NON PLAN WORKS AGREED NOT COMPLETED 2023-24

Irrigation & Administration
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-ASE WORKS- Emergency Protection works by using sand filled Polypropylene bags to the Sea coast for a length of 40m South of CP 1224 (north of thattukadavu fishing gap road ) in Sn puram Panchayath in Kodungallur Taluk-General Civil Work
IRR/IA/EST/1102/2022_5_23_22 W3/15610/2020/GL/DB
-1
18-04-2023
2711-02-103-99-34-3 20,00,000 4,00,000
2
GENERAL- Renovation of building-Additional works to renovation of minor Irrigation Division office building-2nd phase-General Civil Work
IRR/IA/EST/1837/2023_5_1_1 . AS/59D/23/26754
04-05-2023
2702-01-800-94-00-34-3 15,00,000 15,00,000
3
GENERAL-sand bar -Urgent Cutting of sand bar and removal other obstruction to flow from mouth of Paravoor Pozhi-General Civil Work
IRR\IA/EST/2760/2023_5_1_1 AS/59D/23/26791
06-05-2023
2711-01-103-99-00-34-3 3,00,000 3,00,000
4
GENERAL-Monsoon Preparedness 2023- Urgent De-silting and clearing obstructions in Kaipuram- Kakkakkuni Thodu near Ground in Changaroth Panchayath,Perambra L A C Kozhikode District-General Civil Work
IRR/IA/EST/3068/2023 AS/59D/23/26888
10-05-2023
2702-03-101-98-03-34-03 1,29,000 1,29,000
5
GENERAL-Monsoon preparedness -2023 Urgent desiltng of Changaroath thazhe thodu in maniyur panchayath Kuttiady LA -Kozhikode District-General Civil Work
IRR/IA/EST/9261/2022 AS/59D/23/26889
10-05-2023
2702-03-101-98-03 1,00,000 1,00,000
6
GENERAL-Urgent Desilting and clearing obstructions in Marakkadi thodu in ward No:3 Perambra Panhayath Perambra L A C Kozhikode Distict-Monsoon preparedness 2023- Urgent de silting Clearing obstructions in Marakkadi thodu in ward No: 3 of Perambra Panchayath Perambra L A C in Kozhikode district.-General Civil Work
IRR/IA/EST/3067/2023_5_1_1 AS/59D/23/26893
10-05-2023
2702-03-101-98-03 1,36,000 1,36,000
7
GENERAL-Monsoon Preparedness-2023- Urgent Desilting and clearing obstructions in Kaippuram Kakkakkuni thodu in Ward no;13 of Changaroth Panchayath,Perambra L A C Kozhikode District.-General Civil Work
IRR/IA/EST/3069/2023_5_1_1 AS/59D/23/26892
10-05-2023
2702-03-101-98-03 1,30,000 1,30,000
8
GENERAL-Monsoon preparedness 2023 Urgent desilting of Naduthodu at vengadikkal in Maniyur panchayath Kuttiady LA -Kozhikode District-General Civil Work-1.
IRR/IA/EST/9255/2022_5_1_1 AS/59D/23/26887
10-05-2023
2702-03-101-98-03-34-03 1,20,000 1,20,000
9
GENERAL-PRE MONSOON-2023- Thanugadu ela thodu-Urgent removal of silt and debris from Thanungadu ela thodu in Ward no.1 of Pramadam Gramapanchayath.-General Civil Work
IRR/IA/EST/3220/2023_5_1_1 AS/59D/23/26942
12-05-2023
2702-03-101-98-03 80,000 80,000
10
GENERAL-PRE MONSOON 2023-MANJADI THODU-Urgent removal of silt and debris from Manjadi thodu in ward no.10 of Konni Grama Panchayath.-General Civil Work
IRR/IA/EST/3216/2023_5_1_1 As/59D/23/26943
12-05-2023
2702-03-101-98-03 50,000 50,000
11
GENERAL-Pre-monsoon-Deepening of Madathumoozhi thodu(river mouth) in Ranni Perunad Grama Panchayth-General Civil Work
IRR/IA/EST/929/2022_5_1_1 AS/59D/23/26940
12-05-2023
2702-03-101-98-03 70,000 70,000
12
GENERAL-Premonsoon 2023-24-Kannankara thode-Clearing and desilting ofKannankara thode between Municipal bus stand and kallarakadavu in Pathanamthittamunicipality-General Civil Work
IRR/IA/EST/2930/2023_5_1_1 AS/59D/23/26939
12-05-2023
2702-03-101-98-03 1,50,000 1,50,000
13
General-Premansoon 2023-Urgent removal of silt and and debris from Srayilpady Thundiparampil thodu in Nedumpuram Panchayath-General Civil work
IRR/IA/EST/2915/203_5_1_1 AS/59D/23/26944
12-05-2023
2702-03-101-98-03 1,40,000 1,40,000
14
General-Pre-Monsoon 2023-24-Pre-Monsoon works 2023-24_Emergency work for the formation of temporary bund to Cherumotha thodu in ward no.9 of Kalloopara Panchayath in Thiruvalla Constituency-General Civil Work
IRR/IA/EST/2934/2023_5_1_1 AS/59D/23/26966
12-05-2023
2702-03-101-98-03 1,50,000 1,50,000
15
Desiltation of Vellukuzhi kulam in ward No.10 of Kulanada panchayath
IRR/IA/EST/1664/2023_5_1_1 AS/59D/23/26936
12-05-2023
2702-03-101-98-03 1,21,000 1,21,000
16
Desiltation of Thazhakulam thodu near thazhakulam padasekharam in Puramattom panchayath
IRR/IA/EST/2898/2023_5_1_1 AS/59D/23/26937
12-05-2023
2702-03-101-98-03 75,000 75,000
17
Desiltation of Erappanthodu at the upstream and downstream of PIP RBC crossing in Koipuram panchayath
IRR/IA/EST/1724/2023_5_1_1 AS/59D/23/26934
12-05-2023
2702-03-101-98-03 1,15,000 1,15,000
18
Pre Monsoon Works Clearing and Desilting of Mannadi Thazhathuvayal ela thodu in ward no 11 of Kadampanad Panchayath
IRR/IA/EST/3351/2023_5_1_1 AS/59D/23/26931
12-05-2023
2702-01-800-94-00-34-3 70,000 70,000
19
Pre monsoon 2023 2024 Desilting of Paranthal thodu from Paranthal junction to kalyanickal bhagom in Pandalam thekkekara panchayath
IRR/IA/EST/3105/2023_5_1_1 AS/59D/23/26927
12-05-2023
2702-03-101-98-03 90,000 90,000
20
Pre monsoon work 2023 24 Desilting of Neerozhukku thodu in Perumandeth ela in Adoor Muncipality
IRR/IA/EST/2966/2023_5_1_1 AS/59D/23/26933
12-05-2023
2702-03-101-98-03 70,000 70,000
21
Pre Monsoon Works Clearing and Desilting of Enadhimangalam Valiyathodu near Maruthimoodu bhagom in ward no 14 of Enadhimangalam Panchayath
IRR/IA/EST/3350/2023_5_1_1 AS/59D/23/26928
12-05-2023
2702-03-101-98-03 70,000 70,000
22
GENERAL-Monsoon Preparedness 2023-Meenkuzhi-Urgent works required for ensuring the smooth flow during monsoon through Vannathippuzha near Meenkuzhi dam in kadannappalli-Panapuzha Panchayath, Kalliasseri Constituency in Kannur Dist
IRR/IA/EST/3154/2023_5_1_1 AS/59D/23/27117
18-05-2023
2702-03-101-98-03-34-03 9,80,000 9,80,000
23
General Pallickkal river Pre monsoon flood mitigation work-Desiltation of Pallickkal river near Kolakam Puncha in Pulikkulam ward in Soornad North Panchayath-General Civil work
IRR/IA/EST/3213/2023_5_1_1 AS/59D/23/27121
18-05-2023
2711-01-103-99-00-34-3 3,20,000 3,20,000
24
GENERAL-Premonsoon ASE-Urgent protection works to the Tourism gallery near Pozhikkara of Chathanoor Constituency- General Civil Work
IRR/IA/EST/3334/2023_5_1_1 AS/59D/23/27119
18-05-2023
2711-02-103-99-34-3 4,00,000 4,00,000
25
Annual clearance of wastes from trash rack near Erappanthodu PIP RBC crossing during monsoon in ward No.7 of Koipuram panchayath
IRR/IA/TR/3484/2023_5_1_1 AS/59D/23/27153
19-05-2023
2702-03-101-98-03 50,000 50,000
26
GENERAL-Premonsoon-Urgent Protection of eroded embankment on the right bank of Achenkovil river near Nachuravelil kadavu (aasan kadavu)-at Valanchuzhy in Pathanamthitta Municipality-General Civil Work
3285/2023-5-1-1 AS/59D/23/27176
20-05-2023
2711-01-103-99-00-34-3 93,000 93,000
27
GENERAL-Premonsoon- Desiltation and Urgent protection works near foot bridge at Valanchuzhy-in Pramadom Panchayath-General Civil Work
3273/2023_5_1_1 AS/59D/23/27179
20-05-2023
2711-01-103-99-00-34-3 1,12,000 1,12,000
28
GENERAL-MONSOON PREPAREDNESS WORKS-Urgent removal of deposited silt and ebris from Kakkadu river from the mouth portion of Madathil thodu d/s of perunadu SHEP in Ranni perunadu panchayath.-General Civil Work
2775/2023_5_1_1 AS/59D/23/27174
20-05-2023
2711-01-103-99-00-34-3 73,000 73,000
29
GENERAL-MONSOON PREPAREDNESS WORKS-Urgent removal of deposited silt and debris from the mouth of Churulithodu in Ayroor panchayath.-General Civil Work
2775/2023_5_3_2 AS/59D/23/27175
20-05-2023
2711-01-103-99-00-34-3 73,000 73,000
30
GENERAL-MONSOON PREPAREDNESS WORKS-Urgent removal of deposited silt and debris from Kakkadu river from the downstream portion of Madathil thodu d/s of perunadu SHEP in Ranni perunadu panchayath.-General Civil Work
2775/2023_5_2_1 AS/59D/23/27173
20-05-2023
2711-01-103-99-00-34-3 72,000 72,000
31
Monsoon Preparedness--Urgent works required for ensuring smooth flow of rain water during monsoon through karimbam thodu on the U/s and D/s of Parad VCB at Parad in kurumathur Panchayath, Taliparamba Constituency,Kannur District-General Civil Work
IRR/IA/EST/3212/2023_5_1_1 AS/59D/23/27243
23-05-2023
2702-03-101-98-03 6,20,000 6,20,000
32
Monsoon Preparedness-Desiltaion of Gayathri Puzha near Anamari d/s of Onnurpallam check dam in Vadavannur GramaPanchayath in Palakkad District.-General Civil Work
IRR/IA/EST/2731/2023_5_1_1 : D1- General/2023/
Monsoon Preparedness
30-05-2023
2702-03-101-98-03 2,50,000 2,50,000
33
Monsoon Preparedness-Desiltation of Ikshumathipuzha near Palathumpara Jumamasjidh in Elevenchery GramaPanchayath in Palakkad District.-General Civil Work
IRR/IA/EST/2738/2023_5_1_1 General/2023/Monsoo
n Preparedness,
30-05-2023
2702-03-101-98-03 2,50,000 2,50,000
34
GENERAL-Monsoon preparedness-Desilting of Kuzhiyampadam thode in Manjapra panchayath.-General Civil Work
IRR/IA/EST/2888/2023_5_1_1 AS/59D/23/27640
03-06-2023
2702-03-101-98-03 4,00,000 4,00,000
35
Urgent side protection work to kariyakkara thodu near ponpuzha koobenkunnu road in Cherupuzha panchayath,Payyanur constituency in kannur district.
IRR/IA/EST/4490/2022_5_1_1 AS/59D/23/27717
06-06-2023
2702-03-101-98-03 27,80,000 27,80,000
36
GENERAL-ASE-St George Chappel-Urgent Protection works to the sea coast near St George Chapel in Kollam Coorporation of Eravipuram Constituency-General Civil Work
IRR/IA/EST/3521/2023_5_1_1 AS/59D/23/27684
06-06-2023
2711-02-103-99-34-3 10,00,000 10,00,000
37
GENERAL-PREMANSOON 2023-Desilting of Ithikkara River upstream of Ithikkara Cheriyapalam near Thiru aaratu Madannada Temple in Adhichanalloor Panchayath.-General Civil Work
IRR/IA/EST/3259/2023_5_1_1 AS/59D/23/27730
07-06-2023
2711-01-103-99-00-34-3 73,000 73,000
38
GENERAL-PREMANSOON 2023-Desilting of Ithikkara River upstream and downstream of Churakulam Checkdam near Kottukkal farm in Chadayamangalam, Ittiva Panchayath-General Civil Work
IRR/IA/EST/3259/2023_5_2_1 AS/59D/23/27729
07-06-2023
2711-01-103-99-00-34-3 75,000 75,000
39
GENERAL-River Protection-Urgent protection works on both banks of Chalipuzha Downstream of Pulikkayam checkdam in Kodanchery panchayath -General Civil Work
IRR/IA/EST/5697/2022_5_1_1 AS/59D/23/27784
08-06-2023
2711-01-103-99-00-34-3 10,00,000 10,00,000
40
Monsoon preparedness-Removing silt and clearing jungle of left branch canal to Mandikunnu in Annanad LIS.-General Civil Work
IRR/IA/EST/2667/2023_5_2_1 AS/59D/23/27822
09-06-2023
2702-03-101-98-03 65,000 65,000
41
Protecting the right bank of Meenachil river in survey No.545/42 of SH Medical Centre in Kottayam Municipality-Side Protection
IRR/IA/EST/7943/2022_5_1_1 AS/59D/23/27866
12-06-2023
2711-01-103-99-00-34-3 26,00,000 26,00,000
42
Side protection-Protecting the right bank of Mundappally thodu near St. Marys church Enthayar in Koottikkal Panchayath
IRR/IA/EST/1327/2023_5_1_1 AS/59D/23/27864
12-06-2023
2711-01-103-99-00-34-3 25,00,000 25,00,000
43
Side protection works-Protecting the Kalathuva Thodu (Kottathavalam road)near Varambanattu Sree Dharma Shastha Temple in ward no.4 of Poonjar Thekkekara Panchayath
IRR/IA/EST/1423/2023_5_1_1 AS/59D/23/27865
12-06-2023
2711-01-103-99-00-34-3 23,40,000 23,40,000
44
Protection works to the right bank of Nachar river behind KSRTC Stand in ward No. 6 of Arakkulam Panchayath-Reach-1
IRR/IA/EST/2613/2023_5_1_1 AS/59D/23/27870
12-06-2023
2711-01-103-99-00-34-3 25,00,000 25,00,000
45
Protection works to the eroded right bank of Nachar river near Thazhvaram colony and construction small foot bridge across Nachar river in ward No. 13 of Arakkulam Panchayath-Reach-1
IRR/IA/EST/2617/2023_5_1_1 AS/59D/23/27869
12-06-2023
2711-01-103-99-00-34-3 25,00,000 25,00,000
46
Protection works to the eroded right bank of Nachar river near Thazhvaram colony in ward No. 13 of Arakkulam Panchayath-Reach-2
IRR/IA/EST/2620/2023_5_1_1 . AS/59D/23/27868
12-06-2023
2711-01-103-99-00-34-3 24,00,000 24,00,000
47
[ IRR/IA/EST/232/2023_5_1_1 ] GENERAL-Improvements of Punthalapady Ela -Construction of Culvert [Near Vadakkedathukavu Petrol Pump] in Ward No III of Erathu Grama Panchayath-General Civil Work-1
IRR/IA/EST/232/2023_5_1_1 AS/59D/23/27902
13-06-2023
4702-00-101-84-01-00-00 15,00,000 15,00,000
48
General Sea coast protection -Construction of Core wall near CP 1395 and 1397 and minor sea coast protection works between CP 1394 and 1399 in Kadappuram GP Balance work - General Civil Work
IRRIA/EST/3408/2023 5 2 1 AS/59D/23/28001
15-06-2023
2711-02-103-99-34-3 20,00,000 20,00,000
49
GENERAL-Monsoon preparedness -Emergency temporary bund formation works to u/s and d/s of Kanihithilu VCB in Paivalike Panchayat -General Civil Work
IRR/IA/EST/4623/2023_5_1_1 AS/59D/23/28154
19-06-2023
2702-03-101-98-03 2,20,000 2,14,000
50
Side Protection -Side Protection works to Right Bank of Manimala River near Karimbukayam Bhagom
IRR/IA/EST/1592/2023_5_1_1 AS/59D/23/28198
20-06-2023
2711-01-103-99-00-34-3 97,80,000 97,80,000
51
FD - Urgent rectification works to the left bank of Kallumkadavu thodu at Market ward ( ward no. XV ) in Pathanapuram panchayath.
