadam distributory ch 5/315 to the field canal (maariyappadam) at ch 0/000 to 0/450 km LBMC
2021/229/P1 IDMa /2021/229/p1
07-06-2021
2700-04-101-98-00-18-00 8,00,000 0
51
Mangalam project improvement of padoor distributory kunduthodi neythiyamparbu field channel off take ch at 1/460km of RBC
2020/1568/P1 IDMA/2020/1568/P1
07-06-2021
2700-04-101-98-00-18-00 8,00,000 0
52
CRD Scheme -Urgent Rectification work to tail end portion of loading channel from Spout No 16 Special of K V Main Canal
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 2,00,000 0
53
CRD Scheme- Annual mace of clearing and removing the floating materials from the canal during water distribution and urgent works in Edakunny branch canal distributory Meloor South branch Meloor Distributory for the year 2015-16
A1-1236
28-09-2015
2701-02-101-98-00-00-18 1,50,000 0
54
CRD Scheme - Annual Mace of clearing and removing the floating materials from the canal during water distribution and urgent Mace works in LBMC from Ch. 11/200 to 18/400 km , Kizhakkummuri branch canal Marangadan Branch canal and Chirangara branch canal for the year 2015-16.
D2-392/15
28-09-2015
2701-02-101-98-00-00-18 1,24,60,000 0
55
CRD Scheme - Annual maintenance of clearing and removing the floating materials from the canal during water distribution including urgent Mace works K.V Main canal , Koratty branch canal Konoor branch canal , K.V branch canal & M.V Branch canal for the year 2015-16.
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 1,24,60,000 0
56
CRDS-Urgent Repair works of damaged spouts in Mambra branch canal and Parakadavu main canal
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 90,000 0
57
CRD Scheme-Side raising and rectification work of Peechanikadu branch canal bet. Ch 2/000Km to 2/100Km
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 2,00,000 0
58
CRD Scheme - Urgent rectification works to Parakadavu main canal bet Ch. 19/000 to 19/300 Km
A1-1236/2014
28-09-2015
2701-02-101-98-00-00-18 3,00,000 0
59
CRDS-Annual Mace of Clearing and removal of the floating materials during water distribution of Parakadavu branch and Mambra branch canal for the year 2015-16.
D1-389/15
28-09-2015
2701-02-101-98-00-00-18 60,000 0
60
CRDS-Annual Mace of Peechanikadu branch canal bet Ch 2/100 to 3/100 Km and Parakadavu main canal bet ch. 31/100 to 32/000 km for the year 2015-16.
D1-387/15
28-09-2015
2701-02-101-98-00-00-18 70,000 0
61
CRDScheme -Annual Mace of Clearing and cleaning of well drop in Parakadavu branch canal & Peechanikadau branch canal for the year 2015-16.
D1-391/15
28-09-2015
2701-02-101-98-00-00-18 30,000 0
62
CRDScheme - Annual Mace -Clearing and Removing of Floating materials from the canal during water distribution of Attara Karukuttykara and Azhakam branch canal for the year 2015-16.
D1-390/15
28-09-2015
2701-02-101-98-00-00-18 75,000 0
63
CRD Scheme -Annual Mace clearing and removal of floating materials during water distribution of Parakadavu main canal bet. Ch. 18/400 to 25/800 km Karukutty Karayamprambu branch and Sub branch canal for the year 2015-16.
A1-1236/15
28-09-2015
2701-02-101-98-00-00-18 1,24,60,000 0
64
KIP - Kallada dam at Thenmala -Beautification of dam site - Beautification and renovation of Dam entrance and IB approach road.
2021/1040/P2 KIPRBDII/2021/1040/
P2
18-06-2021
2700-80-800-98(00) 16,00,000 0
65
Monsoon preparedness - -Kallada dam - Construction of a shelter to protect the Electrical panel board at dam top
2021/1463/P2 IPRBDII/2021/1463/P
2
29-10-2021
2700-27-101-98-00-18 35,000 0
66
PVIP-Urgent rectification works to the perumbavoor branch canal at Ch.6200m and Ch.8500m
2021/1766/P2 PVIPD1/2021/1766/P2

22-03-2022
2700-01-101-98-00-18 3,40,000 0
67
GENERAL-CRDS/ANGLY/Trees and Branches/22-23-Cutting of trees and branches in dangerous condition on the various canal bunds under Irrigation Section, Angamaly-General Civil Work
IRR/PII/FL/1562/2022 AS/59D/22/19690
07-06-2022
2701-02-101-98-00-00-18 1,20,000 0
68
Construction of cross shutters in Mulavoor branch canal and Perumattom MD -2022-23
IRR/PII/EST/1488/2022_5_1_1 AS/59D/22/22490
30-09-2022
2700-01-101-98-00-18 2,05,000 0
69
PVIP - Urgent rectification works of North Kunnakkal MD near ch. 400m for the year 2022-2023.
