PLAN SPILL OVER WORKS WORKS TS NOT ISSUED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
HARITHA KERALAM - M I Class-II- Construction of Check dam across Olipuzha at Thekkepuram ward No. X of Thuvoor grama panchayath in Malappuram Dist.
2018/1056/IA MIDMpm/2018/1056/IA

10-10-2020
4702-00-101-66(01) 38,00,000 0
2
Renovation of tanks and ponds under Harithakeralam Improvements to Kkkathukunnukulam in Vallachira panchayath
2018/2005/IA GO(Rt) No:140/2019/
WRD Thiruvananthapuram
02-03-2019
4702-00-101-63(00) 6,19,95,000 0
3
MI Class II works - Improvement works to Vandithode at Veliyampallam in Nallepilly Grama Panchayath in Palakkad Disrtict
2019/6836/IA G.O.(Rt)No.560/2019
/WRD
30-07-2019
4702-00-101-82-01-00-00 10,00,000 0
4
Cauvery basin Projects - Kabani Sub basin - MI Projects in Cauvery Basin Improvements to Moolakadakulam in Srambi in Kozhinjamapara Grama Pancahayth in Palakkad District.
G.O.(Rt)No.596/2019
/WRD
20-08-2019
4702-00-101-77(00) 45,00,000 0
5
Community micro irrigation at Pazhayannur - Design, supply, installation, testing and commissioning of drip Irrigation.
2021-296/IA MIDTsr/2021/296/IA
16-02-2021
4702-00-101-66(01) 2,00,00,000 0
6
Rehabilitation of LIS 2020-21-Supplying and erection of 2 Nos. 75 HP motor and pump to Pazhayannur LIS.
2019/11552/IA MIDTsr/2019/11552/I
A
08-10-2020
4702-00-101-73(00) 20,00,000 0
7
New LI Schemes Construction of a pumphouse at Mambra Kadavu near chalakkudy river and laying pipe line to Mambra Padasekharam in ward no( 1)( 18) of Parakkadavu Grama panchayath.
2021/1297/IA MIDEkm/2021/1297/IA

11-05-2021
4702-00-101-97-01-00 1,05,00,000 0
8
Construction of VCB cum Tractorway across Periyattuthura Thodu at Kundam in Cheruthazham Panchayath, Kannur District.
2021/1076/IA MIDKnr/2021/1076/IA

10-05-2021
4702-00-101-65-01-00-00 35,00,000 0
9
Construction of bridge at Vanchipottil Kadavu across Adhi Pamba in Aranmula and Chengannur constituencies.
2020/3589/IA W3-25244/2020/AS/DB
-II
26-07-2021
4711-01-103-99-01-00-00 7,00,00,000 0
10
Construction of RCB at Parappanthara connecting Agali and Puthur Panchayath in Attappadi in Palakkad District under Cauvery Basin projects in Bhavani Sub-basin
2018/2258/IA GO(Rt) No: 862/2018
/WRD
30-11-2018
4702-00-101-71-00-00 9,50,00,000 0
11
Side protection works for the Bhavani river at Ranganathapuram
2018/3298/IA G.O.(Rt)No.155/2019
/WRD
06-03-2019
4711-01-103-99-01-00-00 15,00,000 0
12
Perumballichichira Lift Irrigation Scheme In Ward No:8 Of Kumaramangalam Panchayath
2021/963/IA MIDIki/2021/963/IA
19-05-2021
4702-00-101-97-01-00 1,00,00,000 0
13
Improvements to Devaswam kary padasekaram in ward no.5 of Vechoor Panchyath
ORDER No. MIDKtm/20
21/1931/IA
18-05-2021
4702-00-101-82-01-00-00 15,00,000 0
14
Protection work to the left and right banks of Pampa River and Leading Channel from Veeyapuram to Kurichikkal towards Thottapally Pozhi passing through Veeyapuram,Cheruthana and karuvatta panchayaths
2020/4269/IA GO(RT)360/2021/WRD
09-07-2021
4701-21-800-96(00) 33,30,00,000 0
15
Protection work to the Left & Right Banks of Pampa river (Leading Channel to the Thottappally Spillway) from Kurichikkal to Thottappally Spillway and downstream to the Pozhy mouth in Purakkad Gramapanchayat in Ambalappuzha LAC
2020/4277/IA G.O.(Rt) No.360/202
1/WRD
09-07-2021
4701-21-800-96(00) 37,00,00,000 0
16
Removal of accumulated earth from Kolachira-Naduvattam thodu in ward No.10 of pallipad Panchayath.
2021/332/KP MIDCgr/2021/332/KP
11-10-2021
2702-03-101-98-02-34-3 4,80,000 0
17
PP-Rennovation and modernisation works to tail end field bothie of anakkappara branch canal of RBMC
2021/498/P1 IDMa/2021/498/P1
09-06-2021
4701-80-800-72(00) 10,00,000 0
18
Flood Mitigation works in Tvm City Cleaning of Pazhavangadi thodu Phase I
2021/3328/IA G.O.(Rt)No.654/2021
/WRD
09-12-2021
4711-01-103-98(00) 80,00,000 0
19
MI Class II Construction of VCB to prevent salt water intrusion from TS Canal in Thurayil Kadavu in Kulasekharapuram Panchayath
1319 MIDKlm/2021/1319/IA

10-05-2021
4702-00-101-82-01-00-00 40,00,000 0
20
FLOOD MITIGATION WORKS IN THIRUVANANTHAPURAM CITY- CLEANING OF KARIYIL THODU AND ITS TRIBUTORIES Phase - 1
2021/3053/IA GO(Rt) No 654/2021/
WRD
09-12-2021
4711-01-103-98(00) 55,00,000 0
21
MI Class I-LI Schemes in Wayanad-Construction of Nanjoth LI Scheme in Edavaka Panchayath,Mananthavady consistuency ,Wayanad District
2021/1237/IA MIDSby/2021/1237/IA

16-03-2022
4702-00-101-99(01) 1,50,00,000 0
22
Vellayani Kayal Restoration Scheme
2021/6265/IA 626/2021/WRD
29-11-2021
4702-00-101-65-01-00-00 96,50,000 0
23
Protection work and maintenance of Manjaamkodu chira at Kavuvila, Mukkola in Neduman Ward of Karakulam Panchayath
2022/713/IA MIDTvpm/2022/713/IA

31-03-2022
4702-00-101-63(00) 1,43,00,000 0
24
CONSTRUCTION OF MANJAKUNNU LIFT IRRIGATION SCHEME IN PANANCHERY GRAMA PANCHAYATH
2021/1345/IA MIDTsr/2021/1345/IA
Dated: 30-03-2022
30-03-2022
4702-00-101-97-01-00 1,80,00,000 0
25
Cauvery Basin - Implementation of MI works in Pambar Basin - Construction of a Storage tank near Karpoorakkudi Oda at Mangalam para area in Marayoor Panchayath in Devikulam Constituency
2021/2735/IA MIDIki/2021/2735/IA

30-03-2022
4702-00-101-77(00) 35,00,000 0
26
Providing Micro irrigation System for Sayoojya Cluster in Ward No 5 & 7 of Vandanmedu Panchayath
2021/5083/IA G.O.(Rt) No.257/202
2/WRD
31-03-2022
4702-00-101-66(01) 3,10,00,000 0
27
Side protection works to Chenthandu Edaykkalthodu at Edayikkal in Thachampara GP in Palakkad dist
2020/8/IA MIDPkd/2020/8/IA
31-03-2022
4702-00-101-65-01-00-00 25,00,000 0
28
Construction of check dam across Varagar river at Aralikkonam in Puthur grama panchayath in Attappadi in Palakkad district.
2019/704/IA MIDPkd/2019/704/IA
30-03-2022
4702-00-101-71-00-00 90,00,000 0
29
Construction of check dam across Siruvani river at Bhoothivazhy in Agali grama panchayath in Attappadi in Palakkad district.
2022/3862/IA MIDPkd/2022/3862/IA

30-03-2022
4702-00-101-71-00-00 80,00,000 0
30
Construction of weir across Palliyara thod near Nellipathy Attara bridge at Nellipathy in Agali grama panchayath in Attappadi in Palakkad district.
2022/3865/IA MIDPkd/2022/3865/IA

30-03-2022
4702-00-101-71-00-00 30,00,000 0
31
Renovation of pond-Desilting and side protection work of Padayathkulam in ward no 15 of Pirayiri Panchayath in Palakkad district
2020/298/IA MIDPkd/2020/298/IA
31-03-2022
4702-00-101-63(00) 35,00,000 0
32
Construction of new LIS At Manalaya in Aliparamba Panchayath ,Malappuram Dt
2021/1328/IA MIDMpm/2021/1328/IA

23-03-2022
4702-00-101-97-01-00 1,75,00,000 0
33
Construction and side protection of Perumpuzhathode VCB in Edarikkode .thennala GP
2020/1284/IA GO(Rt)No.11/2022/WR
D
04-01-2022
4702-00-101-99(01) 6,87,00,000 0
34
Rejuvenation of Narni Thodu from Karumalloor to Neerikod for 10 KM in Kalamassery constituency
2021/3093/IA 218/2022/WRD
22-03-2022
4702-00-101-99(01) 1,32,00,000 0
35
GENERAL-MI CLASS -II Harithakeralam-Improvement to the Narayanikulam in Elamkulam Panchayath,Malappuram District.-General Civil Work
IRR/IA/EST/9147/2022 AS/59D/22/25902
29-03-2023
4702-00-101-65-01-00-00 57,00,000 0
36
Construction of check dam & mini LI scheme at Green Valley in Sulthan Bathery Muncipality
2022/1242/IA No.MIDSby/2022/1242
/IA
28-02-2022
4702-00-101-97-01-00 1,50,00,000 0
37
General Olavilam Rcb-Construction of RCB at Olavilam Pathikkal in Chokli panchayath in Kannur District-Mechanical works-General Mechanical Work
636/2022/WRD
21-07-2022
4702-00-101-99(01) 1,850 0
38
Alpara Lift Irrigation Scheme In Manakkad Panchayat
IRR/IA/EST/1941/2022_5_1_1 GO(Rt) 400/2022/WRD

13-05-2022
4702-00-101-97-01-00 2,74,00,000 0
39
Construction of check dam across Ithikkara River at Mannayyam Kadavu in connection with water Supply Scheme to Kalluvathukkal, Parippally & Velinalloor Villages at Kalluvathukkal Panchayath of Kollam District -Construction of Check dam.
2019/1127/IA G.O (Rt) No.14/2017
/WRD
11-01-2017
4711-01-103-99-01-00-00 1,36,00,00,000 0
40
GENERAL-Kilikollur thodu-Rejuvanation of Choorangal-Kilikollur Thodu in Eravipuram constituency-General Civil Work
IRR/IA/EST/3359/2022_5_1_1 GO(RT) No 580/2022/
WRD
02-07-2022
4702-00-101-65-01-00-00 12,40,00,000 0
41
GENERAL Supply of 1 No 30 HP pumpset andits accessories for Vazhamuttom II LI scheme inVallicode Panchayath in Pathanamthitta District General Civil Work
IRR/IA/EST/776/2023_5_1_1 MIDPta/2021/1327/IA

11-05-2021
4702-00-101-97-01-00 50,00,000 0
42
M.I CLASS II Renovation of Maniyankulam Thalakkulam And Improvements of Irrigation Facilities To Thalakkulam Ela In Bhoothakkulam Panchayath
3518 MIDklm 2020 3518 IA

00-00-0000
4702-00-101-82-01-00-00 25,00,000 0
43
GENERAL-New Lift Irrigation Scheme-Construction of Veiiampadi Lift Irrigation Scheme in Kottathara Panchayath-Phase 1-General Civil Work
IRR/IA/EST/5764/2022_5_1_1 AS/59D/22/25547
17-03-2023
4702-00-101-97-01-00 2,00,00,000 0
44
GENERAL-Rehabilitation of Lift Irrigation Schemes 2022-2023-Repair to Cherupuzha LI Scheme in Kottathara Panchayath-General Civil Work
IRR/IA/EST/9186/2022_5_1_1 AS/59D/22/25447
15-03-2023
4702-00-101-73(00) 20,00,000 0
45
GENERAL-MI Class 1 Haritha Keralam-Construction of Check Dam across Cherupuzha at Vandiyambetta in Kottathara Panchayath-General Civil Work
IRR/IA/EST/9191/2022_5_2_1 AS/59D/22/25448
15-03-2023
4702-00-101-66(01) 80,00,000 0
46
GENERAL-OZHUKOLLI-CONSTRUCTION OF OZHUKOLLY LIFT IRRIGATION SCHEME IN PANAMARAM PANCHAYATH-General Civil Work
IRR/IA/EST/9284/2022_5_1_1 AS/59D/22/26047
31-03-2023
4702-00-101-99(01) 2,00,00,000 0
47
GENERAL-NARAMAD CHECK DAM-Construction of Check Dam at NARMAD in Nenmeni Panchayath-General Civil Work
IRR/IA/EST/9198/2022_5_1_1 AS/59D/22/26134
31-03-2023
4702-00-101-82-01-00-00 1,14,00,000 0
48
GENERAL-PLAKKOOTTAM LI SCHEME-Construction of LI Scheme in Plakkoottam Karthan Kalayil Ward-12 in Poothadi Panchayath-General Civil Work
IRR/IA/EST/9249/2022_5_1_1 AS/59D/22/25632
21-03-2023
4702-00-101-77(00) 1,14,16,000 0
49
GENERAL-VCB cum BRIDGE-CONSTRUCTION OF VCB CUM BRIDGE AT MUTHANAHITHILU IN DELAMPADY PANCHAYATH-General Civil Work
IRR/IA/EST/9202/2022_5_1_1 AS/59D/22/26050
31-03-2023
4702-00-101-99(01) 1,04,00,000 0
50
GENERAL-Annual Plan 2022-23-Lift Irrigation scheme at Athithamoola-Uyithadka in Karadka Grama Panchayath of Kasaragod district-General Civil Work
IRR/IA/EST/250/2023_5_1_1 AS/59D/22/25480
15-03-2023
4702-00-101-97-01-00 1,75,00,000 0
51
GENERAL-Renovation of Tanks and Ponds-Renovation of Thottikattil kulam in Division 23 of Mukkam Muncipality, Thiruvambady LA Kozhikode District-General Civil Work
IRR/IA/EST/133/2023 AS/59D/22/25678
22-03-2023
4702-00-101-63(00) 40,00,000 0
52
GENERAL-Investigation Work-Construction of new LI Scheme at Manalaya in Aliparamba Panchayath,Malappuram Dt.-Investigation Work
IRR/IA/EST/7242/2022_3_1_1 MIDMpm/2021/1328/IA