IRR/IA/EST/3171/2022_5_2_1 AS/59D/23/28159
20-06-2023
2702-03-101-98-03 31,40,000 31,40,000
52
GENERAL-Pre monsoon -Desilting Chaliyakara river near Kambipalam in Thenmala panchyath.-General Civil Work
IRR/IA/EST/4301/2023_5_1_1 AS/59D/23/28164
20-06-2023
2711-01-103-99-00-34-3 95,000 95,000
53
MONSOON PREPAREDNESS 2023-24
IRR/IA.EST/4638/2023 ORDER No. AS/59D/23
/28224
21-06-2023
2702-03-101-98-03 3,40,000 3,40,000
54
GENERAL-Monsoon Preparedness-Kappikkara Vrichikunnu thodu in Edakkattuvayal Panchayath-General Civil Work
IRR/IA/EST/2873/2023_5_2_1 AS/59D/23/28332
24-06-2023
2702-03-101-98-03 2,80,000 2,80,000
55
GENERAL-Monsoon preparedness-Removal of weeds & vegetation from nedumkulam in annamanada panchayath-General Civil Work
IRR/IA/EST/7661/2022_5_3_2 AS/59D/23/28452
30-06-2023
2702-03-101-98-03 65,000 65,000
56
GENERAL-Monsoon preparedness-Removal of weeds & vegetation from purakulamthodu in Annamanada panchayath-General Civil Work
IRR/IA/EST/7661/2022_5_2_1 AS/59D/23/28451
30-06-2023
2702-03-101-98-03 68,000 68,000
57
GENERAL-Premonsoon 2023-Urgent cutting down dangerously overhanging branches in Irrigation division campus and cleaning waste of Thodu near Bishophouse in Kollam LAC.- General Civil Work
IRR/IA/EST/3303/2023_5_1_1 AS/59D/23/28464
01-07-2023
2711-01-103-99-00-34-3 96,000 96,000
58
GENERAL-Pre-Monsoon Preparations-Removal of accumulated debris ,water weeds and plastic materials ,branches of trees underneath Kunnam Railway over bridge across Achenkovil river at Thazhakkara Panchayth of Mavelikara LAC-General Civil Work.
IRR/IA/EST/3769/2023_5_1_1 AS/59D/23/28558
05-07-2023
2711-01-103-99-00-34-3 40,000 40,000
59
GENERAL-Pre-Monsoon Preparations-Removal of accumulated debris ,water weeds and plastic materials ,branches of trees underneath Kollukadavu bridge across Achenkovil river at Thazhakkara Panchayth of Mavelikara LAC.-General Civil Work
IRR/IA/EST/3763/2023_5_1_1 AS/59D/23/28559
05-07-2023
2711-01-103-99-00-34-3 40,000 40,000
60
Sub - GENERAL-Cutting of Nombil river-Monsoon Preparedness - 2023 - Cutting of Nombil River Mouth in Uduma Grama Panchayath for the year 2023-24-General Civil Work
IRR/IA/EST/2927/2023_5_1_1 AS/59D/23/28627
07-07-2023
2711-02-103-99-34-3 36,000 36,000
61
GENERAL-Pre monsoon work-Emergency removal of accumulated debris, water, weeds and plastic materials at Mangotta in Pamba river near MP Palam connecting Cheruthana and Edathua Panchayath - General Civil Work-General Civil Work
IRR/IA/EST/3973/2023_5_1_1 AS/59D/23/28624
07-07-2023
2711-01-103-99-00-34-3 2,50,000 2,50,000
62
Monsoon preparedness - Clearing obstructions of various canals in Changanacherry taluk and tributaries of Meenachil river under Puthupally constituency-Cleaning and removal of obstructions at various reaches of canal-
IRR/IA/EST/5142/2023_5_1_1 AS/59D/23/28629
07-07-2023
2711-01-103-99-00-34-3 80,000 80,000
63
GENERAL-Temporary works-ASE-Urgent Temporary protection work using Geobags between CP stone 1111 and 1117 at Veliyathamparambu in Nayarambalam Panchayat -Reach 1 -General Civil Work
IRR/IA/EST/498/2022_5_35_33 AS/59D/23/28641
08-07-2023
2711-02-103-99-34-3 10,00,000 10,00,000
64
GENERAL-Temporary works-ASE-Urgent Temporary protection work using Geobags between CP stone 1111 and 1117 at Veliyathamparambu in Nayarambalam Panchayat-Reach 3-General Civil Work
IRR/IA/EST/498/2022_5_37_35 AS/59D/23/28643
08-07-2023
2711-02-103-99-34-3 10,00,000 10,00,000
65
GENERAL-Poovanpara-Maroor thodu-FD- Side protection works of Poovanpara- Maroor thodu near Snehabhavan at Eliyarakkal in Konni Panchayath.-General Civil Work
IRR/IA/EST/3321/2023_5_1_1 AS/59D/23/28831
14-07-2023
2702-03-101-98-03 5,00,000 5,00,000
66
GENERAL-Removal of waste-Urgent removal of floating material and debris to clear the blockage near Pandi, Mudikuzhy Bridge across the leading channel of Pamba River in Cheruthana Panchayath of Harippad LAC-2023-General Civil Work
IRR/IA/EST/5564/2022_5_5_4 AS/59D/23/28863
15-07-2023
2711-01-103-99-00-34-3 2,00,000 2,00,000
67
Monsoon preparedness 2022 - Emergency cleaning of Kuzhikkanithodu at Mattathur panchayath
IRR/IAIEST/2316/2022_5_1_1 AS/59D/23/29053
24-07-2023
2702-03-101-98-03 1,00,000 1,00,000
68
GENERAL-karaltheru kulam-Rennovation of Karaltheru kulam in ward 26 of Thalassery Municipality in Kannur District.-General Civil
IRR/IA/EST/2158/2023_5_1_1 AS/59D/23/29360
03-08-2023
4702-00-101-84-01-00-00 64,00,000 64,00,000
69
GENERAL-Monsoon preparedness-Emergency block removal near various structures across thodu in Enmakaje, Puthige, Paivalike and Kumbla Panchayath under Kumbla section in Kasaragod District-General Civil Work
IRR/IA/EST/5672/2023_5_1_1 AS/59D/23/29345
04-08-2023
2702-03-101-98-03 2,00,000 2,00,000
70
GENERAL-EMERGENCY GEOBAG WORKS -Emergency Protection work by using sand filled Polypropylene bags to the Sea coast for a length of 200m both side of CP1206 in Eriyad Panchayath in Kodungallur Taluk.-General Civil Work-1
IRR/IA/EST/1623/2023_5_5_4 AS/59D/23/29409
04-08-2023
2711-02-103-99-34-3 20,00,000 20,00,000
71
ANNUAL MAINTENANCE
IRR/IA/EST/4005/2023_5_1_1 AS/59D/23/29454
07-08-2023
2702-01-800-94-00-34-3 87,000 87,000
72
GENERAL-ANNUAL MAINTENENCE-LI SCHEME AT MUYYAM IN KURUMATHUR PANCHAYATH, TALIPARAMBA LA,IN KANNUR DISTRICT FOR THE YEAR 2023-24-General Civil Work
IRR/IA/EST/4007/2023_5_1_1 AS/59D/23/29453
07-08-2023
2702-01-800-94-00-34-3 92,000 87,000
73
Karinkode -Annual Maintenance of MI class 1 work -Vented checkdam cum tractorway across Karinkode river in Cherupuzha Panchayath in Payyannur Constituency ,Kannur District for the year 2023-24-General Civil Work
IRR/IA/EST/3112/2023_5_1_1 AS/59D/23/29445
07-08-2023
2702-01-800-94-00-34-3 1,16,000 1,16,000
74
Sub - GENERAL-S P works-Side Protection works to Prakkandam-Vallorepady Bhagom in Pambadumpara-Vattappara thodu at ward no. 15 of Pampadumpara Panchayath-General Civil Work
IRR/IA/EST/7274/2022_5_1_1 AS/59D/23/29466
07-08-2023
2702-03-101-98-03 19,80,000 19,80,000
75
GENERAL-Muppod-Annual maintanance of Muppod thodu SWECB in Payyanur Municipality,Payyannur Constituency , Kannur district for the year 2023-24-General Civil Work
IRR/IA/EST/3149/2023_5_1_1 AS/59D/23/29442
07-08-2023
2702-01-800-94-00-34-3 87,000 87,000
76
GENERAL-Mulaprathodu--Annual Maintenance of NABARD assistance RIDF XI MI class 1 work of wier cum bridge across Mulaprathodu in Cherupuzha Panchayath ,Payyannur Constituency ,Kannur District for the year 2023-24-General Civil Work
IRR/IA/EST/3104/2023_5_1_1 AS/59D/23/29444
07-08-2023
2702-01-800-94-00-34-3 69,000 69,000
77
GENERAL-Pandikadavu-Annual Maintenance of MI class 1 work Pandikadavu BCR in Cherupuzha panchayath ,Payyannur Constituency ,Kannur District for the year 2023-24-General Civil Work
IRR/IA/EST/3119/2023_5_1_1 AS/59D/23/29452
07-08-2023
2702-01-800-94-00-34-3 61,000 61,000
78
GENERAL-MIP/AM/2/2023-24 (Pothada SWEB)-Annual Maintenance to Pothada Muttukandi SWEB in Pattuvam Panchayath in Kalliasseri Constituency, Kannur District for the year 2023-24-General Civil Work
IRR/IA/EST/3295/2023_5_1_1 AS/59D/23/29449
07-08-2023
2702-01-800-94-00-34-3 56,000 56,000
79
GENERAL-MIP/AM/3/2023-24 (Paranool SWEB)-Annual maintanance to SWEB at Paranool in Pattuvam Panchayath Kalliasseri Constituency ,Kannur Dist.for the year.2023-24-General Civil Work
IRR/IA/EST/3298/2023_5_1_1 AS/59D/23/29448
07-08-2023
2702-01-800-94-00-34-3 54,000 54,000
80
GENERAL-MIP/AM/4/2023-24 (Moolakkeel SWEB)-Annual maintanance to SWEB at Moolakkeel in Madai Panchayath in Kalliasseri Constituency, Kannur Dist. for the year.2023-24-General Civil Work
IRR/IA/EST/3300/2023_5_1_1 AS/59D/23/29447
07-08-2023
2702-01-800-94-00-34-3 58,000 58,000
81
GENERAL-MIP/AM/5/2023-24 (Vellikkeel SWEB)-Annual maintanance to Vellikkeel Panchalai SWEB in Pattuvam Panchayath in Kalliasseri Constituency, Kannur Dist. for the year. 2023-24-General Civil Work
IRR/IA/EST/3301/2023_5_1_1 AS/59D/23/29446
07-08-2023
2702-01-800-94-00-34-3 54,000 54,000
82
GENERAL-MIP/AM/6/2023-24 (Vayalapra)-Annual maintanance to RCB across Ramapuram river at Vayalapra in Cheruthazham Panchayath in Kalliasseri Constituency, Kannur Dist. for the year 2023-24.-General Civil Work
IRR/IA/EST/3304/2023_5_1_1 AS/59D/23/29443
07-08-2023
2702-01-800-94-00-34-3 1,01,000 1,01,000
83
GENERAL-MIP/AM/7/2023-24 (Eryam Poorakkadavu)-Annual Maintenance of Weir cum Tractorway across Eriyam River at Poorakkadavu in Kadannappally - Panapuzha Panchayath in Kalliasseri Constituency, Kannur District for the year 2023-24-General Civil Work
IRR/IA/EST/3306/2023_5_1_1 AS/59D/23/29451
07-08-2023
2702-01-800-94-00-34-3 70,000 70,000
84
GENERAL-ANNUAL MAINTENANCE-RCB AT OTTATHAI IN ALAKODE PANCHAYATH IN IRIKKUR LA, KANNUR DISTRICT FOR THE YEAR 2023-2024-General Civil Work
IRR/IA/EST/4001/2023_5_1_1 AS/59D/23/29486
08-08-2023
2702-01-800-94-00-34-3 54,000 54,000
85
GENERAL-ANNUAL MAINTENANCE-VELLATTUKOLLY RCB IN UDAYAGIRI PANCHAYTH IN IRIKKUR LA, KANNUR DISTRICT FOR THE YEAR 2023-24-General Civil Work
IRR/IA/EST/4004/2023_5_1_1 AS/59D/23/29487
08-08-2023
2702-01-800-94-00-34-3 38,000 38,000
86
GENERAL-FD works-Side protection to Munkipallam Thodu near Mattapalli purayidam to Karotte Chirakkal purayidam bhagam in ward 10 of Karunapuram Grama Panchayath -General Civil Work
IRR/IA/EST/7270/2022_5_1_1 AS/59D/23/29502
08-08-2023
2702-03-101-98-03 14,20,000 14,20,000
87
Sub - GENERAL-Side protection work of Alayar thodu from Joby Sabu purayidam to Jiji Vattamala purayidam of ward 13, Bisonvalley panchayath-Side protection work of Alayar thodu from Joby Sabu purayidam to Jiji Vattamala purayidam of ward 13, Bisonvalley panchayath- General Civil Work
IRR/IA/EST/6270/2022_5_1_1 AS/59D/23/29511
09-08-2023
2702-03-101-98-03 16,20,000 16,20,000
88
Urgent Repair work of Side protection wall to the left bank of thoombathodu tributory of Periyar river at thurthu in ward no 11 of Chengamanadu Grama Panchayath
IRR/IA/EST/478/2023_5_1_1 AS/59D/23/29498
09-08-2023
2711-01-103-99-00-34-3 1,42,000 1,42,000
89
GENERAL-Annual Maintenance 2023-24-Annual Maintenance of Nambiarkal SWE Anicut in kanhangad Municipality for the year 2023-24-General Civil Work
IRR/IA/EST/3440/2023_5_1_1 AS/59D/23/29526
09-08-2023
2702-01-800-94-00-34-3 2,07,000 2,07,000
90
Annual Maintenance of Manakkadavu VCB for the year 2023-24
IRR/IA/EST/3365/2023_5_1_1 AS/59D/23/29515
09-08-2023
2702-01-800-94-00-34-3 1,67,000 1,67,000
91
Annual maintenance to diversion scheme with cross bar across Kudumboor river in Kallar Panchayat
IRR/IA/EST/4106/2023_5_1_1 AS/59D/23/29536
09-08-2023
2702-01-800-94-00-34-3 2,56,000 2,56,000
92
GENERAL-Annual Maintenance for the year 2023-24-Annual Maintenance of Kanichira VCB for the year 2023-24-General Civil Work
IRR/IA/EST/3365/2023_5_3_2 AS/59D/23/29518
09-08-2023
2702-01-800-94-00-34-3 62,000 62,000
93
Annual Maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath
IRR/IA/EST/4106/2023_5_4_3 AS/59D/23/29513
09-08-2023
2702-01-800-94-00-34-3 32,000 32,000
94
Annual Maintenance Work for 2023-24-Annual Maintenance to Checkdam across Panathur river at Balanthodu in Panathady Panchayat-General Civil Work
IRR/IA/EST/4106/2023_5_2_1 AS/59D/23/29514
09-08-2023
2702-01-800-94-00-34-3 82,000 82,000
95
GENERAL-Annual Maintenance Work for 2023-24-Annual Maintenance to the Checkdam across Panathur river at Erinhilamkode in Panathady Panchayat-General Civil Work
IRR/IA/EST/4106/2023_5_3_2 AS/59D/23/29512
09-08-2023
2702-01-800-94-00-34-3 1,02,000 1,02,000
96