IRR/PII/EST/1189/2022_5_1_1 AS/59D/22/22489
30-09-2022
2700-01-101-98-00-18 3,00,000 0
70
PVIP- Annual maintenance of Rakkad MD from ch.0.000 km to 6.000 km for the year 2022-2023.
IRR/PII/EST/1613/2022_5_6_5 AS/59D/22/21054
10-08-2022
2700-01-101-98-00-18 5,00,000 0
71
PVIP Annual maintenance of Perumbavoor Branch canal from ch 3.30Km to tail end and it s F Cs for the year 2022 2023
IRR/PII/EST/1523/2022_5_11_10 AS/59D/22/21096
10-08-2022
2700-01-101-98-00-18 3,50,000 0
72
GENERAL-M&R-Removal of obstruction of Kolechal from Villichira to Konthipulam in Muriyad Kayal for the year 2022-2023- IRR/IA/FL/2897/2022-General Civil Work
IRR/IA/EST/2897/2022_5_1_ WP2-1802/2022/D2
15-09-2022
2701-80-800-97-34-03 6,00,000 0
73
PVIP- Annual maintenance of LLC from ch.26000m to 27800 m and Kuzhoor MD for the year 2022-2023.
IRR/PII/EST/1613/2022_5_1_1 AS/59D/22/21230
12-08-2022
2700-01-101-98-00-18 2,50,000 0
74
PVIP- Annual maintenance-of North Kunnakkal MD from ch.0.000km to 4.125km and West Kunnakkal MD from ch.0.000km to 3.600km & Valakam FC1 &FC2 for the year 2022-2023.-General Civil Work
IRR/PII/EST/1613/2022_5_8_6 AS/59D/22/21060
10-08-2022
2700-01-101-98-00-18 6,00,000 0
75
PVIP - Painting and overhauling of shutter and hoisting of check dam shutter at the mouth of Bhoothathankettu barrage - Mechanical work - 2022-23
IRR/MH/EST/3129/2022_16_1_1 AS/59D/22/21812
01-09-2022
2700-01-101-98-00-18 4,00,000 0
76
-PVIP - Urgent rectification works-to Madathippady MD from ch. 0m to 50m for the year 2022-2023.
IRR/PII/EST/1189/2022_5_4_3 AS/59D/22/20970
05-08-2022
2700-01-101-98-00-18 4,50,000 0
77
PVIP - Urgent rectification works-of Manjanad MD near ch. 400m & 1800 m for the year 2022-2023
IRR/PII/EST/1189/2022_5_5_4 AS/59D/22/20969
05-08-2022
2700-01-101-98-00-18 4,50,000 0
78
PVIP- Annual maintenance-Valakam branch canal from ch.12.000 km to 16.250 km and for the year 2022-2023
IRR/PII/EST/1613/2022_5_4_3 AS/59D/22/20573
21-07-2022
2700-01-101-98-00-18 3,30,000 0
79
PVIP- Annual maintenance- of Uriyankara MD ch.0.000 Km to 4.600 Km for the year 2022-2023
IRR/PII/EST/1613/2022_5_9_7 AS/59D/22/21067
10-08-2022
2700-01-101-98-00-18 3,50,000 0
80
PVIP- Annual maintenance-Vazhappilly MD from ch.4700m to 6600m, Kadathy MD from ch.1700m to 2800m and Palakkattuchira FC for the year 2022-2023
IRR/PII/EST/1613/2022_5_2_1 AS/59D/22/20578
21-07-2022
2700-01-101-98-00-18 2,50,000 0
81
PVIP- Annual maintenance-Valakam branch canal from ch.4000m to 12000 m for the year 2022-2023
IRR/PII/EST/1613/2022_5_5_4 AS/59D/22/20571
21-07-2022
2700-01-101-98-00-18 2,50,000 0
82
GENERAL-CRDS-KKTTY-PMC3-22/23-Annual maintenance of Parakkadavu main canal between ch.21/800 to 33/200 km for the year 2022-23-General Civil Work
IRR/PII/EST/1382/2022_5_1_1 AS/59D/22/21136
11-08-2022
2701-02-101-98-00-00-18 4,75,000 0
83
GENERAL-CRDS-KKTTY-PMC3-22/23-Annual maintenance of Parakkadavu main canal between ch.21/800 to 33/200 km for the year 2022-23-General Civil Work
IRR/PII/EST/1382/2022_5_1_1 AS/59D/22/21136
11-08-2022
2701-02-101-98-00-00-18 4,75,000 0
84
CSM- 2022-23Emergency mansoon preparedness- Cutting damaged and dangerous trees from the canal bund between the ch.22/950 Km to 40/900 Km
IRR/IA/EST/108/2022_5_3_2 AS/59D/22/21639
26-08-2022
2701-03-101-98-00-18 2,00,000 0
85
GENERAL-KIP LB-Annual maintenance of canals-Removal of floating bodies- Chavara distributory from Ch.8500 m to 14767 m,Pattathanam minor distry,Chavara minor distry,Thlamugal distry,Menampally distry,kovilthottam distry,Kollaka distry,mukkuthodu distry,Kulangara bhagom distry,Poroorkkara distry,Kizhakkekara minor no.1distry,Kizhakkekara minor no.2 distry,Thevalakkara distributory , Mukundapuram distributory and Palakkal distry, in connection with water distribution for the year 2022-23- General Civil Work