23-03-2022
4702-00-101-97-01-00 1,75,00,000 0
53
LI Scheme Pokkali-Construction of new LI Scheme at Pokkali in ward no 11&12 of Moorkanad Grama Panchayath,malappuram Dt-General Civil Work
IRR/IA/EST/9309/2022_5_1_1 AS/59D/22/25423
14-03-2023
4702-00-101-97-01-00 1,16,00,000 0
54
GENERAL-MYNAGAPPALLY GRAMA PANCHAYATH-Feasibility studies using Smart Station -Digital investigation for improving Chalayil Madannada Ela in Mynagappally Panchayath-Investigation Work
IRR/IA/EST/5476/2022_3_1_1 AS/59D/22/26120
31-03-2023
4700-80-005-99-02-00 3,43,000 0
55
Cauvery Basin-MI Projects Construction of Storage Tank near Chilanthiyar mariyamman kovil In Vattavavad Panchayath
IRR/IA/EST/9026/2022_5_1_1 AS/59D/22/26005
30-03-2023
4702-00-101-77(00) 29,85,000 0
56
MI-Class II-Construction of a Storage Weir across Madapra thodu at Kannamchirapady area Theppukallelpurayidam bhagam in ward No.1 of Kamakshy Panchayath in Idukki Constituency
IRR/IA/EST/3542/2022_5_4_3 AS/59D/22/25843
28-03-2023
4702-00-101-82-01-00-00 66,00,000 0
57
GENERAL-Thiruvallam thodu-NGT-Improvements to Thiruvallam thodu in Karamana river basin including replacing of existing shutters , pumping system,electrification of operating system and allied civil works near Parasurama temple in Trivandrum district-General Civil Work
IRR/IA/EST/2991/2022_5_2_1 AS/59D/22/25955
29-03-2023
2702-01-800-86-00-00-00 20,00,000 0
58
GENERAL-Meenkuzhi LI-LI Scheme at Kokkottuvayal near Meenkuzhi Dam in Kadannappalli- Panappuzha Panchayath in Kalliasseri Constituency, Kannur Dist
IRR/IA/EST/1578/2023_5_1_1 AS/59D/22/26136
31-03-2023
4702-00-101-97-01-00 68,90,000 0
59
Construction of check dam cum bridge and canal at Chembakakundu across Kalloorpuzha in Noolpuzha Panchayath
IRR/IA/EST/2993/2022 G.O.(Rt) No.945/202
2/WRD
22-10-2022
4702-00-101-77(00) 8,95,00,000 0
60
GENERAL-Renovation of Pond-Renovation of Kammuttikkulam in ward 11 of Valanchery Municipality in Kottakkal LAC in Malappuram District-General Civil Work
IRR/IA/EST/3247/2022_5_1_1 AS/59D/22/25673
22-03-2023
4702-00-101-63(00) 58,00,000 0
61
NABARD-RIDF-XXVIII SWE Regulator at Chithari -Construction of SWE Regulator on upstream of old Chithari RCB across Chithari river in Kasaragod District-General Civil Work-2
IRR/IA/EST/4721/2022_5_1_1 G.O.(Rt)No.154/2023
/WRD
08-02-2023
4702-00-101-99(01) 33,28,00,000 0
62
DASANAKKARA MICRO IRRIGATION SCHEME(CIVIL)-Micro Irrigation Scheme at Dasanakkara in Pulpally Panchayath-wayanad Dt-Civil Part
IRR/IA/EST/7503/2022 G.O.No.344/2023/WRD
TVM
30-03-2023
4702-00-101-66(01) 2,61,50,000 0
63
DASANAKKARA MICRO IRRIGATION SCHEME-Micro Irrigation Scheme at Dasanakkara in Pulpally Panchayath-Micro Irrigation Part
IRR/IA/EST/8287/2022 G.O.No.344/2023/WRD
TVM
30-03-2023
4702-00-101-66(01) 2,61,50,000 0
64
Renovation of Puliyarathoppu, Valiyakulam at Thaliyal, Kalady ward in Nemom LA constituency
IRR/IA/EST/6996/2022_5_1_1 AS/59D/22/25692
22-03-2023
4702-00-101-82-01-00-00 45,00,000 0
65
GENERAL-Aruthalachikulam- Improving Irrigation facilities in Maruthathoor and Kannamkuzhy elah by providing lift Irrigation scheme and allied works connected with Aruthalachikulam in Municipality.-General Civil Work
IRR/IA/EST/9045/2022_5_1_1 AS/59D/22/25542
17-03-2023
4702-00-101-97-01-00 1,80,00,000 0
66
GENERAL-Anjilithara Sluice-Investigation work for construction of concrete sluice at Anjilithara in Manalkoor padasekharam in Kumbalanghi Panchayat-Investigation Work
IRR/IA/EST/2911/2022_3_1_1 AS/59D/22/21936
13-09-2022
4700-80-005-99-02-00 4,00,000 0
67
GENERAL-Construction of sluice at Kandakadavu padasekharam in Chellanam Panchayth -Investigation work for sluices at Kandakadavu Padasekharam in Chellanam Panchayath-Investigation Work
IRR/IA/EST/8288/2022_3_1_1 AS/59D/22/25322
09-03-2023
4700-80-005-99-02-00 4,10,000 0
68
GENERAL-Investigation works-Restoration of Puliyambatta thod in Thrithala Panchayath-Investigation Work
IRR/IA/EST/822/2022_3_1_1 AS/59D/22/25768
24-03-2023
4700-80-005-99-02-00 4,70,000 0
69
GENERAL-Desilting of River /Kayal-NGT- Abatement of a polluted stretch of Puzhakkal River from Olarikkara to Puzhakkal by desilting Kurinjikkal thodu in Thrissur district-General Civil Work.
IRR/IA/EST/5524/2022_5_3_2 S/59D/22/25788
25-03-2023
2702-01-800-86-00-00-00 25,00,000 0
70
GENERAL-Desilting of River /Kayal-NGT-Desilting of tributaries of Wadakkanchery river and Kechery puzha in Thrissur district. -General Civil Work.
IRR/IA/EST/5524/2022_5_2_1 AS/59D/22/25789
25-03-2023
2702-01-800-86-00-00-00 28,00,000 0
71
Construction of pump house for LI station No 1 and necessary maintenance work in existing leading channel in Peruvelichal East puncha in Nooranadu Pt Alappuzha dist General Civil Work
IRR/KP/EST/1527/2023_5_1_1 AS/59D/22/25478
15-03-2023
4702-00-101-73(00) 49,82,548 0
72
Construction of pump house for LI station No 4 and necessary maintenance work in existing leading channel in Peruvelichal West puncha in Nooranadu Pt Alappuzha dist General Civil Work.
IRR/KP/EST/1743/2022_5_1_1 AS/59D/22/25455
15-03-2023
4702-00-101-97-01-00 49,76,000 0
73
KP Protection work to I Block 3500 kayal padasekharam in ward 13 of Neelamperoor panchayath in Alappuzha district
AS/59D/22/20926
04-08-2022
4711-01-103-84-01-00-00 58,30,000 0
74
Cleaning and desilting of Kuratheri Akkanadi thodu in Neelamperoor panchayath in Kuttanad thaluk
IRR/KP/EST/8172/2022_5_1_1 1147/2022/WRD
22-12-2022
4711-01-103-84-01-00-00 54,10,000 0
75
GENERAL-Repair of Division Office-Urgent Repairs to the Office building of Minor Irrigation Division office Chengannur -DPR Preparation Work
IRR/KP/EST/405/2023 AS/59D/22/25521
00-00-0000
2702-03-101-95-00-00-00 23,00,000 0
76
GENERAL-Kizhakepocha thekku-Construction of Motorthara, Motor shed and culvert in Kizhakkeppocha thekku Padom in ward No.2 of Cheruthana G.P.-General Civil Work
IRR/KP/EST/1521/2022 AS/59D/22/25540
17-03-2023
4702-00-101-65-01-00-00 27,00,000 0
77
GENERAL-Kottukal valiya thodu-Improvements and allied works in Kottukal valiya thodu at Kozhode in Kottukal panchayath
IRR/IA/EST/2193/2022_5_1_1 AS/59D/22/24545
31-12-2022
4702-00-101-63(00) 40,00,000 0
78
GENERAL-Rehabilitation of Punnathara LI Scheme - -Urgent Rectification of Irrigation canal for Punnathara LI Scheme - Naduvathukery Padasekharam Canal in Ettumanoor Municipality in Ettumanoor Constituency-General Civil Work
IRR/IA/EST/4740/2022 AS/59D22/25475
15-03-2023
4702-00-101-73(00) 25,00,000 0
79
GENERAL-AKAVOOR MADOM POND-Renovation of Akavoor madam Pond in Pallippad Panchayath.-General Civil Work
IRR/KP/EST/1609/2022 AS/59D/22/25539
17-03-2023
4702-00-101-66(01) 47,00,000 0
80
Construction of new leading channel for Pandanad north Padasekharam in ward no 1 of Pandanad Panchayath
IRR/KP/EST/1586/2022_5_1_1 AS/59D/22/25456
15-03-2023
4702-00-101-97-01-00 40,00,000 0
81
GENERAL-Construction of VCB_Udhikkana thodu-Construction of VCB and side protection works in Udhikkanathodu in Edanad, ward no. 8 of Chengannur municipality-General Civil Work.
IRR/KP/EST/1853/2022 AS/59D/22/25783
25-03-2023
4702-00-101-82-01-00-00 30,00,000 0
82
Construction of pump house and other neccessary works at Rivermouth LI station in Thazhakkara panchayath
IRR/KP/EST/1732/2022_5_1_1 AS/59D/22/25454
15-03-2023
4702-00-101-97-01-00 30,00,000 0
83
GENERAL-Office Maintenance--Urgent repairs of newly allotted building for MI Section ,Mavelikkara, -General Civil Work.
IRR/KP/EST/3796/2022 AS/59D/22/24751
17-01-2023
2702-03-101-95-00-00-00 5,00,000 0
84
GENERAL-PLAN 22-23-Construction of culvert across Azhiveli thodu at Panamthottam bhagom in Karoor Panchayath.-General Civil Work-1
IRR/IA/EST/382/2022 AS/59D/22/25782
25-03-2023
4702-00-101-82-01-00-00 30,00,000 0
85
GENERAL-PLAN 2022-Restoration of thodu between Panikkottilpady to Alummoottilpady and construction of Box culvert and RCC slab in ward no.10 of Peringara Panchayath in Thiruvalla Assembly Constituency -General Civil Work
IRR/IA/EST/1935/2022_5_1_1 AS/59D/22/25690
22-03-2023
4702-00-101-82-01-00-00 50,00,000 0
86
GENERAL-Urgent Side protection of Arathooty- Puthen Thodu -PLAN 22-23 Urgent Side Protection Work for the Breached Portion- D/S of Arathooty Bridge- Right Bank of Arathooty Puthen Thodu in Ward no. 23 Of Kottayam Municipality in Kottayam Constituency -General Civil Work-1
IRR/IA/EST/348/2023 AS/59D/22/25462
15-03-2023
2702-03-101-98-02-34-3 35,00,000 0
87
GENERAL- MIV/4140/2022-Project for Renovation of Public pond-Renovation of Public pond near Manapparambu cement road in ward no 3 of Vaikom Municipality.-General Civil Work
IRR/IA/EST/4140/2022_5_1_1 AS/59D/22/26042
30-03-2023
4702-00-101-63(00) 12,00,000 0
88
Harithakeralam- Renovation of Aduppukoottan parakulam at Peroorkada in Vattiyoorkkavu LA constituency-General Civil Work-1.
IRR/IA/EST/338/2023_5_1_1 AS/59D/22/25644
21-03-2023
4702-00-101-63(00) 43,00,000 0
89
GENERAL-Protection Work- MI Class-II Harithakeralam-Rectification to the outer bund of Nangyagiri Padashekaram in ward no 11 of kurichy panchayath of Changanacherry LAC.-General Civil Work-1
IRR/IA/EST/325/2023 AS/59D/22/25464
15-03-2023
4702-00-101-65-01-00-00 25,00,000 0
90
GENERAL-Moonkilmada LIS -Extension of Moonkilmada LIS in Eruthempathy Gramapanchayath-General Civil Work
IRR/IA/EST/9256/2022_5_1_1 AS/59D/22/25718
23-03-2023
4702-00-101-97-01-00 60,00,000 0
91
GENERAL-Kaliyankavu LIS-Construction of Lift Irrigation Scheme near Kaliyankavu Check dam in Kottayi Panchayath in Palakkad district.-General Civil Work
IRR/IA/EST/9152/2022_5_1_1 AS/59D/22/25952
29-03-2023
4702-00-101-97-01-00 1,83,00,000 0
92
GENERAL-Rehabiliation of LIS-RLIS-2022-23 Renovation of Right branch canal from 600m to 1000m of Kottakadavu LIS in parudur Panchayath -General Civil Work
IRR/IA/EST/9143/2022_5_1_1 AS/59D/22/26209
31-03-2023
4702-00-101-73(00) 25,00,000 0
93
GENERAL-VALIYERI LIS- RLIS-2022-23 REPAIR AND MAINTANANCE OF VALIYERI LIS INCLUDING RESTORATION OF CANAL FROM RBC TO VALIYERI IN KOZHINJAMPARA GP -General Civil Work
IRR/IA/EST/1698/2022_5_1_1 AS/59D/22/25712
23-03-2023
4702-00-101-73(00) 5,00,000 0
94
GENERAL-CAUSEWAY-MI Class 1-Construction of Causeway across Varattayar river at Pazhaniyarpalayam in Kozhinjampara GramaPanchayath.-General Civil Work
IRR/IA/EST/1056/2022_5_1_1 AS/59D/22/26222
31-03-2023
4702-00-101-99(01) 55,00,000 0
95
GENERAL-MI CLASS I Harithakeralam-Renovation of Madayikulam in Muthuthala panchayath-General Civil Work
IRR/IA/EST/9164/2022_5_1_1 AS/59D/22/25834
28-03-2023
4702-00-101-66(01) 90,00,000 0
96
GENERAL-SANKARAKANNAN THODU-protection of sankarakannan thodu at chuvattupadam in vadakkanchey gramapanchayath-General Civil Work
IRR/IA/EST/1073/2022_5_1_1 AS/59D/22/25722
23-03-2023
4702-00-101-82-01-00-00 37,00,000 0
97
GENERAL-Ittiyampadam thodu-Side protection work on the right side of Ittiyampadam thodu in Kunnumparambu at Kuzhalmannam Gramapanchayath in Palakkad district.-General
IRR/IA/EST/4877/2022_5_1_1 AS/59D/22/25852
28-03-2023
4702-00-101-65-01-00-00 36,00,000 0
98
GENERAL-Renovation of Public Pond-Eliyalakulam in ward No 04 of Ananganadi Panchayath-Palakkad District-General Civil Work
IRR/IA/EST/9114/2022_5_1_1 AS/59D/22/25892
29-03-2023
4702-00-101-63(00) 50,00,000 0
99
GENERAL-Plan 2022-23-Rectification of Anamooli diversion canal near forest station in Thenkara GP in Palakkad District-General Civil Work
IRR/IA/EST/9035/2022_5_1_1 . AS/59D/22/25833
28-03-2023
2702-03-101-98-02-34-3 19,50,000 0
100
Renovation Tanks and ponds-Harithakeralam-Renovation of Kara kulam in Muthuthala Panchayath- Second Phase
2021/880 MIDPkd/2021/880/IA
31-03-2022
4702-00-101-63(00) 15,00,000 0
101
GENERAL-CMO Portal Petition-Investigation for Urgent protection works to Right bank of Bharathapuzha at Karakkad- Nambram area, Ongallur panchayat, Palakkad DistrictInvestigation Work-Investigation for the work proposed in CMO Portal
IRR/IA/EST/2592/2022_3_1_1 AS/59D/22/25257
04-03-2023
4700-80-005-99-02-00 4,70,000 0
102
GENERAL- Plan 22-23 Meenachil Meenanthara LIS-Construction of new canal between Madakkal pump house and Poika thodu in Ayarkunnam Panchayath-General Civil Work
IRR/IA/EST/340/2023 AS/59D/22/25473
15-03-2023
4702-00-101-73(00) 30,00,000 0
103
GENERAL-Plan 2022-23 MI Class I-Renovation to the outer bund of Oottupura padasekharam in Vakathanam Panchayath-General Civil Work
IRR/IA/EST/893/2022 AS/59D/22/26156
31-03-2023
4702-00-101-99(01) 25,00,000 0
104
Side protection works to Chenthandu Edaykkalthodu at Edayikkal in Thachampara GP in Palakkad dist.
MIDPkd/2020/8/IA MIDPkd/2020/8/IA
31-03-2022
4702-00-101-65-01-00-00 25,00,000 0
105
Construction of VCB across Thottingal thod ward no 04 in sreekrishnapuram Panchayath of Palakkad district
MIDPkd/2021/927/IA MIDPkd/2021/927/IA
19-05-2021
4702-00-101-82-01-00-00 30,00,000 0
106
Construction of VCB across Thottingal thod ward no 04 in sreekrishnapuram Panchayath of Palakkad district
MIDPkd/2021/927/IA MIDPkd/2021/927/IA
19-05-2021
4702-00-101-82-01-00-00 30,00,000 0
107
GENERAL-Deepening & reconnecting of various thodus-Deepening and reconnecting of various thodus in Kunnukara, Karumalloor and Alangad Grama panchayaths and Reconstruction of Culverts in Kalamassery Constituency-General Civil Work
IRR/IA/EST/145/2022_5_2_1 27/2023/WRD
07-01-2023
4711-01-103-99-01-00-00 8,00,00,000 0
108
Rejuvenation works of Meenachil river from Ettumanoor to Kottayam Municipal area in Kottayam district.
2021/122/IA IDKtm/2021/122/IA
00-00-0000
4701-80-800-88(00) 52,00,000 0

