OTHER SPILL OVER WORKS AGREED NOT COMPLETED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
MLA FUND Renovation of Kudiyom vayal LI SCHEME IN Panamaram Panchayath
2018/606/IA RD-3/4073/2018(1)
15-02-2020
4700-80-800-89-00-00 90,00,000 90,00,000
2
KASARAGOD DEVELOPMENT PACKAGE - CONSTRUCTION OF CHECK DAM ACROSS PANATHUR RIVER AT KOTTODY IN KALLAR PANCHAYATH IN KASARAGOD DISTRICT .
2018/5095/IA 363/2019/KDP/KSD
19-09-2019
2551-60-101-97(00) 2,60,00,000 2,60,00,000
3
Replacement of irrigation shutter near Kattodu bridge accross Kattodu valiyathodu in Thiruvalla constituency
2019/211/IA GO (Rt) No. 821/201
9/WRD
18-11-2019
2702-03-101-98-02-34-3 45,00,000 45,00,000
4
KDP Construction of SWECB at Orie across Edakki puzha in Padne GP
2017/2258/IA GO(Ms)No.101/2020/
Plg
20-02-2020
2551-60-101-97(00) 1,32,00,000 1,32,00,000
5
Construction of storm water drain beyond the boundary of Kannur International Airport-Thodu 2
2016/510/IA 13/2017/WRD
25-02-2017
9999-00-000-00-00-01 18,09,00,000 92,38,000
6
KDP Rejuvenation of Panakkappuzha Thodu
2019/8275/IA 258/2020/KDP/KSD(52
3)
28-02-2020
2551-60-101-97(00) 48,00,000 48,00,000
7
KDP - Renovation of Karattuvayal Lift Irrigation Scheme in Kanhangad Municipality
2018/4738/IA GO(MS) No: 16/2019/
P&EA TVM
08-03-2019
2551-60-101-97(00) 86,50,000 86,50,000
8
LAC - ADS - Construction of SWEVCB cum tractor path across Poorapuzha at Parayil in Prappanagadi Muncipality in Malappuram District.
2019/174/IA G.O ( Rt.) No. 391/
17/WRD
06-05-2017
4700-80-800-89-00-00 1,70,00,000 1,70,00,000
9
Deposit - Rectification works to the Kodinhi - Nannambra canal (cherumukku side) from ch.519 to 659 m of LIS Benchali in Nannambra Panchayath in Malappuram District.
2018/4449/IA 1 91 5C1 0000000045
78
27-05-2019
9999-00-000-00-00-02 20,00,000 20,00,000
10
PUNARJANI QUILON ECO- PARK KOLLAM
2017/4702/IA DTPC-K/363/E/17
18-11-2017
8443-00-108-00-00-00-00 3,00,00,000 2,93,00,000
11
Development of Paravoor Pozhikkara Beach, in Paravoor Muncipality in Kollam District.
2017/4445/IA G.O (Rt) 469/2017/T
ourism
26-09-2017
8443-00-108-00-00-00-00 2,00,00,000 1,75,00,000
12
KDP - Reconstruction of Madhurakot VCB in Madikai Grama Panchayat
2018/4719/IA 177/2020/KSD/KDP (5
12 )
17-02-2020
2551-60-101-97(00) 63,00,000 63,00,000
13
KDP- Reconstruction of Monacha valappu VCB in Madikai Grama Panchayat
2018/4754/IA 178/2020/KSD/KDP (5
13)
20-02-2020
2551-60-101-97(00) 62,00,000 62,00,000
14
KDP-2019-20 HARITHAKERALAM- Rejuvenation of Sreemala-Bethalam-Malankadappu thodu in Karadukka Block of Kasaragod district- Reach III
2020/2070/IA 260/2020/KDP/KSD(52
5)
05-03-2020
2551-60-101-97(00) 1,80,00,000 48,10,000
15
RMF - Urgent protection works to the eroded portion of the right bank of Anchumoorthy Checkdam in Kannadipuzha near Chandrashekharapuram Gramam at Edathara in Parali Panchayath in Palakkad District..
2017/2979/IA 404/15/7/Rd
28-11-2017
9999-00-000-00-00-01 40,00,000 40,00,000
16
Pallikal Manakkatupalam Peruvayal Punchapadam Lift Irrigation in Mavoor Panchayath in Kozhikode District
2019/10565/IA GO(Rt)No.935/2018/L
SGD
31-03-2018
8443-00-108-00-00-00-00 1,10,00,000 1,10,00,000
17
NRuM- Side Protection works to Thuyyam Valiya Thoduin Edappal Grama Panchayath
2018/255/IA Decision 3(5) Edapp
alGramapanchayath
18-06-2019
8443-00-108-00-00-00-00 10,00,000 10,00,000
18
NRuM- Side Protection works to Polpakara Valiyathodein Edappal Grama Panchayath.
2018/254/IA Decision 3(5) Edapp
alGramapanchayath
18-06-2019
8443-00-108-00-00-00-00 30,00,000 30,00,000
19
SPMRM - Thotteri thode side protection , shutter work for preventing salt water in Niramarathur panchayath
2018/4652/IA No.1(5)/19
10-10-2019
8443-00-108-00-00-00-00 50,00,000 5,00,000
20
MLA ADF 2019-20- Asset Development works in Angamaly Constituency - protection works and waiting shed.
2020/854/IA R D-2-1127/2020
09-06-2020
9999-00-000-00-00-02 14,49,000 14,49,000
21
.MLA-ADS 2020-21-Diversion work across Thumbungal thodu including Protection work near Chenakkala in ward no 7 of Kalamassery Municipality
2020/4053/IA RD 2-2121/2020 Date
d 17.09.2020
17-09-2020
9999-00-000-00-00-02 55,00,000 55,00,000
22
KDP-IWMKD-Renovation works to VCB across Kalakkachira thodu at Aravath in Pallikkara Panchayath
2020/3923/IA 1097/2020/KSD/KDP(5
71)
30-01-2021
2551-60-101-97(00) 12,35,000 12,32,000
23
KDP-IWMKD-Repair to VCB at Thiruvakoli across Thiruvali chal in Udma Grama Panchayat.