IRR/PII/EST/3592/2022_5_1_1 AS/59D/22/22440
29-09-2022
2700-27-101-98-00-18 1,60,000 0
86
GENERAL-KIP(LB)-KIP(LB)-Clearing jungle of Adichanalloor distributary in connection with water distribution for the year 2022-23 under the section 29/19,Kottiyam-General Civil Work
IRR/PII/EST/2080/2022_5_1_1 AS/59D/22/22641
07-10-2022
2700-27-101-98-00-18 2,00,000 0
87
GENERAL-Annual Maintenance-KIP(LB)-Annual maintenance estimate for removal of floating materials from canals, Pallimon Distributary from Ch. 0 to 13210m , Kareepra Distributary Ch. 0 to 1170m ,Nedumpana Minor Distributary Ch. 0 to 4160m, Nedumpana Sub Minor Distributary Ch. 0 to 2223m, Nallila Minor Distributary Ch. 0 to 5920m, Nallila Sub Minor Distributary Ch. 0 to 1053m, Adichanalloor Distributary Ch. 6540 to 11340m under the section 29/19, Kottiyam during the year 2022-23-General Civil Work
IRR/PII/EST/1075/2022_5_1_1 AS/59D/22/22976
15-10-2022
2700-27-101-98-00-18 3,00,000 0
88
GENERAL-PVIP- Urgent removal of block-from Valakam branch canal and it's distributaries for the year 2022-2023.-General Civil Work
IRR/PII/EST/1615/2022_5_2_1 AS/59D/22/21245
12-08-2022
2700-01-101-98-00-18 1,70,000 0
89
PVIP Painting the hoisting bridge, counter weight, handrails of Bhoothathankettu barrage Mechanical Works
IRR/MH/EST/933/2022_16_1_1 WP2-2331/2019/D1
22-09-2022
2700-01-101-98-00-18 26,00,000 0
90
CSM 2022-23 Urgent repair work of damaged shutter and shutter frame work of surplus escape near chainage 28/500km, 33/400km and 36/650km. including pynkulam and panjal branch canal shutters.
IRR/MH/EST/5239/2022_16_1_1 Order No.D1-General
-(1)
19-11-2022
2701-03-101-98-00-18 8,00,000 0
91
GENERAL-CUTTING AND STACKING DANGEROUS TREES-Cutting of trees, planting of boundary stones, eviction of encroachments under the jurisdiction of KIP(LB) Section no.28/19
IRR/PII/EST/6903/2022_5_1_1 AS/59D/22/24004
01-12-2022
2700-27-101-98-00-18 25,000 0
92
KIP Annual Maintenance of canal 2022 2023Jungle Clearance of RBMC from Ch 67790 to 69752 m Karunagappally branch canal from Ch 0 to 6580 m
IRR/PII/EST/3598/2022_5_1_1 AS/59D/22/22235
23-09-2022
2700-27-101-98-00-18 2,00,000 0
93
KIPRB Annual Maintenance of canal 2022 2023 Jungle Clearance of Mavila distributary from Ch 0 to 2500m and left minor from Ch 0 to 1551 m and Ulavukadu distributary from Ch 0 to 1900m
IRR/PII/EST/3598/2022_5_4_3 AS/59D/22/22236
26-09-2022
2700-27-101-98-00-18 2,00,000 0
94
KIP RB Annual Maintenance of canal 2022 2023 Jungle Clearance and removal of silt from the canal bed of Vallikunnam distributory
IRR/PII/EST/3607/2022_5_3_2 AS/59D/22/21807
01-09-2022
2700-27-101-98-00-18 2,00,000 0
95
KIP RB Cutting branches of trees and for Eviction process under jurisdiction of KIP RB subdivision No 26 karunagappally for the year 2022
IRR/PII/EST/3607/2022_5_4_3 AS/59D/22/22279
26-09-2022
2700-27-101-98-00-18 1,00,000 0
96
KIPRB Removal of Floating material during water distribution for the year 2022 2023 through various canals under the jurisdiction of KIP Section No 40 26 Karunagappally
IRR/PII/EST/3598/2022_5_7_6 AS/59D/22/21803
01-09-2022
2700-27-101-98-00-18 2,00,000 0
97
KIP Removal of Floating material during water distribution for the year 2022 2023 through various canals under the jurisdiction of KIP Section No 41 26 Karunagappally.