GENERAL-Annual Maintenance of Padne Anicut at Edachakai in Padne Grama Panchayath-Annual maintenance of Padne Anicut at Edachakai in Padne Grama Panchayath for the year 2023-24-General Civil Work
IRR/IA/EST/2774/2022_5_2_1 AS/59D/23/29516
09-08-2023
2702-01-800-94-00-34-3 1,84,000 1,84,000
97
Annual Maintenance of Karattuvayal LI Scheme for the year 2023-24
IRR/IA/EST/3365/2023_5_2_1 AS/59D/23/29554
10-08-2023
2702-01-800-94-00-34-3 2,03,000 2,03,000
98
GENERAL-MIP/AM/1/23-24 (Meenkuzhi)-Annual Maintenance to Vented Dam across Vannathipuzha near Meenkuzhi in Kadannappalli - Panappuzha Panchayath in Kalliasseri Constituency , Kannur District for the year 2023-24 -General Civil Work
IRR/IA/EST/3258/2023_5_1_1 AS/59D/23/29598
11-08-2023
2702-01-800-94-00-34-3 2,76,000 2,76,000
99
GENERAL-Monsoon Preparedness-Urgent cleaning works to various chainages of Canal of Kalpara LI Scheme and various streams at Mangalpady panchayath in Manjeshwaram constituency-General Civil Work
IRR/IA/EST/5164/2023_5_1_1 AS/59D/23/29722
17-08-2023
2702-03-101-98-03 1,47,000 1,47,000
100
GENERAL-Annual Maintenance of LIS Thekkepadam for the year 2023-24-Annual Maintenance of LI Scheme Thekkepadam in Vallikkunnu LAC in Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/3780/2023_5_1_1 AS/59D/23/29695
17-08-2023
2702-01-800-94-00-34-3 1,60,000 1,60,000
101
GENERAL-Annual Maintenance of LIS kooriyad for the year 2023-24-Annual Maintenance of LIS kooriyad in Vengara LAC in Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/3776/2023_5_1_1 AS/59D/23/29731
17-08-2023
2702-01-800-94-00-34-3 1,80,000 1,80,000
102
GENERAL-Annual Maintenance of LIS Valiyora for the year 2023-24-Annual Maintenance of LIS Valiyora in Vengra LAC in Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/3772/2023_5_1_1 AS/59D/23/29732
17-08-2023
2702-01-800-94-00-34-3 1,50,000 1,50,000
103
GENERAL-Annual Maintenance of LIS Irringallur for the year 2023-24-Annual Maintenance of LIS Irringallure in Vengara LAC in Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/3775/2023_5_1_1 AS/59D/23/29730
17-08-2023
2702-01-800-94-00-34-3 1,50,000 1,50,000
104
GENERAL-ANNUAL MAINTENANCE -MADAMBAM RCB AT MADAMBAM IN SREEKANDAPURAM MUNICIPALITY IN IRIKKUR LA, KANNUR DISTRICT FOR THE YEAR 2023-2024-General Civil Work
IRR/IA/EST/4000/2023_5_1_1 AS/59D/23/29701
17-08-2023
2702-01-800-94-00-34-3 4,30,000 1,85,000
105
GENERAL-ANNUAL MAINTENANCE-THIRUR CHAMATHACHAL RCB AT CHAMATHACHAL IN PAYYAVOOR PANCHAYATH, IRIKKUR LA IN KANNUR DISTRICT FOR THE YEAR 2023-24-General Civil Work
IRR/IA/EST/4003/2023_5_1_1 AS/59D/23/29700
17-08-2023
2702-01-800-94-00-34-3 4,83,000 4,83,000
106
GENERAL-Annual Maintenance of LI Schemes.-Kattupara LIS in Pulamanthole Panchayath . -General Civil Work
IRR/IA/EST/3292/2023_5_1_1 AS/59D/23/29736
18-08-2023
2702-01-800-94-00-34-3 6,64,800 6,64,800
107
GENERAL-Annual Maintenance of LI Schemes.-Ramanchadi LIS in Elamkulam Panchayath -General Civil Work
IRR/IA/EST/3292/2023_5_2_1 AS/59D/23/29737
18-08-2023
2702-01-800-94-00-34-3 7,56,800 7,56,800
108
GENERAL-Annual Maintenance of LIS Kolappuram for the year 2023-24-Annual Maintenance of LIS Kolappuram in Vengara LAC in Malappuram District for the year 2023-24- General Civil Work
IRR/IA/EST/3777/2023_5_1_1 AS/59D/23/29782
18-08-2023
2702-01-800-94-00-34-3 1,80,000 1,80,000
109
Side protection of Thoppil thodu near Hariharapuram Thoppil bridge in Elakamon panchayath in Varkala constituency
IRR/IA/EST/4841/2023_5_1_1 A1-3425/2023
18-08-2023
4700-80-800-89-00-00-00 10,60,000 10,60,000
110
GENERAL-MIC/AM/2023-24-Annual maintenance of Valavingal & Kolothumkadav LIS for the year 2023-24-General Civil Work
IRR/IA/EST/3353/2023_5_3_2 AS/59D/23/29858
22-08-2023
2702-01-800-94-00-34-3 2,00,000 2,00,000
111
GENERAL-Temporary Bund 2023-24(Kozhencherry LI)-Providing temporary bund across Pumpa river in Kozhencherry LI Scheme
IRR/IA/EST/3993/2023_5_1_1 AS/59D/23/29897
23-08-2023
2702-01-800-94-00-34-3 1,04,000 1,04,000
112
GENERAL-Annual maintenance 2023-24-Annual maintenance (civil and mechanical)of Omallor L.I Scheme in Omallor grama panchayath Aranmula constituency -General Civil Work
IRR/IA/EST/4219/2023_5_1_1 AS/59D/23/29898
23-08-2023
2702-01-800-94-00-34-3 1,07,000 1,07,000
113
GENERAL-Annual Maintenance of Thottarapuncha thodu on upstream of Olipuram in Ernakulam District for the year 2023-2024- General Civil Work
IRR/IA/EST/2552/2023_5_1_1 AS/59D/23/29886
23-08-2023
2702-01-800-94-00-34-3 12,00,000 12,00,000
114
GENERAL-Annual maintenance- for the year 2023-2024- LI scheme Chaliyar - Areekkode gramapanchayath-Ernad LA- Malappuram Dist-General Civil Work
IRR/IA/EST/4230/2023_5_1_1 AS/59D/23/29901
23-08-2023
2702-01-800-94-00-34-3 5,00,000 5,00,000
115
GENERAL-MIC/AM/2023-24-Annual maintenance of Azhimavu & Thottanchira LIS for the year 2023-24-General Civil Work
IRR/IA/EST/3353/2023_5_4_3 AS/59D/23/29934
24-08-2023
2702-01-800-94-00-34-3 2,60,000 2,60,000
116
Annual maintenance of Manalur LIS for the year 2023-2024
IRR/IA/EST/2775/2022_5_2_1 AS/59D/23/29933
24-08-2023
2702-01-800-94-00-34-3 11,00,000 11,00,000
117
GENERAL-AM 2023-24-Annual maintenance to VCB at Koolikana in Badiadka panchayat for the year 2023-24-General Civil Work
IRR/IA/EST/3193/2023_5_4_3 AS/59D/23/29921
24-08-2023
2702-01-800-94-00-34-3 3,10,000 3,10,000
118
GENERAL-AM-Annual maintanence of Edathiruthy LI scheme in Edathiruthy panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3575/2023_5_1_1 AS/59D/23/29982
26-08-2023
2702-01-800-94-00-34-3 1,00,000 1,00,000
119
GENERAL-Annual Maintenance of LIS Mullankuzhi for the year 2023-24 -Annual Maintenance of LIS Mullankuzhi in Vallikkunnu LAC in Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/3778/2023_5_1_1 AS/59D/23/30002
26-08-2023
2702-01-800-94-00-34-3 1,80,000 1,80,000
120
Annual Maintenance of various LIS under MI Section Kodakara 2023-24 -Annual Maintenance of various LIS under MI Section Kodakara for the year 2023-24 - Repair of PVC Pipes and maintenance-General Civil Work.
IRR/IA/EST/9126/2022_5_3_2 AS/59D/23/30048
02-09-2023
2702-01-800-94-00-34-3 5,00,000 5,00,000
121
GENERAL-Temporary bund 2023-24-Providing temporary bund across Achankovil river near omalloor L.I.Scheme in Aranmula constituency-General Civil Work
IRR/IA/EST/3615/2023_5_1_1 AS/59D/23/30076
04-09-2023
2702-01-800-94-00-34-3 1,01,000 1,01,000
122
Annual Maintenance of various LIS under MI Section Kodakara 2023-24 -Annual Maintenance of various LIS under MI Section Kodakara for the year 2023-24 - Post monsoon cleaning and desiltation of canals-General Civil Work
IRR/IA/EST/9126/2022_5_4_3 AS/59D/23/30080
04-09-2023
2702-01-800-94-00-34-3 6,00,000 6,00,000
123
GENERAL-Annual Maintenance for the year 2023-2024- Piravom & Pazhoor L I Scheme-General Civil Work-1
IRR/IA/EST/1737/2023_5_2_1 AS/59D/23/30083
05-09-2023
2702-01-800-94-00-34-3 15,00,000 15,00,000
124
GENERAL-Annual Maintenance for the year 2023-2024-Kalamboor South & Kalamboor North L I Scheme-General Civil Work
IRR/IA/EST/1737/2023_5_5_4 AS/59D/23/30082
05-09-2023
2702-01-800-94-00-34-3 10,50,000 10,50,000
125
Annual maintenance 2023-24 - Urgent repair work of schemes in Athirappilly, Kodassery, Pariyaram, Meloor panchayaths of Chalakudy Municipality
IRR/IA/EST/3455/2023_5_1_1 AS/59D/23/30095
05-09-2023
2702-01-800-94-00-34-3 5,00,000 5,00,000
126
Annual Maintenance - urgent repair works of MS pipe and NRV / wheel valves in various LIS under MI section Chalakudy
IRR/IA/EST/3455/2023_5_2_1 AS/59D/23/30096
05-09-2023
2702-01-800-94-00-34-3 3,50,000 3,50,000
127
Annual Maintenance - Providing shutter in Koodapuzha check dam and maintenance
IRR/IA/EST/3455/2023_5_3_2 AS/59D/23/30099
05-09-2023
2702-01-800-94-00-34-3 1,00,000 1,00,000
128
Annual Maintenance - Urgent repair works of PVC pipes and canals in various LIS in Kadukutty, Koratty and Annamanada panchayaths
IRR/IA/EST/3455/2023_5_4_3 AS/59D/23/30100
05-09-2023
2702-01-800-94-00-34-3 5,00,000 5,00,000
129
Annual Maintenance - Annual Maintenance of various LIS under MI section Mala for the year 2023-24 in Kuzhur panchayath
IRR/IA/EST/3486/2023_5_4_2 AS/59D/23/30097
05-09-2023
2702-01-800-94-00-34-3 5,70,000 5,70,000
130
GENERAL-Annual maintenance of No.4 LIS -Annual maintenance of no.4 LIS Ramamangalam in Ramamangalam panchayath for the year 2023-2024 -General Civil Work
IRR/IA/EST/3131/2023_5_1_1 AS/59D/23/30111
05-09-2023
2702-01-800-94-00-34-3 10,00,000 10,00,000
131
GENERAL-Annual maintenance of No.2 and No.3 LIS in Ramamangalam panchayath for the year 2023-2024-Annual maintenance of No.2&N0.3 LIS Ramamangalam in Ramamangalam panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3107/2023_5_1_1 AS/59D/23/30081
05-09-2023
2702-01-800-94-00-34-3 12,50,000 12,50,000
132
GENERAL-Annual maintenance of Pampakkuda Relift -Annual maintenance of Pampakuda relift in Pamapkuda Panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3090/2023_5_1_1 AS/59D/23/30084
05-09-2023
2702-01-800-94-00-34-3 12,00,000 12,00,000
133
Annual Maintenancr - Repair and maintenance works of canals under Chirayanchal, Parikkappilly, Thandathikulam LI and Thiruthiparambu LIS in Aloor panchayath
IRR/IA/EST/3486/2023_5_3_5 AS/59D/23/30101
05-09-2023
2702-01-800-94-00-34-3 6,30,000 6,30,000
134
GENERAL-MIC/AM/2023-24-Annual maintenance of Ettumana & Arattupuzha-Karottumuri LIS for the year 2023-24-General Civil Work-2
IRR/IA/EST/3353/2023_5_2_1 AS/59D/23/30166
08-09-2023
2702-01-800-94-00-34-3 2,30,000 2,30,000
135
GENERAL-Annual Maintenance for the year 2023-2024-Kakkad & Kakkad Tail End L I Scheme-General Civil Work
IRR/IA/EST/1737/2023_5_1_1 AS/59D/23/30143
08-09-2023
2702-01-800-94-00-34-3 15,00,000 15,00,000
136
GENERAL-Annual Maintenance for the year 2023-2024-Puthumanakkadavu & Nechoor L I Scheme-General Civil Work
IRR/IA/EST/1737/2023_5_4_3 AS/59D/23/30141
08-09-2023
2702-01-800-94-00-34-3 15,00,000 15,00,000
137
GENERAL-Annual Maintenance for the year 2023-2024- Mulakkulam Vadakkekkara & Mulakkulam North L I Scheme-General Civil Work
IRR/IA/EST/1737/2023_5_3_2 AS/59D/23/30140
08-09-2023
2702-01-800-94-00-34-3 10,50,000 10,50,000
138
Annual Maintenance of KC, Annamanada, Palissery, Vennuthura LI schemes
IRR/IA/EST/3486/2023_5_1_3 AS/59D/23/30165
08-09-2023
2702-01-800-94-00-34-3 5,60,000 5,60,000
139
Annual Maintanance 2023 24 Mechanical Work Annual Maintanance 2023 24 Annual Maintanance of Various L I Stations under MI Setion Adoor Mechanical Work
IRR/IA/EST/3459/2023_16_1_1 AS/59D/23/30215
11-09-2023
2702-01-800-94-00-34-3 6,58,000 6,58,000
140
Annual maintenance of LI schemes under Irinjalakuda section for the year 2023-2024 General civil work
IRR/IA/EST/789/2023_5_1_1 AS/59D/23/30283
13-09-2023
2702-01-800-94-00-34-3 8,00,000 8,00,000
141
Annual maintenance work MI section pudukad LAC for the pumping season in the year 2023-2024 General civil work
IRR/IA/EST/3115/2023_5_1_1 AS/59D/23/30284
13-09-2023
2702-01-800-94-00-34-3 9,00,000 9,00,000
142
GENERAL-Annual maintenance for the year 2023-24 - VCB cum bridge across Cherupuzha-at Koottilangadi gramapanchayath, Mankada LA, Malappuram district-General Civil Work
IRR/IA/EST/4223/2023_5_1_1 AS/59D/23/30310
14-09-2023
2702-01-800-94-00-34-3 3,00,000 3,00,000
143
GENERAL-Annual maintenance for the year 2023-2024- LI scheme Mattathurchali- Othukkungal gramapanchayath, Vengara LA, Malappuram Dist-General Civil Work
IRR/IA/EST/4229/2023_5_1_1 AS/59D/23/30329
14-09-2023
2702-01-800-94-00-34-3 3,00,000 3,00,000
144
Annual Maintenance-of Ayanikkad Dam and Peettakkandy VCB in Koyilandy Municipality, Koyilandy LAC, Kozhikode Dstrict For the year 2023-24.