2020/4194/IA 1088/2020/KSD/KDP (
570)
30-01-2021
2551-60-101-97(00) 9,00,000 8,93,000
24
KDP-IWMKD-Repair works to Chirakkal VCB acorss Adyam thodu in Chemanad Grama Panchayath
2020/3979/IA 1090/2020/KSD/KDP (
569)
30-01-2021
2551-60-101-97(00) 24,30,000 24,30,000
25
Haritha Keralam- Kasaragod Development Package - Rejuvenation of Manoorichal in Parappa, Kanhangad Block Panchayath - PHASE 1
2020/686/IA 259/2020/KDP/KSD (5
24)
28-12-2020
2551-60-101-97(00) 1,62,03,000 1,62,00,000
26
Construction of Core wall in Gangayar thodu Vizhinjam ward of Thiruvananthapuram Corporation
2019/11024/IA W1/AS/14920/2020
22-12-2020
8443-00-108-00-00-00-00 89,00,000 89,00,000
27
MLA- ADS- 2020-21- Renovation of Kattathara thodu in Division 18 in Kochi Corporation- Phase 1
2021/172/IA RD-1/339/2020
25-01-2021
4700-80-800-89-00-00 35,50,000 35,50,000
28
KDP-2018-19-CONSTRUCTION OF VCB ACROSS KOODUNJIL THODU AT KANIHITHALU IN PIVALIKE GRAMA PANCHAYAT
2018/4683/IA Order No. 1489/2020
/KSD/KDP (562)
21-12-2020
2551-60-101-97(00) 60,00,000 60,00,000
29
MLA-ADS Development of Mankuni thodu in Calicut corporation Stage III
2017/4618/IA R.D.2-414/18
23-04-2018
4700-80-800-89-00-00 45,00,000 45,00,000
30
Development of Rural Circuit-Malanad Malabar Cruise Tourism Project in Kerala under Swadesh Darshan Scheme - Theyyam Cruise-Construction of Minor Boat Terminal at Mattool south in Mattool Panchayath in Kannur District.
2019/6596/IA 466/2018/TSM
10-10-2018
9999-00-000-00-00-01 2,84,79,000 91,00,000
31
DEVELOPMENT OF RURAL CIRCUIT -MALANAD MALABAR CRUISE TOURISM PROJECT IN KERALA UNDER SWADESH DARSHAN SCHEME MANGROOVE CRUISE CONSTRUCTION OF MINOR BOAT TERMINAL AT MUTTIL IN CHERUKUNNU PANCHAYATH IN KANNUR DISTRICT
2019/5183/IA 466/2018/TSM
10-10-2018
9999-00-000-00-00-01 80,37,38,000 93,40,000
32
Department of Rural Circuit-Malanad - Malabar River Cruise Tourism Project in Kerala under swadesh Darshasn Scheme- Mangroove cruise-Construction of a Boat Jetty at Thavam in Cherukunnu Panchayath in Kannur District.
2019/61/IA G.O.(Rt) No.466/201
8/TSM dt. 10/10/2018
10-10-2018
9999-00-000-00-00-01 80,37,38,000 82,30,000
33
Deposit Work of Malappuram Municipality 2020-21 - Construction of a Regulator at Nambranikadavu across Kadalundi River in Malappuram Municipality in Malappuram District
Resolution No.(26)
PW-9315/2019
18-01-2021
9999-00-000-00-00-01 18,60,00,000 16,40,00,000
34
KDP-CONSTRUCTION OF VCB ACROSS NAVOOR THODU AT POYYA IN PUTHIGE PANCHAYATH
2021/50/IA 705/2021/KSD/KDP (6
03)
25-02-2021
2551-60-101-97(00) 36,80,000 36,80,000
35
KDP 2020-21 - IWMKD - Renovation of VCB at Kalyanichira across Nellikkunnu thodu in Madhur GP
2017/3456/IA 138/2021/KSD/KDP (5
73)
30-01-2021
2551-60-101-97(00) 6,00,000 6,00,000
36
KDP 2020-21 - IWMKD - Renovation of VCB at Sunnakudlu across Nellikkunnu thodu in Madhur GP
2017/3462/IA 139/2021/KSD/KDP (5
74)
30-01-2021
2551-60-101-97(00) 5,00,000 5,00,000
37
RMF - Protecting the right bank of Perumba river at RS No.256/1(Ward no.XII) on the downstream side of Thottamkadavu bridge a heavily eroded portion in Payyannur Municipality
GO(MS) No536/2015/R
D
01-10-2015
8443-00-108-00-00-00-00 10,00,000 10,00,000
38
RMF- Protecting the banks of Punnappalam river at Punnappalam in Kolayad Panchayath in Kannur District.
2018/927/IA G.O.(Ms)No.344/2018
/RD
27-09-2018
8443-00-108-00-00-00-00 19,50,000 19,50,000
39
RKI-MP-RBC-Urgent rectification works of damaged portion river bank RIGHT side just after spillway
2019/1671/P1 GO.122/2020/P&E
A
03-03-2020
5475-00-115-94-05-00 10,00,000 10,00,000
40
MLA ADS Construction of Walkway from Kallupuram Junction to Kallupalam and step access to Kollam Thodu at Kallupuram Junction in between ch. 73.15 Km to 72.95 Km of West Coast Canal
2020/4312/IA D4-1717/2020/LAC AD
S
24-08-2020
9999-00-000-00-00-02 65,00,000 46,50,000
41
Tourism Department- North Malabar River Cruise Tourism- Boat Jetty at Punnakkadavu
2018/3276/IA 128/2018/TSM
12-03-2018
5452-01-101-99-00-00-00 1,75,00,000 1,75,00,000
42
Tourism Department-Malanadu Tourism-North Malabar River Cruise -Construction Of Boat Jetty and Walkway at Kakkadavu
2018/2684/IA GO(RT)No 125/2018/T
SM
12-03-2018
5452-01-101-99-00-00-00 3,03,00,000 2,81,85,000
43
Department of Tourism Malanad- North Malabar River Cruise Tourism - Boat Terminal at Kariyad
2018/1025/IA GO(RT)No 521/2017/T
SM
23-10-2017
5452-01-101-99-00-00-00 3,03,46,200 2,81,27,000
44
Development of Rural Circuit-Malanad Malabar Cruise Project in Kerala under Swadesh Darshan Scheme- Construction of Boat jetty at Pappinissery
2019/8258/IA G.O.(Rt)No.466/2018
/TSM
10-10-2018
5452-01-101-99-00-00-00 82,04,000 82,00,000
45
Construction of Core wall in Gangayar thodu in Vizhinjam Ward of Thiruvananthapuram Corporation
2019/11024/IA W1/AS/14920/2020
22-12-2020
8443-00-108-00-00-00-00 89,00,000 89,00,000
46
KDP-Total station Survey for the construction of a Regulator across Payaswini River at Adhur -Chonampallam in Karadka Grama Panchayath
2021/4732/IA 1758/2021/KSD/KDP (
638)
21-12-2021
2551-60-101-97(00) 4,70,000 4,70,000
47
MPLADS - Construction of Sea wall for a length of 20 m from 30m south of CES CP0008 at Paruthiyoor in Thiruvananthapuram LS Constituency
2021/5449/IA 358/DPO/TVPM/MPLADS
/ST/2021-22/08
16-12-2021
9999-00-000-00-00-02 20,00,000 19,71,000
48
SDRF- Rectification works to the left side of Ezhachery Thodu in Ward no.8 of Ramapuram Panchayath.