IRR/PII/EST/871/2022_5_1_1 AS/59D/22/21808
01-09-2022
2700-27-101-98-00-18 2,00,000 0
98
KIPO M Removal of Floating bodies lubricating and controlling shutters etc. from various canals under KIP Section 12 3 Bharanicavu
IRR/PII/EST/3574/2022_5_2_1 AS/59D/22/22066
16-09-2022
2700-27-101-98-00-18 2,00,000 0
99
KIP O M Removal of floating materias in various canals under the jurisdiction of KIP section.13 4 Charummoodu during water distribution period for the year 2022 2023
IRR/PII/EST/3613/2022_5_1_1 AS/59D/22/22239
01-09-2022
2700-27-101-98-00-18 2,00,000 0
100
GENERAL-Monsoon preparedness- Cutting of Trees and Removing tree branches staying dangerous to the public from canal land under the jurisdiction of KIP LB SECTION 49/17,Kottarakkara-work-General Civil Work-
IRR/PII/EST/3781/2022_5_1_1 AS/59D/22/21034
08-08-2022
2700-27-101-98-00-18 69,800 0
101
GENERAL-KIP LB Sn no.51/tree /2022-Monsoon Preparedness- KIP LB - Cutting down and stacking dangerous tree and branches of trees standing near the canal bund of (LB) main canal,Pulamon distributory ,minor I&II and Kudavattoor Distributory .-General Civil Work-1-
IRR/PII/EST/3333/2022_5_1_1 AS/59D/22/21547
23-08-2022
2700-27-101-98-00-18 97,000 0
102
GENERAL-KIP-LB- Rectification of leaked portions of Nellikunnam distributory between ch 2812 m to 2950 m-work-General Civil Work.
IRR/PII/EST/3642/2022_5_1_1 AS/59D/22/21728
30-08-2022
2700-27-101-98-00-18 2,74,000 0
103
Annual maintenance and operating of Illikkal, Ettumana, Karanchira, Kottenkottuvalavu, Koothumakkal,Inchamudi regulators for the year 2022-23
IRR/IA/FL/4861/2022 AS/59D/22/25237
02-03-2023
2701-80-800-97-34-03 74,50,000 0
104
GENERAL PVIP Rectification work of side wall and bed of Plamudy M D near ch 2/700 km for the year 22 - 23 General Civil Work
IRR/PII/EST/1444/2022_5_1 AS/59D/22/20601
22-07-2022
2700-01-101-98-00-18 3,00,000 0
105
GENERAL-PVIP-Rectification work of damaged bed and side of Panely branch canal near ch 12/200 km for the year 2022-23-General Civil Work
IRR/PII/EST/1332/2022_5_1 AS/59D/22/20604
22-07-2022
2700-01-101-98-00-18 4,00,000 0
106
GENERAL-PVIP- Rectification work of damaged bed and side wall of Kottapady Sub branch canal between ch 0/250 km to 1/000km for the year 2022-23-General Civil Work
IRR/PII/EST/302/2022_5_1_1 AS/59D/22/20491
16-07-2022
2700-01-101-98-00-18 4,00,000 0
107
GENERAL-pvip-Rectification works of damaged sluices of HLC from ch 0/000 km to 6/500 km, Paneli branch canal and its MDs including painting of km stone and name boards for the year 22-23-General Civil Work
IRR/PII/EST/1334/2022_5_1 AS/59D/22/20967
05-07-2022
2700-01-101-98-00-18 5,00,000 0
108
GENERAL-PVIP-Repair works and painting to the regulator shutters of bifurcation point at Adiyodi and greasing and oiling of head regulator shutters at Chenkara (Mechanical works) -General Mechanical Work
IRR/MH/EST_TS/3565/2022_16_1_1 AS/59D/22/21813
01-09-2022
2700-01-101-98-00-18 15,00,000 0
109
GENERAL-PVIP-PVIP - Painting and overhauling of shutter and hoisting of check dam shutter at the mouth of main canal of Bhoothathankettu barrage - Mechanical works -General Mechanical Work-1
IRR/MH/EST_TS/3129/2022_16_1_1 AS/59D/22/21812
01-09-2022
2700-01-101-98-00-18 4,00,000 0
110
GENERAL-PVIP-Annual Maintenance of shutters and hoisting mechanism of Bhoothathan kettu barrage for the year 2022-23 ,Mechanical Works General Mechanical Work.