IRR/IA/EST/4248/2023 AS/59D/23/30332
14-09-2023
2702-01-800-94-00-34-3 1,59,000 1,59,000
145
GENERAL-Annual Maintenance -of R C B at M a m b a t t i l T h a z h a a c r o s s C h e m b r a - Kadiyangad River in Koothali Panchayath, Kozhikode District for the year 2023-2024- General Civil Work
IRR/IA/TR/4280/2023_5_1_1/1 AS/59D/23/303339
14-09-2023
2702-01-800-94-00-34-3 1,16,000 1,16,000
146
GENERAL-Annual Maintenance - of Kolorapara V C B Cum Bridge in Kayanna Panchayath, Kozhikode District for the year 2023-2024-General Civil Work
IRR/IA/EST/4279/2023_5_1_1 AS/59D/23/30340
14-09-2023
2702-01-800-94-00-34-3 95,000 95,000
147
GENERAL-Annual Maintenance-of Kuluppachal thodu vcb in Thurayur Panchayat , Perambra LAC , Kozhikode District for the year 2023-2024-General Civil Work
IRR/IA/EST/4457/2023_5_1_1 AS/59D/23/30338
14-09-2023
2702-01-800-94-00-34-3 69,000 69,000
148
GENERAL-Annual Maintenance-of Vettikkattil V C B cum Bridge in Kayanna Panchayath,Balussery L A in Kozhikode District for the year 2023-2024.-General Civil Work
IRR/IA/EST/4284/2023_5_1_1 AS/59D/23/30334
14-09-2023
2702-01-800-94-00-34-3 95,000 95,000
149
GENERAL-Annual Maintenance-of Achanveedunada VCB in Thikkodi Panchayath, Kozhikode District for the year 2023-24.-General Civil Work
IRR/IA/EST/4259/2023_5_1_1 AS/59D/23/30344
14-09-2023
2702-01-800-94-00-34-3 1,16,000 1,16,000
150
GENERAL-Annual Maintenance- of Vented Dam A and D Bund in Thurayur Panchayath, Kozhikode district for the year 2023-2024.-General Civil Work
IRR/IA/EST/4276/2023_5_1_1 AS/59/2330342
14-09-2023
2702-01-800-94-00-34-3 95,000 95,000
151
GENERAL-Annual maintenance for the year 2023-2024- LI scheme Mattathurchali- Othukkungal gramapanchayath, Vengara LA, Malappuram Dist-General Civil Work
IRR/IA/TR/4229/2023_5_1_1/1 AS/59D/23/30329
14-09-2023
2702-01-800-94-00-34-3 3,00,000 3,00,000
152
GENERAL-Annual maintenance - Kozhencherry LI Scheme-Annual maintenance of civil ,mechanical ,and electrical works of Kozhencherry LI scheme in Kozhencherry Panchayath during the year 2023-24
IRR/IA/EST/3822/2023_16_1_1 AS/59D/23/30378
15-09-2023
2702-01-800-94-00-34-3 88,000 88,000
153
GENERAL-AM-PRAMADAM-Annual maintenance of LI Station Pramadam in Pramadam Panchayath for the year 2023-24 (Civil ,Mechanical & electrical works)-General Civil Work
IRR/IA/EST/4180/2023_5_1_1 AS/59D/23/30352
15-09-2023
2702-01-800-94-00-34-3 2,31,000 2,31,000
154
GENERAL-AM-NARIYAPURAM-Annual maintenance of LI Station Nariyapuram in Vallicodu Panchayath for the year 2023-24 (Civil ,Mechanical & electrical works)-General Civil Work
IRR/IA/EST/4181/2023_5_1_1 AS/59D/23/30353
15-09-2023
2702-01-800-94-00-34-3 2,19,000 2,19,000
155
GENERAL-Temporory Bund-Providing temporary bund across Achenkovil river in the down stream of Vazhamuttam,Padinjarepadam and Nariyapuram L I Schemes in Vallicodu Panchayat for the year 2023-24-General Civil Work
IRR/IA/EST/3848/2023_5_1_1 AS/59D/23/30355
15-09-2023
2702-01-800-94-00-34-3 3,25,000 3,25,000
156
GENERAL-AM-VAZHAMUTTAM-Annual maintenance of LI Station Vazhamuttam in Vallicodu Panchayath for the year 2023-24 (Civil ,Mechanical & electrical works)-General Civil Work
IRR/IA/EST/3425/2023_5_1_1 AS/59D/23/30354
15-09-2023
2702-01-800-94-00-34-3 2,21,000 2,21,000
157
GENERAL-AM-PADINJAREPADAM-Annual maintenance of LI Station Padinjareppadam in Vallicodu Panchayath for the year 2023-24 (Civil ,Mechanical & electrical works)-General Civil Work
IRR/IA/EST/4179/2023_5_1_1 AS/59D/23/30351
15-09-2023
2702-01-800-94-00-34-3 2,12,000 2,12,000
158
GENERAL-Annual maintenance 2023-24 - Thottarapuncha thodu from River mouth to Manakkathazham in Ernakulam district.-Annual maintanence 2023-24-General Civil Work
IRR/IA/EST/3059/2023_5_1_1 AS/59D/23/30387
15-09-2023
2702-01-800-94-00-34-3 12,00,000 12,00,000
159
GENERAL-Annual maintenance 2023-24-Thottarapuncha thodu from Olipuram to Manakkathazham in Ernakulam district.-General Civil Work
IRR/IA/EST/2648/2023_5_1-1 AS/59D/23/30389
15-09-2023
2702-01-800-94-00-34-3 15,00,000 15,00,000
160
Annual maintenance 2023-24-SWE/VCB at Kunnathpalam in Olavanna Panchayat , Kozhikode Dist
IRR/IA/EST/4263/2023_5_1_1 AS/59D/23/30400
16-09-2023
2702-01-800-94-00-34-3 1,90,000 1,90,000
161
GENERAL-Annual Maintenance - Ummanchira-Providing temporary bund to Vented dam at Ummenchira in Eranholi Panchayath, Kannur District for the year 2023-24-General Civil Work-1
IRR/IA/EST/3448/2023_5_1_1 AS/59D/23/30414
16-09-2023
2702-01-800-94-00-34-3 3,30,000 3,20,000
162
GENERAL-AM 2023-24-Annual Maintenance of VCB cum bridge across Chippar thodu in Paivalike Panchayath for the year 2023-24-General Civil Work
IRR/IA/FL/3230/2023 AS/59D/23/30470
18-09-2023
2702-01-800-94-00-34-3 1,20,000 1,20,000
163
GENERAL-2023-24- near Avala Juma Masjid in Paivalike panchayath for the year 2023-24-General Civil Work
IRR/IA/FL/3219/2023 AS/59D/23/30471
18-09-2023
2702-01-800-94-00-34-3 85,000 85,000
164
GENERAL-AM 2023-24-Annual Maintenance of SWE bund on left bank of Kumbla river in Kumbla Panchayath for the year 2023-24-General Civil Work
IRR/IA/FL/3229/2023 AS/59D/23/30481
18-09-2023
2702-01-800-94-00-34-3 90,000 90,000
165
GENERAL-Annual Maintenance 2023-Vakayad LI scheme in Panamaram panchayath-General Civil Work
IRR/IA/EST/3238/2023_5_1_1 AS/59D/23/30443
18-09-2023
2702-01-800-94-00-34-3 2,00,000 2,00,000
166
GENERAL-MIT/AM/2023-24- Annual maintenance of Kainooor LIS for the year 2023- 24- General Civil Work
IRR/IA/EST/3352/2023_5_5_4 AS/59D/23/30497
18-09-2023
2702-01-800-94-00-34-3 30,000 30,000
167
GENERAL-MIT/AM/2023-24-Annual maintenance of Koottala and Mulayam LIS for the year 2023- 24-General Civil Work
IRR/IA/EST/3352/2023_5_4_3 AS/59D/23/30487
18-09-2023
2702-01-800-94-00-34-3 40,000 40,000
168
GENERAL-Annual Maintenance - Kunduchira-Annual maintenance of Kunduchira Anicut in Thalassery Municipality , Kannur District for the year 2023-24-General Civil Work-1
IRR/IA/EST/3450/2023_5_1_1 AS/59D/23/30447
18-09-2023
2702-01-800-94-00-34-3 4,00,000 4,00,000
169
GENERAL-Annual Maintenance - of Marakkadi thodu SWE/VCB in Cheruvannur Panchayath, Kozhikode District for the year 2023-2024.-General Civil Work
IRR/IA/EST/4278/2023-24 AS/59D/23/30530
19-09-2023
2702-01-800-94-00-34-3 69,000 69,000
170
GENERAL-AM 2023-24-Annual Maintenance of VCB at Kodiyamma in Kumbla Panchayath for the year 2023-24-General Civil Work
IRR/IA/FL/3232/2023 AS/59D/23/30576
20-09-2023
2702-01-800-94-00-34-3 1,10,000 1,10,000
171
GENERAL-AM 2023-24 -Annual Maintenance of SWECB at Kinnikkatta in Arikady village of Kumbla Panchayath for the year 2023-24-General Civil Work
IRR/IA/FL/3234/2023 AS/59D/23/30578
20-09-2023
2702-01-800-94-00-34-3 55,000 55,000
172
AM-2023-24-ANNAUL MAINTENANCE TO VCB AT KORIKAR IN BADIADKA PANCHAYATH FOR THE YEAR 2023-24
IRR/IA/EST/3193/2023_5_6_5 AS/59D/23/30583
20-09-2023
2702-01-800-94-00-34-3 1,50,000 1,50,000
173
AM-2023-24-Annual maintenance to VCB at Poyyakandam in Nekraje Village of Chengala Panchayath for the year 2023-24
IRR/IA/EST/3193/2023_5_2_1 AS/59D/23/30581
20-09-2023
2702-01-800-94-00-34-3 1,52,000 1,52,000
174
AM-2023-24-Annual maintenance to VCB cum bridge at Arattukadave in Chengala Panchayath for the year 2023-24
IRR/IA/EST/3193/203_5_3_2 AS/59D/23/30582
20-09-2023
2702-01-800-94-00-34-3 1,80,000 1,80,000
175
AM-2023-24-Annual maintenance to VCB cum foot bridge across Pallathaduka at Kuduppamkuzhy in Badiadka Panchayath for the year 2023-24
IRR/IA/EST/3193/2023_5_7_6 AS/59D/23/30604
21-09-2023
2702-01-800-94-00-34-3 4,50,000 1,10,000
176
GENERAL-AM 2023-24-Annual Maintenance of Bambrana Anicut in Kumbla Panchayath in Kasaragod district for the year 2023-24 -General Civil Work
IRR/IA/EST/3231/2023_5_1_1 AS/59D/23/30602
21-09-2023
2702-01-800-94-00-34-3 5,40,000 5,40,000
177
GENERAL-2023-24-Annual maintanence of Kanchikkatta SWECB at Kumbla panchayath for the year 2023-24-General Civil Work
IRR/IA/EST/3170/20 23_5_1_1 AS/59D/23/30603
21-09-2023
2702-01-800-94-00-34-3 3,80,000 3,80,000
178
GENERAL-AM 2023-24-Annual maintenance to VCB cum Bridge at Madhur-Muttathody in Chengala gramapanchayat for the year 2023-24-General Civil Work.
IRR/IA/EST/3193/2023_5_5_4 AS/59D/23/30604
21-09-2023
2702-01-800-94-00-34-3 4,50,000 4,50,000
179
GENERAL-AM 2023-24-Annual Maintainance to Keerikkadu VCB in Kumbdaje Gramapanchayath of Kasaragod District-General Civil Work
IRR/IA/EST/3316/2023_5_1_1 AS/59D/23/30608
21-09-2023
2702-01-800-94-00-34-3 2,50,000 2,50,000
180
GENERAL-AM 2023-24-Annual maintenance to SWE Dam at Kottakunje across Madhuvahini river in Mogral Puthur panchayat for the year 2023-24-General Civil Work
IRR/IA/EST/3193/2023_5_1_1 AS/59D/23/30605
21-09-2023
2702-01-800-94-00-34-3 3,00,000 3,00,000
181
GENERAL-Annual maintenance of Mamalassery LIS -Annual maintenance of Mamalassery LIS for the year 2023-2024-General Civil Work
IRR/IA/EST/3089/2023_5_1_1 AS/59D/23/30652
23-09-2023
2702-01-800-94-00-34-3 14,00,000 14,00,000
182
Annual maintenance 2023-24-Annual maintenance of various LIS under minor irrigation section Mala 2023-24 Thrygram 1,Thrygram2,Thiruthikulangara and vanchipurathazham-General Civil Work.
IRR/IA/EST/3486/2023_5_6_4 AS/59D/23/30783
29-09-2023
2702-01-800-94-00-34-3 5,80,000 5,80,000
183
Annual maintenance of VCB across Pavoor thodu at Marikkapu in vorkady village of vorkady panchayath for the year 2023-24
IRR/IA/FL/3395/2023 AS/59D/23/30768
29-09-2023
2702-01-800-94-00-34-3 1,60,000 1,60,000
184
Annual maintenance of F P Bund cum road on the RB of Shiriya river on NH 66 Mangalpady Panchayath 2023-2024
IRR/IA/FL/3366/2023 AS/59D/23/30770
29-09-2023
2702-01-800-94-00-34-3 80,000 80,000
185
Annual maintenance of vcb across Manjeshwar River at Badaje in Badaje village of Manjeshwar Panchayath 2023-24
IRR/IA/FL/3403/2023 ORDER No. AS/59D/23
/30772
29-09-2023
2702-01-800-94-00-34-3 1,40,000 1,40,000
186
Annual maintenance 2023-24-SWE/VCB at Cherukulam in Kakkodi Panchayat, Kozhikode District
IRR/IA/EST/4261/2023_5_1_1 AS/59D/23/30765
29-09-2023
2702-01-800-94-00-34-3 4,00,000 4,00,000
187
Annual maintenance of VCB cum Tractor way across Peruvai river at Balloor Ottappadapu in Paivalike Grama Panchayath for the year 2023-24
IRR/IA/FL/3870/2023 ORDER No. AS/59D/23
/30798
30-09-2023
2702-01-800-94-00-34-3 1,10,000 1,10,000
188
Annual maintenance of Mandaram LIS for the year 2023-24-General Civil Work-1
IRR/IA/EST/3353/2023_5_1_1 AS/59D/23/30826
03-10-2023
2702-01-800-94-00-34-3 4,10,000 4,10,000
189
Annual maintenance of Pootharakkal & Anthikad LIS for the year 2023-24-General Civil Work-1
IRR/IA/EST/3353/2023_5_5_4 AS/59D/23/30827
03-10-2023
2702-01-800-94-00-34-3 4,80,000 4,80,000
190
GENERAL-AM-Annual maintenance of VCB cum bridge across Bangara Manjeshwar river at Mudimar in Pavoor village of Vorkady Grama Panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3394/20 23_5_1_1 AS/59D/23/30875
04-10-2023
2702-01-800-94-00-34-3 3,20,000 3,20,000
191
GENERAL-AM-Annual maintenance of Uppala Anicut in Meenja village of Meenja Panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3392/2023_5_1_1 AS/59D/23/30871
04-10-2023
2702-01-800-94-00-34-3 2,40,000 2,40,000
192
GENERAL-Annual maintenance-Annual maintenance of VCB cum bridge across Swarnagiri river at Manihithlu in Mangalpady panchayath for the year 2023-24-General civil work-General Civil Work
IRR/IA/EST/3336/2023_5_1_1 AS/59D/23/30873
04-10-2023
2702-01-800-94-00-34-3 3,70,000 3,70,000
193
GENERAL-AM-Annual maintenance of VCB Cum bridge at Kudumbalachil thodu at Kudumbalachil in Pathur village of Vorkady Panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/3378/2023_5_1_1 AS/59D/23/30874
04-10-2023
2702-01-800-94-00-34-3 2,20,000 2,20,000
194
GENERAL-Pump house maintenance-Maintenance work to Pump houses of various LI Schemes under MI Section Pampakkuda -General Civil Work
IRR/IA/EST/5055/2022_5_1_1 AS/59D/23/30907
05-10-2023
2702-01-800-94-00-34-3 8,40,000 8,40,000
195
GENERAL-Annual maintenance of Nadakkuthazha - Chorode canal at Kommanerithazha VCB cum BRIDGE in Eramala Panchayath,Kozhikode District for the year 2023-2024--Vatakara LA-General Civil Work-1.
IRR/IA/EST/4056/2023_5_1_1 AS/59D/23/30970
07-10-2023
2702-01-800-94-00-34-3 64,000 64,000
196
Annual maintenance of Poomala Dam for the year 2023-24- General Civil Work
IRR/IA/EST/3352/2023_5_6_5 AS/59D/23/30985
09-10-2023
2702-01-800-94-00-34-3 12,00,000 12,00,000
197
GENERAL-Annual Maintanance - Annual Maintenance of VCB cum Bridge across Bangaramanjeshwar river at pavoor of Manjeshwar panchayath year 2023-24-General Civil Work
IRR/IA/EST/3261/20 23_5_8_7 AS/59D/23/31025
10-10-2023
2702-01-800-94-00-34-3 5,70,000 4,80,000
198
GENERAL-Annual maintenance of Cherandathur chira L I scheme in Maniyur Panchayath, for the year 2023-2024-Kozhikode District.
IRR/IA/EST/4265/2023_5_1_1 AS/59D/23/31013
10-10-2023
2702-01-800-94-00-34-3 1,89,000 1,89,000
199
GENERAL-Annual Maintenance of Various VCBs in Nadakku thazha Chorode Canal of Vatakara Municipality and Chorode Panchayath for the year 2023-2024-Kozhikode District-General Civil Work-1
IRR/IA/EST/4273/2023+5_1_1 AS/59D/23/31047
11-10-2023
2702-01-800-94-00-34-3 1,46,000 1,46,000
200
Emergency Protection Works using Sand filled Geobags at Perward Kadappuram in Kumbala Grama Panchayth.
IRR/IA/FL/4210/2023 Order No.AS/59D/23/
31284
20-10-2023
2711-02-103-99-34-3 24,00,000 24,00,000
201
GENERAL-Shiriya canal-laying of boundary stone after fixing land boundary by revenue survey-General Civil Work
IRR/IA/EST/6787/20 23_5_1_1 AS/59D/23/31296
25-10-2023
2702-01-800-94-00-34-3 3,00,000 3,00,000
202
GENERAL-Repairs to kadungooth chira -at ward no.15 of Kootilangadi GP-General Civil Work
IRR/IA/EST/3898/2023_5_1_ AS/59D/23/31739
14-11-2023
2702-01-800-94-00-34-3 12,00,000 12,00,000
203
RELIS-Urgent repair works to Chaliyar LI Scheme-in Areekode GP in Ernad LA in Malappuram District-General Civil Work
IRR/IA/EST/7384/2023_5_1_1 AS/59D/23/31657
14-11-2023
4702-00-101-84-01-00-00 8,00,000 8,00,000
204
AM-Annual Maintenance of Kalpara LI Scheme in Heroor Village of Mangalpady Panchayath for the year 2023-2024-General Civil Work.