2020/5061/IA MIDKtm/2020/5061/IA

17-08-2021
8443-00-108-00-00-00-00 25,00,000 25,00,000
49
Waste removal and desiltation from Kariyilakkulam thodu in Bhoothakkulam Panchayath.
2022/1862/IA Resolution 4(!)
28-02-2022
8443-00-108-00-00-00-00 4,00,000 4,00,000
50
KDP Construction of VCB cum Tractorway at Bellipady Kukkuguda in Delampady Panchayath in Kasaragod district
2020/5466/IA 321/2021/KSD/KDP(62
0)
28-12-2021
2551-60-101-97(00) 47,30,000 47,30,000
51
Ozhukam Suchiyayi- Desilting and protection works to Ithikkara river near Kumaranalloor in Alayamon Panchayath
2022/1532 AS Go No.2(2)
28-02-2022
8443-00-108-00-00-00-00 20,00,000 20,00,000
52
Ozhukam Suchiyayi- Desiltation and Cleaning works on Marthandapuram Koyikkal thodu in East Kallada Panchayath
2022/3260/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 1,34,000 1,34,000
53
Ozhukam Shuchiyayi - Desiltation of Karumattayil Thodu in ward 13 of Mundrothuruth Panchayath.
2022/3472/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 1,26,000 1,26,000
54
Ozhukam Shuchiyayi- Desiltation of kalluvila kadavil Mullavayalil thodu in ward 10 of Mundrothuruthu Panchayath.
2022/3285/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 1,30,000 1,30,000
55
Ozhukam Shuchiyayi- Desiltation of Karoothara kadavu Mattayil thodu in ward 4 of Mundrothuruthu Panchayath
2022/3468/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 4,36,000 4,36,000
56
Ozhukam Shuchiyayi- Urgent Desiltation and Side protection of Kannittayil thodu in ward 1 of Mundrothuruthu Panchayath.
2022/3281/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 4,91,000 4,91,000
57
Ozhukam Suchiyayi - Desilting and Damaged side protection works to Kavungara Bhagom Thodu in Chathannoor Panchayath.
2022/3688/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 10,00,000 10,00,000
58
Deposit work Construction of Retainingwall along left bank of Pulamon thodu back side of Kalayapuram Market in Kulakkada Panchayath
2021/5923/IA K3-457/21
01-12-2021
8443-00-108-00-00-00-00 31,00,000 31,00,000
59
Desliting and Side Protection Works of Sree Subramanya Swamy Maha Badrakali Kshethram temple Pond in Kumbalangi Panchayath
2021/6297/IA MIDEkm/2021/6297/IA

31-03-2022
4702-00-101-84-01-00-00 9,50,000 9,50,000
60
Deposit work urgent side bund protection of Thengara Madatrhiyara Mannarkonam Ela thodu at kokkadu north In Vettikkavala panchayath
2022/5816/IA A2/295/2022
13-01-2022
8443-00-108-00-00-00-00 14,74,500 14,74,500
61
Deposit work Urgent rectification of side bund of Kaduvappara Kamukinkodu ela thodu in Vettikkavala Panchayath
2021/5817/IA A2-295/2021
15-01-2022
8443-00-108-00-00-00-00 10,00,000 10,00,000
62
Ozhukam suchiyayi Desiltation and side protection works for Kulanjiyil thodu in Kulanji bridge in Edamulackal panchayath
2022/3369/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 7,80,000 7,80,000
63
Deposit work Renovation of Areenchira kulam at ward 3 of kulakkada panchayath
2022/3722/IA 1 (1)
28-02-2022
8443-00-108-00-00-00-00 7,52,831 7,52,800
64
Ozhukam suchiyayi:- Desilting and protection works to Nellikkunnam Vilayanthur thodu near Mundamoodu Bridge in Ummannur Panchayath.
2022/3326/IA A12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 10,00,000 10,00,000
65
Ozhukam suchiyayi- Desilting and protection work to Ithala Valiyathodu near Pattom Ela in Chadayamangalam Panchayath.