IRR/MH/EST/3644/2022_16_1_1 AS/59D/22/23736
17-11-2022
2700-01-101-98-00-18 10,00,000 0
111
GENERAL-PVIP-Urgent rectification works of Surplus Escape in LLC at Ch 10/100km for the year 2022 -23 General Civil Work
IRR/PII/EST/643/2022_5_1_1 AS/59D/22/20396
12-07-2022
2700-01-101-98-00-18 6,80,000 0
112
GENERAL-PVIP-Up keeping of garden at Bhoothathanketttu for the year 2022-23-General Civil Work
IRR/PII/EST/7541/2022_5_1_1 ORDER No. AS/59D/22
/23391
29-10-2022
2700-01-101-98-00-82 2,00,000 0
113
GENERAL-PVIP-Improvements to the tourist facilities in the Bhoothathankettu Garden 2022-23-General Civil Work
IRR/PII/EST/6618/2022_5_1_1 ORDER No. AS/59D/22
/23398
29-10-2022
2700-01-101-98-00-82 5,50,000 0
114
GENERAL-PVIP-Upkeeping and maintenance of IB and Office building at Bhoothathankettu and supplying diesel for generator sets for the year 2022-23-General Civil Work
IRR/PII/EST/9297/2022_5_1_1 ORDER No. AS/59D/22
/24598
05-01-2023
4701-80-800-76-02-00 2,50,000 0
115
PIP- LBC-annual maintenance of Pandanadu branch canal from ch.0 m to 13070 m for the year 2022-23
IRR/PII/EST/218/2022_5_4_3 AS/59D/22/20553
20-07-2022
2700-16-101-98-00-18 2,50,000 0
116
PIP RBC Annual maintenance of Main canal -from Ch: 13500 m to 20230 m for the year 2022-2023
IRR/PII/EST/453/2022_5_1_1 AS/59D/22/20723
29-07-2022
2700-16-101-98-00-18 4,60,000 0
117
PIP RBC Annual maintenance of Kuttoor branch canal -from ch :0 m to ch :7500 m for the year 2022-2023
IRR/PII/EST/460/2022_5_1_1 AS/59D/22/20933
05-08-2022
2700-16-101-98-00-18 3,00,000 0
118
PIP-LBC-Annual maintenance to Main canal between ch: 25022 m - 28000 mfor the year 2022-23
IRR/PII/EST/146/2022_5_1_1 AS/59D/22/20548
20-07-2022
2700-16-101-98-00-18 3,00,000 0
119
PIP-LBC-Annual maintenance to Main canal between ch.28000 m - 31200 m for the year 2022-23
IRR/PII/EST/148/2022_5_1_1 AS/59D/22/20550
20-07-2022
2700-16-101-98-00-18 3,00,000 0
120
PIP- LBC-Annual maintenance of Venmony Branch canal from ch.0 m to 5870 m for the year 2022-23
IRR/PII/EST/218/2022_5_5_4 AS/59D/22/20155
19-07-2022
2700-16-101-98-00-18 2,00,000 0
121
PIP RBC Annual maintenance of Vallamkulam Branch canal-from Ch:0 m to 4700 m for the year 2022-2023
IRR/PII/EST/456/2022_5_1_1 AS/59D/22/21197
11-08-2022
2700-16-101-98-00-18 2,00,000 0
122
PIP-RBC-Rectification works to Vallamkulam branch canal between ch 300 m to1000 m and from ch.1600 m to 2400 m
IRR/PII/EST/295/2022_5_1_1 AS/59D/22/20953
05-08-2022
2700-16-101-98-00-18 14,00,000 0
123
PIP-LBC-Rectification works-Venmony branch canal near ch.2300
IRR/PII/EST/249/2022_5_3_2 AS/59D/22/20968
05-08-2022
2700-16-101-98-00-18 5,00,000 0
124
PIP-RBC-Rectification works to main canal between ch:19400 m to 19530 m
IRR/PII/EST/291/2022_5_1_1 AS/59D/22/20938
05-08-2022
2700-16-101-98-00-18 10,00,000 0
125
PIP-LBC-Rectification works-LB canal from Ch.36250 m to 36450 m -General
IRR/PII/EST/4074/2022_5_1_1 AS/59D/22/21013
08-08-2022
2700-16-101-98-00-18 19,50,000 0
126
LBC-Annual maintenance of LB Main Canal from ch.16140 m to 19000 m for the year 2022-23
IRR/PII/EST/218/2022_5_1_1 AS/59D/22/20552
20-07-2022
2700-16-101-98-00-18 3,00,000 0
127
PIP- LBC-Annual maintenance of LB Main Canal from ch.19000 m to 22000 m for the year 2022-23
IRR/PII/EST/218/2022_5_2_1 AS/59D/22/20551
20-07-2022
2700-16-101-98-00-18 3,00,000 0