IRR/IA/EST/3406/2023_5_1_1 AS/59D/23/31807
17-11-2023
2702-01-800-94-00-34-3 5,40,000 5,10,000
205
GENERAL-AM 2023-24-Annual Maintenance of Shiriya Canal in Puthige Panchayath for the year 2023- 24 -General Civil Work
IRR/IA/EST/3228/2023_5_1_1 AS/59D/23/31806
17-11-2023
2702-01-800-94-00-34-3 9,00,000 9,00,000
206
GENERAL-AM-Mundengara 2023-24 Annual Maintenance to LIS Mundengara of Edavanna Panchayath,Malappuram (Dt)
IRR IA EST 4127 2023-5-1-1 AS/59D/23/31902
22-11-2023
2702-01-800-94-00-34-3 2,00,000 2,00,000
207
GENERAL-AM-Annual maintenance of Beriyolika LI scheme in Ichilangod village of Mangalpady Panchayath for the year 2023-2024 -General Civil Work
IRR/IA/EST/3388/2023_5_1_1 AS/59D/23/31917
23-11-2023
2702-01-800-94-00-34-3 3,20,000 3,20,000
208
GENERAL-BATTVADY LI SCHEME -Annual maintenance of Battvady LI scheme in Sulthan Bathery municipality in Sulthan bathery constituency ,Wayanad DistrictGeneral Civil Work
IRR/IA/EST/3237/2023_5_1_1 AS/59D/23/31929
24-11-2023
2702-01-800-94-00-34-3 2,75,000 2,75,000
209
GENERAL-OFFICE SHIFTING-Shifting of Irrigation Sub-Division office and Section Offices from the existing building to the Chamravattom Inspection Bungalow in Ponnani Municipality-General Civil Work
IRR/IA/EST/2680/2023_5_1_1 AS/59D/23/31922
24-11-2023
2711-01-103-99-00-34-3 50,000 50,000
210
GENERAL-Vazhathoppu-behind KSRTC depot-R1-Protecting the Right bank of Cheruthoni thodu behind the Proposed Cheruthoni KSRTC Depot in ward No.10 of Vazhathoppu Panchayath-Reach-1-General Civil
IRR/IA/EST/2742/2023_5_1_1 AS/59D/23/32026
27-11-2023
2711-01-103-99-00-34-3 25,00,000 25,00,000
211
GENERAL- Kudayathoor GP 2022-23 P/W, P No.01 - Construction of Damaged Protection wall at the Right bank of Chemmandoor thodu near Saraswathy school in ward No. 10 of Kudayathoor Panchayath.
IRR/IA/EST/7371/2022_5_1_1 AS/59D/23/32020
27-11-2023
2711-01-103-99-00-34-3 22,00,000 22,00,000
212
GENERAL-Koottappuram -Protecting the Left Bank of kadalundi River in Koottappuram Kadavu in Koottilangadi Panchayath in Mankada LAC In Malappuram District.-General Civil Work
IRR/IA/EST/1607/2022_5_1_1 AS/59D/23/32233
08-12-2023
2711-01-103-98-34-03-00 34,70,000 34,70,000
213
GENERAL-Kanchiyar GP 2022-23 P/W, P No.01-Protection works of the eroded banks of Kalthotti -Palakkada Anchuruli thodu near at Labbakkkada Junction in Kanchiyar G.P.-General Civil Work.
IRR/IA/EST/5508/2022_5_1_1 AS/59D/23/32235
08-12-2023
2711-01-103-98-34-03-00 50,00,000 50,00,000
214
GENERAL-MLA-ADS-Nurumbil thodu-SIDE PROTECTION TO NURUMBIL THODU IN DHARMADAM GP.-General Civil Work-1
IRR/IA/EST/6531/2023_5_1_1 JD/3130/23/AD4/F2
15-12-2023
4700-80-800-89-00-00-00 25,00,000 25,00,000
215
GENERAL-AM-Annual Maintenance-of Kavanakkallu Regulater Cum Bridge in Vazhakkad Panchayath,Kondotty LAC for year 2023-24-General Civil Work
IRR/IA/EST/3713/2023_5_1_1 AS/59D/23/32495
29-12-2023
2702-01-800-94-00-34-3 16,00,000 16,00,000
216
GENERAL-EMERGENCY -permanent blockage of Kanchikatta bridge in Kumbla Grama Panchayath in Kasaragod District -General Civil Work.
IRR/IA/EST/8396/2023_5_1_1 AS/59D/23/32497
29-12-2023
2702-01-800-94-00-34-3 50,000 50,000
217
GENERAL-Work Related to Kanakkankadavu RCB-Providing antisalinity bund at Kanakkankadavu-Providing Screening and Sluice arrangements at Kozhithuruthu Bridge across Chalakkudy river in Puthenvelikkara Grama Panchayath for the year 2023-2024-General Civil Work
IRR/IA/EST/5793/2022_5_7_6 AS/59D/23/32488
29-12-2023
2702-01-800-94-00-34-3 6,42,000 6,42,000
218
GENERAL-Annual Shutter operation-Weir at Anappara Pottammal Kadavu in Koottilangadi Panchayath in Malappuram District for the year of 2023-24-General Civil Work
IRR/IA/EST/4417/2023_5_1_1 AS/59D/23/32532
02-01-2024
2702-01-800-94-00-34-3 1,22,000 1,22,000
219
GENERAL-Annual Maintenance (2023-2024)-of Biyyam Regulator Cum Bridge in Ponnani Taluk, Malappuram District for the year 2023-24-General Civil Work
IRR/IA/EST/6215/2023_5_1_1 AS/59D/23/32588
06-01-2024
2702-01-800-94-00-34-3 4,30,000 4,30,000
220
GENERAL-FD-Naduthodu-Side protection of Naduthodu in Ward No.16 of Alex Nagar in Sreekandapuram Municipality in Irikkur L.A in Kannur District.-General Civil Work
IRR/IA/EST/5573/2022_5_1_1 AS/59D/23/32743
17-01-2024
2702-03-101-98-03 15,34,000 15,34,000

Project - I
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-Removal of waste-Urgent removal of floating material and debris to clear the blockage near Perumankara Bridge across Pamba River in Cheruthana Panchayath of Harippad LAC-2023-General Civil Work.
IRR/IA/EST/5564/2022_5_4_3 AS/59D/23/28609
06-07-2023
2711-01-103-99-00-34-3 3,50,000 3,50,000
2
KPIP-Monsoon Preparedness-Emergency works between Ch 10/940km and Ch 23/000km and its distributaries during monsoon for the year 2023 24
IRR/PI/EST/5624/2023_5_1_1 AS/59D/23/29242
31-07-2023
2700-18-101-98-00-18-00 65,000 65,000
3
KPIP-Monsoon Preparedness-Emergency works between Ch:23/000 km and 33/000 km and its distributaries during monsoon period for the year 2023-24
IRR/PI/EST/6045/2022_5_2_1 AS/59D/23/29241
31-07-2023
2700-18-101-98-00-18-00 65,000 65,000
4
KPIP-Monsoon preparedness -Urgent works between LBMC Ch:2/500 km to 10/940 km and its distributories during monsoon period for the year 2023-24-Urgent tree cutting
IRR/PI/EST/5606/2023_5_1_1 AS/59D/23/29240
31-07-2023
2700-18-101-98-00-18-00 70,000 70,000
5
KPIP-Monsoon Preparedness
IRR/PI/EST/5625/2023_5_1_1 AS/59D/23/29310
03-08-2023
2700-18-101-98-00-18-00 50,000 50,000
6
Monsoon preparedness-KPIP-Urgent work during Monsoon for the year 2023-24 between ch 52/000km to 61/700km
IRR/PI/EST/5654/2023_5_1_1 AS/59D/23/29313
03-08-2023
2700-18-101-98-00-18-00 50,000 50,000
7
KPIP-AM-water distribution works through LBMC between Ch 2/500 km and 10/940 km and its distributories for the year 2023-24
IRR/PI/EST/6175/2023_5_2_1 AS/59D/23/29895
23-08-2023
2700-18-101-98-00-18-00 3,00,000 3,00,000
8
KPIP- AM- Clearing jungle, silt removal and minor rectification works for all distributaries offtaking from LBMC between Ch: 23/000 km and 33/000 km for the year 2023-24
IRR/PI/EST/6179/2023_5_4_3 AS/59D/23/29893
23-08-2023
2700-18-101-98-00-18-00 3,00,000 3,00,000
9
KPIP- AM- Water distribution works through LBMC between Ch: 23/000 km and 33/000 km and its distributaries for the year 2023-24
IRR/PI/EST/6179/2023_5_1_2 AS/59D/23/29894
23-08-2023
2700-18-101-98-00-18-00 2,00,000 2,00,000
10
KPIP- AM- Rectification works to Mannampetta No 1 distributory between Ch 2/600km and 2/650km for the year 2023-24
IRR/PI/EST/6179/2023_5_3_1 AS/59D/23/29920
24-08-2023
2700-18-101-98-00-18-00 3,50,000 3,50,000
11
KPIP-AM-Clearing jungle, silt removal and minor rectification works for all distributaries offtaking from LBMC between Ch 10/940 km and 23/000 km for the year 2023-24
IRR/PI/EST/6170/2023_5_3_2 AS/59D/23/29918
24-08-2023
2700-18-101-98-00-18-00 3,50,000 3,50,000
12
KPIP-AM-Clearing jungle, silt removal and minor rectification works of LBMC between Ch:10/940 km and 23/000 km for the year 2023-24.
IRR/PI/EST/6170/2023_5_2_1 AS/59D/23/29917
24-08-2023
2700-18-101-98-00-18-00 7,00,000 7,00,000
13
KPIP- AM-Water distribution works through LBMC between Ch:10/940 km and 23/000 km for the year 2023-24
IRR/PI/EST/6170/2023_5_1_1 AS/59D/23/29916
24-08-2023
2700-18-101-98-00-18-00 3,50,000 3,50,000
14
KPIP-AM-Clearing Jungle,silt removal,minor rectification works and demolishing damaged SP at Ch:4/400 km of LBMC between Ch:2/500 km and 10/940 km for the year 2023-24
IRR/PI/EST/6175/2023_5_1_1 AS/59D/23/29915
24-08-2023
2700-18-101-98-00-18-00 8,00,000 8,00,000
15
KPIP-AM-Clearing Jungle, silt removal and minor rectification works for all distributories offtaking from LBMC between Ch 2/500 km and 10/940 km for the year 2023-24
IRR/PI/EST/6175/2023_5_3_2 AS/59D/23/30010
01-09-2023
2700-18-101-98-00-18-00 4,00,000 4,00,000
16
KPIP- AM- Clearing jungle, silt removal and minor rectification works of LBMC between Ch: 23/000 km and 33/000 km for the year 2023-24
IRR/PI/EST/6179/2023_5_2_1 AS/59D/23/30017
01-09-2023
2700-18-101-98-00-18-00 6,50,000 6,50,000
17
GENERAL-Annual Maintenance of Velliyamkallu RCB & Campus 2023-24-General Civil Work
IRR/IA/EST/6698/2023_5_1_1 AS/59D/23/31262
21-10-2023
2701-20-101-98-00-18-00 6,00,000 6,00,000
18
KPIP-Urgent rectification and leak proofing works-at Ch:20/700 KM of LBMC for the year 2023-24
IRR/PI/EST/3712/2022_5_1_1 AS/59D/23/32120
30-11-2023
2700-18-101-98-00-18-00 6,52,000 6,52,000

Project - II
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
CRDS-2023-24-RBC-Cutting down trees or branches of trees dangerously standing on the canal bunds under Head works Section Thumboormuzhy for one year.
IRR/PII/EST/2356/2023_5_1_1 AS/59D/23/27748
07-06-2023
2701-02-101-98-00-00-18 1,00,000 1,00,000
2
CRDS-2023-24-RBC-Cutting down trees or branches of trees standing dangerously on canal bunds under RBC section No.1 chalakudy for one year.
IRR/PII/EST/2363/2023_5_1_1 AS/59D/23/27760
07-06-2023
2701-02-101-98-00-00-18 75,000 75,000
3
GENERAL-CRDS-KKTY/TREE CUTTING /23-24-Cutting branches or trees standing dangerously on the canal bund under irrigation section Karukutty.-General Civil Work
IRR/PII/EST/2297/2023_5_1_1 AS/59D/23/27805
08-06-2023
2701-02-101-98-00-00-18 93,000 93,000
4
GENERAL-CRDS/TREE -CUT-Cutting branches or trees standing dangerously on the canal bund under irrigation section Koratty for the year 23-24-General Civil Work
IRR/PII/EST/2290/2023_5_1_1 AS/59D/23/27804
08-06-2023
2701-02-101-98-00-00-18 1,00,000 1,00,000
5
GENERAL-CRDS-2023-24-TREECUTTING-Cutting branches of trees standing dangerously on the canal bund under Irrigation LBC Section Chalakudy.-General Civil Work
IRR/PII/EST/2365/2023_5_1_1 ORDER No. AS/59D/23
/27831
09-06-2023
2701-02-101-98-00-00-18 1,00,000 1,00,000
6
CRDS-2023-24-RBC-Cutting down trees or branches-Cutting down trees or branches of trees standing dangerously on canal bunds and irrigation quarters compound under RBC Section No.3 chalakudy for one year
IRR/PII/EST/2358/2023_5_1_1 AS/59D/23/27816
09-06-2023
2701-02-101-98-00-00-18 70,000 70,000
7
GENERAL-CRDS/ANGLY/Trees and Branches/23-24-Cutting of trees and branches in dangerous condition on the various canal bunds under Irrigation Section Angamaly-General Civil Work
IRR/PII/EST/2199/2023_5_1_1 AS/59D/23/27829
09-06-2023
2701-02-101-98-00-00-18 1,20,000 1,20,000
8
CRDS-2023-24-RBC-Tree-cutting down trees or branches of trees standing dangerously on the canal bunds under RBC section No.2 chalakudy for one year.
IRR/PII/EST/2359/2023_5_1_1 AS/59D/23/27898
13-06-2023
2701-02-101-98-00-00-18 60,000 60,000
9
GENERAL-WSM 2023-24-WSM-Annual Maintenance of Kakkinikad diversion canal of Vazhani Irrigation Project for the Year 2023-24-General Civil Work.