2022/3288/IA A 12-1386/2022
24-03-2022
8443-00-108-00-00-00-00 6,70,000 6,70,000
66
GENERAL-Construction of VCB across Kallikandy Puzha at Panolithazhe near Parammal U.P School in Thrippangottur Panchayath Kannur District-General Civil works-1
IRR/IA/EST/1055/2022_5_1_1 G.W/KNR/1644/2020
28-04-2022
8443-00-108-00-00-00-00 72,00,000 72,00,000
67
Kasaragod Development Package - 2021-22 - Integrated Water Management - Renovation of Ramanchira SWE Anicut in Cheruvathur Grama Panchayath
IRR/IA/EST/2910/2022_5_1_1 830/2021/KSD/KDP(63
0)
24-12-2021
2551-60-101-97(00) 1,76,00,000 1,76,00,000
68
RMF-2022-Protecting the eroded left bank of Kallada river between Thevarukadavu and Mukkadavu in Kulakkada Panchayath - General Civil Work
IRR/IA/EST/3212/2022_5_1_1 3372/2022/RD
08-08-2022
8443-00-108-00-00-00-00 45,00,000 45,00,000
69
DEPOSIT-Jilla Panchayath Kollam-Construction of checkdam, water tank and allied works across Ithikkara river near Kottukkal farm in Chadayamangalam for supply of sufficient water for irrigation at Kottukkal govt. farm - Construction of Retaining wall D/S of Check dam - General Civil Work -1
IRR/IA/EST/1818/2022_5_1_1 A13-4151/2021
22-03-2022
8443-00-108-00-00-00-00 45,00,000 45,00,000
70
DEPOSIT - Ozhukam Suchiyai - Construction of Protection wall at the upstream and downstream of Check dam at Attoorkonam Ward of Velinalloor Panchayath
IRR/IA/EST/1665/2022_5_1_1 A 12- 1386/22
16-04-2022
8443-00-108-00-00-00-00 32,50,000 32,50,000
71
Restoration of diverted Chirakkal thodu path near Model Residential School in Vadaserikkara Grama Panchayth Ranni constituency
2021/5502/IA D3-6004/2021
22-01-2022
8443-00-108-00-00-00-00 50,00,000 50,00,000
72
Construction of Drainage Channel & Culvert Near model residential School in Vadaserikkara Grama Panchayath in Ranni Constituency
2021/5812/IA D3-6004/2021
22-01-2022
8443-00-108-00-00-00-00 47,00,000 47,00,000
73
Rejuvenation of Ranni Valiyathodu in U/S side of Mamukku bridge in Ranni Angadi Grama Panchayth Ranni Constituency.
2022/3744/IA Decision no14/1
01-06-2021
8443-00-108-00-00-00-00 6,17,200 6,17,100
74
Kasaragod Development Package-Integrated Water Management-Renovation of Shiriya Anicut and Canal in Puthige G.P.-Part-2
IRR/IA/EST/4529/2022_5_1_1 1167/2021/KSD/KDP(6
21)
28-12-2021
2551-60-101-97(00) 2,59,10,500 52,72,000
75
Deposit work - Protection works with cover slabs to Shasthamveli-Shanmughapuram thodu in Perumbalam Panchayath of Aroor LAC
2021/5905/IA 65/2021/DPC/DPO/ALP

07-02-2022
8443-00-108-00-00-00-00 15,24,200 15,24,000
76
LAC-ADS-Annuvellil school road-MLA ADS Construction of concrete road near aannu vellil school -paricham veetil in ward no:13 and road tarring near vadakum thala villlage office in ward no:4 in chavara constituency.-General Civil Work
IRR/IA/EST/3463/2022_5_1_1 D6-2503/2022 MLA-AD
S
20-08-2022
8443-00-108-00-00-00-00 29,00,000 29,00,000
77
Rejuvenation of Rivers-Removal of debris and obstructions from Poonoor Puzha near Poolakkadavu bridge in Kuruvattoor panchayath
2022/1657/IA 11/2021(3)/21-01-02
2
21-01-2022
8443-00-108-00-00-00-00 5,70,000 5,70,000
78
MLA ADS Construction of road near kureethara malayilmukku-panmana ashramom in ward no:9 and concrete road near thoppil junction -society junction in ward no:16 in chavara constituency
IRR/IA/EST/3466/2022_5_1_1 D6-2502/2022 MLA-AD
S
20-08-2022
8443-00-108-00-00-00-00 32,50,000 32,50,000
79
NRUM -Improvement of irrigation facilities to Chelavoorkonam-Kulappadam ela in Nedumpana Panchayath
1725 1(3)
10-11-2021
8443-00-108-00-00-00-00 27,30,000 27,20,000
80
Deposit work side protection of Anjakulam ela thodu in Kulakkada panchayath
2022/3721/IA 1(1)
28-02-2022
8443-00-108-00-00-00-00 20,00,000 20,00,000
81
GENERAL- Repair work -Urgent Repair and Renovation of MI Sub Division office Chittur- General Civil Work -2
IRR/IA/EST/2511/2022_5_1_1 AS/59D/22/23242
22-10-2022
2702-03-101-95-00-00-00 25,00,000 25,00,000
82
Rejuvenation of rivers-Removal of debris and obstructions from Poonoor puzha at Poolakamannil in Kizhakoth panchayath
2022/1643/IA 11/2023(3)
21-01-2022
8443-00-108-00-00-00-00 5,70,000 5,70,000
83
Rejuvenation of rivers-Removal of debris and obstructions from Poonoor puzha near Cherukulam (Reach 2) in Kakkodi panchayath
2022/1667/IA 11/2021(3)
21-01-2022
8443-00-108-00-00-00-00 2,75,000 2,75,000
84
Kasargod Development Package-Integrated Water Management- Renovation of Shiriya Anicut and Canal in Puthige G.P: Part 1-General Civil Work
IRR/IA/EST/4529/2022_5_3_1 1167/2021/KSD/KDP(6
21)
28-12-2021
2551-60-101-97(00) 2,59,10,500 78,50,000
85
Ozhukam suchiyayi - Urgent side protection, Restoration of kadavu near Nelparakunnu Govt. high school in west Kallada panchayath in Kunnathoor constituency