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
KRP-Rewiring of Sub Division No.3,Sulthan Bathery and Quarters of Karapuzha colony at Sulthan Bathery
2020/3636 WP3/2394/2020
09-10-2020
4701-13-00-00(00) 15,00,000 0
2
KRP - Renovation of well and pump house near downstream of earthen dam.
2021/769/P1 WP8-2321/ACP/2021-2
2
26-04-0021
4701-13-800-97-00-00-00 12,00,000 0
3
KRP - Maintenance including BT surfacing road from Kakkavayal junction to subdivision office near dam site
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-98-00-00-00 1,50,00,000 0
4
KRP-Providing water connection from KWA, and allied works to the Division office at Kalpetta.
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-93-00-00-00 5,00,000 0
5
KRP - Urgent repair work of Division colony Quarters at Kalpetta - Phase II
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-93-00-00-00 20,00,000 0
6
KRP-Jungle clearance and desilting of Padinjareveedu branch canal from Ch.3200m to Ch. 8940m including construction of surplus escape and sealing of expansion joints.
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-93-00-00-00 30,00,000 0
7
KRP-Clearing light jungle and removal of silt from open canal Ch. 7000m to Ch. 8000m of LBMC including sealing of expansion joints.
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 2,00,000 0
8
KRP - Formation of breached portion of Padinjareveedu branch canal near Ch. 4000 m.
WP8/2321/ACP/2021-2
2
24-04-2021
4701-13-800-91-00-00-00 30,00,000 0
9
KRP-Investigation of Padinjareveedu branch canal after cut & cover near Ch. 4000m.
WP8/2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 7,00,000 0
10
KRP-Jungle clearance and desilting of Padinjareveedu branch canal from Ch.3200m to Ch. 8940m including construction of surplus escape and sealing of expansion joints.
2021/799/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 30,00,000 0
11
PyIP- Providing lining in Main canal between Ch:14/775 Km and Ch: 15/000 km U/S of existing SDRF lining work for the year 2021-2022.
2021/0319/P1 PYIPDKr/2021/319/P1

29-04-2021
4700-12-800-97-00-00-00 17,25,000 0
12
Re construction of Sunken portion of left side retaining wall of Chamravattom RCB.
2021/4867/IA CPDEmlm/2021/4867/I
A
26-10-2021
4701-18-800-86-00-00 70,00,000 0
13
KRP Urgent repair work of Division colony Quarters at Kalpetta - Phase II
2021/982/P1 WP8-2321/ACP/2021-2
022
26-04-2021
4701-13-800-93-00-00-00 20,00,000 0
14
Cheramangalam scheme 2021 22 Improvement and urgent rectification work to 16A Branch canal Ch 2300 to 2580km
2021/475/P1 IDMa/2021/475/P1
14-06-2021
4701-17-800-92-00-00-00 17,66,000 0
15
GPS I - Dam Safety 2021-22 - Clearing Jungle, Fencing Of Automatic Rain Gauge Station, Maintenance Of Control Room At Meenkara Dam
2021/662/P1 IDCr/2021/662/P1
30-09-2021
4700-80-800-97(00) 12,00,000 0
16
GPS - I - Dam Safety 2021-22 - Fencing Of Dam Catchment Area & Fixing Gate Near Njavilthodu & Office Premises Of Meenkara Dam Section
2021/661/P1 IDCr/2021/661/P1
11-10-2021
4700-80-800-97(00) 10,25,000 0
17
PP Renovation and modernisation works to thottassery field bothie of chemmanthodu branch canal of RBMC
2021/502/P1 IDMa /2021/506/P1
09-06-2021
4701-80-800-72(00) 10,00,000 0
18
PP-Rennovation and modernisation works to sluice no 4 of Chelluvadi branch canal of RBMC
2021/503/P1 IDMa/2021/503/P1
09-06-2021
4701-80-800-72(00) 9,00,000 0
19
PP Renovation and modernisation works to Kurukkanparambu field bothie of Malakkulam branch canal II nd reach of RBMC
2021/519/P1 IDMa/2021/519/P1
09-06-2021
4701-80-800-72(00) 12,00,000 0
20
CPP-MLBC - Modernisation of field channel of Sluice no.9 at ch 1/000 km(LHS) of Meenkara No.2 branch canal and Ch.1/010 km(RHS) of Meenkara No.2 branch canal
2021/362/2021 IDCr/2021/362/P1
23-06-2021
4701-80-800-72(00) 76,70,000 0
21
GPS II - DAM SAFETY 2021-22- CHULLIYAR DAM- CLEARING JUNGLE - FENCING OF AUTOMATIC RAIN GAUGE STATION & FIXING GATYES NEAR THE MASONRY DAM
2021/766/P1 IDCr/2021/306/P1
17-06-2021
4701-80-800-72(00) 35,00,000 0
22
KyIP ACP Plan 2021 22 Emergency rectification works before water distribution between Ch 0 350 and 0 400 Km of Narayamkulam FB
2022/127/P1 KYIPDPa/2022/127/P1

04-03-2022
4700-13-800-97-00-00-00 3,50,000 0
23
kyip ACP plan 2021 22 Rectification work to nochad distributary in between ch 02 500 to 03 000 km
2022/138/P1 KYIPDPa/2022/138/P1