128
PIP- LBC-Annual maintenance of LB Main Canal from ch.22000 m to 25022 m for the year 2022-23
IRR/PII/EST/218/2022_5_3_2 AS/59D/22/20549
20-07-2022
2700-16-101-98-00-18 3,00,000 0
129
PIP-RBC-Rectification works to Kuttoor Branch Canal from Ch:600 m to 1000
IRR/PII/EST/242/2022_5_1_1 AS/59D/22/20937
05-08-2022
2700-16-101-98-00-18 10,00,000 0
130
PIP-LBC-Rectification works-2 nd distributory of Pandanad Branch canal
IRR/PII/EST/249/2022_5_2_1 AS/59D/22/21132
11-08-2022
2700-16-101-98-00-18 10,00,000 0
131
PIP-LBC-Rectification works-2 nd distributory of Pandanad Branch canal
IRR/PII/EST/249/2022_5_2_1 AS/59D/22/21132
11-08-2022
2700-16-101-98-00-18 10,00,000 0
132
PIP LBC Leak arresting works to- LB Main canal between ch.21000m to 21200 m
IRR/PII/EST/375/2022_5_1_1 AS/59D/22/20964
05-08-2022
2700-16-101-98-00-18 12,00,000 0
133
PIP-LBC-Rectification works-Thazhakkara East Branch canal between Ch 0 m to 2200 m
IRR/PII/EST/4074/2022_5_2_1 AS/59D/22/21015
08-08-2022
2700-16-101-98-00-18 15,50,000 0
134
PIP-LBC-Annual maintenance to Chennithala Branch canal between ch: 0m -8032 m for the year 2022-23
IRR/PII/EST/239/2022_5_1_1 AS/59D/22/20546
20-07-2022
2700-16-101-98-00-18 3,00,000 0
135
PIP-RBC-Rectification works-Main canal between ch.3300m to 3400 m and 3550 to 3650 m
IRR/PII/EST/4073/2022_5_1_1 AS/59D/22/21014
08-08-2022
2700-16-101-98-00-18 17,50,000 0
136
PIP-LBC--Rectification works to LB main canal between ch.27060 m 27120 m
IRR/PII/EST/227/2022_5_1_1 AS/59D/22/20928
04-08-2022
2700-16-101-98-00-18 4,50,000 0
137
PIP- LBC-Annual maintenance of Kulanada branch canal from Ch.0 m to 5470 m for the year 2022-23
IRR/PII/EST/218/2022_5_7_6 AS/59D/22/20547
20-07-2022
2700-16-101-98-00-18 2,50,000 0
138
PIP-LBC-Urgent rectification works to LB Main canal-near Ch.21980 m
IRR/PII/EST/7199/2022_5_1_1 AS/59D/22/23268
25-10-2022
2700-16-101-98-00-18 2,00,983 0
139
PIP- LBC-Annual maintenance of Puliyoor Branch canal from ch.0 m to 8201 m for the year 2022-23
IRR/PII/EST/218/2022_5_6_5 AS/59D/22/20174
19-07-2022
2700-16-101-98-00-18 2,00,000 0
140
PIP-LBC-Urgent Reconstruction of damaged protection wall of LBMC superpass at Ch.19800 m
2021/1780/P2 PIPD/2021/1780/P2
27-12-2021
2700-16-101-98-00-18 34,600 0
141
PIP-LBC- Rectification works to Peruvelichal distributory canal between Ch.0 m to 7184 m
2021/365/P2 PIPD/2021/365/P2
18-05-2021
2700-16-101-98-00-18 20,00,000 0

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
CSIND- Repair, dredging and other urgent maintenance works of Thoppumpady, Thevara and Vyttila Jetties
2017/3914/IA IDEkm/2017/3914/IA
22-09-2017
3075-60-800-97(00) 22,50,000 0
2
Side protection of thodu near Vettatheri Padam in ward no. 18 of Chennithala GP
2020/403/KP MIDCgr/2020/403/KP
29-12-2021
2702-03-101-98-03 9,70,000 0

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North bank of Mahi river to South side of Naval Academy -Reach 1 ( CP 2140 to 2412) under Coastal Erosion Studies Section, Thalassery for the year 2018-19.
2018/98/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,84,600 0
2
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Northend of of Naval Academy to South bank of Poonchavi river-Reach 2 ( CP 2507 to 2581) under Coastal Erosion Studies Section, Thalassery for the year 2018-19.