IRR/IA/EST/6024/2022_5_1_1 decision No. 1
14-10-2022
8443-00-108-00-00-00-00 17,00,000 15,77,000
86
Deposit Ochira Panchayath side protection works to Thottukara Thodu from Nattuvathukkal to Thazhathodu in Ochira Panchayath -Second Reach
IRR/IA/EST/7970/2022_5_2_1 2(1) Ochira Panchay
ath
19-09-2022
8443-00-108-00-00-00-00 22,27,500 22,27,500
87
DEPOSIT -Ochira Block Panchayath -Side protection works to Thottukkara Thodu from Nattuvathukkal to Thazhathodu in Ochira Panchayath- First Reach - General Civil Work
IRR/IA/EST/7970/2022/5_1_1 2(1) Ochira Panchay
ath
19-09-2022
8443-00-108-00-00-00-00 22,27,500 22,27,500
88
DEPOSIT-Kuriyottumala Project - Construction of water storage structure at Kuriyottumala Hitech dairy farm - General Civil Work
IRR/IA/EST/6268/2022_5_1_1 Decision No. 33
27-10-2021
8443-00-108-00-00-00-00 99,40,000 99,40,000
89
Annual maintenance to pump motor and accessories to Aranmula No.1 LI Scheme for the year 2022-23
IRR/IA/EST/4876/2022 16 1 1 AS/59D/22/23554
08-11-2022
2702-01-800-94-00-34-3 1,04,000 1,03,000
90
Annual Maintenance Mechanical Works-Annual Maintenance to pump motor and accessories to Aranmula No.2 LI Scheme for the year 2022-23
IRR/IA/EST/4936/2022 16 1 1 AS/59D/22/23713
15-11-2022
2702-01-800-94-00-34-3 1,01,000 1,01,000
91
Annual Maintenance Mechanical Works-Annual Maintenance to pump motor and accessories to Malakkara LI Scheme for the year 2022-23
IRR/IA/EST/4944/2022 16 1 1 AS/59D/22/23563
08-11-2022
2702-01-800-94-00-34-3 1,16,000 1,16,000
92
Annual Maintenance Mechanical Works-Annual Maintenance to pump motor and accessories to Kulanada LI Scheme for the year 2022-23
IRR/ia/est/4958/2022 16 1 1 AS/59D/22/23564
08-11-2022
2702-01-800-94-00-34-3 1,18,000 1,12,000
93
Annual Maintenance Mechanical Works-Annual Maintenance to pump motor and accessories toLahavayal LI Scheme for the year 2022-23
IRR/IA/EST/4940/2022 16 1 1 AS/59D/22/23562
08-11-2022
2702-01-800-94-00-34-3 1,39,000 1,39,000
94
Annual Maintenance Mechanical Works-Annual Maintenance to pump motor and accessories to Kakkadu LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 6 5 AS/59D/22/23717
15-11-2022
2702-01-800-94-00-34-3 2,64,000 2,64,000
95
Annual Maintenance Mechanical Works-Annual repairs to pump motor and accessories to Koipuram LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 4 3 AS/59D/22/27316
15-11-2022
2702-01-800-94-00-34-3 2,64,000 2,64,000
96
Annual Maintenance Mechanical Works-Annual repairs to pump motor and accessories to Madappally LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 5 4 AS/59D/22/23560
15-11-2022
2702-01-800-94-00-34-3 1,69,000 1,69,000
97
Annual maintenance 2022-23 - Annual repairs to the pump, motor and accessories of Nellikkal LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 1 1 AS/59D/22/23715
15-11-2022
2702-01-800-94-00-34-3 2,82,000 2,82,000
98
Annual maintenance 2022-23 - Annual repairs to the pump, motor and accessories of Panchavadi LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 7 6 AS/59D/22/23718
15-11-2022
2702-01-800-94-00-34-3 3,00,000 3,00,000
99
Annual maintenance 2022-23 - Annual repairs to the pump, motor and accessories of Palavayal LI Scheme for the year 2022-23
IRR/IA/EST/4806/2022 16 3 2 AS/59D/22/23567
08-11-2022
2702-01-800-94-00-34-3 1,75,000 1,75,000
100
Annual maintenance 2022-23 - Annual maintenance to the pump, motor and accessories of Ikkadu LI Scheme for the year 2022-23
IRR/IA/EST/4952/2022 AS/59D/22/23555
08-11-2022
2702-01-800-94-00-34-3 1,14,000 1,14,000
101
DEPOSIT Desilting of Kodumon Valiyathodu Urgent removal of silt and debris from KodumonValiyathodu (Tributary of Achankovil River) atNarikkuzhy VCB Vaalakuzhi reach in VallicoduGrama Panchayath. General Civil Work
IRR/IA/EST/4378/2022_5_1_1 1(1)
01-07-2022
8443-00-108-00-00-00-00 3,46,000 3,46,000
102
DEPOSIT-Kuriyottumala phase II-Improvement to water storage structure and allied works -General Civil Work
IRR/IA/EST/637/2023_5_1_1 D 1785 /17
30-05-2022
8443-00-108-00-00-00-00 51,70,000 51,70,000
103
DEPOSIT-CFC TIED FUND-- CONSERVATION OF MARUTHADY VATTAKAYAL IN SHAKTHIKULANGARA VILLAGE IN CHAVARA CONSTITUENCY ,KOLLAM CORPORATION --General Civil Work
IRR/IA/EST/6450/2022_5_1_1 NO. 54/54 Decision
08-12-2022
8443-00-108-00-00-00-00 1,00,00,000 1,00,00,000
104
GENERAL-DEPOSIT CFC TIED FUND-RENOVATION AND CONSERVATION OF MARUTHADY KATTAKKAL KAYAL IN SHAKTHIKULANGARA VILLAGE IN CHAVARA CONSTITUENCY ,KOLLAM CORPORATION --General Civil Work
IRR/IA/EST/6451/2022_5_1_1 No. 54/54 Decision
08-12-2022
8443-00-108-00-00-00-00 50,00,000 50,00,000
105
MLA-SDF-Payyalakkavu-MLA-SDF-Rennovation of concrete road from Payyalakkavu temple to Elanjikulam ward No.13 in Chavara Constituency.