15-03-2022
4700-13-800-97-00-00-00 6,60,000 0
24
KRP - Maintenance including BT surfacing road from Kakkavayal junction to Subdivision office near Dam site.
2021/1210/P1 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-98-00-00-00 1,50,00,000 0
25
KRP- Maintenance of Furniture and other T.P. including numbering
2021/1102/P1 FP2-1842/20
01-04-2021
4701-13-800-93-00-00-00 1,00,000 0
26
KRP - Land Acquisition in Reservoir area
KRP A1/2021-22 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-98-00-00-00 10,50,00,000 0
27
KRP - Preparation of Project report and Action plan for 2021- 2022
KRP/A2/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-98-00-00-00 60,000 0
28
KRP - Eviction of encroachers .
KRP/A3/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-98-00-00-00 5,00,000 0
29
KRP- Rectification work of unexpected contingencies of LBMC.
KRP/D1/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-92-00-00-00 25,00,000 0
30
KRP- Rectification work for unexpected contingencies of RBMC.
KRP/D15/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-92-00-00-00 25,00,000 0
31
KRP - Rectification of Kolliyil Branch Canal
KRP/E8/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 2,00,00,000 0
32
KRP - Provision for emergency rectification work of Branch canals of LBC
KRP/E10/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 20,00,000 0
33
KRP - Provision for emergency rectification work of Branch canals of RBC
KRP/E11/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-91-00-00-00 20,00,000 0
34
KRP - Investigation of distributaries of LBC Phase I
KRP/F1/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 20,00,000 0
35
KRP- Sub soil investigation of Manivayal distributary
KRP/F2/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 20,00,000 0
36
KRP- Sub soil investigation of Arimula distributary
KRP/F3/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 15,00,000 0
37
KRP- Sub soil investigation of Ponginithody distributary
KRP/F4/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 10,00,000 0
38
KRP- Sub soil investigation of Vallipatta distributary
KRP/F5/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 20,00,000 0
39
KRP- Sub soil investigation of Chikkalloor distributary
KRP/F6/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 3,00,000 0
40
KRP - Formation of Arimula Distributary including CD works
KRP/F7/2021 WP8-2321/ACP/2021-2
2
26-04-2021
4701-13-800-90-00-00-00 4,37,00,000 0
41
KRP- Land aquisition in Reservoir area
2022 1 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-98-00-00-00 10,50,00,000 0
42
KRP - Maintenance of Kaakkavayal - Vazhavatta Road - Phase II
2022 5 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-98-00-00-00 80,00,000 0
43
KRP- Formation of belt area road around the reservoir at Villoonni
2022 7 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-98-00-00-00 35,00,000 0
44
KRP - Maintenance of Project road from Subdivision office No.II, Vazhavatta to down stream Bridge across spilway channel
2022 8 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-98-00-00-00 15,00,000 0
45
KRP - Repair of corroded plates between the girder of the hoist bridge and foundation plates
2022 9 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-97-00-00-00 5,00,000 0
46
KRP - Maintenance of existing Inspection Bungalow at Vazhavatta
2022 11 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-97-00-00-00 2,00,000 0
47
KRP - Renovation of well and pump house near downstream of earthen dam and rehabilitation of existing RCC tank
2022 12 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-97-00-00-00 20,00,000 0
48
KRP - Providing Culvert near belt area road in Cheruvayal in Thomattuchaal Village.
2022 13 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-97-00-00-00 15,00,000 0
49
KRP - Maintenance of emergency shutters for irrigation sluice of dam and operating platform of radial gates.
2022 14 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-96-00-00-00 7,00,000 0
50
KRP- Rectification work of unexpected contingencies of LBMC.
2022 15 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 25,00,000 0
51
KRP- Arresting seepage of canal near 5500m of LBMC and allied works
2022 17 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 10,00,000 0
52
KRP - Rectification of leading drain near Ch. 1700m of LBMC
2022 18 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 10,00,000 0
53
KRP- Construction of culvert near Ch. 3200 of LBMC
2022 20 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 10,00,000 0
54
KRP- Providing hand rail and sealing of expansion joints of the aqueduct between Ch 485m and 585m of LBMC
2022 23 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 20,00,000 0
55
KRP- Maintenance of Canal shutters of LBMC
2022 24 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 20,00,000 0
56
KRP - Cutting branches of trees near Swargamkunnu, mele Vazhavatta of Kakkavayal-Vazhavatta road and Division colony quarters at Kalpetta and shifting of rosewood log near reservoir rim .
2022 25 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 75,000 0
57
KRP- Rectification work for unexpected contigencies of RBMC.
2022 26 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 25,00,000 0
58
KRP-Jungle clearance and silt removal of RBMC between Ch. 3700m and Ch. 6305m including sealing of expansion joints.
2022 27 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 10,00,000 0
59
KRP - Jungle clearance and silt removal of RBMC
2022 28 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 10,00,000 0
60
KRP - Eviction of encroachers from government land of RBMC
2022 34 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-92-00-00-00 5,00,000 0
61
KRP-Rectification of breached portion of Padinjareveedu branch canal near Ch. 3925m.
2022 38 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 2,00,00,000 0
62
KRP- Providing lining, Jungle clearance and desilting of Padinjareveedu branch canal from Ch.3200m to Ch. 8940m including construction of surplus escape and sealing of expansion joints.
2022 39 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 1,30,00,000 0
63
KRP- Repair works of canal inspection road from Ch.1998m to Ch.2248m of Padinjareveedu branch canal
2022 40 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 20,00,000 0
64
KRP-Renovation of water supply arrangements and pumping lines of Division office colony at Kalpetta.
2022 64 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-93-00-00-00 20,00,000 0
65
KRP - Rectification of Kolliyil Branch Canal
2022 41 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 2,00,00,000 0
66
KRP - Provision for emergency rectification work of Branch canals of LBC
2022 42 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 20,00,000 0
67
KRP- Maintenance of Branch Canal shutters of LBMC.
2022 43 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 20,00,000 0
68
KRP - Provision for emergency rectification work of Branch canals of RBC
2022 46 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 20,00,000 0
69
KRP- Rectification works of Kariambady branch canal lining of RBMC between Ch. 0m to 8500m-Phase III
2022 47 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 60,00,000 0
70
KRP- Making inspection road motorable of Kariyambady branch canal and allied works from Ch.4100m to 4400m
2022 48 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-91-00-00-00 25,00,000 0
71
KRP - Investigation of distributaries of LBC Phase I
2022 50 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 20,00,000 0
72
KRP- Sub soil investigation of Manivayal distributory
2022 51 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 20,00,000 0
73
KRP- Sub soil investigation of Arimula distributory
2022 52 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 20,00,000 0
74
KRP- Sub soil investigation of Ponginithody distributory
2022 53 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 10,00,000 0
75
KRP- Sub soil investigation of Vallipatta distributory
2022 54 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 20,00,000 0
76
KRP - Formation of Arimula Distributary including CD works
2022 56 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 4,37,00,000 0
77
KRP - Formation of Vallipetta Distributary including CD works
2022 57 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 7,37,00,000 0
78
KRP - Formation of Chikkaloor Distributary including CD works
2022 58 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 83,00,000 0
79
KRP - Formation of Pongithody Distributary including CD works
2022 59 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 4,38,00,000 0
80
KRP - Formation of Manivayal Distributary including CD works
2022 60 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-90-00-00-00 6,93,00,000 0
81
KRP-Providing water connection from KWA, and allied works to the Division office at Kalpetta.
2022 62 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-93-00-00-00 5,00,000 0
82
KRP-Providing motor, pipeline and protection net for existing well near pumphouse No.1 at Emily at Kalpetta colony
2022 65 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-93-00-00-00 7,00,000 0
83
KRP- Upkeeping of Division office and quarters of Karapuzha colony at Kalpetta.
2022 70 WP8-4118/ACP/2022-2
3
17-08-2022
4701-13-800-93-00-00-00 7,00,000 0
84
GENERAL-AIP-Bhavani Basin-Goolikkadavu-Chittur Road-Construction of side protection wall, Laying of Guard stone at dangerous curves and providing signboard at necessary locations
IRR/P1/EST/5730/2022_5_1_1 AS/59D/22/22595
03-10-2022
4701-12-800-97-00-00-00 50,00,000 0
85
GENERAL-MP-RBC--Modernization of CADA field channel - Urgent rectification works to the field channel between Ch. 0/000 km to 0/350 km offtake at Ch.2/853 km of Mankara Branch Canal-General Civil Work
IRR/PI/EST/3630/2022_5_3_2 AS/59D/22/22499
03-10-2022
4701-80-800-72-00-00-00 15,50,000 0
86
KyIP-ACP(PLAN)2022-23 Urgent reconstruction of under tunnel and canal at breached portion of RBMC at ch 6/300 Km
IRR/P1/EST/413/2022_5_1_1 AS/59D/22/21560
23-08-2022
4700-13-800-97-00-00-00 80,00,000 0
87
KyIP-ACP(PLAN) 2022-23 -Urgent Rectification work to LBMC between Ch 8/750 Km and 8/900 Km
IRR/P1/EST/5863/2022_5_1_1 AS/59D/22/21561
23-08-2022
4700-13-800-97-00-00-00 25,00,000 0
88
GENERAL-KS-CADA-2022-23-MP LBC Modernization of field channel and drains renovation off take from ch 23050 m of LBMCGeneral Civil Work
IRR/PI/EST/4210/2022_5_1_1 AS/59D/22/21239
12-08-2022
4701-80-800-72-00-00-00 16,00,000 0
89
BSP - Rectification & De- silting of Main canal from ch 150m to 1130m and ch 1500m to 2730m.
IRR/PI/EST/1713/2022_5_1_1 WP3/1774/2021
30-03-2022
4700-28-800-92-00-00-00 2,60,00,000 0
90
GENERAL-NIRA 2022-23-Cheramangalam scheme-2022-23 Improvements and urgent rectification work to Main canalCh10800 to 10930m-General Civil Work
IRR/PI/EST/5734/2022_5_2_1 AS/59D/22/21506
22-08-2022
4701-80-800-72-00-00-00 20,00,000 0
91
GENERAL-NIRA 2022-23-Cheramangalam scheme-2022-23 Improvements and urgent rectification work to 24 Field boothie ch1440 to 1940m-General Civil Work
IRR/PI/EST/5734/2022_5_13_12 AS/59D/22/21508
22-08-2022
4701-80-800-72-00-00-00 19,00,000 0
92
BSP-Surplus escape for Main canal and Construction of Leading drain.
IRR/PI/EST/2148/2022_5_1_1 WP3/1774/2021
30-03-2022
4700-28-800-92-00-00-00 40,00,000 0
93
GENERAL-NIRA 2022-23-Cheramangalam scheme-2022-23 Improvements and urgent rectification work to Main canalch1500 to 1600m-General Civil Work
IRR/PI/EST/5734/2022_5_1_1 AS/59D/22/21507
22-08-2022
4701-80-800-72-00-00-00 16,50,000 0
94
BSP-Assesment of Strength-Conducting Load test on completed parts of Aqueduct from Ch1130 to 1500m of main canal.
2021 3 WP3/1774/2021
30-03-2022
4700-28-800-92-00-00-00 12,30,000 0
95
BSP-Soil Investigation of Venniyode branch canal-Construction of an aqueduct from ch 3715m to ch 3975m, including CD works.
2021 4 WP3/1774/2021
30-03-2022
4700-28-800-91-00-00-00 3,00,000 0
96
Annual maintenance of mechanical work for shutters operating system and sluice shutters of chamravattom RCB
EST NOIRRMHEST155520221611 RDER No. AS/59D/22/
21789 Dated: 31-08-2022
31-08-2022
4701-18-800-86-00-00 25,00,000 0
97
BSP-Assesment of Strength of completed parts of Aqueduct from Ch 20m to 570 m of Venniyode Branch Canal.
2022/181/P1 WP3/1774/2021
30-03-2022
4700-28-800-91-00-00-00 2,00,000 0
98
BSP- Investigation of distributories Kurumbala, Kuppadithara andproviding boundary stone for land acquisition of Kappumkunnu and Venniyode distributaries.
2022/202/P1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 8,30,000 0
99
BSP- Soil Investigation for the Aqueduct portions in Kappumkunnu, Peral, Veetikkamoola and Venniyode distributaries.
2022/204/P1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 35,00,000 0
100
GENERAL-KyIP-ACP(PLAN) 2022-23 -Urgent rectification work to Kallur branch canal between Ch. 3/100 Km and 3/225Km-General Civil Work
IRR/PI/EST/98/2022_5_3_2 AS/59D/22/21601 Dat
ed: 25-08-2022
25-08-2022
4700-13-800-97-00-00-00 16,00,000 0
101
KyIP - ACP (Plan) -2022 - 2023 - Urgent rectification of Kakkodi branch canal from ch: 26/500 to 27/500 km
IRR/PI/FL/276/2022 AS/59D/22/21229 Dat
ed: 19-08-2022
19-08-2022
4700-13-800-97-00-00-00 20,00,000 0
102
BSP- Construction of Kappumkunnu Distributary from ch 0 m to 735 m including CD Works (Chainage as per new alignment)
2021 9 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 3,24,00,000 0
103
BSP- 2021- Site Clearing and Boundary Stone laying for land acquisition for distributaries of Banasura Sagar Project.
2021/668/P1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 3,40,000 0
104
BSP- Construction of Kappumkunnu Distributary from Ch 1020 m to 1500 m including CD works (Chainage as per new alignment).
IRR/PI/EST/1002/2022_5_1_1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 99,00,000 0
105
BSP- Construction of Kappumkunnu Distributary from Ch 1500 m to 1620 m including CD works (Chainage as per new alignment).
IRR/PI/EST/1592/2022_5_1_1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 70,00,000 0
106
BSP- Construction of aqueduct from Ch 0 m to 252 m of Peral distributary including CD Works
2021 13 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 1,00,00,000 0
107
BSP- Construction of Peral distributary from Ch 1290 m to 1755 m including CD Works.
2021 16 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 1,90,00,000 0
108
BSP- Construction of Peral distributary from Ch 1755 m to 2045 m including CD Works.
IRR/PI/EST/1/2022_5_2_1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 90,00,000 0
109
BSP- Construction of Peral distributary from Ch 2045 m to 2280 m including CD Works.
2022/293/P1 WP3/1774/2021
30-03-2022
4700-28-800-90-00-00-00 70,00,000 0
110
GENERAL-CPP-MLBC -Modernisation of field channel at ch.3/500km Right side of Pallassena Distributory (Alampara) and field channel at.ch 1/200km Right side of Old Arampadam Distributory-General Civil Work
IRIRR/PI/EST/510/2022_5_1_1 ORDER No. AS/59D/22
/22827 Dated: 11-10-2022
11-10-2022
4701-80-800-72-00-00-00 24,00,000 0
111
GENERAL-CPP-MLBC-Modernisation of field channel at ch.16/550km Right side of Arampadam Branch canal (Thekkumpuram)-General Civil Works
IRIRR/PI/EST/511/2022_5_1_1 ORDER No. AS/59D/22
/22823 Dated: 11-10-2022
11-10-2022
4701-80-800-72-00-00-00 24,00,000 0
112
GENERAL Chitturpuzha Project Thembaramadakku System - CADA Works-CPP TMSModernization of CADA field channel from sluice No 5 LHS tail end of field channel from sluice No 3 RHS of Chenamooli distributory of Panayur branch canal. General Civil Work
IRRIRR/PI/EST/3368/2022_5_3_2 ORDER No. AS/59D/22
/22825 Dated: 11-10-2022
11-10-2022
4701-80-800-72-00-00-00 20,50,000 0
113
GENERALChitturpuzha Project Thembaramadakku System 1 CADA WorksCPPTMS-Modernization of Field Channel From Sluice No40 at Ch5210kmLHS of Nallepilly Branch Canal.General Civil Work
IRR/PI/EST/4872/2022_5_1_1 ORDER No. AS/59D/22
/22826 Dated: 11-10-2022
11-10-2022
4701-80-800-72-00-00-00 29,00,000 0
114
GENERAL Chitturpuzha Project Thembaramadakku System 1 CADA WorksCPPTMSModernization of Field Channel From Sluice No35 From 0000km to 1100km at Ch4 590km LHS of Nallepilly Branch CanalGeneral Civil Work
IRR/PI/EST/4872/2022_5_2_1 ORDER No. AS/59D/22
/22824 Dated: 11-10-2022
11-10-2022
4701-80-800-72-00-00-00 45,50,000 0
115
CADA-CPP-KKPS-Modernization of field channel between ch.0/110 and 0/650m starting from ch.25/120m(LHS) of main canal.
IRR/PI/EST/2102/22_5_1_1 AS/59D/22/21553
23-08-2022
4701-80-800-72-00-00-00 8,90,000 0
116
MVIP Upkeeping Muttom colony for the year 2022 23
IRR/PII/EST/4766/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-98(00) 3,50,000 0
117
KRP-Maintenance of branch canal shutters of LBMC
IRR/MH/EST/8360/2022/16_1_1 WP8-4118/ACP/2022-2
3
10-02-2023
4701-13-800-91-00-00-00 20,00,000 0
118
KRP- Maintenance of branch canal shutters of RBMC
IRR/MH/EST/3975/2022/16_2_1 WP8-4118/ACP/2022-2
3
10-02-2023
4701-13-800-91-00-00-00 20,00,000 0
119
KRP - Maintenance of Kaakkavayal - Vazhavatta Road - Phase II
IRR/P1/EST/8237/2022_5_1_1 WP8-4118/ACP/2022-2
3
10-02-2023
4701-13-800-98-00-00-00 2,70,00,000 0
120
GENERAL Pazhassi Irrigation Project PyIP Rectification of Mahe Branch Canal near ch 14 500 km for the year 2022-23-General Civil Work
IRR/PI/EST/4272/2022 AS/59D/22/24255
14-12-2022
4700-12-800-97-00-00-00 1,00,000 0
121
GENERAL-MP-LBC-MS-CADA-2022-23-MP-LBC-Modernization of field channels- Renovation of field channel Sluice 3A of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3198/2022_5_2_1 AS/59D/22/21258
12-08-2022
4701-80-800-72-00-00-00 4,50,000 0
122
GENERAL-MP-LBC-MS-CADA-2022-23-MP-LBC-Modernization of field channels- Renovation of field channel Sluice 3 of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3198/2022_5_3_2 AS/59D/22/21254
12-08-2022
4701-80-800-72-00-00-00 6,00,000 0
123
GENERAL-KS-CADA-2022-23-MP LBC Modernization of field channel and drains renovation off take from ch 31/200 km of LBMC-General Civil Work
IRR/PI/EST/4210/2022_5_2_1 AS/59D/22/20978
05-08-2022
4701-80-800-72-00-00-00 9,00,000 0
124
GENERAL-MP-LBC-MS-CADA-2022-23-MP-LBC- Modernization of field channels- Renovation of field channel Sluice 24 of Peringottukurussi canal-General Civil Work
IRR/PI/EST/3198/2022_5_1_1 AS/59D/22/21256
12-08-2022
4701-80-800-72-00-00-00 14,50,000 0
125
GENERAL-ES-CADA-2022-23-MP-LBC-Modernisation of Field channels and Drains - Renovation of field channel offtake Ch 0/200 km of Pazhambalakkod branch canal of chulannur canal in Kuruthikkode Padasekharamithi. -General Civil Work
IRR/PI/EST/4188/2022_5_1_1 AS/59D/22/21185
11-08-2022
4701-80-800-72-00-00-00 13,00,000 0
126
KRP-Maintenance of Canal shutters of LBMC
8630/2022_16_1_1 WP8-4118/ACP/2022-2
3
10-02-2023
4701-13-800-92-00-00-00 20,00,000 0
127
KRP-Maintenance of canal shutters of RBMC
3975/2022_16_2_1 WP8-4118/ACP/2022-2
3
10-02-2023
4701-13-800-92-00-00-00 20,00,000 0
128
BSP- 2021- Site Clearing and Boundary Stone laying for land acquisition for distributaries of Banasura Sagar Project.
'2021/668/P1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
129
BSP- Construction of Kappumkunnu Distributary from ch 0 m to 735 m including CD Works (Chainage as per new alignment)
' G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
130
BSP - Construction of Kappumkunnu Distributary from ch 735 m to 1020 m including CD Works - Chainage as per new alignment
'2022/210/P1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
131
BSP- Construction of Kappumkunnu Distributary from Ch 1020 m to 1500 m including CD works - Chainage as per new alignment
IRR/PI/EST/1002/2022_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
132
BSP- Construction of Kappumkunnu Distributary from Ch 1500 m to 1620 m including CD works - Chainage as per new alignment.
IRR/PI/EST/1592/2022_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
133
BSP- Construction of aqueduct from Ch 0 m to 252 m of Peral distributary including CD Works
' G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
134
BSP- Construction of Peral distributary from Ch 252 m to 590 m including CD Works
IRR/PI/EST/01/2022_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
135
BSP- Construction of Peral distributary from Ch 590 m to 1290 m including CD Works
'2022/176/P1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
136
BSP- Construction of Peral distributary from Ch: 1755 m to 2045 m including CD Works.
IRR/PI/EST/1/2022_5_2_1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
137
BSP- Construction of Peral distributary from Ch 1290 m to 1755 m including CD Works.
' G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
138
BSP- Construction of Peral distributary from Ch 2045 m to 2280 m including CD Works.
'2022/293/P1 G.O.(MS)No. 4/99/Ir
-D 30-01-1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
139
BSP - Construction of Kappumkunnu distributary from Ch. 3350 to Ch. 3629 including CD works( Chainage as per new alignment.
EST 1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
140
BSP-Constuction of Peral distributary Left branch from Ch.0 to Ch.300m including CD works
EST 2 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
141
BSP-Constuction of Peral distributary Left branch from Ch.300 to Ch.820 m including CD works
EST 3 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
142
BSP-Constuction of Veettikkamoola distributary from Ch.0 to Ch.200m including CD works
IRR/PI/FL/5798/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
143
BSP- Constuction of Veettikkamoola distributary from Ch.200m to Ch.655m including CD works
IRR/PI/EST/5799/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
144
BSP-Constuction of Veettikkamoola distributary from Ch.655m to Ch.1090m including CD works
IIRR/PI/EST/5801/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
145
BSP-Constuction of Veettikkamoola distributary from Ch.1090 to Ch.1300m including CD works
IRR/PI/EST/5802/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
146
BSP-Constuction of Venniyode distributary from Ch.0 to Ch.120m including CD works.
IRR/PI/FL/5140/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
147
BSP-Construction of Venniyode distributary from Ch.120m to Ch.270m including CD works
IRR/PI/FL/5225/2023 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
148
BSP-Constuction of Venniyode distributary from Ch.270m to Ch.600m including CD works.
IRR/PI/EST/5227/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
149
BSP-Constuction of Venniyode distributary from Ch.600m to Ch.860m including CD works
IRR/PI/EST/5230/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
150
BSP-Constuction of Venniyode distributary from Ch.860m to Ch.1500m including CD works
IRR/PI/EST/5231/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
151
BSP-Constuction of Venniyode distributary from Ch.1500m to Ch.1620m including CD works
IRR/PI/EST/5803/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
152
BSP-Constuction of Venniyode distributary from Ch.1620m to Ch.1950m including CD works.
IRR/PI/EST/5805/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
153
BSP-Constuction of Venniyode distributary from Ch.1950m to Ch.2130m including CD works
IRR/PI/EST/5806/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
154
BSP-Constuction of Venniyode distributary from Ch.2130m to Ch.2825m including CD works
IRR/PI/EST/7347/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
155
BSP- Surplus escape for Disributaries
EST 17 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
156
BSP-Constuction of Kurumbala distributary from Ch.0m to Ch.840m including CD works
IRR/PI/EST/5356/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
157
BSP-Constuction of Kurumbala distributary from Ch.840m to Ch.1680m including CD works
IRR/PI/EST/5356/2023_5_2_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
158
BSP-Constuction of Kuppadithara distributary from Ch.0m to Ch.600m including CD works
IRR/PI/EST/5843/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-90-00-00-00 37,88,00,000 0
159
BSP- Rennovation of Division office building ,improving sanitation facilities of staff quarters and construction of car porch and other maintenance works at Padinjarathara.
IRR/PI/EST/4774/2023_5_1_1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-93-00-00-00 37,88,00,000 0
160
BSP- Maintenance works to dormitory and demolition of damaged Type-III quarters at Vellamunda
IRR/PI/TR/5143/2023_5_1_1/1 G.O.(MS)No. 4/99/Ir
-D 30/01/1999
00-00-0000
4700-28-800-93-00-00-00 37,88,00,000 0