:IRR/IA/EST/2222/2023_5_28_26 AS/59D/23/27956
14-06-2023
2700-14-101-98-00-18 5,00,000 5,00,000
10
GENERAL-PVIP-Annual maintenance to Thiruvankulam MD at Ch.2/200km to 5/200km for the year 2023-24-General Civil Work
IRR/PII/EST/7138/2022_5_1_1 AS/59D/23/28635
07-07-2023
2700-01-101-98-00-18 6,50,000 6,50,000
11
GENERAL-PVIP-Annual maintenance for Kanjiramattam MD between Ch:0/500km to 2/000 km for the year 2023-24-General Civil Work
IRR/PII/EST/6732/2022_5_1_1 AS/59D/23/28638
07-07-2023
2700-01-101-98-00-18 3,50,000 3,50,000
12
GENERAL-PVIP-Annual maintenance- for Karikode MD and Thalakode MD for the year 2023-24 -General Civil Work
IRR/PII/EST/532/2023_5_1_1 AS/59D/23/28652
10-07-2023
2700-01-101-98-00-18 5,00,000 5,00,000
13
GENERAL-ACTION PLAN 2023-24-PVIP-Annual Maintenance and removal of all tree stumps of High Level Canal from Ch: 20/000km to 22/500km for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_3_2 AS/59D/23/28654
10-07-2023
2700-01-101-98-00-18 4,00,000 4,00,000
14
GENERAL-ACTION PLAN 2023-24-PVIP-Rectification work-Side Protection wall between Ch: 1/500 km to 1/700 km of Airapuram Left MD for the year 2023 -2024-General Civil Work
IRR/PII/EST/1109/2023_5_8_7 AS/59D/23/28660
10-07-2023
2700-01-101-98-00-18 4,50,000 4,50,000
15
GENERAL-ACTION PLAN 2023-24-PVIP-Annual Maintenanace and removal of all tree stumps of Kolenchery Branch canal from Ch: 0/000km to 4/600km for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_4_3 AS/59D/23/28656
10-07-2023
2700-01-101-98-00-18 3,50,000 3,50,000
16
GENERAL-PVIP-Annual maintenance to Thiruvankulam MD between ch.5/200 km and 8/200 km for the year 2023-24-General Civil Work
IRR/PII/EST/757/2023_5_1_1 AS/59D/23/28653
10-07-2023
2700-01-101-98-00-18 7,00,000 7,00,000
17
GENERAL-Action plan 2023-2024-Annual Maintenance in wadakkanchery chira in Wadakkanchery river 2023-2024 -General Civil
IRR/IA/FL/1996/2023 AS/59D/23/28713
11-07-2023
2701-80-800-97-34-03 2,00,000 2,00,000
18
GENERAL-Action plan 2023-2024-Annual Maintenance in Attampatta chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_35_34 AS/59D/23/28737
11-07-2023
2701-80-800-97-34-03 1,80,000 1,80,000
19
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of chira in survey no.131 of Virupakka village in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/FL/2345/2023 AS/59D/23/28694
11-07-2023
2701-80-800-97-34-03 40,000 40,000
20
GENERAL-Action plan 2023-2024-Annual Maintenance in Munnathamkuzhy chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_38_37 AS/59D/23/28722
11-07-2023
2701-80-800-97-34-03 1,40,000 1,40,000
21
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Kattil chira in Wadakkanchery river for the year 2023-24-General Civil Work
D : IRR/IA/FL/2345/2023 AS/59D/23/28693
11-07-2023
2701-80-800-97-34-03 54,000 54,000
22
GENERAL-Action plan 2023-2024-Annual Maintenance in Chalakkal chira in Wadakkanchery river 2023 2024 General Civil Work
IRR/IA/EST/1996/2023_5_36_35 AS/59D/23/28695
11-07-2023
2701-80-800-97-34-03 2,00,000 2,00,000
23
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Parayanthuruthy chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/FL/2345/2023 AS/59D/23/28692
11-07-2023
2701-80-800-97-34-03 52,000 52,000
24
GENERAL-Action plan 2023-2024-Annual Maintenance in Peringiri chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_37_36 AS/59D/23/28714
11-07-2023
2701-80-800-97-34-03 2,00,000 2,00,000
25
GENERAL-Action plan 2023-2024-Annual Maintenance in Adhur chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_39_38 AS/59D/23/28709
11-07-2023
2701-80-800-97-34-03 1,60,000 1,60,000
26
GENERAL-Action plan 2023-2024-Annual Maintenance in Elavathingal and Mullingal chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_40_39 AS/59D/23/28715
11-07-2023
2701-80-800-97-34-03 1,00,000 1,00,000
27
GENERAL-Action plan 2023-2024-Annual Maintenance in Peruvan chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_42_41 AS/59D/23/28712
11-07-2023
2701-80-800-97-34-03 1,40,000 1,40,000
28
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Puthenkovilakam chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_5_3 AS/59D/23/28696
11-07-2023
2701-80-800-97-34-03 54,000 54,000
29
GENERAL-Action plan 2023-2024-Annual Maintenance in Tholur chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_43_42 AS/59D/23/28717
11-07-2023
2701-80-800-97-34-03 1,85,000 1,85,000
30
GENERAL-Action plan 2023-2024-Annual Maintenance in Muttikkal chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_44_43 AS/59D/23/28710
11-07-2023
2701-80-800-97-34-03 85,000 85,000
31
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Akkathuruthy chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_6_4 AS/59D/23/28697
11-07-2023
2701-80-800-97-34-03 54,000 54,000
32
GENERAL-Action plan 2023-2024-Annual Maintenance in Mookola chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_45_44 AS/59D/23/28711
11-07-2023
2701-80-800-97-34-03 1,20,000 1,20,000
33
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Vadakkumoola chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_8_12 AS/59D/23/28701
11-07-2023
2701-80-800-97-34-03 50,000 50,000
34
GENERAL-Action plan 2023-2024-Annual Maintenance in Aloor aqueduct chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_46_45 AS/59D/23/28720
11-07-2023
2701-80-800-97-34-03 60,000 60,000
35
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Ekramari chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_10_7 AS/59D/23/28703
11-07-2023
2701-80-800-97-34-03 50,000 50,000
36
KIP(LB) Urgent leak rectification work of OBC near Mottakkuzhy bridge between ch.15732 m and 15882 m in Veliyam GP
IRR/PII/EST/968/2023_5_1_1 AS/59D/23/28729
11-07-2023
2700-27-101-98-00-18 4,00,000 4,00,000
37
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Koopen chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_12_9 AS/59D/23/28704
11-07-2023
2701-80-800-97-34-03 63,000 63,000
38
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Varadan chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_1_14 AS/59D/23/28699
11-07-2023
2701-80-800-97-34-03 53,000 53,000
39
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Changarath chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_7_5 AS/59D/23/28700
11-07-2023
2701-80-800-97-34-03 54,000 54,000
40
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Chembra chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_9_6 AS/59D/23/28702
11-07-2023
2701-80-800-97-34-03 53,000 53,000
41
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Mankara chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_13_10 AS/59D/23/28706
11-07-2023
2701-80-800-97-34-03 54,000 54,000
42
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Annual maintenance of Neeliyara chira in Wadakkanchery river for the year 2023-24-General Civil Work
IRR/IA/EST/2345/2023_5_11_8 AS/59D/23/28705
11-07-2023
2701-80-800-97-34-03 51,000 51,000
43
GENERAL RECTIFICATION WORK-KIP LB Rectification work of Pulamon shutter point at ch.29365 m of LBMC General Civil Work
IRR/PII/EST/451/2023_5_2_1 AS/59D/23/28725
11-07-2023
2700-27-101-98-00-18 5,90,000 5,90,000
44
GENERAL KIP LB Urgent rectification work for Preventing leakage at transition portion of Ponmannur Aqueduct between ch:36800m and 37200m of LBMC work General Civil Work
IRR/PII/EST/374/2023_5_1_1 AS/59D/23/28731
11-07-2023
2700-27-101-98-00-18 5,13,500 5,13,500
45
GENERAL-Urgent modification in Vazhani Irrigation Project-Urgent rectification works to Library Cum Cultural Centre of Vazhani Irrigation Project-General Civil Work
IRR/IA/EST/6602/2022_5_2_1 AS/59D/23/28758
12-07-2023
4701-80-800-76-02-00 6,90,000 6,88,000
46
GENERAL-ACTION PLAN 2023-24-PVIP-Annual Maintenance and removal of all tree stumps of High Level Canal from Ch: 17/716km to 20/000km for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_2_1 AS/59D/23/28781
13-07-2023
2700-01-101-98-00-18 3,00,000 3,00,000
47
GENERAL-ACTION PLAN 2023-24-PVIP-Annual maintenance and removal of all tree stumps of Perumani MD from Ch: 0/000km to 2/550km and Perumani FC from Ch 0/000km to 2/885km for the year 2023-24
IRR/PII/EST/1109/2023_5_5_4 AS/59D/23/28779
13-07-2023
2700-01-101-98-00-18 4,50,000 4,50,000
48
GENERAL-Rectification work-Rectification work to prevent leakage of Karavoor aqueduct from Ch 15600m to 15700m-General Civil Work
IRR/P2/EST/2482?2023_5_1_1 AS/59D/23/28787
14-07-2023
2700-27-101-98-00-18 5,00,000 5,00,000
49
GENERAL-CDP-Annual Maintenance of Campus, Office and Quarters For The Year 2023-2024
IRR/IA/EST/2457/2023_5_1_1 AS/59D/23/28951
20-07-2023
2701-14-101-98-00-18 8,00,000 8,00,000
50
GENERAL-WSM 2023-24-WSM-Annual Maintenance of Vazhani Dam for the Year 2023- 24-General Civil Work
IRR/IA/EST/2222/2023_5_1_1 AS/59D/23/28947
20-07-2023
2700-14-101-98-00-18 6,50,000 6,50,000
51
GENERAL-CSM- 2023-24-Urgent Rectification works to LBMC near Ch. 33/950 km
IRR/IA/EST/2456/2023_5_8_7 AS/59D/23/28988
21-07-2023
2701-03-101-98-00-18 4,50,000 4,50,000
52
GENERAL-CDP-Constructing and maintaining Kannattupadam chira for the year 2023- 2024
IRR/IA/EST/2471/2023_5_1_1 AS/59D/23/28982
21-07-2023
2701-14-101-98-00-18 10,25,000 10,25,000
53
GENERAL-CDP- Constructing and maintaining Vasupuram -chira for the year 2023-2024
IRR/IA/EST/2475/2023_5_1_1 AS/59D/23/28978
21-07-2023
2701-14-101-98-00-18 13,75,000 13,75,000
54
GENERAL-CDP-Annual maintenance of masonry dam and allied structures for the year 2023-2024
IRR/IA/EST/2470/2023_5_1_1 AS/59D/23/28977
21-07-2023
2701-14-101-98-00-18 7,50,000 7,50,000
55
GENERAL-CDP- Constructing and maintaining Thottumugham-chira for the year 2023- 2024
IRR/IA/EST/2474/2023_5_1_1 AS/59D/23/28973
21-07-2023
2701-14-101-98-00-18 13,00,000 13,00,000
56
Urgent side protection of right bund of LBMC canal at Ch 10/300km of Vazhani Irrigation Project
IRR/IA/EST/67/2022_5_1_1 G.O(Rt) No:657/2023
/WRD
21-07-2023
2700-14-101-98-00-18 3,50,000 3,50,000
57
GENERAL RECTIFICATION WORK KIP LB Rectification of aqueduct in Pulamon distributary at ch 4592 m General Civil Work
IRR/PII/EST/451/2023_5_1_1 AS/59D/23/29015 Dat
ed: 21-07-2023
21-07-2023
2700-27-101-98-00-18 4,00,000 4,00,000
58
GENERAL-Action plan 2023-2024-WSM 2023-24 Annual Maintenance of LBMC Vazhani canal from Ch.16/000 km to 27/000 km & Clearing and removing obstructions of LBMC 16/000 to 27/000 km during water distribution for the year 2023-24-General Civil Work
IRR/IA/EST/1996/2023_5_1_1 AS/59D/23/29041
22-07-2023
2700-14-101-98-00-18 14,00,000 14,00,000
59
GENERAL-Action plan 2023-2024-WSM 2023-24 Annual Maintenance of LBMC Vazhani canal from Ch.27/000 km to 39/200 km & Clearing and removing obstructions of LBMC 27/000 to 39/200 km during water distribution for the year 2023-24-General Civil Work
IRR/IA/EST/1996/2023_5_3_2 AS/59D/23/29042
22-07-2023
2700-14-101-98-00-18 13,50,000 13,50,000
60
GENERAL-ACTION PLAN 2023-24-PVIP-Rectification works - Reconstruction of wingwall and Canal lining at breached aquaduct at Ch: 17/716km of HLC for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_12_11 AS/59D/23/29038
22-07-2023
2700-01-101-98-00-18 20,00,000 20,00,000
61
GENERAL-CRDS-KKTY/Water distribution /PMC2/23-24-Clearing & Removing floating materials during water distribution in Parakkadavu main canal between ch 25/400km to 33/200km, Peechanikkad br canal and Parakkadavu br canal for the year 2023-24--General Civil Work
IRR/PII/EST/2515/2023_5_1_1 AS/59D/23/29054
24-07-2023
2701-02-101-98-00-00-18 1,89,000 1,89,000
62
GENERAL-CDP-Annual Maintenance of Earthen Dam and Allied Structures for the Year 2023-2024
IRR/IA/EST/2459/2023_5_1_1 AS/59D/23/29078
24-07-2023
2701-14-101-98-00-18 5,50,000 5,50,000
63
GENERAL-CDP-Constructing and maintaining-Karukulam chira for the year 2023-2024
IRR/IA/EST/2473/2023_5_1_1 AS/59D/23/29077
24-07-2023
2701-14-101-98-00-18 11,50,000 11,50,000
64
GENERAL-M&R- Construction of temporary bund at Commondo mukham,Allapad - Pullu,Pullakuzhi thodu near Nandhi for 2023-24-General Civil Work-1
IRR/IA/EST/404/2023_5_4_3 AS/59D/23/29076
24-07-2023
2701-80-800-97-34-03 5,00,000 5,00,000
65
GENERAL-M&R-Putting up Temporary bund at Idiyanchira for the year 2023-24- General Civil Work-1
IRR/IA/EST/404/2023_5_2_1 AS/59D/23/29101
25-07-2023
2701-80-800-97-34-03 18,00,000 18,00,000
66
GENERAL-CRDS/WD/LBMC-I-Clearing and removing floating materials during water distribution of LBMC between Ch.11/200 km to Ch.14/000 km , Edakunny branch canal & its distributory, meloor south branch canal & its distributory for the year 2023-24-General Civil Work
IRR/PII/EST/2524/2023_5_1_1 ORDER No. AS/59D/23
/29133
26-07-2023
2701-02-101-98-00-00-18 1,80,000 1,80,000
67
GENERAL-CRDS-KKTY/Water distribution/PMC1/23-24-Clearing & Removing floating materials during water distribution in Parakkadavu main canal between ch 18/400km to25/400km,Karukutty karayamparambu br. canal and karukutty karayamparambu sub br canal for the year 2023-24-General Civil Work
IRR/PII/EST/2518/2023_5_1_1 AS/59D/23/29135
26-07-2023
2701-02-101-98-00-00-18 1,85,000 1,85,000
68
GENERAL-CDP-Annual Maintenance of Chimoni Dam Inspection Bungalow for the year 2023-2024-General Civil Work
IRR/IA/EST/2461/2023_5_1_1 AS/59D/23/29003
26-07-2023
2701-14-101-98-00-18 1,00,000 1,00,000
69
GENERAL-Maintenance and Renovation-Existing Pump house & Well and allied works
IRR/PII/EST/2007/2023_5_4_3 AS/59D/23/29128
26-07-2023
2700-16-101-98-00-18 4,00,000 4,00,000
70
GENERAL-PVIP-Annual maintenance of Thuruthikkra MD for the year 2023-24-General Civil Work
IRR/PII/EST/753/2023_5_1_1 AS/59D/23/29124
26-07-2023
2700-01-101-98-00-18 3,00,000 3,00,000
71
GENERAL-M & R- CHIRA ANNUAL MAINTENANCE-Urgent rectification works to Vadakkumoola chira in Wadakkanchery river-General Civil Work
IRR/IA/EST/2345/2023_5_16_16 AS/59D/23/29091
26-07-2023
2701-80-800-97-34-03 4,00,000 4,00,000
72
GENERAL-CRDS 2023-24-FLOATING/HEAD REGULATOR/LBMC/BRANCHES-Upkeeping of HEAD REGULATOR and Clearing and removing floating materials from the LBMC between Ch.0/000km and 11/200km and from all BRANCH CANALS including operating all shutters, proper watching of canal and canal bund and , other urgent works required if any for delivering water to tail end to facilitate hurdle free water distribution for 1 year under Irrigation LBC Section Chalakudy.-General Civil Work
IRR/PII/EST/2360/2023_5_1_1 AS/59D/23/29162
27-07-2023
2701-02-101-98-00-00-18 5,00,000 5,00,000
73
GENERAL-CRDS-2023-24-AM-POOLANI, POOTHAMKUTTY & THANGUCHIRA BRANCH CANALS-Annual maintenance of Poolani, Poothamkutty and Thanguchira branch canals under Irrigation LBC Section Chalakudy-General Civil Work
IRR/PII/EST/2376/2023_5_1_1 ORDER No. AS/59D/23
/29167
27-07-2023
2701-02-101-98-00-00-18 2,60,000 2,60,000
74
GENERAL-CRDS-2023-24-AM-POOLANI, POOTHAMKUTTY & THANGUCHIRA BRANCH CANALS-Annual maintenance of Poolani, Poothamkutty and Thanguchira branch canals under Irrigation LBC Section Chalakudy-General Civil Work
IRR/PII/EST/2376/2023_5_1_1 ORDER No. AS/59D/23
/29167
27-07-2023
2701-02-101-98-00-00-18 2,60,000 2,60,000
75
GENERAL-CRDS/WD/LBMC-II-Clearing and removing floating materials during water distribution of LBMC between Ch.14/000 km to Ch.18/400 km, Kizhakkumury branch canal, Marangadan branch canal and Chirangara branch canal for the year 2023-24 -General Civil Work
IRR/PII/EST/2525/2023_5_1_1 AS/59D/23/29321
02-08-2023
2701-02-101-98-00-00-18 1,40,000 1,40,000
76
GENERAL-CRDS/WD/KVM-Clearing and removing floating materials from the canal during water distribution of KV Main canal, Koratty branch canal, Konoor branch canal, KV branch canal & MV branch canal for the year 2023-24-General Civil Work
IRR/PII/EST/2526/2023_5_1_1 AS/59D/23/29323
02-08-2023
2701-02-101-98-00-00-18 2,20,000 2,20,000
77
GENERAL-Action plan 2023-2024-Annual Maintenance in Parannur chira in Wadakkanchery river 2023-2024 -General Civil Work
IRR/IA/EST/1996/2023_5_41_40 AS/59D/23/29306
02-08-2023
2701-80-800-97-34-03 2,22,000 2,22,000
78
CRDS - 2023-24- RBC -Annual Maintenance of Mattathur Branch Canal and connected distributories/well drops under irrigation section, Kodakara including pre water distribution cleaning, operating all shutters , proper watching of canals and canal bund, clearing and removal of floating bodies to facilitate hurdle free water distribution for one year
IRR/PII/EST/2142/2023 AS/59D/23/29399
04-08-2023
2701-02-101-98-00-00-18 7,65,000 7,65,000
79
CRDS - 2023-24- RBC-Annual maintenance of Areswaram, Thessery & Blachira branch canals and connected distributories under Irrigation section Kodakara including pre water distribution cleaning, operating all shutters , proper watching of canals and canal bund, clearing and removal of floating bodies to facilitate hurdle free water distribution for one year
IRR/PII/EST/2143/2023 AS/59D/23/29397
04-08-2023
2701-02-101-98-00-00-18 6,50,000 6,50,000
80
CRDS 2023-24 Annual maintenance of RBMC between ch .30/400 to Ch. 46/700 under RBC section No.2 Chalakudy including Pre water distribution cleaning, operating all shutters , proper watching of canals and canal bund, clearing and removal of floating bodies from main canal and siphon to facilitate hurdle free water distribution for one year
IRR/PII/EST/2354/2023_5_1_1 AS/59D/23/29402
04-08-2023
2701-02-101-98-00-00-18 9,60,000 9,60,000
81
CRDS 2023-24 Annual maintenance of RBMC between ch 13/00 km to 30/400 km under RBC section No.1 Chalakudy including Pre water distribution cleaning, operating all shutters , proper watching of main canal and canal bund, clearing and removal of floating bodies from main canal to facilitate hurdle free water distribution for one year
IRR/PII/EST/2322/2023_5_1_1 AS/59D/23/29390
04-08-2023
2701-02-101-98-00-00-18 9,60,000 9,60,000
82
Annual maintenance of RBMC between ch. 46/700 to ch. 48/050, Perambra, Parayanthodu, Aloor, Kottanallur, Annallur & Annamanada branch canals and connected sub branches / distributories /well drops under RBC section No .3 Chalakudy including pre water distribution cleaning, operating all shutters , proper watching of canals and canal bund , clearing and removal of floating bodies to facilitate hurdle free water distribution for one year-General Civil Work.