IRR/IA/EST/6173/2022_5_1_1 D4/2945/2022/MLASDF

08-11-2022
4700-80-800-89-00-00 9,50,000 9,50,000
106
Reinstate the leading channel to intake well of Nita Gelatin Company Ltd. at Kathikudam in Kadukutty panchayath - 2022-C-18/2022-General Civil Work
IRR/IA/EST/7644/2022_5_1_1 A5-497/2014
27-01-2023
8443-00-108-00-00-00-00 4,40,000 44,000
107
Kasargod Development Package-VCB cum Bridge at Payyacheri-Construction of VCB cum bridge across Chullikkara-Kottody thodu at Payyacheri in Kallar Panchayath-General Civil Work
IRR/IA/EST/9119/2022_5_1_1 DCKSGD/10880/2022-0
1/KDP(704)
30-12-2022
2551-60-101-97(00) 81,00,000 81,00,000
108
GENERAL-Side protection work of eroded bank of Vilangupara thodu near Marsleeva church in ward no.13 of Vannappuram G.P-Side protection work of eroded bank of Vilangupara thodu near Marsleeva church in ward no.13 of Vannappuram G.P-General Civil Work
IRR/IA/EST/1931/2023 AS/59D/22/26129
31-03-2023
4702-00-101-84-01-00-00 13,80,000 13,80,000
109
DEPOSIT-Chelannur block Panchayat-2022-23-Construction of FRP shutter including civil works for Chelapram VCB across Irumbokk thodu in Chelannur block Panchayat, Kozhikode district
IRR/IA/EST/1275/2023_5_1_1 3/2022-23
07-04-2022
8443-00-108-00-00-00-00 15,00,000 15,00,000
110
DEPOSIT-Grama Panchayath- Protection works to Poolenkara Chali in Olavanna Panchayath-General Civil Work
IRR/IA/EST/1454/2023_5_1_1 2(1)
11-05-2021
8443-00-108-00-00-00-00 1,06,09,000 1,06,09,000
111
DEPOSIT- WORKS -2022-23 -RENOVATION OF IRANIYAN CHIRA AT KOTTAKKAL MUNICIPALITY-General Civil Work
IRR/IA/EST/8863/2022_5_3_2 E2-18444/2022
30-12-2022
8443-00-108-00-00-00-00 12,53,000 12,53,000
112
DEPOSIT- WORKS -2022-23 - CONSTRUCTION OF MARAVATTAM CHIRA AT KOTTAKKAL MUNICIPALITY-General Civil Work
IRR/IA/EST/8863/2022_5_1_1 E2- 18444/2022
23-10-2022
8443-00-108-00-00-00-00 13,70,000 13,70,000
113
DEPOSIT- WORKS -2022-23 -RENOVATION OF NAYAR CHIRA AT KOTTAKKAL MUNICIPALITY-General Civil Work
IRR/IA/EST/8863/2022_5_5_4 E2- 18444/2022
23-11-2022
8443-00-108-00-00-00-00 8,49,000 8,49,000
114
IWMKD - REPAIR TO VCB AT PAMBDE - KOYANGOD IN BELLUR VILLAGE OF BELLUR GRAMA PANCHAYTH OF KASARAGOD DISTRICT.
2020/4994/IA 679/2021/KSD/KDP (6
02)
28-12-2021
2551-60-101-97(00) 15,73,000 15,73,000
115
Repair works to Achikkode- Kandamchira thodu and Construction of Tractor Ramp in Keezhpayur padasekharam in ward No ; 1 of Meppayur Panchayath, Kozhikode District
IRR/IA/728/2023 ADFW/7750/2022-TA1
28-12-2022
8443-00-108-00-00-00-00 9,48,000 9,48,000
116
DEPOSIT-Ozhakam Suchiyai 2023-Protection work to Left bank of Kulathupuzha river near Sastha temple &Improvement to Puthenvila thodu-General Civil Work
IRR/IA/EST/1418/2023_5_1_1 A1/468/2023
06-03-2023
8443-00-108-00-00-00-00 42,80,000 42,80,000
117
FDR-MISC/CDLM/Edakkod/Pattom-Ozhukaam Suchiyaayi - Construction of culvert across Ayathila Valiya thod and side protection works near Pattom Mammoottil in Edakkod ward of Chadayamangalam Panchayath-General Civil Work
6524 A1/468/2023
06-03-2023
8443-00-108-00-00-00-00 24,90,000 24,90,000
118
DEPOSIT-Check dam-Construction of Check dam Across Ithikkara river for water conservation Attoorkonam ward of Velinalloor Panchyath- Phase-II-General Civil Work-1
IRR/IA/EST/5079/2022_5_1_1 DECISION OF MEETING
ON 23/05/2022
23-05-2022
8443-00-108-00-00-00-00 44,00,000 44,00,000
119
FDR-MISC/ Vadakkevayal ela thodu -Ozhukaam Suchiyaayi - Desilting and protection works to the damaged bund of Vadakkevayal ela thodu near Kizhunila junction in Chithara Panchayath.-General Civil Work-1
739 A1-468/2023
06-03-2023
8443-00-108-00-00-00-00 16,80,000 16,80,000
120
GENERAL-Kanjiram Kulam -Renovation and allied works of Kanjiram Kulam in Balaramapuram Panchayath-General Civil Work
IRR/IA/EST/9192/2022_5_1_1 AS/59D/22/24836
24-01-2023
4702-00-101-99(01) 36,50,000 36,50,000
121
DEPOSIT-Protection work-Side protection of Kadakkad thodu along the boundary of Sugar cane seed farm in Pandalam MuncipalityBalance work-General Civil Work
IRR/IA/EST/1110/2023_5_1_1 EE(2)-206/2023
06-03-2023
8443-00-108-00-00-00-00 10,00,000 10,00,000
122
Renovation of Njarod ela pond in Poothakkulam Panchayath
7437 2(4)
11-01-2023
8443-00-108-00-00-00-00 30,13,450 30,13,400
123
GENERAL-Kalchira water supply -Urgent side bund protection works of Nedumonkavu thodu near Kalchira water authority pump house weir in Kareepra Grama panchayath-General Civil Work
IRR/IA/FL/8481/2022 13
29-12-2022
8443-00-108-00-00-00-00 32,50,000 32,50,000
124
DEPOSIT-Side Protection works-Protection works for Kuriyani Ela Thodu in Vettikavala Panchayath-General Civil Work
IRR/IA/EST/1494/2023_5_1_1 400285/DPDC-01/GTO/
2023/918
15-02-2023
8443-00-108-00-00-00-00 5,50,000 5,50,000
125