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
MVIP -RBMC- Rectification works to the Foot Bridge/ Super passages(4 nos) between ch 0 to 8000m
2021/871/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-92(00) 40,00,000 0
2
IIP-Annual maintenance of low level canal from ch. 2700m to 6200m for the year 2021-2022
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 11,00,000 0
3
IIP-Main canal-Construction of leading channel and providing DI pipe for recharging Puthenkulam in Malayatoor Gramapanchayath from chelachuvadu sluice.
2021/808/P2 WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 50,00,000 0
4
Supplying furniture, other accessories and lifting curtain in inspection Bungalow in Angamaly
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 6,00,000 0
5
IIP-LLC-Annual maintenance of Low Level Canal between ch.0m and ch.2700m for the year 2021-2022.
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 4,00,000 0
6
IIp-Low level canal- Land Acquisition for Kanjoor Thekkumbhagam branch canal ch. 0 m to 3500 m (Balance work)
G.O(Rt)No.810/2018/
WRD
12-11-2018
4700-20-800-92(00) 4,89,00,000 0
7
IIP-Land acquisition of Kanjoor Thekkumbhagam branch canal
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 2,00,00,000 0
8
IIP - C.R.D- Scheme- Construction of compound wall for quarters compound at Palissery
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 5,00,000 0
9
IIP-Rewiring and electrical fittings of Inspection Bunglowat Bhoothathankettu
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 5,00,000 0
10
IIP - Modification of RBMC bet .ch.23/650 to 25/000 km including CD works (balance work)
WP2-1402/2021/D5
01-04-2021
4700-20-800-92(00) 8,00,000 0
11
IIP - CRDS- Repair works to cross shutter near Perambra branch canal at RBMC ch.32/850km & cross shutter near Muriyad branch canal at RBMC ch.34/224km
2021/468/P2 WP2-1402/2021
01-04-2021
4700-20-800-92(00) 5,00,000 0
12
IIP-LLC Construction of Kanjoor Thekkumbhagam branch canal from Ch. 0 to 400 m
WP2-4718/96/D7
07-10-2020
4700-20-800-92(00) 1,00,00,000 0
13
Construction Low level pressure syphon from ch.13818.50 m to 13876.5 m railway crossing portion.(Deposit work by railway)
1123/2015/WRD
28-12-2015
4700-20-800-92(00) 21,50,00,000 0
14
Construction of LLC pressure Syphon from Ch.13818.5 m to 13879.50 m (Deposit work by Railway - Balance amount to be deposited as way leave charge)
G.O(Rt )No. 9/2017/
WRD
04-01-2017
4700-20-800-92(00) 62,50,000 0
15
Construction of LLC pressure syphon from ch. 13818.5 m to 13879.50 m (Deposit work by Railway- )
G.O.(Rt)No. 987/201
7/WRD
11-12-2017
4700-20-800-92(00) 10,00,000 0
16
Construction of LLC pressure syphon from Ch.13818.5 m to 13879.50 m(Deposit work by Railway - Balance amount)
G.O.(Rt)No.810/2018
/WRD
12-11-2018
4700-20-800-92(00) 37,00,000 0
17
IIP-Land acquisition for flush escape at ch. 14623 m of low level canal and leading channel to Manjalithodu
WP2-4718/96/D7
09-07-2019
4700-20-800-92(00) 20,00,000 0
18
Construction of LLC pressure Syphon from Ch.13818.5 m to 13879.50 m ( Deposit work by Railway - ) (Balance amount)
WP2-4718/96/D7
09-07-2019
4700-20-800-92(00) 11,00,000 0
19
construction of flush escape for tail end discharge at ch. 14623m of Low level canal and leading channel to Manjali Thodu.
WP2-4718/96/D7
09-07-2019
4700-20-800-92(00) 70,00,000 0
20
LAND ACQUISITION FOR FLUSH ESCAPE AT ch. 14623m OF LOW LEVEL CANAL AND LEADING CHANNEL TO MANJALITHODU.
GO(RT) NO.987/2017/
WRD
11-12-2017
4700-20-800-92(00) 30,00,000 0
21
LAND ACQUISITION FOR FLUSH ESCAPE AT ch. 14623m OF LOW LEVEL CANAL AND LEADING CHANNEL TO MANJALITHODU.
GO(RT)NO.810/2018/W
RT
12-11-2018
4700-20-800-92(00) 80,00,000 0
22
MVIP-Vilayamcode distributory -Annual maintenance from ch 0m to 3425m for the year 2021-22
2021/333/P2 .WP2-1403/2021/D10
01-04-2021
4700-22-800-90(00) 1,50,000 0
23
MVIP Rectification works to breached porion of Peruva distributary from Ch1800m to 1850m damaged due to flood
2018/829/P2 WP2/3574/96/D5(3)/V
ol-II
16-10-2019
4700-22-800-90(00) 1,31,00,000 0
24
MVIP-Kakkoor distributory-Improvements of canal bund road between ch.0/100 to 1/600 of Kakkoor distributory
2021/1443/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-90(00) 19,50,000 0
25
MVIP-Malankara Dam fully comprehensive annual maintenance of shutter mortar and other connected eletrical installation at Malankara dam
2021/224/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-97(00) 4,30,000 0
26
MVIP-Rewiring of staff quarters near Malankara dam site-10 Nos (Electrical work).
2021/230/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-93(00) 5,00,000 0
27
MVIP-Rewiring of electrical installation of IB at Muttom (Electrical work).
2021/225/P2 WP2-1403/2021/D10
01-04-2021
4700-22-800-93(00) 8,00,000 0
28
IIP-LLC-Improvements to inspection road between ch.9525m to 10490m.
2018/48/P2 987/2017/WRD
11-12-2017
4700-20-800-92(00) 23,00,000 0
29
MVIP-Providing solar panal to High mast light,Dam top light and other lights in dam and premises
WP2-3574/96/D5(3)Vo
l.III
16-10-2019
4700-22-800-97(00) 15,00,000 0
30
MVIP-Arakkulam bridge at FRLarea to instal a temperory cross bar to control the traffic of heavy vehicles
WP2-3574/96/D5(3)/V
oll
16-10-2019
4700-22-800-98(00) 2,00,000 0
31
MVIP- Rewiring of electrical installation of IB at Muttom
WP2-1403/2021/D10
31-03-2021
4700-22-800-93(00) 8,00,000 0
32
CADA Construction of field channel from spout at ch.2700m of Kidangoor minor distributory to Muthalady padasekharam
2018/85/P2 GO(Rt)No.80/2018/WR
D
06-02-2018
4700-22-800-84-00-00-00 2,50,000 0
33
MVIP- Micro/ Drip Irrigation- Proposal to Kunthanikunnu- Nakapuzha in Kalloorkadu Grama Panchayath in Ernakulam District
2019/2459/P2 G.O.(Ms)No.41/2019/
WRD
16-10-2019
4700-22-800-84-00-00-00 10,00,00,000 0
34
MVIP-Malankara Dam fully comprehensive annual mainrtenace of shutter motor and other connected electrical installation at Malankara Dam (Electrical work)
WP2-1403/2021/D10
31-03-2021
4700-22-800-97(00) 8,28,45,000 0
35
MVIP-CADA Construction of fiel channel and side protection of existing drain near chainage 11000 RBMC
2019/804/P2 11011/72/2014-CADWM
/906-929
11-03-2020
4700-22-800-84-00-00-00 10,00,000 0
36
MP LBC Modernization of field channels and drains renovation to tail end field channel of vilayannur no.2 branch canal of chulannur branch canal in vilayannur padasekhara samithi
2021/439/P1 IDMa /2021/439/P1
10-06-2021
4701-80-800-72(00) 5,10,000 0
37
PP Renovation and modernization works to II nd reach of thoducadu field bothie of LBMC
2021/613/P1 IDMa /2021/613/P1
11-06-2021
4701-80-800-72(00) 1,00,000 0
38
MP LBC Modernization of field bothie channel renovation of field channel sluice no 1 of bemanniyur branch canal of perigottukurussi canal in cherakulankara padasekhara samithi at perigottukurussi gramapanchayath
2021/606/P1 IDMa /202/1606/P1
14-06-2021
4701-80-800-72(00) 6,00,000 0
39
MP-RBC-cada work-Urgent rectification works to remaining portion of cada channel starting from the tail end of vallikkode-1 branch canal
2021/399/P1 IDMa/2021/399/P1
14-06-2021
4701-80-800-72(00) 3,00,000 0
40
MP-lBC-Modernisation of field channels and Drains-Construction ofTD field channel of kunisseri No.1 branch canal to Thenarippadam padasekhara samithi in Erimayur panchayath
2021/324/P1 IDMa/324/P1
15-06-2021
4701-80-800-72(00) 7,00,000 0
41
MP RBC a modernization of cada field channel urgent rectification works to the field channel b/w ch 0/000 km to 0/700 km off take at ch 5/450 km of pathirippala branch canal
2021/481/P1 IDMa /2021/481/P1
15-06-2021
4701-80-800-72(00) 3,00,000 0
42
MP RBC a modernization of cada field channel urgent rectification works to the tail end field channel of mannur md b/w ch 0/600 km to 0/900 km
2021/480/P1 IDMa 2021/480/P1
15-06-2021
4701-80-800-72(00) 3,00,000 0
43
MP-RBC-Cada work-Urgent rectification works to cada channel starting from the sluice at Ch.1/650 km of vallikkode-1branch canal near mahali Anganvadi
2021/397/P1 IDMa/2021/397/P1
15-06-2021
4701-80-800-72(00) 7,00,000 0
44
MP LBC a modernization of cada field channel urgent works to cada from the ch 3/200 km of main RB canal (phase two)
2021/336/P1 IDMa /2021/336/P1
15-06-2021
4701-80-800-72(00) 5,00,000 0
45
MP-RBC-Cada work-Urgent rectification works to the cada channel between Ch 0/200km to 0/500 km starting from the sluice at Ch19/820 km of RBMC
2021/396/P1 IDMa/2021/396/P1
15-06-2021
4701-80-800-72(00) 10,00,000 0
46
MP RBC a modernization of cada field channel a urgent rectification works to the tail end field channel (left direction of right diverted field channel ) of thenur branch canal b/w ch 0/350 km to ch 0/600 km including fixing of net inside the filed channel
2021/494/P1 IDMa /2021/494
16-06-2021
4701-80-800-72(00) 5,00,000 0
47
MP-RBC Modernisation of CADA field channel urgent works to CADA from the ch 4/700 Tail end of Puduppariyaram Branch canal (near Temple ) phase two
2021/378/P1 IDMa/2021/378/P1
15-06-2021
4701-80-800-72(00) 5,00,000 0
48
MP RBC a modernization of cada field channel a urgent rectification works to the field channel b/w ch 0/000 km to 0/200 km of palappuram branch canal
2021/493/P1 IDMa /2021/493/P1
16-06-2021
4701-80-800-72(00) 5,00,000 0
49
MP-Rbmc-Modernisation of CADA field channel -urgent works to CADA from the ch 4/700 tail end of Puduppariyaram branch canal (Near Temple) phase two
2021/337/P1 IDMa/2021/337P1
15-06-2021
4701-80-800-72(00) 5,00,000 0
50
MP RBC a modernization of cada field channel a urgent rectification works to the field channel including construction of culvert b/w ch 0/100 km to 0/600 km of tail end field channel of mankurussi branch canal
2021/528/P1 IDMa /2021/528
16-06-2021
4701-80-800-72(00) 5,00,000 0
51
MP RBC Modernization of cada field channel and drain renovation of TD field channel of tarur branch canal of chulannur canal in mannamkode tarur tail end padasekhara samithis
2021/627/P1 IDMa /2021/627/P1
16-06-2021
4701-80-800-72(00) 4,00,000 0
52
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to Main canal Ch 4/700 to 4/800 km
2021/467/P1 IDMa/2021/467/P1
07-06-2021
4701-17-800-92-00-00-00 9,20,000 0
53
Cheramangalam scheme 2021-22 improvement and urgent rectification work to main canal ch 5/400 to ch 5/500
2021/470/P1 IDMa 2021/470/P1
07-06-2021
4701-17-800-92-00-00-00 11,00,000 0
54
Cheramangalam scheme 2021-22 improvement and urgent rectification work to main canal ch 6/900 to 7/000
2021/469/P1 IDMa /2021/469/P1
07-06-2021
4701-17-800-92-00-00-00 12,20,000 0
55
Cheramangalam scheme 2021-22 improvement and urgent rectification work to main canal ch 3/400 to ch 3/500 km
2021/466/P1 IDMa /2021/466/P1
07-06-2021
4701-17-800-92-00-00-00 11,10,000 0
56
Cheramangalam scheme 2021-22 improvement and urgent rectification work to Ernakulam branch canal ch 1/500 to 1/620
2021/464/P1 IDMA /2021/464/P1
07-06-2021
4701-17-800-92-00-00-00 11,23,000 0
57
Cheramangalam scheme 2021-22 improvement and urgent rectification work 16A branch canal ch 0/200 to ch 0/500 km
2021/474/P1 IDMa 2021/474/P1
17-06-2021
4701-17-800-92-00-00-00 24,50,000 0
58
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to 18 field boothie ch 0/250 to 0/500
2021/472/P1 IDMa/2021/472/P1
07-06-2021
4701-80-800-72(00) 9,30,000 0
59
Cheramangalam scheme 2021-22 improvement and urgent rectification work to 24 field boothie ch 0630 to ch 1/440
2021/459/P1 IDMa 2021/459
17-06-2021
4701-17-800-92-00-00-00 31,51,000 0
60
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to 22 Field Boothie
2021/477/P1 IDMa/2021/477/P1
07-06-2021
4701-80-800-72(00) 5,70,000 0
61
Cheramangalam scheme 2021-22 improvement and urgent rectification work to 26 field boothie
2020/1571 IDMa 2021/1571
17-06-2021
4701-17-800-92-00-00-00 30,50,000 0
62
Cheramangalam scheme 2021-22 improvement and urgent rectification work to 15 field boothie ch 0/340 to 0/760
2021/460/P1 IDMa
17-06-2021
4701-17-800-92-00-00-00 15,50,000 0
63
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to main canal Ch5/800 to 5/900
2021/473/P1 IDMa/2021/473/P1
07-06-2021
4701-80-800-72(00) 12,40,000 0
64
Cheramangalam scheme improvement and urgent rectification work to 23 field boothie ch 0/550 km to 1/120 km
2021/637/P1 IDMa /2021/637/P1
23-06-2021
4701-17-800-92-00-00-00 19,60,000 0
65
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to main canal Ch 0/950 to 1/050
2021/465/P1 IDMa/2021/465/P1
07-06-2021
4701-80-800-72(00) 11,10,000 0
66
Cheramangalam scheme 2021-22 improvement and urgent rectification work to 16A branch canal ch 1/200 to 1/480
2021/476/P1 IDMa /2021/476/P1
14-06-2021
4701-17-800-92-00-00-00 17,50,000 0
67
Cheramangalam scheme 2021-22 Improvement and urgent rectification work to 16A Branch canal Ch 2/300 to 2/580
2021/475/P1 IDMa/2021/475/P1
14-06-2021
4701-80-800-72(00) 17,66,000 0
68
Mangalam project dam section improvement of kalavam padam distributary ch 5/315 to the field canal (choriyamkulam ) at ch 0/000 to 0/600 km of LBMC
2021/226/P1 IDMa /2021/226/P1
14-06-2021
4701-80-800-72(00) 19,70,000 0
69
MP LBC modernization of field channel renovation of field channel sluice no 25 offtake from ch 10/570 km of perigottukurussi canal in viluruthy padasekhara at Mathur gramapanchayath
2021/605/P1 IDMa /2021/605/P1
14-06-2021
4701-80-800-72(00) 16,50,000 0
70
PP-Renovation and modernisation works to thandalode field boothie of LBMC
2021/420/P1 IDMa/2021/420/P1
11-06-2021
4701-80-800-72(00) 12,00,000 0
71
MP LBC Modernization of field channels and drain renovation of TD field channel of tarur branch canal of chulannur canal in mannamkode ,tarur tail end padasekhara samithis
2021/321/P1 IDMa /2021/321/P1
16-06-2021
4701-80-800-72(00) 17,40,000 0
72
PP Renovation and modernisation works to the IInd reach of field bothie at sluice no 4 of Nemmara branch canal of LBMC
2021/422/P1 IDMa/2021/420/P1
11-06-2021
4701-80-800-72(00) 12,00,000 0
73
MP LBC CADA Modernization of field channels urgent rectification works to tail end field channel of thasrak branch canal in alanyankad padasekhara samithis of peruvemba gramapanchayath
2021/607/P1 IDMa /2021/607/P1
17-06-2021
4701-80-800-72(00) 17,50,000 0
74
Micro irrigation-providing irrigation water from Kuravilangadu distributary to District Agricultural Farm and state seed tarm at Kozha in Kottayam District.
2019/3117/P2 Wp2-2374/2018/D5(3)