IRR/PII/EST/2355/2023_5_1_1 AS/59D/23/29401
04-08-2023
2701-02-101-98-00-00-18 9,40,000 9,40,000
83
CRDS-2023-24-Annual maintenance.-CRDS-2023-24-Annual maintenance of RBMC between ch.0/00 km to 13/00 km, Echippara, Kuttikad branch canals and connected sub branches/ distributaries/ well drops under Head works section Thumboormuzhy including pre water distribution,cleaning, operating all shutters,proper watching of canals and canal bund ,clearing and removal of floating bodies to facilitate hurdle free water distribution for one year-General Civil Work.
IRR/PII/EST/2325/2023_5_1_1 AS/59D/23/29418
05-08-2023
2701-02-101-98-00-00-18 13,65,000 13,65,000
84
CRDS-2023-24-Annual matce. of branch canal-CRDS-2023-24-Annual maintenance of Kundukuzhipadam, Mettipadam, Chalakudy Pariyaram combined, Potta and Kalikkalkkunnu branch canals and connected sub branches/ distributaries /well drops under RBC section 1 , Chalakudy including pre water distribution , cleaning operating all shutters, proper watching of canals and canal bund, clearing and removal of floating bodies to facilitate hurdle free water distribution for one year.-General Civil Work.
IRR/PII/EST/2324/2023 AS/59D/23/29420
05-08-2023
2701-02-101-98-00-00-18 13,25,000 13,25,000
85
CRDS- 2023-24 - RBC- Annual maintenance of Branch canals-Annual maintenance of Kodakara,Muriyad,Kallettumkara, Thazhekkad, Kaduppassery & Alathur branch canals and connected sub branches/distributories/well drops under RBC section No.2 Chalakudy including pre water distribution cleaning, operating all shutters, proper watching of canals and canal bund, clearing and removal of floating bodies to facilitate hurdle free water distribution for one year.-General Civil Work.
IRR/PII/EST/2357/2023 AS/59D/23/29419
05-08-2023
2701-02-101-98-00-00-18 11,00,000 11,00,000
86
GENERAL-CRDS/KKTY/Annual maintenance & Water distribution/Mambra/23-24-Annual maintenance and clearing & removing floating materials during water distribution in Mambra branch canal for the year 2023-24-General Civil Work
IRR/PII/EST/2220/2023_5_1_1 AS/59D/23/29424
05-08-2023
2701-02-101-98-00-00-18 1,56,000 1,56,000
87
CRDS-KKTY/Annual maintenance/PMC2/23-24-Annual maintenance of Parakkadavu main canal between ch.25/400km to 33/200 km, Peechanikkad br canal and Parakkadavu br canal including shutter maintenanace at ch. 25/330 km for the year 2023-24-
IRR/PII/EST/2254/2023 AS/59D/23/29500
08-08-2023
2701-02-101-98-00-00-18 3,65,000 3,65,000
88
CRDS-KKTY/Annual maintenance /PMC1/23-24-Annual maintenance in Parakkadavu main canal between ch. 18/400km to 25/400 km ,Karukutty karayamparambu br. canal and karukutty karayamparambu sub br canal including shutter maintenance for the year 2023-24
IRR/PII/EST/2232/2023 . AS/59D/23/29499
08-08-2023
2701-02-101-98-00-00-18 3,84,000 3,84,000
89
GENERAL-M&R -Constructing and Maintaining Konthipulam Chira for the year 2023- 24-General Civil Work
IRR/IA/EST/2391/2023_5_9_8 AS/59D/23/29364
10-08-2023
2701-80-800-97-34-03 7,50,000 7,50,000
90
GENERAL-M&R -Construction of new chira at upstream of Thamaravalayam Sluice for the year 2023-24-General Civil Work
IRR/IA/EST/2391/2023_5_10_9 AS/59D/23/29636
14-08-2023
2701-80-800-97-34-03 7,50,000 7,50,000
91
CRDS-RECTIFICATION TO ADICHILY-2023-24-Rectification of Adichily branch canal in between 3/750 km to 3/850 km
IRR/PII/EST/2813/2023_5_1_1 AS/59D/23/29719
17-08-2023
2701-02-101-98-00-00-18 3,50,000 3,50,000
92
GENERAL-CRDS/MV/RECT-Rectification works at MV branch canal between ch.2/400 km to 2/950 km and spout at ch.3/100 & 3/400 km for the 2023-24-General Civil Work
IRR/PII/EST/1227/2022_5_1_1 AS/59D/23/29709
17-08-2023
2701-02-101-98-00-00-18 77,000 77,000
93
GENERAL-CRDS/KKTY /RECT/KARUKUTTIKKARA/23-24-Rectification of karukuttikkara br canal between ch 0/300km to 0/600km-General Civil Work
IRR/PII/EST/2825/2023_5_1_1 AS/59D/23/29711
17-08-2023
2701-02-101-98-00-00-18 2,48,000 2,48,000
94
GENERAL-CRDS/KKTY/ SPOUT RECT/PMC1/23-24-Rectification of spouts in parakkadavu main canal and shutter maintenance of karukttykarayamparambu br canal & mambra br canal -General Civil Work
IRR/PII/EST/2827/2023_5_1_1 ORDER No. AS/59D/23
/29749
18-08-2023
2701-02-101-98-00-00-18 2,43,000 2,43,000
95
GENERAL-ACTION PLAN 2023-24-PVIP-Annual Maintenance and removal of all tree stumps of Mangalathunada North FC (Kuttippilly FC) from Ch: 0/000km to 0/500km for the year 2023-24-General Civil Work.
IRR/PII/EST/1109/2023_5_19_18_19_19 AS/59D/23/29833
21-08-2023
2700-01-101-98-00-18 1,00,000 1,00,000
96
GENERAL-CRDS/AGLY/RECT-MANJ.BR.(7/200-7/250)/23-24-Urgent Rectification works to Manjapra branch canal between ch.7/200 km and 7/250 km.-General Civil Work
IRR/PII/EST/2815/2023_5_1_1 AS/59D/23/29869
22-08-2023
2701-02-101-98-00-00-18 2,16,000 2,16,000
97
PIP-RBC-Rectification works-Main canal between ch:19550 m to 19725 m
IRR/PII/EST/1953/2023_5_1_1 AS/59D/23/29962
25-08-2023
2700-16-101-98-00-18 15,00,000 15,00,000
98
Rectification works - Othara branch canal from ch 300 m to 800 m
IRR/PII/EST/1953/2023_5_5_4 AS/59D/23/29961
25-08-2023
2700-16-101-98-00-18 10,00,000 10,00,000
99
GENERAL-PVIP Action Plan 2023-24-Annual Maintenance - Clearing blockages in syphon, culvert, cut and cover etc in Link Canal, Kizhakkambalam branch canal and its distributaries , Poothrikka MD and its distributories, Vadayambady MD, Pariyaram MD and Kurinji FC for the year 2023-24-General Civil Work
IRR/PII/EST/256/2023_5_10_9 AS/59D/23/29979
26-08-2023
2700-01-101-98-00-18 5,50,000 5,50,000
100
GENERAL-ACTION PLAN 2023-24-PVIP-Clearing blockage in cross regulators ,Syphons, culverts,cut and cover etc.in HLC from ch: 17/716 km to 24/312 km, Perumani MD, Perumani FC, Kolenchery Branch canal, Karukappilly MD, Kadamattom MD and Mazhuvannoor branch canal and it's distributaries, cross shutter operations and canal watching during water distribution for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_1_1 AS/59D/23/29978
26-08-2023
2700-01-101-98-00-18 5,00,000 5,00,000
101
GENERAL-PVIP-Clearing blockages in cross regulators, culverts,syphon , cut and cover etc. of Kolenchery Branch Canal , Thiruvankulam MD , Edakkattuvayal MD and Kanjiramattom MD and its minor distributaries during water distribution for the year 2023-24 -General Civil Work
IRR/PII/EST/1300/2023_5_1_1 AS/59D/23/29980
26-08-2023
2700-01-101-98-00-18 5,00,000 5,00,000
102
GENERAL-PVIP-Annual maintenace of Kanjiramattam MD between Ch: 3/500km to 6/000km for the year 2023-24-General Civil Work
IRR/PII/EST/750/2023_5_1_1 AS/59D/23/29974
26-08-2023
2700-01-101-98-00-18 5,50,000 5,50,000
103
PIP LBC AP 2023-24 -Rectification works to Puliyoor branch canal near offtake of Edavankad distributary
IRR/PII/EST/1822/2023_5_1_1 AS/59D/23/30009
01-09-2023
2700-16-101-98-00-18 10,00,000 10,00,000
104
PIP LBC AP 2023-24 -Leak arresting works to LB Main canal near ch.18100 m
IRR/PII/EST/1822/2023_5_2_1 AS/59D/23/30065
04-09-2023
2700-16-101-98-00-18 16,00,000 16,00,000
105
PIP LBC AP 2023-24 -Rectification works to LB Main canal near ch.18700 m and allied works
IRR/PII/EST/1822/2023_5_3_2 AS/59D/23/30064
04-09-2023
2700-16-101-98-00-18 17,50,000 17,50,000
106
GENERAL-PVIP-Annual maintenance between Ch.11/500km to 16/000km of Kolenchery Branch Canal for the year 2023-24-General Civil Work
IRR/PII/EST/2234/2023_5_1_1 AS/59D/23/30074
04-09-2023
2700-01-101-98-00-18 12,00,000 12,00,000
107
GENERAL-GENERAL-PVIP -Reconstruction of sluice shutter and box culvert at chainage 0km of Thamarachal puram SBC for the year 2023-24-General Civil Work
IRR/PII/EST/599/2023_5_7_5 WP2-2050/2023/D1
05-09-2023
2700-01-101-98-00-18 21,80,000 21,80,000
108
GENERAL-PVIP-Special Repairs and Maintenance of PVIP Division ,Subdivision offices and Compound at Aluva for the year 2023-24-General Civil Work
IRR/PII/EST/6011/2023_5_1_1 WP2-2050/2023/D1
05-09-2023
4701-80-800-76-02-00 20,00,000 20,00,000
109
GENERAL-PVIP Rectification-works to preventing leakage near ch 11.300km in Paravoor Branch Canal at Green valley for the year 2023-24-General Civil Work
IRR/PII/EST/467/2023_5_1_1 AS/59D/23/30121
07-09-2023
2700-01-101-98-00-18 15,10,000 15,10,000
110
PIP-RBC-Rectification works-Vallamkulam branch canal from Ch. 3000 m to 3800 m
IRR/PII/EST/1953/2023_5_2_1 AS/59D/23/30181
11-09-2023
2700-16-101-98-00-18 15,00,000 15,00,000
111
PIP-RBC-Annual maintenance 2023-24-Main canal from ch:13500 m to 20230 m
IRR/PII/EST/1872/2023_5_1_1 AS/59D/23/30182
11-09-2023
2700-16-101-98-00-18 5,00,000 5,00,000
112
GENERAL-Annual Maintenance-KIP Dam at Parappar Annual maintenance of weir at Ottakkal and Saddle Dam at Pallamvetty under KIP RB Section 1/2 Thenmala for the year 2023 -24-General Civil Work
IRR/PII/EST/7348/2022_5_3_2 AS/59D/23/30556
20-09-2023
2700-27-101-98-00-18 3,80,000 3,80,000
113
GENERAL-KIP-Dam at Parappar-Emergency work-such as cutting and felling down trees in dam premises, removing silted earth and timber logs in Dam shutter for the year 2023-24-General Civil Work
IRR/PII/EST/1343/2023_5_1_1 AS/59D/23/30553
20-09-2023
2700-27-101-98-00-18 2,40,000 2,40,000
114
GENERAL-KIP Dam at Parappar-Annual maintenance of dam-Jungle clearing to dam premises and approach roads and upkeeping the dam premises under KIP(RB) Section 3/2, Thenmala for the year 2023-24-General Civil Work
IRR/PII/EST/1338/2023_5_1_1 AS/59D/23/30555
20-09-2023
2700-27-101-98-00-18 4,30,000 4,30,000
115
GENERAL-KIP-Dam at Parappar-Annual maintenance of New IB at Dam site-Maintenance of New IB,Office building and office campus including furnishing under KIP(RB) Section 3/2, Thenmala for the year 2023-24-General Civil Work
IRR/PII/EST/1341/2023_5_1_1 AS/59D/23/30567
20-09-2023
2700-27-101-98-00-18 3,50,000 3,50,000
116
GENERAL-KIP-Dam at Parappar-Annual maintenance of Dam gallery-up keeping of gallery premises,cleaning sump well and drain of gallery for the year 2023-24-General Civil Work
IRR/PII/EST/1334/2023_5_1_1 AS/59D/23/30554
20-09-2023
2700-27-101-98-00-18 2,31,000 2,31,000
117
GENERAL-Annual Maintenance-KIP LBMC Annual maintenance of canals Clearing light jungle and removal of silt Removing floating bodies from LBMC Ch : 0 - 13500 m Chakkiyara distributary 0 - 787 m Karavaloor distributary 0 - 1840 m coming under the jurisdiction of KIP (RB) section 1/2 Thenmala in connection with water distribution through the canal during the year 2023 - 24 -General Civil Work
IRR/PII/EST/7348/2022_5_2_1 AS/59D/23/30560
20-09-2023
2700-27-101-98-00-18 3,00,000 3,00,000
118
GENERAL-Annual maintenance-KIP RBMC - Annual Maintenance of Canals-RBMC Ch: 0 m to 16950 m, Punnala distributory from Ch: 0 m to 9820 m, Mukkuttumon distributory from Ch: 0 m to 4505 m and Chekom distributory from ch: 0 m to 2507m during 2023-24 -General Civil Work
IRR/PII/EST/2784/2023 AS/59D/23/30558
20-09-2023
2700-27-101-98-00-18 5,50,000 5,50,000
119
GENERAL-KIP CAMPUS-Annual maintenance-Annual maintenance of Residential buildings, pumphouse and water supply system at KIP Campus Thenmala for the year 2023-2024-General Civil Work
IRR/PII/EST/2651/2023_12_1_1 AS/59D/23/30649
23-09-2023
2700-27-101-98-00-18 2,25,000 2,25,000
120
GENERAL-Rectification work-KIP RB- Punnala distributory-Rectification work to prevent leakage from Ch.5200m to 5400 m near Anakkulam in Piravanthoor Panchayath-General Civil Work
IRR/PII/EST/742/2023_5_1_1 AS/59D/23/30719
27-09-2023
2700-27-101-98-00-18 2,88,700 2,88,700
121
GENERAL-Original work-Enhancing the basicamenities for tourists, in Thenmala KIPCampus by providing new drinking waterfacility.-General Civil Work
IRR/PII/EST/3250/2023_5_1_1 AS/59D/23/31157
16-10-2023
2700-80-800-98(00) 5,60,000 5,60,000
122
GENERAL-M&R -Removal of Obstruction of kole chal from Pullathara bridge to Kodunthara bridge for the year 2023-24-General Civil Work
IRR/IA/EST/2391/2023_5_2_1 AS/59D/23/31288
20-10-2023
2701-80-800-97-34-03 5,00,000 5,00,000
123
GENERAL-M&R -Removal of Obstruction of kole chal from Konthipulam bridge to Puthenthode bridge for the year 2023-2024-General Civil Work
IRR/IA/EST/2391/2023_5_5_4 AS/59D/23/31289
20-10-2023
2701-80-800-97-34-03 4,00,000 4,00,000
124
GENERAL-Emergency work-Urgent rectification of cavity formed on the left bank of RB main canal at chainage: 800m at Urukunnu in Thenmala panchayath-General Civil Work
IRR/PII/EST/6902/2023_5_1_1 AS/59D/23/31342
21-10-2023
2700-27-101-98-00-18 5,90,000 5,90,000
125
GENERAL-GENERAL-PVIP -Clearing grass/jungle, cutting trees including removal of stumps of Aluva branch canal-General Civil Work
IRR/PII/EST/599/2023_5_12_13 AS/59D/23/31336
21-10-2023
2700-01-101-98-00-18 15,20,000 15,20,000
126
GENERAL-ACTION PLAN 2023-24-PVIP-Annual Maintenance and removal of all tree stumps of mazhuvannoor branch canal from ch: 0/000 km to ch: 2/100 km for the year 2023-24-General Civil Work
IRR/PII/EST/1109/2023_5_13_12 AS/59D/23/31340
21-10-2023
2700-01-101-98-00-18 3,50,000 3,50,000