GENERAL-Rectification work-Leak rectification of pipe under Manappattuchira left bank canal near valve house in ward No. 5 of Malayattoor Neeleeswaram GP-General Civil Work
IRR/IA/EST/9034/2022_5_1_1 AS/59D/22/25715
23-03-2023
4702-00-101-73(00) 3,25,000 3,25,000
126
DEPOSIT-Deposit work 2022-23-SIde bund protection and other allied works of Madathiyara Thengara Ela thodu in Vettikkavala panchayath
IRR/IA/EST/120/2023_5_1_1 SC1/3090
28-06-2022
8443-00-108-00-00-00-00 5,23,000 5,23,000
127
DEPOSIT-Repair of Sluices in Clappana -Rectification works to damaged sluices in Clappana Panchayath
IRR/IA/EST_TS/7795/2022_5_1_1 1(2)
08-04-2022
8443-00-108-00-00-00-00 30,00,000 30,00,000
128
DEPOSIT-Ozhukam Suchiyai-Protection works to eroded bank of Ithikkara river upstream of checkdam at Attoorkonam ward in Velinalloor Panchayath-General Civil Work
IRR/IA/EST/1665/2022_5_2_1 A1/468/2023
06-03-2023
8443-00-108-00-00-00-00 15,00,000 15,00,000
129
Desiltation Kechery river-Removing obstructions and desiltation of Kechery river between chainage 0 to 300m starting from the border of elavally grama panchayath -General Civil Work
IRR/IA/EST/1183/2023_5_1_1 14/22(1)
28-03-2023
8443-00-108-00-00-00-00 9,30,000 9,30,000
130
Desiltation Kechery river-Removing obstructions and desiltation of kechery river between chainage 325 to 530m starting from the border of elavally grama panchayath-General Civil Work
IRR/IA/EST/1183/2023_5_2_1 14/22(1)
28-03-2023
8443-00-108-00-00-00-00 5,70,000 5,70,000
131
DEPOSIT-Desiltation work in Iruthulli Puzha -at Illathum kadavu in Kunnamangalam Panchyat.-General Civil Work
IRR/IA/EST/8556/2022_5_1_1 27(1)
23-12-2022
8443-00-108-00-00-00-00 10,90,000 10,90,000
132
DEPOSIT-Desiltation work in Iruthulli Puzha-at Edathum kadavu in Kunnamangalam Panchayat.-General Civil Work
IRR/IA/EST/8570/2022_5_1_1 27(1)2
23-12-2022
8443-00-108-00-00-00-00 13,10,000 13,10,000
133
Additional work in the destination development of Varkala - Improvement to the renovation of Theerthakulam, Sree Janardhana Swami Temple and allied structure at Varkala
IRR/IA/EST/2881/2022_5_1_1 P6-7111/2020
11-01-2023
8443-00-108-00-00-00-00 37,00,000 37,00,000
134
DEPOSIT-POONUR PUZHA - KAKKODI BUND-Protecting the right bank of Poonur puzha and Earthern bund of Kakkodi flood bank road in Kakkodi Panchayath-General Civil Work
IRR/IA/EST/7148/2023_5_1_1 73/21(1)
26-11-2021
8443-00-108-00-00-00-00 1,30,00,000 1,30,00,000
135
DEPOSIT- 2022-23-Renovation of BK Canal - Mundakan thodu in Beypore LA, Kozhikode corporation-General Civil Work
IRR/IA/EST/8709/2022_5_1_1 133
02-03-2023
8443-00-108-00-00-00-00 1,70,00,000 1,70,00,000
136
DEPOSIT-2022-23-Thonichira SWEVCB- Prevention of saline water intrusion- Phase I- Renovation & side protection works of Thonichirathodu, Beypore LA in Kozhikode corporation.-General Civil Work
IRR/IA/EST/5103/2023_5_1_1 133
02-03-2023
8443-00-108-00-00-00-00 2,00,00,000 2,00,00,000
137
DEPOSIT-2022-23-Side protection works of Kolangottu Vayal Mundakan thodu in Beypore LAC, Kozhikode Corporation.-General Civil Work
IRR/IA/EST/767/2023_5_1_1 133
02-03-2023
8443-00-108-00-00-00-00 2,30,00,000 2,30,00,000

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
NABARD RIDF ASSISTANCE FOR KUTTANADU -Flood Mitigation Programme-Valiyakari padasekharam in Kainakary panchayath.
2019/1204/KP G.O.(Rt)No.780/2020
/WRD
30-12-2020
4711-01-103-83(00) 8,31,00,000 8,31,00,000
2
PVIP-Net fixing across Mulavoor branch canal near ch-6.800km 2022-23
IRR/PII/FL/1485/2022 AS/59D/22/20361
11-07-2022
2700-01-101-98-00-18 40,000 40,000
3
MLA ADS PyIP Construction of slab cuivert in main canal at 38 100km at Perumachery in Kolachery grama Panchayath
2021/952/P1 RD.7/1023/2021
28-10-2021
4700-80-800-89-00-00 18,00,000 18,00,000
4
MLA ADS PyIP Taring of canal bund road of Main canal between ch 38 500km to ch 39 297km in Kolachery grama Panchayath
2021/1218/P1 RD.7/3480/2021
11-01-2022
4700-80-800-89-00-00 18,00,000 18,00,000
5
MLA-SDF-Azheekkal Branch Canal-PyIPConstruction of slab culvert across Azheekkalbranch canal near ch.2/000KM near Thalamundakavu in Munderi GramaPanchayath-General Civil Work
IRR/PI/EST/3125/2022_5_2_1 RD4/1780/2022 Dt. 1
0/02/2023
10-02-2023
4700-80-800-89-00-00 25,00,000 25,00,000

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
MLA-ADS-Rejuvanation of Kanampuzha-Phase II-Rejuvanation from upstream of chovva Railway bridge to Manden vayal in Kannur corporation, Kannur dt.
2019/10992/IA RD4/3308/2019
20-03-2020
4700-80-800-89-00-00 2,00,00,000 2,00,00,000
2
MLA-SDF-2019-20-Construction of new bridge across Kariyil thodu in Muttathara Ward, Asan Nagar road
2020/852/IA D1-796/20
29-03-2020
4700-80-800-89-00-00 15,00,000 15,00,000
3
LAC-ADS Repair and Strengthening of collapsed and damaged side wall at u/s of Marapalam at emergrncy reaches in Pattom thodu, Tvpm Coptn.