2018/99/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,17,500 0
3
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North bank of Poonchavi river to South end of Bakel Fort-Reach 3 ( CP 2587 to 2656) under Coastal Erosion Studies Section, Thalassery for the year 2018-19.
2018/100/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,31,800 0
4
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North end of Bakel Fort to South bank of Thalapadi river Reach 4 ( CP 2661 to old CP 101) under Coastal Erosion Studies Section, Thalassery for the year 2018-19.
2018/101/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 2,13,200 0
5
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Padinjarekkara to Thanur harbour - Reach 1 ( CP 1555 to 1659) Coastal Erosion Studies Section, Parappanangadi for the year 2018-19.
2018/90/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,56,000 0
6
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Thanur harbour to Kadalundi -Reach2 ( CP 1664 to 1743) Coastal Erosion Studies Section, Parappanangadi for the year 2018-19.
2018/91/IDRB Dummy As
05-03-2019
2711-02-800-99-03 84,000 0
7
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Kadalundi to Koyilandi -Reach 1 ( CP 1745 to 1935) under Coastal Erosion Studies Section, Kozhikode for the year 2018-19.
2018/89/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,72,500 0
8
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Kadalundi to Koyilandi -Reach 1 ( CP 1745 to 1935) under Coastal Erosion Studies Section, Kozhikode for the year 2018-19.
2018/89/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,72,500 0
9
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Koyilandi to Moorad river -Reach 2 ( CP 1939 to 2042) under Coastal Erosion Studies Section, Kozhikode for the year 2018-19.
2018/88/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 1,39,200 0
10
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Moorad river to Mahi Poozhithala -Reach 3 ( CP 2046 to 2120) under Coastal Erosion Studies Section, Kozhikode for the year 2018-19.
2018/87/IDRB Dummy AS
05-03-2019
2711-02-800-99-03 97,600 0
11
Annual estimate for the study of sea coast- Physical survey and collection of field data of Coastal Engineering Section Ernakulam for 2019-20
2019/204/IDRB dummy
01-04-2019
2711-02-800-99-03 2,12,000 0
12
Annual estimate for the study of sea coast- Physical survey and collection of field data of Coastal Engineering Section Ernakulam for 2020-21
2020/121/IDRB dummy
01-04-2020
2711-02-800-99-03 1,47,000 0
13
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Padinjarekkara to Thanur harbour - Reach 1 ( CP 1555 to 1659) Coastal Erosion Studies Section, Parappanangadi for the year 2019-20.
2019/190/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,57,016 0
14
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Thanur harbour to Kadalundi -Reach2 ( CP 1664 to 1743) Coastal Erosion Studies Section, Parappanangadi for the year 2019-20
2019/193/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 83,268 0
15
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North bank of Mahi river to South side of Naval Academy -Reach 1 ( CP 2140 to 2412) under Coastal Erosion Studies Section, Thalassery for the year 2019-20.
2019/180/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,84,560 0
16
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Northend of of Naval Academy to South bank of Poonchavi river-Reach 2 ( CP 2507 to 2581) under Coastal Erosion Studies Section, Thalassery for the year 2019-20.
2019/181/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,31,542 0
17
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North bank of Poonchavi river to South end of Bakel Fort-Reach 3 ( CP 2587 to 2656) under Coastal Erosion Studies Section, Thalassery for the year 2019-20.
2019/188/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,32,974 0
18
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from North end of Bakel Fort to South bank of Thalapadi river Reach 4 ( CP 2661 to old CP 101) under Coastal Erosion Studies Section, Thalassery for the year 2019-20.
2019/187/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 2,14,953 0
19
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Kadalundi to Koyilandi -Reach 1 ( CP 1745 to 1935) under Coastal Erosion Studies Section, Kozhikode for the year 2019-20.
2019/179/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,73,669 0
20
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Koyilandi to Moorad river -Reach 2 ( CP 1939 to 2042) under Coastal Erosion Studies Section, Kozhikode for the year 2019-20.
2019/178/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 1,40,104 0
21
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Moorad river to Mahi Poozhithala -Reach 3 ( CP 2046 to 2120) under Coastal Erosion Studies Section, Kozhikode for the year 2019-20.
2019/177/IDRB Dummy AS
10-03-2020
2711-02-800-99-03 99,160 0
22
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Kadalundi to Koyilandi -Reach 1 ( CP 1745 to 1935) under Coastal Erosion Studies Section, Kozhikode for the year 2020-21.
2020/115/IDRB Dummy A.S
05-03-2020
2711-02-800-99-03 1,59,000 0
23
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Moorad river to Mahi Poozhithala -Reach 3 ( CP 2046 to 2120) under Coastal Erosion Studies Section, Kozhikode for the year 2020-21.