127
GENERAL-PVIP-Annual maintenance to Edakkattuvayal MD From ch.0/000km to tail end-General Civil Work
IRR/PII/EST/6260/2023_5_1_1 AS/59D/23/31341
21-10-2023
2700-01-101-98-00-18 7,70,000 7,70,000
128
GENERAL-PVIP-Annual maintenance of Kalamboor MD and Thonnalloor MD from Ch.0/000km to tail end for the year 2023-24-General Civil Work
IRR/PII/EST/752/2023_5_1_1 AS/59D/23/31334
21-10-2023
2700-01-101-98-00-18 5,70,000 5,70,000
129
GENERAL-Mundur 2022-23-WSM 2022-2023 Annual maintenance of Mundur Branch Canal and distributory & Cleaning and removing Obstructions of Mundur Branch canal and distributary during Water distribution for the year 2022-2023-General Civil Work
IRR/IA/EST/676/2022_5_1_1 D2-5816-C /2023
21-10-2023
2700-14-101-98-00-18 7,50,000 7,50,000
130
GENERAL-Parlikkad and Kuranchery branch canal 2022-2023-WSM-2022-23- Annual maintenance of Parlikkad and Kuranchery Branch Canals & Cleaning and removing obstructions of Parlikkad and Kuranchery Branch Canals during water distribution for the year 2022-2023 -General Civil Work
IRR/IA/EST/437/2022_5_1_1 D2-5E16B/2023
21-10-2023
2700-14-101-98-00-18 10,00,000 10,00,000
131
GENERAL-PVIP Action Plan 2023-24-Rectification works to Erumeli MD b/w Ch:1/200km and Ch:1/400km for the year 2023-24-General Civil Work
IRR/PII/EST/256/2023_5_4_3 AS/59D/23/31386
25-10-2023
2700-01-101-98-00-18 11,50,000 11,50,000
132
GENERAL-PVIP-Annual maintenance to Kolenchery Branch Canal from Ch 4/600km to 11/500km-General Civil Work
IRR/PII/EST/6276/2023_5_1_1 AS/59D/23/31424
26-10-2023
2700-01-101-98-00-18 3,00,000 3,00,000
133
GENERAL-CRDS/AGLY/RECT /K.Main/23-24-Maintenance and rectification of Kalady main canal at various stretches and repairs to spouts at Ch.0/670 km,Ch.1/150 km,Ch.2/820 km,Ch.5/120 and Ch.6/745 km -General Civil Work-1
IRR/PII/EST/5984/2023_5_1_1 ORDER No. AS/59D/23
/31463 Dated: 27-10-2023
27-10-2023
2701-02-101-98-00-00-18 1,63,000 1,63,000
134
Annual maintenance of - Kulanada branch canal from Ch.0 m to 8470 m
IRR/PII/EST/1812/2023_5_6_5 AS/59D/23/31500
28-10-2023
2700-16-101-98-00-18 2,00,000 2,00,000
135
Annual maintenance of -Puliyoor Branch Canal from ch.0m to 8201m
IRR/PII/EST/1812/2023_5_4_3 AS/59D/23/31499
28-10-2023
2700-16-101-98-00-18 2,00,000 2,00,000
136
Annual maintenance of -Pandanad branch canal from ch. 0m to 13070m
IRR/PII/EST/1812/2023_5_7_6 AS/59D/23/31501
28-10-2023
2700-16-101-98-00-18 2,00,000 2,00,000
137
Annual maintenance of -LB Main Canal from ch.22000 m to 25022 m
IRR/PII/EST/1812/2023_5_3_2 AS/59D/23/31498
28-10-2023
2700-16-101-98-00-18 2,50,000 2,50,000
138
Annual maintenance of -LB Main Canal from ch.16140m to 19000m
IRR/PII/EST/1812/2023_5_1_1 AS/59D/23/31496
28-10-2023
2700-16-101-98-00-18 2,60,000 2,60,000
139
Annual Maintenance-to Korattissery distributory canal between ch.0 m to 3090 m
IRR/PII/EST/1810/2023_5_4_3 AS/59D/23/31547
31-10-2023
2700-16-101-98-00-18 2,00,000 2,00,000
140
Annual Maintenance-to Main canal between ch.25022 m - 28000 m
IRR/PII/EST/1810/2023_5_1_1 AS/59D/23/31546
31-10-2023
2700-16-101-98-00-18 3,00,000 3,00,000
141
PIP RBC Annual maintenance of Vallamkulam Branch canal-from Ch 0 m to 4700 m for the year 2023-24
IRR/PII/EST/456/2022_5_1_1 AS/59D/23/31568
01-11-2023
2700-16-101-98-00-18 2,40,000 2,40,000
142
Annual maintenance 2023-24-Kuttur branch canal from ch:0 m to 8000 m
IRR/PII/EST/1872/2023_5_3_2 AS/59D/23/31569
01-11-2023
2700-16-101-98-00-18 3,50,000 3,50,000
143
Annual Maintenance-to Main canal between ch.28000 m - 31200 m
IRR/PII/EST/1810/2023_5_2_1 AS/59D/23/31570
01-11-2023
2700-16-101-98-00-18 3,50,000 3,50,000

Kuttanad Package & Inland Navigation
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-Restructuring of Inland Navigation Offices in Varkala-Restructuring of Inland Navigation Office building in Varkala-General Civil Work
IRR/KP/EST/2348/2023_5_1_1 AS/59D/23/27778
09-06-2023
3075-60-800-97(00) 1,92,000 1,92,000

IDRB
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-PSM-Annual maintenance of RBMC from Ch.0/000 Km to 8/000 Km for the year 2023-24-Annual Maintenance-General Civil Work
IRR/IA/EST/2757/2023_5_1_1 DS-AD3(Gel)/2793/20
23/IDRB
03-06-2023
2701-01-101-98-00-18-00 6,00,000 6,00,000
2
Monsoon Preparedness -LBC and branch canals- Removal of slipped earth, clearing of canal block during heavy rain, cutting and removal of falling trees and trees are in dangerous condition.
IRR/IA/FL/2759/2023 AS/59D/23/27769
07-06-2023
2701-01-101-98-00-18-00 2,00,000 2,00,000
3
PSM-2023-24 Emergency Monsoon Preparedness and flood damages for the south west monsoon-Monsoon related works-General Civil Work
IRR/IA/EST/2779/2023_5_1_1 AS/59D/23/27783
08-06-2023
2701-01-101-98-00-18-00 2,00,000 2,00,000
4
Annual maintenance of Vilvattom ,Cheroor and Viyyoor Branch Canals for the year 2023-24 -General Civil Work
IRR/IA/EST/1914/2023_5_5_4 AS/59D/23/29208
29-07-2023
2701-01-101-98-00-18-00 9,00,000 9,00,000
5
GENERAL-PSM--Annual maintenance of OBC Between Ch 8/000-14/400Km for the year 2023-24-General Civil Work
IRR/IA/EST/1914/2023_5_6_5 AS/59D/23/29171
29-07-2023
2701-01-101-98-00-18-00 12,00,000 12,00,000
6
PSM--Annual maintenance of Nadathara ,Kalathode and Chiyyaram Branch canals for the year 2023-24-General Civil Work
IRR/IA/EST/1914/2023_5_7_6 AS/59D/23/29172
29-07-2023
2701-01-101-98-00-18-00 9,00,000 9,00,000
7
GENERAL-PSM 2023-24-Annual Maintenance of OBC from Ch. 0/000 to 8/000 km and Nettissery Branch Canal from Ch. 0/000 km to 2/440 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_2_1 AS/59D/23/29388
04-08-2023
2701-01-101-98-00-18-00 10,00,000 10,00,000
8
GENERAL-PSM 2023 - 24-Annual maintenance of LBMC from Ch.18/000 to 27/000KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_2_1 AS/59D/23/29391
04-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
9
GENERAL-PSM 2023 - 24-Annual maintenance of Puthur Branch canal from Ch.0/000 to 11/260KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_5_4 AS/59D/23/29393
04-08-2023
2701-01-101-98-00-18-00 9,00,000 9,00,000
10
GENERAL-PSM 2023 - 24-Annual maintenance of Kallur Branch canal from Ch.0/000 to 5/200KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_6_5 AS/59D/23/29389
04-08-2023
2701-01-101-98-00-18-00 3,50,000 3,50,000
11
GENERAL-PSM 2023 - 24-Annual maintenance of Puthur Diversion canal from Ch.0/000 to 5/000KM for the year 2023-24-General Civil Work
[ IRR/IA/EST/2759/2023_5_7_6 ] AS/59D/23/29372
04-08-2023
2701-01-101-98-00-18-00 2,50,000 2,50,000
12
GENERAL-PSM 2023 - 24-Putting up and maintaining Kainur Chira in Manali river for 2023-24-General Civil Work
[ IRR/IA/EST/2759/2023_5_8_7 ] AS/59D/23/29377
04-08-2023
2701-01-101-98-00-18-00 2,00,000 2,00,000
13
GENERAL-PSM--Annual maintenance of Kolazhy,Thirur,Kuttur,Velappaya,Perinchira and Uthramkulangara branch canals for the year 2023-24 -General Civil Work
IRR/IA/EST/1914/2023_5_4_3 AS/59D/23/29433
05-08-2023
2701-01-101-98-00-18-00 12,00,000 12,00,000
14
GENERAL-PSM 2023 - 24-Annual maintenance of LBMC from Ch.8/500 to 18/000KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_1_1 AS/59D/23/29457
07-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
15
GENERAL-PSM 2023 - 24-Annual maintenance of LBMC from Ch.27/000 to 36/000KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_3_2 AS/59D/23/29440
07-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
16
GENERAL-PSM 2023 - 24-Annual maintenance of LBMC from Ch.36/000 to 44/900KM and urgent maintenance to spouts for the year 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_4_3 AS/59D/23/29456
07-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
17
GENERAL-PSM 2023-24-Annual Maintenance of Vazhukkumpara Branch Canal from Ch.0/000 to 4/200 km and Thekkumpadam Branch Canal from Ch. 0/000 to 1/050 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_6_5 AS/59D/23/29596
11-08-2023
2701-01-101-98-00-18-00 4,50,000 4,50,000
18
PSM--Annual maintenance of TDC Between Ch 16/700-23/600Km for the year 2023-24-General Civil Work
IRR/IA/EST/1914/2023_5_3_2 AS/59D/23/29602
11-08-2023
2701-01-101-98-00-18-00 15,00,000 15,00,000
19
GENERAL-PSM -Annual Maintenance and Operation of Thrikkur Regulator for the year 2023-24-General Civil Work
IRR/IA/EST/2266/2023_5_3_2 AS/59D/23/29637
14-08-2023
2701-01-101-98-00-18-00 4,50,000 4,50,000
20
GENERAL-PSM 2023-24-Annual Maintenance of Kozhukkully Branch Canal from Ch.0/000 to 6/700 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_7_6 AS/59D/23/29631
14-08-2023
2701-01-101-98-00-18-00 5,00,000 5,00,000
21
GENERAL-PSM 2023-24-Annual Maintenance of RBMC from Ch. 8/000 to Ch. 18/000 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_5_4 AS/59D/23/29644
14-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
22
GENERAL-PSM 2023-24-Annual Maintenance of RBMC from Ch. 18/000 to Ch. 28/000 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_9_8 AS/59D/23/29645
14-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
23
GENERAL-PSM 2023-24-Annual Maintenance of Pattikkad Branch Canal from Ch.0/000 to 5/200 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_10_9 AS/59D/23/29642
14-08-2023
2701-01-101-98-00-18-00 4,50,000 4,50,000
24
GENERAL-PSM 2023-24-Annual Maintenance of Mudikkode Branch Canal from Ch.0/000 to 6/700 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_4_3 AS/59D/23/29640
14-08-2023
2701-01-101-98-00-18-00 4,50,000 4,50,000
25
GENERAL-PSM 2023-24-Annual Maintenance of Vellanikkara Branch Canal from Ch.0/000 to 5/400 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_3_2 AS/59D/23/29653
14-08-2023
2701-01-101-98-00-18-00 4,00,000 4,00,000
26
GENERAL-PSM -Annual Maintenance of Amballur Branch Canal from Ch.0/000 to 14/600 for the year 2023-24.-General Civil Work
IRR/IA/EST/2266/2023_5_1_1 AS/59D/23/29633
14-08-2023
2701-01-101-98-00-18-00 13,50,000 13,50,000
27
GENERAL-PSM 2023 - 24-Putting up and maintaining Puthur Chira in Manali river for 2023-24-General Civil Work
IRR/IA/EST/2759/2023_5_9_8 AS/59D/23/29648
14-08-2023
2701-01-101-98-00-18-00 9,00,000 9,00,000
28
GENERAL-PSM 2023-24-Improvement work to RBMC between Ch. 20/200 to 20/600 km-General Civil Work
IRR/IA/EST/2734/2023_5_13_12 AS/59D/23/29650
14-08-2023
2701-01-101-98-00-18-00 10,50,000 10,50,000
29
GENERAL-PSM-Annual Maintenance of LBMC Ch:0/000 km to 8/500 km for the year 2023-2024-Annual Maintenance-General Civil Work
IRR/IA/EST/2753/2023_5_1_1 AS/59D/23/29630
14-08-2023
2701-01-101-98-00-18-00 5,00,000 5,00,000
30
GENERAL-PSM-Annual maintenance of swimming pool and pump house for the year 2023-24-Maintenance-General Civil Work
IRR/IA/EST/2768/2023_5_1_1 AS/59D/23/29651
14-08-2023
2701-01-101-98-00-18-00 6,00,000 6,00,000
31
GENERAL-PSM 2023-24-Annual Maintenance of RBMC from Ch. 28/000 to Ch. 37/200 km for the year 2023-24-General Civil Work
IRR/IA/EST/2734/2023_5_1_1 AS/59D/23/29786
18-08-2023
2701-01-101-98-00-18-00 11,00,000 11,00,000
32
GENERAL-PSM--Improvements to Ollukkara Branch canal between Ch. 3/700 to 3/900 Km for the year 2023-24-General Civil Work
IRR/IA/EST/1914/2023_5_21_20 AS/59D/23/29802
19-08-2023
2701-01-101-98-00-18-00 14,00,000 14,00,000
33
GENERAL-PSM-Annual maintenance of Koottala branch canal 0/000 Km to 6/330 Km for the year 2023-24-Annual maintenance-General Civil Work
IRR/IA/EST/2761/2023_5_1_1 AS/59D/23/29819
19-08-2023
2701-01-101-98-00-18-00 3,50,000 3,50,000
34
GENERAL-PSM-Annual maintenance of Peechi house and rest house for the year 2023-24-Annual maintenance-General Civil Work
IRR/IA/EST/2767/2023_5_1_1 AS/59D/23/29818
19-08-2023
2701-01-101-98-00-18-00 5,00,000 5,00,000
35
GENERAL-PSM-Annual maintenance and electrification works in Peechi Dam for the year 2023-24-Annual maintenance-General Civil Work
IRR/IA/EST/2762/2023_5_1_1 AS/59D/23/29879
22-08-2023
2701-01-101-98-00-18-00 4,00,000 4,00,000
36
PSM - Annual maintanance of Peechi garden for the year 2023-2024
IRR/IA/FL/2920/2023 AS/59D/23/29981
26-08-2023
2701-01-101-98-00-18-00 2,00,000 2,00,000
37
PSM-Annual maintenance of Peechi garden for the year 2023-24
IRR/IA/EST/2920/2023_5_1_1 AS/59D/23/29981
26-08-2023
2701-01-101-98-00-18-00 2,00,000 2,00,000
38
GENERAL-PSM--Improvements to Ollukkara Branch canal between Ch. 2/200 to 2/400 Km for the year 2023-24-General Civil Work
IRR/IA/EST/1914/2023_5_19_18 AS/59D/23/30811
30-09-2023
2701-01-101-98-00-18-00 10,00,000 10,00,000

Mechanical Wing
SL.No Name of work PRICE ID AS ORDER & Date HEAD OF ACCOUNT AS AMOUNT TS AMOUNT
1
GENERAL-PIP-Mechanical works for various canal shutters at RBMC and its distributary canals.
IRR/MH/EST/7880/2022_16_2_1 AS/59D/23/31873
20-11-2023
2700-16-101-98-00-18 8,25,000 8,25,000
2
General Madampam RCB Maintenance of Mdampam RCB in Kannur District Mechanical works General mechanical work
IRR/MH/EST/2952/2022_16_1_1 GoRTNo533/2023/WRD
of WRD MI
08-06-2023
2702-01-800-94-00-34-3 30,50,000 29,68,000