15-11-2019
4700-22-800-84-00-00-00 43,00,000 0
75
IIP- Main canal Flood damages 2021 Repair and restoration of damaged side wall of leading channel to Karakkattuchira from Main Canal Ch 28500 m
2021/1629/P2 WP2-1402/2021/D5
30-11-2021
4700-20-800-92(00) 10,73,65,000 0
76
I.I.P. - GPS based surveying for mapping of canal network and ayacut area of proposed Kanjoor Thekkumbhagam Branch Canal
2021/12/P2 WP2-1402/2021/D5
30-11-2021
4700-20-800-92(00) 10,73,65,000 0
77
KIP-Dam safety works- Kallada Dam at Thenmala - Construction of Parapet wall near Auxillary spillway, maintenance of generator room and control room for instrumentation
2021/986/P2 KIPRBDII/2021/986/P
2
08-06-2021
4700-80-800-97(00) 22,50,000 0
78
Annual Maintenance of IIP- LLC from Ch.12000m to 14863 mfor the year 2021-22
2021/414/P2 WP2-1402/2021/D5
31-03-2022
4700-20-800-92(00) 6,00,000 0
79
GENERAL-Action plan-MVIP-Annual maintenance of kadappoor distributory from ch0m to 7435m for the year 2022-23
IRR/PII/EST_TS/172/2022_5_1_1 WP2-2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,50,000 0
80
GENERAL-Action plan 2022-23-MVIP-Annual maintenance of vilayamcode distributory from ch0m to ch 3425m for the year 2022-23
IRR/PII/EST_TS/171/2022_5_1_1 WP2-2125/2022/D10
20-06-2022
4700-22-800-90(00) 2,00,000 0
81
GENERAL-MVIP-Construction Of Bund Road Near ch 3150m Of Kuravilangadu Major Distributory -Kuravilangadu distributory-General
IRR/PII/EST_TS/201/2022_5_1_1 WP2-2125/2022/D10
20-06-2022
4700-22-800-90(00) 6,00,000 0
82
GENERAL-IIP-CRDS-Rectification of ADICHILY BRANCH-Side rising works to Adichily Branch canal between Ch:1/00 km and 1/100 km and Urgent leak proof works between Ch:1/800 km and 2/000 km .-General Civil Work
IRR/PII/EST/8653/2022_5_1_1 WP2-1877/2022/D5
30-03-2023
4700-20-800-92(00) 4,00,000 0
83
MVIP-Providing fencing work near downstream of bathing ghat
IRR/PII/EST/4771/2022_5_1_1 wp2/2125/2022/D10
20-06-2022
4700-22-800-98(00) 4,30,000 0
84
MVIP RBMC Annual maintenance for water distribution from Ch 0m to 14000m for the year 2022 23
IRR/PII/EST/6134/2022_5_1_1 wp2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 6,00,000 0
85
MVIP Ramamangalam branch canal Engaging labour for water distribution through Ramamangalam Branch canal and its disrtibutories for the year 2022-23
IRR/PII/EST/6802/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-91(00) 3,90,000 0
86
MVIP-RBMC-Annual Mauntenance from ch.14000m to 17775m for the year 2022-23
2022/1361/P2 WP2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 2,00,000 0
87
MVIP LBMC shutter operationS Engaging labour and other connected works for water distribution from ch.16000m to 25624m and Marika distributory for the year 2022 23
IRR/PII/EST/78/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 3,50,000 0
88
MVIP RBMC Annual maintenance from ch 17775 to 28337 m for water distribution for the year 2022 23
IRR/PII/FL/402/2022 WP2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 3,00,000 0
89
MVIP Engaging labour for water distribution for Muvattupuzha Branch Canal and its Distributories for the year 2022 2023
IRR/PII/FL/374/2022 WP2-2125/2022/D10
20-06-2022
4700-22-800-91(00) 1,15,000 0
90
MVIP Engaging labour for water distribution for Marady Branch Canal and its distributories for the year 2022 23
IRR/PII/EST/568/2022_5_1_1 WP2-2125/2022/D10
20-06-2022
4700-22-800-91(00) 3,00,000 0
91
MVIP Construction of a well for MVIP quarters near Malankara Dam 2022 23
IRR/PII/EST/6184/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-98(00) 1,50,000 0
92
MVIP Overhauling and Annual maintenance of main canal shutters at Malankara Dam for the year 2022 23 Mechanical 2022 23
IRR/MH/EST/867/2022_16_1_2 WP2/2125/2022/D10
20-06-2022
4700-22-800-92(00) 4,00,000 0
93
GENERAL MVIP Piravom branch canal Annual maintenance from ch 0m to ch 6604m for the year 2022 23 General civil work
IRR/PII/EST/42/2022_ 5 _1 _1 WP2/2125/2022/D10
20-06-2022
4700-22-800-91(00) 3,00,000 0
94
MVIP Annual Maintenance work from ch 0m to 3765m of Madakkathanam distributory for the year 2022 23
IRR/PII/EST/4780/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,50,000 0
95
MVIP Annual maintenance of Varapetty,Inchoor and Naduvakkad distributories for the year 2022 23
IRR/PII/EST/404/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 0
96
MVIP Engaging labour for water distribution for RBMC from ch 17750 to 28337 m ,Inchoor,Varappetty and Naduvakkad distributories for the year 2022 23
IRR/PII/TR/405/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,75,000 0
97
MVIP Annual maintenance of Anicad MD from ch.0 m to 2225m & Anicad East Distributories from ch 0 m to 1855m for the year of 2022-2023
IRR/PII/EST/366/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,50,000 0
98
MVIP Engaging labours for upkeeping dam and premises for the year 2022 2023
IRR/PII/EST/5858/2022_5_1-1 WP2/2125/2022/D10
20-06-2022
4700-22-800-98(00) 5,00,000 0
99
MVIP Annual maintenance of Maruthoor M D from ch 0m to 2540m & Vazhakkulam MD from ch 0m to 3575m for the year of 2022 2023
IRR/PII/FL/369/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 2,00,000 0
100
MVIP Annual maintenance of Karimattom M D from ch.0m to 3050m & Kizhakkekara MD from ch.0m to 1645m for the year of 2022 2023
IRR/PII/FL/371/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,50,000 0
101
GENERAL MVIP Onakoor distributory Annual maintenance from ch 0m to 5200m for the year 2022 23 General civil work
IRR/PII/EST/25/2022 _5_ 1 _1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,50,000 0
102
IIP-2022-23-IIP Main Canal - Urgent rectification works to the breached portion near ch. 31625m
2022/507/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 15,00,000 0
103
MVIP-Overhauling of motor Pump set and starter unit in Plakuaha LIS (Under MVIP Sub Dn.9)-2022-2023
PWD/BLDG/EST/9912/2022_6_2_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,20,000 0
104
IIP-Construction of Flush escape for tail end discharge at Ch 14623m of Low Level Canal and leading Channel to Manjali thodu (Additional Fund)
2018/1188/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 14,00,000 0
105
IIP-Construction of LLC Pressure syphon from Ch. 13818.50m to 13879.50m (Excluding Railway Portion) -Additional amount
2022/793/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 11,00,000 0
106
IIP- 2022-23-CDRS -Upkeeping of Inspection Benglaw and Pavalion at Thumboormuzhy and operation of main shutter for the year 2022 -23
2022/967/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 14,89,000 0
107
IIP - 2022-23- CDRS - Annual maintenance works of IIP Division no.2 Chalakudy including construction of drain and allied works for the year 2022-23
2022/1366/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 4,00,000 0
108
IIP- 2022-23-CDRS -Upkeeping of IB at Chalakudy and improvements to the building and compound for the year 2022-23
2022/890/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 6,50,000 0
109
IIP-2022-23-Upkeeping Inspection Bungalow and IIP Office Compound at Malayattoor for the year 2022-23
2022/922/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 4,00,000 0
110
IIP- 2022-23-CRDS -Maintenace and special repair works to irrigation quarters campus and IB at Chalakudy for the year 2022-23
2022/891/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 4,00,000 0
111
IIP-2022-23-CDRS - Construction of culvert at ch.7/700km of right bund of Adichily branch canal
2022/405/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 3,00,000 0
112
IIP-2022-23 CRDS- Urgent rectification works to UT inlet drain including clearing of UT between Ch.23/200km and 23/400km
2022/1462/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 3,00,000 0
113
IIP-2022-23- CRDS-Rectification works to Meloor Branch canal between ch1/800 to 2/300 km & raising of sides between 0/500 to 0/550 km
2022/846/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 7,00,000 0
114
IIP-2022-23-CRDS-Rectification works to Poothamkutty Branch canal downstream to ch4/500km so as to ensure water availability to tail end - Phase-I
2022/849/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 18,00,000 0
115
IIP-2022-23- CRDS- Urgent Rectification works to Kuttikad branch canal between ch.0/500 km and 1/00km.
2022/972/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 7,00,000 0
116
IIP-2022-23- CRDS-Side protection works at the tail end of distributory No.II of Mattathur branch canal near Kurumali river.
2022/97/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 18,00,000 0
117
IIP - 2022-23-CRDS- Procurement of two Nos. Levelling instruments to Irrigation Sub division No.1, Chalakudy
2022/1367/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 75,000 0
118
IIP - 2022-23-CRDS- Procurement of two Nos. Levelling instruments to Irrigation Sub division No.2, Chalakudy
2022/850/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 75,000 0
119
IIP-2022-23-CRDS Rectification works to KV main canal between ch1/780km and 2/000 km
2022/981/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 10,00,000 0
120
IIP-2022-23- CRDS- Urgent rectification works to Vengoor branch canal between ch. 5/000 km and ch. 5/600 km
2022/992/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 3,00,000 0
121
IIP-2022-23- CRDS- Urgent rectification works to Kalady branch canal between ch. 1/000 km and ch. 1/100 km
2022/991/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 3,00,000 0
122
Urgent rectification works to Manjapra branch Canal between Ch.2/300 km to 2/400 km and maintenance to spout at Ch.1/750 km
IRR/PII/EST/4782/2022 WP2-1877/2022/D5
01-10-2022
4700-20-800-92(00) 4,00,000 0
123
IIP -2022-23- CRDS - Correcting longitudinal slope and rectification works for Parakkadavu Main canal between Ch. 30/200km and 33/200km to ensure water availability at tail end of Parakkadavu Main Canal - phase I
2022/941/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 17,00,000 0
124
IIP-2022-23-CRDS-Rectification works to RBMC between Ch.47/600 km and 47/700 km
2022/923/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 10,25,000 0
125
IIP-2022-23-CRDS- Urgent rectification works of Mettipadam branch canal bet. ch.0/800km and 1/00 km
2022/657/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 4,00,000 0
126
IIP-2022-23-CRDS- Urgent rectification works to left bund of RBMC bet ch.15/600km and 15/800km.
2022/656/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 6,00,000 0
127
IIP-2022-23-CDRS- Urgent rectification works of RBMC bet ch.14/600km and 14/800km
2022/655/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 17,00,000 0
128
IIP-2022-23-CRDS- Urgent rectification works of Pariyaram Dist. 1 & 2 at ch.0/0km
2022/659/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 4,00,000 0
129
GENERAL MVIP South kakkad distributory Annual maintenance from ch 0m to ch 11340m for the year 2022 23 General civil work
IRR/PII/EST/37/2022 _5 _1_ 1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 2,00,000 0
130
MVIP Maintenance of Inspection Bangalow IB at Muttom Colony
IRR/PII/EST/6238/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-93(00) 1,00,000 0
131
GENERAL MVIP Engaging Pump operators for Lift Irrigation scheme of Koothattukkulam distributory canal including Labours for shutter operation and clearing floating material stagnated near to the trashnets after Flush escape for the year 2022 23 General civil work
IRR/PII/EST/140/2022 _5_ 1 _1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,40,000 0
132
GENERALMVIP Annual Maintenance of Koothattukkulam Distributory canal after lift irrigation scheme for the year 2022 23 General civil work
IRR/PII/EST/143/2022 _5_ 1_ 1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 0
133
GENERAL Action plan MVIP Annual maintenance of kadappoor distributory from ch 0m to 7435m for the year 2022 23 General Civil Work
IRR/PII/EST/172/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,50,000 0
134
IIP-2022-23- Annual maintenance of IIP main canal from Ch.28800m to Ch.32278m for the year 2022-23
2022/907/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 6,00,000 0
135
IIP-2022-23- Annual maintenance of link canal from Ch.0m to 2000m for the year 2022-23
2022/897/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 3,50,000 0
136
IIP-2022-23- Providing greasing ,oiling to shutters and removing waste, boulders etc. of IIP main canal from ch.28800m to 32278m for the year 2022-23
2022/910/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 65,000 0
137
IIP-2022-23-Annual Maintanance for clearing jungle of Manappattuchira for the year 2022-23
2022/916/P2 WP2-1877/2022/D5
17-05-2022
4700-20-800-92(00) 2,00,000 0
138
MVIP Urgent maintenance work to clean overflowing waste water tank and providing waste disposal system for project circle office building for the year 2022 2023
IRR/PII/EST/677/2022 _5 _1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-93(00) 3,37,000 0
139
MVIP Annual maitenanence of Oliyappuram MD from ch.0m to 1030m and Ammanamattom MD from ch.0m to1400m for the year 2022 2023
IRR/PII/EST/6802/2022_5_2_1 WP2/2125 /2022
20-06-2022
4700-22-800-90(00) 2,00,000 0
140
MVIP Kakkoor MD Annual maitenance from ch.0m to 6710m for the year 2022 2023
IRR/PII/EST/6802/2022_5_3_2 WP2/2125/2023/D10
20-06-2022
4700-22-800-90(00) 7,00,000 0
141
MVIP Valiyappadam MD Annual maitenance from ch.0m to 2050 m for the year 2022 2023
IRR/PII/EST/6802/2022_5_4_3 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,90,000 0
142
MVIP Mamalassery from MD Annual maintenance from ch.0m to 7100 for the year 2022 2023
IRR /PII/EST/6802/2022_5_5_4 WP2/2125/2023/D10
20-06-2022
4700-22-800-90(00) 7,00,000 0
143
MVIP Kakkad M D Annual maintenance from ch. 0m 7300m for the year 2022 2023
IRR/PII/EST/6802/2022_5_6_5 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 7,00,000 0
144
MVIP Kizhumury M.D Annual maintenance from ch. 0m to 3800m for the year 2022 23
IRR/PII/EST/6802/2022_5_7_6 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 0
145
MVIP Ooramana M.D Annual maintenance from ch. 0m to 7910m for the year 2022 23
IRR/PII/EST/6802/2022_5_8_7 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 7,00,000 0
146
MVIP Annual maintenance of Palakkuzha Distributary Before lift from Ch.0 to 1870m and After lift from Ch.0 to 2300m for the year 2022 2023
IRR/PII/EST/105/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 0
147
MVIP Palakuzha LI Scheme Engaging labour and other connected works for pumping and water distribution
IRR/PII/EST/229/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 3,00,000 0
148
General MVIP Kuravilangadu Distributary Annual Maintenance From ch.0m To 10465m For The Year 2022 2023 Kuravilangadu distributory General civil work
IRR/PII/EST/207/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 4,00,000 0
149
General MVIP Muttuchira Distributory Annual Maintenance From ch.0m To 3195m For The Year 2022 2023 Muttuchira distibutory General civil work
IRR/PII/EST/208/2022_5_1_1 WP2/2125/2022/D10
20-06-2022
4700-22-800-90(00) 1,00,000 0
150
GENERAL-PVIP-MLA-SDF-Reconstruction of Box culvert -PVIP-MLA -SDF -Reconstruction of Box culvert near Ch7.80km of Aluva branch canal.-General Civil Work
IRR/PII/EST/965/2022_5_1_1 DCEKM/5984/2020-F2
DCEKM/5984/2020-F2
02-11-2022
4250-00-800-99-00-00-00 52,20,000 0
151
PIP RBC Rectification works-Thiruvanvandoor branch canal between Ch.1500 m to 3000 m
IRR/PII/EST/4383/2022_5_2_1 264/2022/WRD
03-03-2022
4700-16-800-97(00) 16,95,000 0

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
CSIND-Floods of August 2018 -Desilitation of Kollamthodu 6th Reach from Ch72.950 km to74.180 km of T.S Canal
2018/3057/IA (MS) NO 8/2018/CSIN
D
22-12-2018
5075-60-800-94(00) 9,16,50,000 0
2
CSIND-Clearing obstructions and desilting in Meenachil river(Neelimangalam feeder canal) & repair of Kumarakom boat route canal in Kottayam District
2020/5559/IA IDKtm/2020/5559/IA
18-02-2021
5075-60-800-94-03-00 50,00,000 0
3
CSIND Reconstruction of St. Andrews Bridge and Approach Road across TS canal at Ch. 24.3 Km in Kadinamkulam panchayath
2020/1085/IA G.O.Rt.No.6/2021/CS
IND
26-02-2021
5075-60-800-94-03-00 12,50,00,000 0
4
Development of waterways and Canals-Improvements to IWT Route from Korappuzha to Kanayamkodu from Ch-418.32 Km to 429.32 Km in Kozhikode District- Estimate for Hydrographic Survey and Soil Sampling And Testing
2017/4960/IA ORDER No. IDKkd/201
7/4960/IA
23-10-2021
3056-00-001-96-00-00 4,80,000 0
5
CSIND-Chain link fencing to curb waste disposal at Kollam Thodu from Eravipuram Boat Jetty to Karunyatheeram (in between Ch 66.32km to 67.12 km) in Reach-I
2021/4332/IA INDKlm/2021/4332/IA