2020/1997/IA D1-2734/20
26-10-2020
4700-80-800-89-00-00 27,00,000 27,00,000
4
PVIP-MLA-ADS-2020-21 Reconstruction of culvert at Ch. 2.30km of West Vengola Sub Branch Canal
 2019/3120/P2  R D 2-2361/2020
23-12-2020
4700-80-800-89-00-00 10,00,000 10,00,000
5
SDRF-CRDS-Flood Damage work -Urgent rectification works to LBMC bet ch 11/200 to 11/580 Km
2019/897/P2 IIPDII/2019/897/P2
19-06-2019
8443-00-108-00-00-00-00 20,00,000 20,00,000
6
SDRF - CRDS - Flood Damage Work - Urgent Rectification works to LBMC bet Ch.8/200 to 8/400 km.
2019/918/P2 IIPDII/2019/918/P2
12-06-2019
8443-00-108-00-00-00-00 20,00,000 20,00,000
7
MLA ADF Renovation of KIP LB Main canal bund road between ch 54619 m to 55970 mLMS Transformer Punnamukku Cholakkal Mundakkal road in Elampalloor Panchayath
2021/248/P2 D4-497/2021/LAC ADS

18-02-2021
8443-00-108-00-00-00-00 20,00,000 20,00,000
8
MLA ADF Construction of KIPLB Main canal bund road between ch 52100 m to 52685m Indilayappan Madankavu Junction to Ambipoika Pynumoodu in Elampalloor Panchayath
2021/65/P2 D4-432/2021/LAC ADS

18-02-2021
8443-00-108-00-00-00-00 26,00,000 26,00,000
9
MPL ADS- 2018-19- Sri.K.Somaprasad MP (RS) -KIP LB- Maravoor Distributory -Construction of road in ward 14, Cherupoikayil Thekku- Kallumoodu junctionKottapuram Colony road between Ch.7300m and 7600m in Pavithreswaram Grama Panchayat (SC Work)
2022/214/P2 Pls. 308/2019-20/MP
LADS/DPO/KLM/KS
14-03-2022
9999-00-000-00-00-02 25,00,000 25,00,000
10
PVIP-Action plan -2022-23-Annual maintenance of Thuruthi M D ,Thuruthikara F C & Puzhukkad F C for the year 2022-2023
IRR/PII/EST_TS/1523/2022_5_13_12 AS/59D/22/20119
28-06-2022
2700-01-101-98-00-18 2,00,000 2,00,000
11
PVIP-Action plan -2022-23- Removal of Blockage from LLC from Ch 15.3km to 21.2km, Kodanadu west Branch canal and its MDs and FCs , Perumbavoor branch canal and its MDs and FCs Punnayam MD,Vattakattupady MD, Rayamangalam MD and its FCs during water distribution for the year 2022-23
IRR/PII/EST_TS/1523/2022_5_15_14 AS/59D/22/20120
28-06-2022
2700-01-101-98-00-18 2,00,000 2,00,000
12
PVIP-Removal of blockage in the Kodanadu East branch canal and its MDs Kizhakambalam branch canal and its MDs during water distribution for the year 2022-23
IRR/PII/EST_TS/3983/2022_5_1_1 AS/59D/22/20377
12-07-2022
2700-01-101-98-00-18 60,000 60,000
13
PVIP-Action plan -2022-23-Annual maintenance of Chemmanam MD, Kuruppampady M D and Perumbavoor sub branch canal for the year 2022-23
IRR/PII/EST/1523/2022_5_10_9 AS/59D/22/21095
10-08-2022
2700-01-101-98-00-18 2,00,000 2,00,000
14
GENERAL-PVIP-PVIP - Desilting of Mudakkuzha East M D between ch 5.00 km to 9.50 km including chiselling hard rock for maintaining the proper gradient of canal for the year 2022-23 -General Civil Work
IRR/PII/EST/2058/2022 AS/59D/22/20393
12-07-2022
2700-01-101-98-00-18 3,00,000 3,00,000

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Department of Tourism - North Malabar River Cruise Tourism - Boat Terminal at Parapram, Kannur
2018/3065/IA G.O.(Rt) No.520/201
7/TSM
23-10-2017
5075-60-800-94(00) 3,47,00,000 3,20,00,000
2
Reconstruction of Navigational lock cum bridge at Thrikkunnapuzha in Haripad constituency of Alappuzha District
2016/997/IA IWAI/PLNW-3/3/97 Vo
l II dt 20-06-2017
20-06-2017
8443-00-108-00-00-00-00 38,00,00,000 36,55,00,000
3
SDRF-KP-Improvements to Idayilakkuzhy Padasekharam in Karuvatta Panchayath
2021/215/KP MIDCgr/2021/215/KP
19-10-2021
8443-00-108-00-00-00-00 25,00,000 25,00,000
4
Tourism Department-Malanad North Malabar River Cruise -Boat Terminal and walkway at New Mahe
2018/2685/IA 126/2018/TSM
12-03-2018
5452-01-101-99-00-00-00 5,02,00,000 4,69,45,000
5
SDRF- Desilting of Othalappuzha Thodu in Chettikulangara Panchayath
2021/575/KP MIDCgr/2021/575/KP
31-12-2021
8443-00-108-00-00-00-00 5,00,000 5,00,000

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
Reconstruction of Navigational Lock at Thrikkunnapuzha on National Waterway.No.3(15.55m X 4.2m two Nos)
No.2017/66/MH IWAI/PLNW-3/3/97 Vo
l.II
20-06-2017
9999-00-000-00-00-01 38,00,00,000 3,42,60,000
2
General-Chelapram Cheerp -Construction of mechanical shutters at chelapram cheerp-chelanoor block panchayath,Calicut-General Mechanical work
IRR/MH/EST/3402/2022_16_1_1 1474/22
16-10-2022
8443-00-108-00-00-00-00 9,50,000 9,50,000
3
Renovation of Palakkalthodu SWEVCB in ward no.34 of Feroke municipality in Beypore LA Kozhikode District Re installation of ms shutter with screw rod Hoist(1.6x2.1m)(mechanical works)
2022/20/MH MIDKkd/2022/366/A
30-03-2022
2702-03-101-98-02-34-3 2,80,000 2,80,000