2020/133/IDRB DUMMY AS
05-03-2020
2711-02-800-99-03 91,000 0
24
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Padinjarekkara to Thanur harbour - Reach 1 ( CP 1555 to 1659) Coastal Erosion Studies Section, Parappanangadi for the year 2020-21.
2020/112/IDRB Dummy AS
30-05-2020
2711-02-800-99-03 1,43,000 0
25
Study of coastal belt in Kerala coast- Estimate for Annual Routine work from Thanur harbour to Kadalundi -Reach2 ( CP 1664 to 1743) Coastal Erosion Studies Section, Parappanangadi for the year 2020-21.
2020/113/IDRB Dummy AS
30-05-2020
2711-02-800-99-03 77,000 0
26
Peechi Scheme maintenance 2019-20-Annual maintenance of Mudikkode branch canal from ch-0/000 Km to 6/700 Km for the year 2019-20
2019/7311/IA IDTsr/2019/7311/IA
07-09-2019
2701-01-101-98-00-18-00 3,00,000 0
27
Conducting physical survey and collecting field data under Coastal erosion studies section Thalassery -Reach-1 from North bank of Mahi river to south side of Navel academy (CP-2140 to CP-2412) for the year 2020-21
2020/134/IDRB Dummy AS
15-03-2021
2711-02-800-99-03 1,70,000 0
28
Conducting physical survey and collecting field data under Coastal erosion studies section Thalassery Reach-2 from north end of Navel academy to south bank of poonchavi river (CP-2507 to CP-2581) for the year 2020-21
2020/135/IDRB Dummy AS
15-03-2021
2711-02-800-99-03 1,21,000 0
29
Conducting physical survey and collecting field data under Coastal erosion studies section Thalassery Reach-3 from north bannk of Poonchavi river to south end of Bekal fort (CP-2587 to CP 2656) for the year 2020-2021
2020/136/IDRB Dummy AS
15-03-2021
2711-02-800-99-03 1,21,000 0
30
Conducting physical survey and collecting field data under Coastal erosion studies section Thalassery Reach-4 from North end of Bakel fort to south bank of Thalappady river (CP-2661 to Old CP-101) for the year 2020-21
2020/137/IDRB Dummy AS
15-03-2021
2711-02-800-99-03 1,83,000 0
31
PSM- Urgent protection and leak proofing works of RBMC from Ch. 1/700 Km to 1/900 Km for the year 2021-2022
2021/805/IA IDTsr/2021/805/IA
18-11-2021
2701-01-101-98-00-18-00 15,00,000 0
32
Construction of damaged compound wall and wire fencing at KERI Quarters and Offices for the year 2021-2022
2021/542/IA IDTsr/2021/542/IA
23-03-2022
2701-01-101-98-00-18-00 25,00,000 0
33
Construction of damaged compound wall and wire fencing at KERI Quarters and Offices for the year 2021-2022
2021/542/IA IDTsr/2021/542/IA
23-03-2022
2701-01-101-98-00-18-00 25,00,000 0
34
GENERAL-PSM2022-2023 Emergency Monsoon Preparedness and flood damages for the south west monsoon under Head Works
IRR/IA/EST/3898/2022_5_1_1 AS/59D/22/21036
08-08-2022
2701-01-101-98-00-18-00 2,00,000 0
35
Monsoon Preparedness - RBMC and branch canals - Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition under Thanippadam Section
IRR/IA/EST/3894/2022_5_1_1 AS/59D/22/21207
12-08-2022
2701-01-101-98-00-18-00 2,00,000 0
36
GENERAL-PSM 2022-23-Improvement works to Kozhukkully branch canal in betwen Ch. 0/600km to 0/700km and 1/800km to
IRR/IA/EST/3894/2022_5_14_14 AS/59D/22/25115
21-02-2023
2701-01-101-98-00-18-00 13,00,000 0

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Urgent maintenance for shutters of kattilchira in Wadakkenchery river
2021/104/MH IMDmpa/2021/104/MH
06-08-2021
2701-80-800-97-34-00 2,00,000 0
2
Supply, Fabrication, painting and erection of Regulator shutter-1no, overhauling of hoisting mechanism for 3Nos.shutters (Kayal side)Replacing suction pipe line 200mm dia and Providing new base nut-2nos for pump house side intake shutters (Karamana River side) etc. Near Thiruvallam Parasurama Temple at Thiruvanathapuram Dist
IRR/MH/EST/3375/2022_16_1_1 AS/59D/22/19902
17-06-2022
2711-01-103-99-00-34-3 24,60,000 0