26-10-2021
5075-60-800-94-03-00 1,49,00,000 0
6
CSIND-Chain link fencing to curb waste disposal at Kollam Thodu from Karunyatheeram to Eravipuram Bridge (in between Ch 67.12km to 67.82 km) in Reach-I
2021/4362/IA INDKlm/2021/4362/IA

26-10-2021
5075-60-800-94-03-00 1,37,00,000 0
7
CSIND - Protection Works to the Right bank of TS Canal U/S of Channankara bridge near Ch.27.00 Km in Kadinamkulam Grama panchayat
2021/4304/IA INDKlm/2021/4304/IA

27-10-2021
5075-60-800-94-03-00 1,20,00,000 0
8
IMPROVEMENTS TO THE CANAL BUND ROAD ON THE RIGHT BANK OF BADAGARA MAHE CANAL FROM KOTTAPPALLI VILLAGE OFFICE PREMISE TO KOTTAPPALLI BRIDGE.
2021/4792/IA INDKnr/2021/4792/IA

27-10-2021
5075-60-800-94-03-00 15,00,000 0
9
Improvements to the canal bund road on the right bank of Badagara Mahe canal from Cheripoyil aquaduct to Kalleri from Ch 459.450 to 460.450km
2021/4710/IA INDKnr/2021/4710/IA

29-10-2021
5075-60-800-94-03-00 1,36,00,000 0
10
Soil investigation for the re-construction of KYIP aquaduct span across BM canal at ch 459.450km
2021/4797/IA INDKnr/2021/4797/IA

17-11-2021
3056-00-001-96-00-00 3,60,000 0
11
Protecting the left bank of Palakkode Perumba River in Valapattanam-Kotti Navigation Route on north side of Puthiya Puzhakkara Bridge in Ramanthali Panchayath
2019/5893/IA INDKnr/2019/5893/IA

17-11-2021
5075-60-800-94-03-00 45,00,000 0
12
CSIND -Deepening and Widening of TS Canal between ch16.090Km and ch 17.690Km.
2021/4878/IA INDKlm/2021/4878/IA

29-11-2021
5075-60-800-94(03) 1,99,60,000 0
13
CSIND-Deepening and Widening of TS Canal between ch 17.740Km and ch 19.370Km.
2021/4879/IA INDKlm/2021/4879/IA

29-11-2021
5075-60-800-94-03-00 1,99,80,000 0
14
CSIND-Deepening and Widening of TS Canal between Ch.21.05Km to 22.55Km
2021/5146/IA INDKlm/2021/5146/IA

29-11-2021
5075-60-800-94-03-00 1,99,00,000 0
15
CSIND-Deepening and Widening of TS Canal between ch 19.420Km and ch 21.050Km.
2021/5147/IA INDKlm/2021/5147/IA

29-11-2021
5075-60-800-94-03-00 1,98,50,000 0
16
Deepening Vembanadu kayal from Kannangattu - Willingdon Island bridge to Aroor bridge ( Edakochi- Aroor) in Ernakulam District -Reach 1
2021/4705/IA IDEkm/2021/4705/IA
09-12-2021
5075-60-800-94-03-00 1,20,00,000 0
17
CSIND - Protecting the eroded bank of Ashtamudi kayal near Kanjaaveli, Prakkulam in Thrikkaruva Panchayath in Kollam Assembly Constituency
2021/1290/IA INDKlm/2021/1290/IA

22-12-2021
5075-60-800-94-03-00 7,00,000 0
18
Development of Waterways and Canals- Feasibility study for Inland Water Transport in Dharmadam River
2020/3269/IA INDKnr/2020/3269/IA

18-01-2022
3056-00-001-96-00-00 18,00,000 0
19
Construction of Boat Jetty at Palliyath near Thookkupalam in Peralassery Grama Panchayath
2020/4056/IA INDKnr/2020/4056/IA

10-02-2022
5075-60-800-94-03-00 1,23,80,000 0
20
CSIND - Construction of culvert connecting Ashtamudy kayal and kollam thodu for protecting the residential area at Vadakkumbhagam near the confluence point of Kollam thodu with Ashtamudy kayal for regulation of flood water during high tide including allied protection works in Kollam L.A Constituency
2021/4429/IA INDKlm/2021/4429/IA

16-02-2022
5075-60-800-94-03-00 68,00,000 0
21
Dismantling of concrete pillars near Palamkadavu bridge in Orumanayoor Panchayath in Thrissur District
2020/5620/IA AIDTsr/2020/5620/IA

23-02-2022
5075-60-800-94-03-00 17,000 0
22
IND - Development of WCC in Vettoor Panchayath- Construction of RCC cantilever retaining wall on right bank of canal near Thazhevettoor Masjid (Ch. 45.800 Km to Ch. 45.875 Km)
2021/5815/IA INDKlm/2021/5815/IA

02-03-2022
5075-60-800-94-03-00 1,93,00,000 0
23
IND- Construction of Counterfort Retaining wall in front of Rathikal Juma masjid, right bank of TS Canal Ch. 44.725 Km to Ch. 44.770 Km
2021/3640/IA INDKlm/2021/3640/IA

02-03-2022
5075-60-800-94-03-00 1,60,00,000 0
24
Investigation work for Boat Jetty at Kattampallikkadavu in Kuppam River
2022/483/IA INDKnr/2022/483/IA
26-02-2022
3056-00-001-96-00-00 4,20,000 0
25
KP-Rectification works to Thekkumchery Padasekharam in Thalayolapparambu Panchayath
2021/77/KP KDDTm/2021/77/KP
20-05-2021
4711-01-103-84(00) 1,58,70,000 0
26
CSIND -Demolition of old concrete foot bridge at ch 5.00 Km across Parvathy Puthanar at Edayar in Thiruvallam village
2021/5542/IA INDKlm/2021/5542/IA

04-03-2022
5075-60-800-94-03-00 5,90,000 0
27
CSIND-Protecting the left bank of Palakkode Perumba River in Valappattanam- Kotti Navigation Route on south side of PuthiyaPuzhakkara Bridge in Ramanthali Panchayath
2019/5894/IA INDKnr/2019/5894/IA

19-03-2022
5075-60-800-94-03-00 30,00,000 0
28
Reconstruction of Damaged Access of Azheekkal Ferry Boat Jetty in Kannur District
2021/2820/IA INDKnr/2021/2820/IA

19-03-2022
5075-60-800-94-03-00 76,00,000 0
29
CSIND - Urgent protection on the left and right banks of Kollam Thodu in between Ch 72.75 km to 73.10 km
2022/3610/IA INDKlm/2022/3610/IA

19-03-2022
5075-60-800-94-03-00 1,98,20,000 0
30
Estimate for obtaining CRZ clearance for the eight boat jetty construction (At Kandikkal, near Eranholi bridge, near Mammakunnu bridge, Kayapanichi, Varayilthazhe, Ozhayilbhagam, Kaali park and Kacheri)
2021/4791/IA INDKnr/2021/4791/IA

26-03-2022
5075-60-800-94-03-00 91,00,000 0
31
Development of waterways and canals- Investigation work for deepening of water route along Valapattanam river to Valluvankadavu boat jettY
2021/6107/IA INDKnr/2021/6107/IA

31-03-2022
3056-00-001-96-00-00 5,50,000 0
32
KP - Budget works 2021-2022 -Restoring outer bund of Mayakadu Padasekharam in Ramankary Panchayath
2021/170/KP KDDMu/2021/170/KP
17-06-2021
4711-01-103-84(00) 51,00,000 0
33
CSIND-Construction of a Lock cum Bridge in CH 316.728 km of West Coast canal at Veliyancode in Ponnani Taluk in Malappuram District (PHASE -2 WORKS)
2021/3400/IA G.O.(Rt)No. 7/ 2022
/ CSIND
26-03-2022
5075-60-800-94-03-00 14,10,00,000 0
34
GENERAL-Kotti-Kottappuram Navigation route-Protecting the left bank of Valiyaparamba backwater at Oriyara in Valiyaparamba Panchayath in Kasaragod District. - CSIND-Side protection of Valiyaparamba back water near Ambedkar boat jetty at Oriyara in Valiyaparamba Panchayath of Kasaragod District-General Civil Work-2
IRR/IA/EST/237/2022_5_1_1 AS/59D/22/21087
10-08-2022
5075-60-800-94-03-00 51,90,000 0
35
GENERAL-CSIND-Nileswaram Bekal Water way-Arayi Kottakkadavu-Construction of Steel Footbridge across Arayi River at Arayi Kottakkadavu in Kanhangad Municipality in Kasaragod District-General Civil Work
IRR/IA/EST/128/2022_5_1_1 AS/59D/22/20643
23-07-2022
5075-60-800-94-03-00 1,50,00,000 0
36
GENERAL-CSIND- Kotti Kottapuram Navigation Route-Dredging of Valiyaparamba Back water between Mavilakkadapuram and Madakkara in Valiyaparamba Grama panchayth in Kasaragod district
IRR/IA/EST/625/2022_5_1_1 AS/59D/22/20640
23-07-2022
5075-60-800-94-03-00 2,00,00,000 0
37
GENERAL-IWT-Investigation work for the construction of 3 sluices in Kodungallur Muncipality-General Civil Work
IRR/IA/EST/726/2022_5_10_9 AS/59D/22/21734
30-08-2022
3056-00-001-96-00-00 15,10,000 0
38
GENERAL-CSIND-IWT-DEVELOPMENT OF WATERWAYS AND CANALS - THALASSERY-DREDGING-Dredging of water way in Anjarakkandy river from Ch- 1.800 (Dharmadam boat jetty) to Ch- 11.000 (Mambaram bridge) in Kannur district-General Civil Work-1
IRR/KP/EST/5352/2022_5_1_1 AS/59D/22/21484 Dat
ed: 20-08-2022
20-08-2022
5075-60-800-94-03-00 1,95,00,000 0
39
GENERAL-SULTHAN CANAL-Soil Investigation for the construction of side protection of Sulthan Canal-Investigation Work.
IRR/IA/EST/100/2022_3_1_1 AS/59D/22/21000 Dat
ed: 06-08-2022
06-08-2022
3056-00-001-96-00-00 6,00,000 0
40
GENERAL-CSIND- BM CANAL - 1ST REACH - WORKS-CONSTRUCTION OF BATHING GHAT AT MOOZHIKKAL IN MANIYUR PANCHAYATH -General Civil Work
IRR/KP/EST/5187/2022 5 2 1 AS/59D/22/22051
16-09-2022
5075-60-800-94-03-00 11,00,000 0
41
GENERAL-BUND ROAD-Improvement to Right Bank bund road from Vengoli to Pothimadathil (ch 462.930 to 463.480 km) in Badagara-Mahe canal-General Civil Work
IRR/KP/EST/5230/2022 5 1 1 AS/59D/22/22078
16-09-2022
5075-60-800-94-03-00 36,00,000 0
42
KANNAMKURUDY PADASEKHARAM-KP - Mitigation of flood in the Kannamkurudi padasekharams in Punnapra North Panchayath of Ambalapuzha Taluk-General Civil Work-1
IRR/KP/EST/666/2022 AS/59D/22/20907
04-08-2022
4711-01-103-84-01-00-00 33,50,000 0
43
GENERAL-KODAMBANADY PADASEKHARAM-MIPM Protecting the outer bund of Kodambanady Padasekharam in Thalavady Panchayath -General Civil Work
IRR/KP/EST/4992/2022_5_1_1 AS/59D/22/21172
11-08-2022
4711-01-103-84-01-00-00 21,00,000 0
44
GENERAL-BUND ROAD-Improvement to Left Bank bund road from Vengoli to Pothimadathil (ch 462.930 to 463.480 km) in Badagara-Mahe canal-General Civil Work
IRR/KP/EST/5230/2022_5_2_1 AS/59D/22/22071
16-09-2022
5075-60-800-94-03-00 39,20,000 0
45
GENERAL-Investigation-investigation for proposed improvement to right bank bund road from pothimadathil to kaliyamvally (ch 463.480-464.160)-Investigation Work
IRR/KP/EST/3392/2022_3_1_1 AS/59D/22/22059
16-09-2022
3056-00-001-96-00-00 2,00,000 0
46
GENERAL-CHUNGOM EDACHUNGOM PADASHEKARAM-KP-Construction of Culvert at Chungom Edachungom padashekaram in Edathua grama panchayath-General Civil Work
IRR/KP/EST/2419/2022_5_1_1 AS/59D/22/20858
03-08-2022
4711-01-103-84-01-00-00 21,00,000 0
47
GENERAL-PALOOKKARY PADASEKHARAM- KP- Mitigation of flood in the Palookkari padasekharams in Ambalapuzha south Panchayath of Ambalappuzha Taluk -General Civil Work
IRR/KP/EST/660/2022_5_1_1 AS/59D/22/20908
04-08-2022
4711-01-103-84-01-00-00 60,00,000 0
48
GENERAL-Development of waterways and canals-Improvements to IWT Route of Vadakkumbad river from Ch 377.51Km to 385.32Km in Kozhikode District-Estimate for Hydro graphic survey - Soil sampling and Testing-General Civil Work
IRR/IA/EST/3414/2022_5_1_1 AS/59D/22/22202
20-09-2022
3056-00-001-96-00-00 4,00,000 0
49
GENERAL-Investigation Works-Investigation for the Protection Works to the R/B of TS Canal U/S of Channankara bridge near Ch.27 Km-Investigation Work
IRR/KP/EST/3467/2022_3_1_1 AS/59D/22/20641
23-07-2022
3056-00-001-96-00-00 1,27,500 0
50
GENERAL-Kari Enpathupadasekharam-Rectification work at Karienpathupadasekharam in Veliyanadu Panchayath-General Civil Work
IRR/KP/EST/6192/2022_5_1_1 ORDER No. AS/59D/22
/21725
29-08-2022
4711-01-103-84-01-00-00 25,40,000 0
51
GENERAL-KP-Protection work to I Block 3500 kayal padasekharam in ward 13 of Neelamperoor panchayath in Alappuzha district.-General Civil Work
IRR/KP/EST/5550/2022_5_1_1 AS/59D/22/20926
04-08-2022
4711-01-103-84-01-00-00 58,30,000 0
52
GENERAL-Mulavanakkary Padasekharam-KP-Mitigation of flood in the Padasekharam of Kuttanad Taluk- Mitigation of flood in Mulavanakkary Padasekharam in Muttar Grama Panchayath-General Civil Work
IRR/KP/EST/3620/2022_5_1_1 AS/59D/22/20847
03-08-2022
4711-01-103-84-01-00-00 1,00,00,000 0
53
GENERAL-Desilting -Desilting in west coast canal from Madhurampilly to Munayam in Thrissur Dt-General Civil Work
IRR/IA/EST/2948/2022_5_1_1 AS/59D/22/20722
29-07-2022
5075-60-800-94-03-00 1,34,50,000 0
54
GENERAL-PROTECTION WORK-Protection work at Kodikkal valavu to Kaithathodu bridge in Muttar Grama Panchayath.-General Civil
IRR/KP/EST/5468/2022_5_1_1 AS/59D/22/21470
20-08-2022
4711-01-103-84-01-00-00 69,00,000 0
55
GENERAL-West Coast Canal Development ch. 43.78-55.17-Construction of a drain along the right bank of WCC at Rathikkal in front of Rathikkal Juma Masjid between chainage 44700 and 44950-General Civil Work
IRR/KP/EST/6517/2022_5_1_1 AS/59D/22/22878
12-10-2022
5075-60-800-94-03-00 95,00,000 0
56
GENERAL-Reconstruction of Boat Jetty at Valluvankadavu in Chirakkal Panchayath-INSK/BT/01/2022-23-General Civil Work-1-Existing Boat jetty is in dilapidated condition and needs to be replaced for which this work is proposed..
IRR/IA/EST/363/2022_5_1_1 AS/59D/22/20642 Dat
ed: 23-07-2022
23-07-2022
5075-60-800-94-03-00 1,20,00,000 0
57
GENERAL-Deepening of the embarkment area of Boat Jetties -CSIND- Deepening of the embarkment area of Eight Boat Jetties for the smooth voyage of SWTD/ Country Boats in Kollam/ Kunnathur / Chavara Assembly Constituencies.-General Civil Work
IRR/IA/EST/3041/2022_5_1_1 AS/59D/22/20878
03-08-2022
5075-60-800-94-03-00 14,90,000 0
58
GENERAL-CSIND- Renovation of Manalil Boat Jetty inThrikkaruva Panchayath-CSIND-Renovation of Manalil Boat Jetty in Thrikkaruva Panchayath in Kollam Assembly Constituency-General Civil Work
IRR/IA/EST/274/2022_5_1_1 AS/59D/22/20879
03-08-2022
5075-60-800-94-03-00 7,00,000 0
59
GENERAL-Protecting the eroded bank of Ashtamudi kayal in Neendakara Panchayath-CSIND- Protecting the eroded bank of Ashtamudi kayal in ward No.12 of Neendakara Panchayath in Chavara Assembly Constituency-General Civil Work
IRR/KP/EST/4371/2022_5_1_1 AS/59D/22/20990
06-08-2022
5075-60-800-94-03-00 15,00,000 0
60
GENERAL-Urgent protection on the left and right banks of Kollam Thodu -CSIND - Urgent protection on the left and right banks of Kollam Thodu in between Ch 72.75 km to 73.10 km-Investigation Work
IRR/KP/EST/4438/2022_3_1_1 AS/59D/22/20826
02-08-2022
3056-00-001-96-00-00 3,40,000 0
61
GENERAL-Badagara - Mahe Canal- Vth reach-Construction of a steel foot bridge across Badagara-Mahe canal at Kelothkandi thazhe at Ch. 466.600 km.-General Civil Work-1
IRR/IA/EST/1689/2022_5_1_1 AS/59D/22/23379
28-10-2022
5075-60-800-94-03-00 1,10,00,000 0
62
GENERAL-VALAPATTANAM-KOTTI NAVIGATION ROUTE - DREDGING-Investigation to the deepening of water way in Valapattanam-Kotti main Navigation Route in Palakkode Perumba River between Chainage559.75 to 567.90 km (Muttom to Kotti) and in Feeder Route between ch 0 and 6.00km from Changorichal to Perumba-General Civil Work
IRR/IA/EST/1103/2022_5_2_1 (Edit Id 4) AS/59D/22/23829
22-11-2022
3056-00-001-96-00-00 18,20,000 0
63
Desilting of Manathrakkad Meppuram thodu in Nedumudy panchayath
IRR/KP/EST/7928/2022/5_1_1 GO(Rt) No. 1147/202
2/WRD,TVM
22-12-2022
4711-01-103-84-01-00-00 45,69,000 0
64
GENERAL-VETTITHURUTH PADASHEKARAM-KP- Restoring outer bund of Vettithuruth padashekaram in Edathua Gramapanchayat-General Civil Work
IRR/KP/EST/619/2022_5_1_1 AS/59D/22/20736
30-07-2022
4711-01-103-84-01-00-00 1,05,40,000 0
65
GENERAL-PATHUM PADASHEKHARAM-KP- Flood Mitigation Programme and Improving the Infrastructure Facilities of Pathum Padasekharam in Thakazhy Panchayath General Civil Work
IRR/KP/EST/692/2022_5_1_1 AS/59D/22/20735
30-07-2022
4711-01-103-84-01-00-00 1,05,30,000 0
66
GENERAL-Improvement works to Vadakkeputhusseri Padasekharam-Mitigation of flood damages- Infrastructural development works at Vadakkeputhusseri Padasekharam in Thalayolaparampu Panchayath-General Civil Work
IRR/KP/EST/1158/2022_5_1_1 AS/59D/22/20832
03-08-2022
4711-01-103-84-01-00-00 47,00,000 0
67
GENERAL-KANNAMKURUDY PADASEKHARAM-KP - Mitigation of flood in the Kannamkurudi padasekharams in Punnapra North Panchayath of Ambalapuzha Taluk-General Civil Work-1
IRR/KP/EST/666/2022_5_1_1 AS/59D/22/20907
04-08-2022
4711-01-103-84-01-00-00 33,50,000 0
68
GENERAL-SIDE PROTECTION OF THODU -SIDE PROTECTION OF KAITHATODU IN WARD No. 10 of MUTTAR GRAMA PANCHAYATH-General Civil Work
IRR/KP/EST/8566/2022_5_1_1 AS/59D/22/25009
09-02-2023
4711-01-103-84-01-00-00 65,00,000 0
69
GENERAL-Desilting of Manathrakkad Meppuram thodu in Nedumudy panchayath-General Civil work
IRR/KP/EST/7928/2022 G.O.(Rt).1147/2022/
WRD
22-12-2022
4711-01-103-84-01-00-00 45,69,000 0
70
GENERAL-SIDE PROTECTION OF THODU -SIDE PROTECTION OF KAITHATODU IN WARD No. 10 of MUTTAR GRAMA PANCHAYATH-General Civil Work
IRR/KP/EST/8566/2022 AS/59D/22/25009
09-02-2023
4711-01-103-84-01-00-00 65,00,000 0
71
GENERAL-Kari Enpathupadasekharam-Rectification work at Karienpathupadasekharam in Veliyanadu Panchayath-General Civil Work
IRR/KP/EST/6192/2022 AS/59D/22/21725
29-08-2022
4711-01-103-84-01-00-00 25,40,000 0
72
GENERAL-KODAMBANADY PADASEKHARAM-MIPM Protecting the outer bund of Kodambanady Padasekharam in Thalavady Panchayath -General Civil Work
IRR/KP/EST/4992/2022 AS/59D/22/21172
11-08-2022
4711-01-103-84-01-00-00 21,00,000 0
73
GENERAL-DESILTING-Desilting the branch thodus of Areethodu in Thalavady and Edathua Panchayath-General Civil Work
IRR/KP/EST/7937/2022_5_3_1 GO (Rt) No. 1147/20
22/WRD
22-12-2022
4711-01-103-84-01-00-00 20,76,000 0
74
GENERAL-PALOOKKARY PADASEKHARAM- KP- Mitigation of flood in the Palookkari padasekharams in Ambalapuzha south Panchayath of Ambalappuzha Taluk -General Civil Work-1
IRR/KP/EST/660/2022_ AS/59D/22/20908
04-08-2022
4711-01-103-84-01-00-00 60,00,000 0
75
GENERAL-KANNAMKURUDY PADASEKHARAM-KP - Mitigation of flood in the Kannamkurudi padasekharams in Punnapra North Panchayath of Ambalapuzha Taluk-General Civil Work-1
IRR/KP/EST/666/2022 AS/59D/22/20907
04-08-2022
4711-01-103-84-01-00-00 33,50,000 0
76
GENERAL-Soil Investigation-Investigation work near Arattuvazhi bridge(Ch -22.55km)at Kadinamkulam Panchayat in Thiruvananthapuram District.-Investigation Work
RR/KP/EST/964/2023_3_1_1 AS/59D/22/25168
25-02-2023
3056-00-001-96-00-00 4,70,000 0
77
GENERAL-Construction of Boat Terminal at Ezhome Kadavu -Soil Investigation work- General Civil Work
IRR/KP/EST/8048/2022_5_1_1 AS/59D/22/25932
29-03-2023
3056-00-001-96-00-00 4,70,000 0
78
GENERAL-VALAPATTANAM-KOTTI NAVIGATION ROUTE BOAT JETTIES INVESTIGATION-Soil Investigation work for Boat jetty at Vellachal kadavu in Madayi Panchayath -Investigation Work
IRR/KP/EST/5461/2022_3_2_1 AS/59D/22/25905
29-03-2023
3056-00-001-96-00-00 4,30,000 0
79
GENERAL-INVESTIGATION-Soil investigation for the construction of Boat Jetty at Melur in Dharmadam Panchayath in Dharmadm LA Constituency-Investigation Work
IRR/KP/EST/8998/2022_3_1_1 AS/59D/22/25909
29-03-2023
3056-00-001-96-00-00 3,50,000 0
80
GENERAL-VALAPATTANAM-KOTTI NAVIGATION ROUTE BOAT JETTIES INVESTIGATION-Soil Investigation to the Boat jetty at Muttom-Investigation Work
IRR/KP/EST/5461/2022_3_1_1 AS/59D/22/25907
29-03-2023
3056-00-001-96-00-00 4,30,000 0
81
Construction of a steel foot bridge across Badagara-Mahe canal at Kelothkandi thazhe at Ch. 466.600 km.
IRR/IA/FL/1689/2022 .: AS/59D/22/2337
9
28-10-2022
5075-60-800-94-03-00 1,10,00,000 0
82
GENERAL-Development of Canal-Development of TS canal-Rejuvenation of TS canal from Arattuvazhi to Anakkapillai (Ch.22.55 Km to Ch.25.95Km) at Kadinamkulam Panchayat in Thiruvananthapuram Dist.-General Civil Work
IRR/IA/FL/2257/2022 സ.ഉ.(സാധ
) നം.12/2023/CSIND
27-01-2023
5075-60-800-94-03-00 14,85,98,000 0

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Establishing Staff gauge at Ten New Stations under Hydrology Section Thiruvananthapuram as per the direction of District Disaster Management Authority Thiruvananthapuram
2021/121/IDRB HDCgr/2021/121/IDRB

07-06-2021
2701-80-005-92(00) 4,56,700 0
2
Construction of Dam Safety Head Quarters,PMG-Electrification of Block I
509/2021 481/2020/WRD
22-07-2020
4701-80-800-70(00) 30,00,00,000 0
3
GPS II - Dam Safety 2021-22 - Fencing of Catchment Area At Chulliyar Dam
2021/763/P1 IDCr/2021/763/P1
30-09-2021
4700-80-800-97(00) 12,50,000 0
4
Modernization of Quality control section Thiruvananthapuram-Electrification of Vamanapuram Irrigation Project Division Office building for setting up of New Laboratory.
2021/315/IDRB QCDKka/2021/315/IDR
B
30-10-2021
2701-80-005-93(00) 4,34,000 0
5
Electrical work for Quality Control Division kottarakara.
2021/201/IDRB QCDKka/2021/IDRB
29-06-2021
2701-80-005-93(00) 50,000 0
6
MHIS-Renovation of Baveli River Gauge Station Under Hydrology section Mananthavady
.2021/130/IDRB HDTsr/2021/130/IDRB

25-05-2021
2701-80-005-92(00) 5,00,000 0
7
PIP- DS Works - Clearing jungle in dam premises and fixing additional scale for water level measurement
2021/925/P2 PIPD/2021/925/P2
10-06-2021
4700-80-800-97(02) 1,00,000 0
8
Karapuzha Irrigation Project -Providing KSEB Service connection to Spillway -Balance work
2021/530/P1 KIPDKa/2021/530/P1
04-06-2021
4700-80-800-97(02) 35,221 0
9
KRP-Soil test for reviewing the stability analysis of existing earth dam - Balance work
2021/534/P1 KIPDKa/2021/534/P1
04-06-2021
4700-80-800-97(02) 1,32,750 0
10
Chimoni dam - Providing electrical connection to the dam top, watchman cabin and Quarters - Service connection charges
2021/2855/IA IDTsr/2021/2855/IA
08-07-2021
4700-80-800-97(02) 2,47,440 0
11
KyIP-Dam Safety 2021-2022-Clearing Jungle, floating materials and de-rooting plants from Peruvannamuzhi Dam
2021/488/P1 KYIPDPa/2021/488/P1

18-08-2021
4700-80-800-97(02) 3,00,000 0
12
PIP-De silting of Maniyar Barrage-Formation of Path to launch the Boat
2021/1285/P2 PIPD/2021/1285/P2
18-09-2021
4700-80-800-97(02) 3,67,400 0
13
PIP Head works-Dewatering the D/S Apron portion of Maniyar Barrage
2021/1318/P2 PIPD/2021/1318/P2
23-09-2021
4700-80-800-97(02) 36,000 0
14
MP-Dam safety-protection ,maintenance and beautification of earth dam with annual jungle clearence and grass turfing of the slope portion.at malampuzha garden.
2021/861/P1 IDMa/2021/861/P1
10-01-2022
4700-80-800-97(02) 13,00,000 0
15
CPP-Dam Safety- Urgent Supply of Diesel fuel for the Generators installed in Moolathara Regulator for the Second half of 2021-2022
2021/1100/P1 IDCr/2021/1100/P1
24-01-2022
4700-80-800-97(02) 25,800 0
16
Dam safety measures - SITC of High mast and mini mast light system at Pazhassi dam site at Veliyambra, Kannur distrct.
2021/1098/P1 PYIPDKr/2021/1098/P
1
03-02-2022
4700-80-800-97(02) 16,50,000 0
17
Deposit work- Pipe line extension and providing water connection to Pazhassi Irrigation office and staff quarters at Veliyambra
2022/337/P1 PYIPDKr/2022/337/P1

25-03-2022
4700-80-800-97(02) 90,000 0
18
Hiring of vehicle for site inspection, Sample collection, and other departmental use for Quality control section Kalpetta for the year 2022-23
QCDTSR/02/08/D2-204
5/2022-23
29-09-2022
2701-80-005-93(00) 3,00,000 0
19
Hiring of vehicle for site inspection, sample collection, and other departmental use for Quality control section Kalpetta for the year 2022-23
NIL QCDTSR/02/08/D2-204
5/2022-23
29-09-2022
2701-80-005-93(00) 3,00,000 0
20
Hiring of vehicle for Irrigation Quality Control section, Pathanamthitta.
DM_AD_5_4_2015_IDRB 02/IQC/AEE/AS/2022-
23
28-09-2022
2701-80-005-93(00) 1,50,000 0
21
GENERAL-Annual maintenance of Moolathara regulator-Dam safety-Annual maintenance to Radial gates(6Nos), vertical gates(13Nos), LB canal gates (3Nos)and to their operating mechanisms of Moolathara regulator in Palakkad district-General Mechanical Work
IRR/MH/EST/2688/2022_16_1_1 AS/59D/22/23169
21-10-2022
4700-80-800-97(02) 11,50,000 0
22
Hiring vehicle for QC section Iduki under Quality control sub division Kottayam.
C2022/145/IDRB QCDKka/2022/145/IDR
B
05-04-2022
2701-80-005-93(00) 3,00,000 0
23
Setting up NDT (Non Destructive Testing) - Facilities Purchase of Rebound Hammer for Quality Control Lab- Kottayam
DS/AD3/5/2022/IDRB D4-1271/2022
27-09-2022
2701-80-005-93(00) 3,70,000 0
24
Setting up Concrete mix design facilities for Quality control Lab Kottayam.
DS-AD3/2/2022/IDRB D4-1324/2022
11-10-2022
2701-80-005-93(00) 4,20,000 0
25
Setting up Soil Testing Facilities for Quality Control Laboratory Idukki.
DS-AD3/5/2022/IDRB D4-1300/2022
11-10-2022
2701-80-005-93(00) 1,50,000 0
26
Setting up Soil Testing facilities for Quality Control Laboratory Kottayam.
DS-AD3-5/2022/IDRB D4-1308/2022
11-10-2022
2701-80-005-93(00) 1,20,000 0
27
Hiring of Vehicle for Quality Control Subdivision Thiruvananthapuram
D1_608_2022_23 02/QCS/TVM/AS/2022-
23
30-09-2022
2701-80-005-93(00) 1,20,000 0

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-Thenmala-MS2-NGT-Fabrication and erection of 2 Nos of shutter near Thiruvallom Parasurama Temple and Electrification of hoisting mechanism-Supply, Fabrication, Erection and Trial run of 2 Nos of Shutter and Electrification of 3 Nos of hoisting mechanism near Thiruvallom Parasurama Temple at Thiruvananthapuram District- General Mechanical Work
IRR/MH/EST/3354/2023_16_1_1 AS/59D/22/25955
29-03-2023
2702-01-800-86-00-00-00 20,00,000 0